180-152790-2_BattelleCorp.xls

XLS spreadsheet 47 KB Posted

Attached to
Maintenance Dredging of Shrewsbury River, New Jersey Federal Navigation Channel - Upland
Solicitation number
W912DS23B0017
Issued by

About this file

This document contains analytical test results from Battelle Corporation for a composite sample submitted under federal contract number 180-152790-2. The test results show concentrations of various metals and analytes detected in the sample using methods EPA 6020B, 7196A, and 16065-83-1. Analytes with results above detection limits include aluminum, arsenic, barium, beryllium, cadmium, chromium, cobalt, copper, iron, manganese, molybdenum, nickel, lead, antimony, selenium, strontium, thallium, vanadium and zinc. Quality control samples like matrix spikes, matrix spike duplicates, laboratory control samples, method blanks and laboratory blanks were also run for the sample with most recoveries falling within acceptance criteria. Extraction and analysis dates for the sample and quality control samples are provided from March to April 2023.

The related federal contract opportunity is solicitation number W912DS23B0017 for maintenance dredging of the Shrewsbury River Federal Navigation Channel in New Jersey. The solicitation was issued by the Department of the Army Corps of Engineers New York District. No other details are provided on required services, response dates, or other contract terms.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS23B0017 Amendment 00002.pdf PDF
180-152564-2_BattelleCorp.xls XLS spreadsheet
02 - SBR23 Amendment 1-Upland Contract - NJDEP SAV Map.pdf PDF
180-153025-1_BattelleCorp.xls XLS spreadsheet
W912DS23B0017 Amendment 00001.pdf PDF
180-152563-1_BattelleCorp.xls XLS spreadsheet
Shrewsbury Upland - DO004_Threshold Comparisons_Values.xlsx XLSX spreadsheet
180-153025-2_BattelleCorp.xls XLS spreadsheet
180-152564-1_BattelleCorp.xls XLS spreadsheet
180-152790-3_BattelleCorp.xls XLS spreadsheet
180-152790-1_BattelleCorp.xls XLS spreadsheet
J153025-1 Std_Tal_L4 Final Report_Part4.pdf PDF
J152563-1 Std_Tal_L4 Final Report_Part6.pdf PDF
J152790-1 Std_Tal_L4 Final Report_Part4.pdf PDF
J153025-1 Std_Tal_L4 Final Report_Part5.pdf PDF
J152564-1 Std_Tal_L4 Final Report_Part4.pdf PDF
J152564-1 Std_Tal_L4 Final Report_Part5.pdf PDF
J152564-1 Std_Tal_L4 Final Report_Part2.pdf PDF
J152563-1 Std_Tal_L4 Final Report_Part1.pdf PDF
J153025-1 Std_Tal_L4 Final Report_Part2.pdf PDF
J153025-1 Std_Tal_L4 Final Report_Part1.pdf PDF
J152563-1 Std_Tal_L4 Final Report_Part4.pdf PDF
J153025-1 Std_Tal_L4 Final Report_Part6.pdf PDF
J152563-1 Std_Tal_L4 Final Report_Part5.pdf PDF
J152790-1 Std_Tal_L4 Final Report_Part6.pdf PDF
J152563-1 Std_Tal_L4 Final Report_Part2.pdf PDF
J153025-1 Std_Tal_L4 Final Report_Part3.pdf PDF
J152564-1 Std_Tal_L4 Final Report_Part6.pdf PDF
J152563-1 Std_Tal_L4 Final Report_Part3.pdf PDF
J152564-1 Std_Tal_L4 Final Report_Part1.pdf PDF
J152790-1 Std_Tal_L4 Final Report_Part1.pdf PDF
J152790-1 Std_Tal_L4 Final Report_Part2.pdf PDF
J152790-1 Std_Tal_L4 Final Report_Part5.pdf PDF
J152790-1 Std_Tal_L4 Final Report_Part3.pdf PDF
J152564-1 Std_Tal_L4 Final Report_Part3.pdf PDF
Shrewsbury River - Upland GS Final Report.pdf PDF
J152564-2 Std_Tal_L4 Final Report (1).pdf PDF
06 - Attachment N- 5274-alldays-3med-mllw-elev.pdf PDF
J153025-2 Std_Tal_L4 Final Report.pdf PDF
04 - Shrewsbury River NJ plans - upland.pdf PDF
08 - Attachment M - Shrewsbury River FNC FY23_EFHcommentform.pdf PDF
08 - Attachment M -USACE Shrewsbury River ESA BA.pdf PDF
DO004 Shrewsbury Cover Letter.pdf PDF
J152790-2 Std_Tal_L4 Final Report.pdf PDF
W912DS23B0017.pdf PDF
03 - Shrewsbury River NJ Specifications - Upland - with attachments.pdf PDF
08 - Attachment M - USACE Shrewsbury River Dredge ESA Concurrence.pdf PDF
J152790-3 Std_Tal_L4 Final Report.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Results

Project_NoLab_NameLab_Sample_IDClient_IDMethodSample_TypeAnalyteCAS_NoAnalyte_TypeAnalyte_ConcLab_QualUnitsBasisMDLLOQTargetRecoveryRecovery_QualExtraction_DateAnalysis_Date
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 37196ASACr (III)16065-83-1T14ug/LDry3.21004/26/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAAluminum7429-90-5T610ug/LWet163003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAArsenic7440-38-2T1.6ug/LWet0.281.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSABarium7440-39-3T20ug/LWet3.11003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSABeryllium7440-41-7T0.27Uug/LWet0.271.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSACadmium7440-43-9T0.22Uug/LWet0.221.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAChromium7440-47-3T14ug/LWet1.52.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSACobalt7440-48-4T1.9ug/LWet0.260.5003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSACopper7440-50-8T49Bug/LWet1.12.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAIron7439-89-6T38Jug/LWet285003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSASilver7440-22-4T0.22Uug/LWet0.221.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAManganese7439-96-5T1.3Uug/LWet1.35.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAMolybdenum7439-98-7T140ug/LWet0.615.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSASodium7440-23-5T110000Bug/LWet18050003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSANickel7440-02-0T19ug/LWet0.521.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSALead7439-92-1T0.60Jug/LWet0.381.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAAntimony7440-36-0T0.97Uug/LWet0.972.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSASelenium7782-49-2T1.8Jug/LWet0.745.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAStrontium7440-24-6T2200ug/LWet1.75.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAThallium7440-28-0T0.47Uug/LWet0.471.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAVanadium7440-62-2T9.4ug/LWet0.781.003/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 6020BSAZinc7440-66-6T6.0Uug/LWet6.01503/07/202304/25/2023
EET PIT180-152790-2#20230099 AMENDED COMPOSITE 3EPA 7196ASACr (VI)18540-29-9T0.0060Umg/LWet0.00600.01003/03/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSAluminum7429-90-5T5090ug/LWet163050009003/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSArsenic7440-38-2T954ug/LWet0.281.010009503/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSBarium7440-39-3T954ug/LWet3.11010009303/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSBeryllium7440-41-7T432ug/LWet0.271.05008603/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSCadmium7440-43-9T471ug/LWet0.221.05009403/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSChromium7440-47-3T474ug/LWet1.52.05009203/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSCobalt7440-48-4T472ug/LWet0.260.505009403/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSCopper7440-50-8T461ug/LWet1.12.05008203/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSIron7439-89-6T4360ug/LWet285050008703/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSSilver7440-22-4T233ug/LWet0.221.02509303/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSManganese7439-96-5T467ug/LWet1.35.05009303/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSMolybdenum7439-98-7T645ug/LWet0.615.050010103/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSSodium7440-23-5T1430004ug/LWet18050025000123N03/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSNickel7440-02-0T472ug/LWet0.521.05009103/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSLead7439-92-1T482ug/LWet0.381.05009603/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSAntimony7440-36-0T252ug/LWet0.972.025010103/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSSelenium7782-49-2T943ug/LWet0.745.010009403/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSStrontium7440-24-6T29104ug/LWet1.75.0500139N03/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSThallium7440-28-0T973ug/LWet0.471.010009703/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSVanadium7440-62-2T494ug/LWet0.781.05009703/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 6020BMSZinc7440-66-6T241ug/LWet6.0152509603/07/202304/25/2023
EET PIT180-152790-2 MS#20230099 AMENDED COMPOSITE 3EPA 7196AMSCr (VI)18540-29-9T0.0060UF1mg/LWet0.00600.0100.5000N03/03/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDAluminum7429-90-5T4930ug/LWet163050008703/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDArsenic7440-38-2T903ug/LWet0.281.010009003/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDBarium7440-39-3T917ug/LWet3.11010009003/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDBeryllium7440-41-7T421ug/LWet0.271.05008403/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDCadmium7440-43-9T449ug/LWet0.221.05009003/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDChromium7440-47-3T454ug/LWet1.52.05008803/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDCobalt7440-48-4T447ug/LWet0.260.505008903/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDCopper7440-50-8T454ug/LWet1.12.05008103/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDIron7439-89-6T4160ug/LWet285050008203/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDSilver7440-22-4T222ug/LWet0.221.02508903/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDManganese7439-96-5T445ug/LWet1.35.05008903/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDMolybdenum7439-98-7T610ug/LWet0.615.05009403/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDSodium7440-23-5T1410004ug/LWet18050025000114N03/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDNickel7440-02-0T457ug/LWet0.521.05008803/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDLead7439-92-1T455ug/LWet0.381.05009103/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDAntimony7440-36-0T242ug/LWet0.972.02509703/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDSelenium7782-49-2T901ug/LWet0.745.010009003/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDStrontium7440-24-6T25804ug/LWet1.75.050074N03/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDThallium7440-28-0T921ug/LWet0.471.010009203/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDVanadium7440-62-2T473ug/LWet0.781.05009303/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 6020BMSDZinc7440-66-6T227ug/LWet6.0152509103/07/202304/25/2023
EET PIT180-152790-2 MSD#20230099 AMENDED COMPOSITE 3EPA 7196AMSDCr (VI)18540-29-9T0.0060UF1mg/LWet0.00600.0100.5000N03/03/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBAluminum7429-90-5T16Uug/LWet163003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBArsenic7440-38-2T0.28Uug/LWet0.281.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBBarium7440-39-3T3.1Uug/LWet3.11003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBBeryllium7440-41-7T0.27Uug/LWet0.271.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBCadmium7440-43-9T0.22Uug/LWet0.221.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBChromium7440-47-3T1.5Uug/LWet1.52.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBCobalt7440-48-4T0.26Uug/LWet0.260.5003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBCopper7440-50-8T1.1Uug/LWet1.12.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBIron7439-89-6T28Uug/LWet285003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBSilver7440-22-4T0.22Uug/LWet0.221.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBManganese7439-96-5T1.31Jug/LWet1.35.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBMolybdenum7439-98-7T0.61Uug/LWet0.615.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBSodium7440-23-5T3030ug/LWet18050003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBNickel7440-02-0T0.52Uug/LWet0.521.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBLead7439-92-1T0.38Uug/LWet0.381.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBAntimony7440-36-0T0.97Uug/LWet0.972.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBSelenium7782-49-2T0.74Uug/LWet0.745.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBStrontium7440-24-6T1.7Uug/LWet1.75.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBThallium7440-28-0T0.47Uug/LWet0.471.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBVanadium7440-62-2T0.78Uug/LWet0.781.003/07/202304/25/2023
EET PITLB 180-427941/1-FLB 180-427941/1-FEPA 6020BPBZinc7440-66-6T6.0Uug/LWet6.01503/07/202304/25/2023
EET PITLB 180-427942/1-ALB 180-427942/1-AEPA 7196APBCr (VI)18540-29-9T0.0060Umg/LWet0.00600.01003/03/2023
EET PITLCS 180-428119/4LCS 180-428119/4EPA 7196ALCSCr (VI)18540-29-9T0.504mg/LNA0.00600.0100.50010103/03/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSAluminum7429-90-5T4410ug/LNA163050008803/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSArsenic7440-38-2T918ug/LNA0.281.010009203/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSBarium7440-39-3T923ug/LNA3.11010009203/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSBeryllium7440-41-7T426ug/LNA0.271.05008503/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSCadmium7440-43-9T467ug/LNA0.221.05009303/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSChromium7440-47-3T462ug/LNA1.52.05009203/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSCobalt7440-48-4T458ug/LNA0.260.505009203/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSCopper7440-50-8T451ug/LNA1.12.05009003/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSIron7439-89-6T4370ug/LNA285050008703/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSSilver7440-22-4T227ug/LNA0.221.02509103/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSManganese7439-96-5T455ug/LNA1.35.05009103/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSMolybdenum7439-98-7T473ug/LNA0.615.05009503/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSSodium7440-23-5T24300ug/LNA180500250009703/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSNickel7440-02-0T452ug/LNA0.521.05009003/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSLead7439-92-1T471ug/LNA0.381.05009403/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSAntimony7440-36-0T248ug/LNA0.972.02509903/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSSelenium7782-49-2T936ug/LNA0.745.010009403/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSStrontium7440-24-6T466ug/LNA1.75.05009303/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSThallium7440-28-0T944ug/LNA0.471.010009403/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSVanadium7440-62-2T470ug/LNA0.781.05009403/07/202304/25/2023
EET PITLCS 180-428337/2-ALCS 180-428337/2-AEPA 6020BLCSZinc7440-66-6T240ug/LNA6.0152509603/07/202304/25/2023
EET PITMB 180-428119/3MB 180-428119/3EPA 7196APBCr (VI)18540-29-9T0.0060Umg/LNA0.00600.01003/03/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBAluminum7429-90-5T16Uug/LNA163003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBArsenic7440-38-2T0.28Uug/LNA0.281.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBBarium7440-39-3T3.1Uug/LNA3.11003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBBeryllium7440-41-7T0.27Uug/LNA0.271.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBCadmium7440-43-9T0.22Uug/LNA0.221.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBChromium7440-47-3T1.5Uug/LNA1.52.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBCobalt7440-48-4T0.26Uug/LNA0.260.5003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBCopper7440-50-8T1.14Jug/LNA1.12.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBIron7439-89-6T28Uug/LNA285003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBSilver7440-22-4T0.22Uug/LNA0.221.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBManganese7439-96-5T1.3Uug/LNA1.35.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBMolybdenum7439-98-7T0.61Uug/LNA0.615.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBSodium7440-23-5T180Uug/LNA18050003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBNickel7440-02-0T0.52Uug/LNA0.521.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBLead7439-92-1T0.38Uug/LNA0.381.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBAntimony7440-36-0T0.97Uug/LNA0.972.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBSelenium7782-49-2T0.74Uug/LNA0.745.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBStrontium7440-24-6T1.7Uug/LNA1.75.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBThallium7440-28-0T0.47Uug/LNA0.471.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBVanadium7440-62-2T0.78Uug/LNA0.781.003/07/202304/25/2023
EET PITMB 180-428337/1-AMB 180-428337/1-AEPA 6020BPBZinc7440-66-6T6.0Uug/LNA6.01503/07/202304/25/2023

File details come from the government source that posted it. Updated .