This amendment modifies a solicitation for the renovation of Building 125 at the Watervliet Arsenal in New York. The Army Corps of Engineers seeks to update drawings, remove notes referencing the integration of existing HVAC equipment into the Johnson Controls Metasys BAS, clarify questions from prospective bidders, and revise room finish schedules. Bidder questions addressed include noise levels, the CCTV system scope, sprinkler design requirements, fire protection details, and clarifications on painting and electrical demolition scopes.

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Answ er questions to prospective bidders for informational purposes only.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE DATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS23B0008

X 9B. DATED (SEE ITEM 11)

25-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jun-2023

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 00005

Watervliet Arsenal, NY Bldg 125 Renovation

W912DS23B0008

Amendment 0005

AMENDMENT 0005 to DRAWINGS and SPECIFICATIONS for Bldg 125 Renovation at Watervliet Arsenal NY

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- Drawings 150-H110 thru 150-H135 – the following note is hereby removed in its entirety without replacement.” ALL EXISTING EQUIPMENT CURRENTLY CONNECTED TO BMS VIA JACE TO

BE CONVERTED TO JOHNSON CONTROLS METASYS AS A PART OF THIS PROJECT. SEE

LIST ON 150-H701 FOR ADDITIONAL INFORMATION”

- Drawing 150-H701 – the following note is hereby removed in its entirety without replacement

“ADDITIONAL EXISTING EQUIPMENT TO BE INTEGRATED INTO JOHNSON CONTROLS

METASYS SYSTEM (CURRENTLY JACE)

• TRANE RTU #6

• CARRIER RTU'S 1-4

• UNIT HEATERS

• EXHAUST FANS

• MAU”

2. The following DRAWINGS have been REVISED and REISSUED:

W912DS23B0008

- Drawing 80-A005

- Drawing 80-A601

- Drawing 80-A602

- Drawing 120-FP001

- Drawing 120-FP103

- Drawing 120-FP104

- Drawing 120-FP501

- Drawing 120-FP502

- Drawing 160-E200

- Drawing 160-E201

- Drawing 160-E306

- Drawing 160-E309

- Drawing 160-E310

- Drawing 160-E400

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- None

PROPOSER’S QUESTIONS AND GOVERNMENT REPLY

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation. This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted on SAM.Gov.

1. Please provide the ambient noise level in the following areas: Manufacturing Shop area 109; Utilities/Fire Suppression area 106; Existing Mechanical room 103; Receiving area 197; Existing Electric room 149;

Corridor 113 and Office area 111. RESPONSE: The noise levels at each location is not available, however, there is no hearing protection required in any of them.

2. Please confirm the CCTV system & please provide contact information for the current system integrator. RESPONSE: The CCTV system itself is NOT part of the project just the conduits for future installation.

3. Please confirm the CCTV system is to be included in our SOW. If yes, please provide contact information for the existing system integrator. Should we assume cabling each camera from the nearest IDF room?

RESPONSE: CCTV system NOT part of this project, just the conduits.

4. Per note #7 on the “Exhaust Fan Schedule” shown on 150-H601, the electrical contractor will furnish and install HOA Starter for each EF. Please indicate the locations these are to be installed relative to the equipment it serves. Please provide specification for HOA Starter. RESPONSE: Locations of the HOA switches are shown on 150-H111 (between columns 11 and 11.5, and A and B).

5. Drawing Reference: 150-H701 Please clarify if the current additional equipment that is integrated to the JACE controller needs new field controllers and controls? If yes, please provide a points list and sequence for existing equipment. RESPONSE: Please note revision to Drawing Notes as noted above, the referenced noted have been removed as part of this amendment.

6. Drawing Reference: 150-H701 Please clarify if the existing equipment is apart and viewed from the Metasys BMS system currently? Or is there a separate BMS system that the JACE is tied to?

RESPONSE: There is a separate BMS system for the equipment currently on JACE. WVA would like to have that equipment tied into the Metasys BMS and remove the JACE system entirely.

7. Drawing Reference: 50-H501 Please clarify, is AC-1 an existing or new unit? RESPONSE: Please review other drawings as well, AC-1 is a new air compressor unit.

8. Drawing 80-A005 - Interior Partition Types: GYP7a, GYP7a-1hr, GYP7a-IMP, & GYP7a-1hr-IMP call for an STC 57. The above partition assemblies as shown on drawing do not reach STC 57 (as depicted). Can Architect provide a STC test number depicting wall assembly and STC rating of 57; such as, National Gypsum Company test NGC B-3456? RESPONSE: Please provide the best STC rating possible as shown; please see updated sheet 80-A005.

9. Per UFC 3-600-01, ordinary hazard occupancies (as defined by NFPA 13) shall have a sprinkler design demand & minimum K-factor in accordance with table 9-3. UFC 3-600-01 table 9-3, indicates a minimum K-factor requirement of 11.2K for ceiling heights in excess of 30ft. The peak of the “shark tooth” style roof in manufacturing area 109 is roughly 37’-6” AFF. Are 11.2K factor sprinkler heads required in these areas? RESPONSE: Per coordination with AHJ, minimum 8.0K sprinklers are acceptable for sawtooth areas.

10. Are the design areas noted in UFC3-600-01 table 9-3 required to be increased by 30% for sloped ceilings exceeding a slope of 2 in 12 (per section 9-7.3.6) in manufacturing area 109? RESPONSE: Correct, follow the requirements of the UFC.

11. There appeared to be two (2) existing 8” RPZ backflow prevention devices at the existing incoming 8” water service. Per UFC 3-600-01 section 9-6.3.5, hydraulic calculations must require a minimum pressure drop of 12 PSI across reduced pressure backflow preventers. Is a minimum of 24 PSI pressure drop required to account for both devices? RESPONSE: Refer to sheet 120FP502 from this amendment for water service entrance configuration. Minimum 8 psi loss shall be included for double check backflow preventer per UFC 3-600-01.

12. Regarding the fire sprinkler hydraulic calculations, is there a minimum safety factor or safety cushion requirement (such as 10% or 10 PSI)? RESPONSE: The qualified FPE should follow hydraulic calculations meeting NFPA-13 and UFC 3-600-01.

13. Is the existing site water supply capable of supplying the water demands as set forth by UFC 3-600-01, NFPA 13? RESPONSE: Per notes on FP-001 Contractor shall perform and witness a hydrant flow test utilizing a plan which has been approved by the contractor’s QFPE and WVA. Contractor shall base hydraulic calculations on contractor’s hydrant flow test. Any deficiencies which arise due to the site water supply shall be immediately brought to the attention of COR and the contractor’s

QFPE.

14. Fire Protection General Note 6-A on drawing 120FP001 states that all pipe shall be schedule for 40 black steel. Can schedule 10 black steel be provided in lieu of schedule 40 for any pipe sizes? RESPONSE:

Please follow the requirements as set forth in the plans and specifications.

15. Please provide new data device install drawings or a basis to bid. RESPONSE: There are no new Data devices.

16. Please provide New Fire alarm install drawings or a basis to bid. RESPONSE: There are no new FA devices to be installed.

17. Please provide security wiring diagrams or a basis to bid. RESPONSE: Contractor to install raceway and new devices, devices to be tied into existing security system. Please reference linear footage from devices to IDF rooms on security sheets per previously revised 170-TS001.

18. The electrical demo drawings don’t reflect all the demo needed in the clean room area. Please clarify to what extent the electrical demo is in the clean room area and the Mezzanine area. RESPONSE: All equipment within the clean room area and mezzanine are being demolished. There are items specifically called out on A100 that are to be salvaged. For feeders, branch circuits, and other electrical conduits within these areas, remove all conduit that is not concealed and inaccessible and remove all conductors.

19. As per the door schedule in the drawing 80-A602, what are the requirements for doors 001 and 002? Do they have to be repaired or replaced? RESPONSE: Replaced; please see updated sheet 80-A602.

20. As per the room finish schedule given in the drawing 80-A601, do we have to paint and provide base to all the walls present in the South and West in manufacturing shop area and existing corridor?

RESPONSE: To be provided at new wall locations only; please see updated sheet 80-A601.

21. As per the room finish schedule given in the drawing 80-A601, is it required to only paint and only provide base to new walls present in South and West in manufacturing shop area and existing corridor?

RESPONSE: To be provided at new wall locations only; please see updated sheet 80-A601.

22. Do we have to paint and provide a base for both the existing corridors? RESPONSE: To be provided at new wall locations only; please see updated sheet 80-A601.

23. Do we have to paint and provide a base to East wall of the Receiving area? RESPONSE: To be provided at new wall locations only; please see updated sheet 80-A601.

24. Is there any preference for panel boards? RESPONSE: Panelboards do not need to be purchased as panelboard VN2-1 is an existing panel located in the Mezzanine Catwalk that is to be removed and reinstalled as shown on the plans. The switchgear (PP-125-1-1, PP-125-1-2, PP-125-2-1, PP-125-2-

2) shall be per Spec 26 23 00 Low Voltage Switchgear with preference for gear similar to existing.

25. Which type of cables does all interior wall wiring be in, EMT or MC cable? RESPONSE: Cables in EMT conduit may be used as allowed in Spec 26 20 00 INTERIOR DISTRIBUTION SYSTEM. MC cables shall not be used.