Section 21 12 00 Page 1
SECTION 21 12 00
STANDPIPE SYSTEMS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C651 (2014) Standard for Disinfecting Water Mains
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;
Errata 17-1; Errata 17-2) Standard for the
Installation of Sprinkler Systems
NFPA 14 (2016) Standard for the Installation of
Standpipes and Hose Systems
NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their
Appurtenances
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2; TIA
17-3; TIA 17-4; TIA 17-5; TIA 17-6; TIA 17-7;
TIA 17-8; TIA 17-9; TIA 17-10; TIA 17-11; TIA
17-12; TIA 17-13; TIA 17-14) National
Electrical Code
NFPA 72 (2016; Errata 1 2018) National Fire Alarm and
Signaling Code
UNDERWRITERS LABORATORIES (UL)
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 RELATED REQUIREMENTS
a. Section 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS applies to this section with additions and modifications specified herein.
b. Equipment or systems specified in this section are part of the commissioning process. Refer to Section 01 91 00.15 TOTAL BUILDING
COMMISSIONING for additional requirements.
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/23%2003%2000.00%2020.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/01%2091%2000.15.docx
Section 21 12 00 Page 2
1.3 SYSTEM DESCRIPTION
Design and provide new combination wet Class I standpipe and fire sprinkler systems as shown.
1.4 SYSTEM DESCRIPTION
System design and manufacturer's products shall be in accordance with the required and advisory provisions of NFPA 14 except as modified herein.
Provide sprinkler portion of system under Section 21 13 13.00 10 WET PIPE
SPRINKLER SYSTEM, FIRE PROTECTION. Each system shall be designed for earthquakes and shall include materials, accessories, and equipment inside and outside the building necessary to provide each system complete and ready for use. Devices and equipment shall be UL Fire Prot Dir listed or FM APP
GUIDE approved for fire protection service. In the publications referred to herein, the advisory provisions shall be considered to be mandatory, as though the word "shall" had been substituted for "should" wherever it appears; reference to the "authority having jurisdiction" shall be interpreted to mean the Contracting Officer.
1.4.1 Residual Pressure
The minimum residual pressure at the outlet of the most remote 64 mm hose connection shall be 65 psig while the system is discharging at the required design flow rates.
1.4.2 Friction Losses
Calculate losses in piping in accordance with the Hazen-Williams formula with
'C' value of 120 for steel piping, 150 for copper tubing, and 140 for cement-lined ductile-iron piping.
1.4.3 Water Supply
Base hydraulic calculations on a static pressure of 60 psi (gage with 1126 gpm available at a residual pressure of 55 psi (gage) at the junction with the existing water distribution piping system. Base hydraulic calculations on operation of fire pumps provided in Section 21 30 00 FIRE PUMPS.
1.4.4 Standpipe System Drawings
Prepare in accordance with the requirements for "Plans and Specifications" as specified in NFPA 14. Each drawing shall be 34 by 22 inches. Plans shall be drawn to a scale not less than 1/8 inch scale Do not commence work until the design of each system and the various components have been approved. Show data essential for proper installation of each system. Show details, plan view, elevations, and sections of the systems supply and piping. Show piping schematic of systems supply, devices, valves, pipe, and fittings. Submit drawings signed by a registered fire protection engineer. Show:
a. Room, space or area layout and include pipe supports and hangers.
b. Field wiring diagrams showing locations of devices and points of connection and terminals used for all electrical field connections in the system, with wiring color code scheme.
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/21%2013%2013.00%2010.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/21%2030%2000.docx
Section 21 12 00 Page 3
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
The fire protection engineer and Contracting Officer will review any approve all submittals in this section requiring Government approval.
SD-02 Shop Drawings
Standpipe system; G, RO, AE
SD-03 Product Data
Aboveground Pipe and fittings; G, RO, AE
Mechanical couplings; G, RO, AE
Pipe hangers and supports; G, RO, AE
Valves, including gate, check, and hose; G, RO, AE
Data which describes more than one type of item shall be clearly marked to indicate which type the Contractor intends to provide.
Submit one original for each item and clear, legible, first-generation photocopies for the remainder of the specified copies.
Incomplete or illegible photocopies will not be accepted. Partial submittals will not be accepted.
SD-06 Test Reports
Preliminary tests; G, RO, AE
Acceptance tests; G, RO, AE
Submit for all inspections and tests specified under paragraph entitled "Field Quality Control."
SD-07 Certificates
Qualifications of installer; G, RO, AE
Submit installers qualifications as required under paragraph entitled "Qualifications of Installer."
SD-10 Operation and Maintenance Data
Alarm valves, Data Package 3; G, RO, AE
Backflow preventer, Data Package 3; G, RO, AE
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA. Furnish one complete package prior to the time that final acceptance tests are performed, and furnish the remaining file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/01%2033%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/01%2078%2023.docx
Section 21 12 00 Page 4 before the contract is completed. Inscribe the following identification on the cover: the words OPERATION AND MAINTENANCE
MANUAL, the location of the building, the name of the Contractor, system manufacturer and the contract number. The instructions shall be legible and easily read, with large sheets of drawings folded in.
The package shall include: schematic drawings showing piping;
circuit drawings; installation instructions; maintenance instructions; safety precautions, diagrams, and illustrations; test procedures; performance data; and parts list.
SD-11 Closeout Submittals
System as-built drawings; G, RO, AE
1.6 QUALITY ASSURANCE
1.6.1 Qualifications of Installer
Prior to commencing work, submit data showing that the Contractor has successfully installed fire extinguishing standpipe systems of the same type and design as specified herein, or that he has a firm contractual agreement with a subcontractor having the required experience. Include the names and locations of at least two installations where the Contractor, or the subcontractor referred to above, has installed such systems. Indicate the type and design of each system, and certify that the system has performed satisfactorily for a period of at least 18 months.
Qualifications of System Technician: Installation drawings, shop drawing and as-built drawings shall be prepared, by or under the supervision of, an individual who is experienced with the types of works specified herein, and is currently certified by the National Institute for Certification in
Engineering Technologies (NICET) as an engineering technician with minimum
Level-III certification in Automatic Sprinkler System program. Contractor shall submit data for approval showing the name and certification of all involved individuals with such qualifications at or prior to submittal of drawings.
1.6.2 System As-Built Drawings
Upon completion, and before final acceptance of the work, submit a complete set of as-built drawings of each system. Submit 34 by 22 inch reproducible as-built drawings on mylar film with title block similar to full size contract drawings. Furnish as-built(record) working drawings in addition to the as-built drawings required by Division 1, "General Requirements."
1.7 DELIVERY, STORAGE AND HANDLING
Protect stored equipment from weather, humidity and temperature variations, dirt, dust, and other contaminants.
PART 2 PRODUCTS
2.1 ABOVEGROUND PIPING SYSTEMS
Provide fittings for changes in direction of piping and for connections. Make changes in piping sizes through tapered reducing pipe fittings; bushings will
Section 21 12 00 Page 5 not be permitted. Perform welding in the shop; field welding will not be permitted. Conceal piping in areas with suspended ceiling.
2.1.1 Pipe and Fittings
NFPA 14, except as modified herein. Steel piping shall be Schedule 40 for sizes less than 8 inches, and Schedule 30 or 40 for sizes 8 inches and larger. Fittings shall be welded, threaded, or grooved-end type. Plain-end fittings with mechanical couplings and fittings which use steel gripping devices to bite into the pipe when pressure is applied will not be permitted.
Rubber gasketed grooved-end pipe and fittings with mechanical couplings shall be permitted in pipe sizes 1.5 inches and larger. Fittings shall be UL Fire
Prot Dir listed or FM APP GUIDE approved for use in wet pipe sprinkler systems. Fittings, mechanical couplings, and rubber gaskets shall be supplied by the same manufacturer. Steel piping with wall thickness less than Schedule 30 shall not be threaded. Pipe and fittings shall be metal.
2.1.2 Pipe Hangers and Supports
Provide in accordance with NFPA 14.
2.1.3 Valves
NFPA 14. Provide valves of types approved for fire service. Hose and gate valves shall open by counterclockwise rotation. Provide isolation and check valves as required by NFPA 14. Isolation valves shall be OS&Y type. Check valves shall be flanged clear opening swing-check type with flanged inspection and access cover plate for sizes 4 inches and larger.
2.1.3.1 Hose Valves
Provide bronze hose valve with 2 1/2 inch National Standard male hose threads, and 2 1/2 inch NH female by 1 1/2 inch IPT male reducer with cap and chain.
2.1.4 Identification Signs
NFPA 14. Attach properly lettered and approved metal signs to each valve and alarm device.
2.1.5 Main Drains
Provide separate drain piping to discharge at safe points outside each building or to sight cones attached to drains of adequate size to readily receive the full flow from each drain under maximum pressure. Provide auxiliary drains as required by NFPA 13 and NFPA 14.
2.1.6 Pipe Sleeves
Provide where piping passes entirely through walls, floors, roofs and partitions. Secure sleeves in position and location during construction.
Provide sleeves of sufficient length to pass through entire thickness of walls, floors, roofs and partitions. Provide one inch minimum clearance between exterior of piping and interior of sleeve or core-drilled hole.
Firmly pack space with mineral wool insulation. Seal space at both ends of the sleeve or core-drilled hole with plastic waterproof cement which will dry to a firm but pliable mass, or provide a mechanically adjustable segmented
Section 21 12 00 Page 6 elastomeric seal. In fire walls and fire floors, seal both ends of pipe sleeves or core-drilled holes with UL listed fill, void, or cavity material.
2.1.6.1 Sleeves in Masonry and Concrete Walls, Floors, and Roofs
Provide hot-dip galvanized steel, ductile-iron, or cast-iron sleeves. Core drilling of masonry and concrete may be provided in lieu of pipe sleeves when cavities in the core-drilled hole are completely grouted smooth. Extend sleeves in floor slabs 3 inches above finished floors.
2.1.6.2 Sleeves in Partitions
Provide 26 gage galvanized steel sheet.
2.1.7 Escutcheon Plates
Provide one piece or split hinge type metal plates for piping passing through walls, floors, and ceilings in both exposed and concealed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces. Securely anchor plates in place.
2.1.8 Fire Pumps
Provide as specified in Section 21 30 00 FIRE PUMPS.
2.2 ELECTRICAL WORK
Provide electrical work associated with this section under Section 26 20 00
INTERIOR DISTRIBUTION SYSTEM, except for fire alarm wiring. Provide fire alarm wiring and connection to fire alarm systems under Section 28 31 76
INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM.
2.2.1 Wiring
Provide fire alarm wiring and connections to fire alarm systems, under this section and conforming to NFPA 70, and NFPA 72. Wire for 120 volt circuits shall be No. 12 AWG minimum solid conductor. Wire for low voltage DC circuits shall be No. 14 AWG minimum solid conductor. All wiring shall be color coded. Wiring, conduit and devices exposed to water or weather shall be weatherproof. Wiring, conduit and devices located in hazardous atmospheres, as defined by NFPA 70 and as shown, shall be explosion proof.
All conduit shall be minimum 3/4 inch size. Identify circuit conductors within each enclosure where a tap, splice or termination is made. Identify conductors by plastic coated self sticking printed markers or by heat-shrink type sleeves. Attach the markers in a manner that will not permit accidental detachment.
PART 3 EXECUTION
3.1 EXCAVATION, BACKFILLING, AND COMPACTING
Provide under this section as specified in Section 31 00 00 EARTHWORK.
3.2 CONNECTIONS TO EXISTING WATER SUPPLY SYSTEMS
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/21%2030%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/26%2020%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/28%2031%2076.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/31%2000%2000.docx
Section 21 12 00 Page 7
Connections to existing water supply system are specified in Section 33 11 00
WATER UTILITY DISTRIBUTION PIPING.
3.3 STANDPIPE SYSTEM INSTALLATION
Equipment, materials, installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing shall be in accordance with the NFPA standards referenced herein. Install piping straight and true to bear evenly on hangers and supports. Conceal piping to the maximum extent possible. Piping shall be inspected, tested and approved before being concealed. Provide fittings for changes in direction of piping and for all connections Make changes in piping sizes through standard reducing pipe fittings; do not use bushings. Cut pipe accurately and work into place without springing or forcing. Ream pipe ends and free pipe and fittings from burrs. Clean with solvent to remove all varnish and cutting oil prior to assemble. Make screw joints with PTFE tape applied to male thread only.
3.4 DISINFECTION
Disinfect new water piping from the point of connection at the water main and existing water piping affected by the Contractor's operation in accordance with AWWA C651. Exercise caution when mixing chlorine disinfectant solutions. Fill piping systems with solution containing minimum of 50 parts per million of free available chlorine and allow solution to stand for a minimum of 24 hours. Flush solution from systems with clean water until maximum residual chlorine content is not greater than 0.2 parts per million.
Obtain at least two consecutive satisfactory bacteriological samples from new water piping, analyze by a certified laboratory, and submit results prior to new water piping being placed into service.
3.5 FIELD PAINTING
Field painting of fire extinguishing standpipe system shall be specified in
Section 09 90 00 PAINTS AND COATINGS. Field painting requirements for "Fire
Extinguishing Sprinkler Systems" shall apply.
3.5.1 Piping Labels
Provide permanent labels in mechanical rooms, spaced at 20 foot maximum intervals along pipe, indicating "STANDPIPE."
3.6 ELECTRICAL WORK
Provide electrical work associated with this section under Section 26 20 00
INTERIOR DISTRIBUTION SYSTEM, except for fire alarm wiring. Provide fire alarm wiring and connection to fire alarm systems under Section 28 31 76
INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM.
3.6.1 Wiring
Provide fire alarm wiring and connections to fire alarm systems, under this section in accordance with NFPA 70, and NFPA 72. Provide wiring in rigid metal conduit or intermediate metal conduit, except electrical metallic tubing may be used in dry locations not enclosed in concrete or where not subject to mechanical damage. Do not run low voltage DC circuits in the same conduit with AC circuits.
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/33%2011%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/09%2090%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/26%2020%2000.docx
Section 21 12 00 Page 8
3.7 FLUSHING
Flush the piping system with potable water in accordance with NFPA 14.
Continue flushing operation until water is clear, but for not less than 10 minutes.
3.8 FIELD QUALITY CONTROL
Prior to initial operation, inspect equipment and piping systems for compliance with drawings, specifications, and manufacturer's submittals.
Perform tests in the presence of the Contracting Officer to determine conformance with the specified requirements.
3.8.1 Preliminary Tests
Each piping system shall be hydrostatically tested at 200 psig in accordance with NFPA 14 and NFPA 24 and shall show no leakage or reduction in gauge pressure after 2 hours. The Contractor shall conduct complete preliminary tests, which shall encompass all aspects of system operation. When tests have been completed and all necessary corrections made, submit to the
Contracting Officer a signed and dated certificate, similar to that specified in NFPA 13, attesting to the satisfactory completion of all testing and stating that the system is in operating condition. Also include a written request for a formal inspection and test.
3.8.2 Formal Inspection and Tests (Acceptance Tests)
The Contracting Officer will witness formal tests and approve all systems before they are accepted. The system shall be considered ready for such testing only after all necessary preliminary tests have been made and all deficiencies found have been corrected to the satisfaction of the Contracting
Officer and written certification to this effect is received by the Division
Fire Protection Engineer. Submit the request for formal inspection at least
15 working days prior to the date the inspection is to take place.
Experienced technicians regularly employed by the Contractor in the installation of both the mechanical and electrical portions of such systems shall be present during the inspection and shall conduct the testing. All instruments, personnel, appliances and equipment for testing shall be furnished by the Contractor. The Government will furnish water for the tests. All necessary tests encompassing all aspects of system operation shall be made including the following, and any deficiency found shall be corrected and the system retested at no cost to the Government.
3.8.2.1 Flow Test
Perform flow tests of each standpipe riser in accordance with NFPA 14. Affix
0-200 psi pressure gauges to lowest hose valve and next-to-highest hose valve. Connect lined, 2 1/2 inch diameter fire hose with underwriter's playpipe to highest hose valve and flow at least 250 gpm for 5 minutes from standpipe to a safe location outside the building. Furnish hose, nozzles and fittings required for this test.
3.8.3 Additional Tests
When deficiencies, defects or malfunctions develop during the tests required, all further testing of the system shall be suspended until proper adjustments, corrections or revisions have been made to assure proper
Section 21 12 00 Page 9 performance of the system. If these revisions require more than a nominal delay, the Contracting Officer shall be notified when the additional work has been completed, to arrange a new inspection and test of the system. All tests required shall be repeated prior to final acceptance, unless directed otherwise.
-- End of Section --
Section 21 13 13.00 10 Page 1
SECTION 21 13 13.00 10
WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
05/09
1.1 REFERENCES
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1015 (2011) Performance Requirements for Double
Check Backflow Prevention Assemblies and Double
Check Fire Protection Backflow Prevention
Assemblies - (ANSI approved 2010)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron
Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for
Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron
Pressure Pipe and Fittings
AWWA C151/A21.51 (2017) Ductile-Iron Pipe, Centrifugally Cast
AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape -
Hot-Applied
ASME INTERNATIONAL (ASME)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged
Fittings Classes 25, 125, and 250
ASME B16.11 (2016) Forged Fittings, Socket-Welding and
Threaded
ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe
Flanges
ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2011) Standard for Gray Iron Threaded
Fittings; Classes 125 and 250
Section 21 13 13.00 10 Page 2
ASME B16.9 (2012) Standard for Factory-Made Wrought Steel
Buttwelding Fittings
ASME B18.2.2 (2015) Nuts for General Applications: Machine
Screw Nuts, Hex, Square, Hex Flange, and
Coupling Nuts (Inch Series)
ASTM INTERNATIONAL (ASTM)
ASTM A135/A135M (2009; R2014) Standard Specification for
Electric-Resistance-Welded Steel Pipe
ASTM A183 (2014) Standard Specification for Carbon Steel
Track Bolts and Nuts
ASTM A449 (2014) Standard Specification for Hex Cap
Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use
ASTM A47/A47M (1999; R 2014) Standard Specification for
Ferritic Malleable Iron Castings
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and
Seamless
ASTM A536 (1984; R 2014) Standard Specification for
Ductile Iron Castings
ASTM A795/A795M (2013) Standard Specification for Black and
Hot-Dipped Zinc-Coated (Galvanized) Welded and
Seamless Steel Pipe for Fire Protection Use
ASTM F436 (2011) Hardened Steel Washers
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-71 (2011; Errata 2013) Gray Iron Swing Check
Valves, Flanged and Threaded Ends
NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life
Safety Code
NFPA 13 (2016; TIA 16-1; TIA 16-2; TIA 16-3 2016;
Errata 17-1; Errata 17-2) Standard for the
Installation of Sprinkler Systems
NFPA 1963 (2014) Standard for Fire Hose Connections
Section 21 13 13.00 10 Page 3
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering
Technology (Field Code 003) Subfield of
Automatic Sprinkler System Layout
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-310-04 (2013; with Change 1) Seismic Design of
Buildings
UL 668 (2004; Reprint Jul 2016) UL Standard for Safety
Hose Valves for Fire-Protection Service
UL Bld Mat Dir (updated continuously online) Building
Materials Directory
1.2 SYSTEM DESCRIPTION
Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in all areas of the building. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13. Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.
1.2.1 Hydraulic Design
Hydraulically design the system to discharge a minimum density of 0.2 gpm/square foot over the hydraulically most demanding 2,500 square feet of floor area. The minimum pipe size for branch lines in gridded systems shall be 1-1/4 inch. Hydraulic calculations shall be in accordance with the
Area/Density Method of NFPA 13. Water velocity in the piping shall not exceed 20 ft/s.
1.2.1.1 Hose Demand
Section 21 13 13.00 10 Page 4
Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand at the fire hydrant shown on the drawings closest to the point where the water service enters the building.
1.2.1.2 Basis for Calculations
The design of the system shall be based upon a water supply with a static pressure of 60 psi, and a flow of 1,126 gpm at a residual pressure of 55 psi.
Water supply shall be presumed available at the base of the riser. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 150 for copper tubing, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping. Hydraulic calculations shall be based on operation of the fire pump(s) provided in
Section 21 30 00 FIRE PUMPS
1.2.1.3 Hydraulic Calculations
Submit hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments and as outlined in NFPA 13, except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, actual discharge pressures and actual flows.
Elevations of hydraulic reference points (nodes) shall be indicated.
Documentation shall identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included and shall be independent of shop drawings. A minimum of 12 psi must be used for BFP pressure loss in the hydraulic calculations completed.
1.2.2 Sprinkler Coverage
Sprinklers shall be uniformly spaced on branch lines. In buildings protected by automatic sprinklers, sprinklers shall provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces. Coverage per sprinkler shall be in accordance with NFPA 13, but shall not exceed 100 square feet for extra hazard occupancies, 130 square feet for ordinary hazard occupancies, and 225 square feet for light hazard occupancies.
Exceptions are as follows:
a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101.
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/21%2030%2000.docx
Section 21 13 13.00 10 Page 5
1.3 SUBMITTALS
a designation following the "G" designation identifies the office that will review the submittal for the Government. SSubmit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Shop Drawings; G, RO, AE
As-Built Drawings
Fire Protection Related Submittals
Materials and Equipment; G, RO, AE
Spare Parts
Preliminary Tests; G, RO, AE
Final Acceptance Test; G, RO, AE
Onsite Training; G, RO, AE
Fire Protection Specialist; G, RO, AE
Sprinkler System Installer; G, RO, AE
SD-05 Design Data
Sway Bracing; G, RO, AE
Hydraulic Calculations; G, RO, AE
Preliminary Test Report
Final Acceptance Test Report
Inspection by Fire Protection Specialist
Operating and Maintenance Manuals; G, RO, AE
1.4 QUALITY ASSURANCE
a. Compliance with referenced NFPA standards is mandatory. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governs. Interpret reference to "authority having jurisdiction" to mean the Contracting
Officer.
b. Equipment or systems specified in this section are part of the commissioning process. Refer to Section 01 91 00.15 TOTAL BUILDING
COMMISSIONING for additional requirements.
1.4.1 Fire Protection Specialist
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/01%2033%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/01%2091%2000.15.docx
Section 21 13 13.00 10 Page 6
Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist who is an individual registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or who is certified as a Level III Technician by National
Institute for Certification in Engineering Technologies (NICET) in the
Automatic Sprinkler System Layout subfield of Fire Protection Engineering
Technology in accordance with NICET 1014-7. Submit the name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations. The Fire
Protection Specialist shall prepare and submit a list of the fire protection related submittals, no later than 7 days after the approval of the Fire
Protection Specialist, from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government.
The Fire Protection Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.2 Sprinkler System Installer
Work specified in this section shall be performed by the Sprinkler System
Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and who has served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months. Submit the name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.
1.4.3 Shop Drawings
Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13. Submit 3 copies of the Sprinkler System shop drawings, no later than 21 days prior to the start of sprinkler system installation. Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:
a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.
b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross-mains and branch lines
Section 21 13 13.00 10 Page 7 to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
d. Longitudinal and transverse building sections showing typical branch line and cross-main pipe routing as well as elevation of each typical sprinkler above finished floor.
e. Details of each type of riser assembly; pipe hanger; sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. Submit load calculations for sizing of sway bracing, for systems that are required to be protected against damage from earthquakes.
f. Details of fire pump and all parts and components necessary to have a functioning fire pump and fire protection system. This includes, but is not limited to, providing an isometric view of the fire pump.
1.5 DELIVERY, STORAGE, AND HANDLING
All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.
1.6 EXTRA MATERIALS
Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
2.1 STANDARD PRODUCTS
Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
2.2 NAMEPLATES
All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.
2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE
Provide Materials and Equipment that have been tested by Underwriters
Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory
Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or
FM APP GUIDE. Submit manufacturer's catalog data included with the Sprinkler
System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for
Section 21 13 13.00 10 Page 8 consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity.
2.4 UNDERGROUND PIPING COMPONENTS
2.4.1 Pipe
Piping from a point 6 inches above the floor to the point of connection to the existing water mains shall be ductile iron with a rated working pressure of 150 psi conforming to AWWA C151/A21.51, with cement mortar lining conforming to AWWA C104/A21.4. Piping more than 5 feet outside the building walls shall comply with Section 33 11 00 WATER UTILITY DISTRIBUTION PIPING.
2.4.2 Fittings and Gaskets
Fittings shall be ductile iron conforming to AWWA C110/A21.10 with cement mortar lining conforming to AWWA C104/A21.4. Gaskets shall be suitable in design and size for the pipe with which such gaskets are to be used. Gaskets for ductile iron pipe joints shall conform to AWWA C111/A21.11.
2.4.3 Gate Valve and Indicator Posts
Gate valves for underground installation shall be of the inside screw type with counter-clockwise rotation to open. Where indicating type valves are shown or required, indicating valves shall be gate valves with an approved indicator post of a length to permit the top of the post to be located 3 feet above finished grade. Gate valves and indicator posts shall be listed in UL
Fire Prot Dir or FM APP GUIDE.
2.5 ABOVEGROUND PIPING COMPONENTS
Aboveground piping shall be steel.
2.5.1 Steel Piping Components
2.5.1.1 Steel Pipe
Except as modified herein, steel pipe shall be blackas permitted by NFPA 13 and shall conform to applicable provisions of ASTM A795/A795M, ASTM A53/A53M, or ASTM A135/A135M. Pipe in which threads or grooves are cut or rolled formed shall be Schedule 40 or shall be listed by Underwriters' Laboratories to have a corrosion resistance ratio (CRR) of 1.0 or greater after threads or grooves are cut or rolled formed. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.
2.5.1.2 Fittings for Non-Grooved Steel Pipe
Fittings shall be cast iron conforming to ASME B16.4, steel conforming to
ASME B16.9 or ASME B16.11, or malleable iron conforming to ASME B16.3.
Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.
2.5.1.3 Grooved Mechanical Joints and Fittings
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/33%2011%2000.docx
Section 21 13 13.00 10 Page 9
Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer;segmented welded fittings shall not be used. Fitting and coupling houses shall be malleable iron conforming to ASTM A47/A47M, Grade 32510; ductile iron conforming to ASTM A536, Grade
65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts shall be heat-treated steel conforming to ASTM A183 and shall be cadmium plated or zinc electroplated.
2.5.1.4 Flanges
Flanges shall conform to NFPA 13 and ASME B16.1. Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21, 1/16 inch thick, and full face or self-centering flat ring type.
2.5.1.5 Bolts, Nut, and Washers
Bolts shall be conform to ASTM A449, Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Nuts shall be hexagon type conforming to ASME B18.2.2. Washers shall meet the requirements of ASTM F436. Flat circular washers shall be provided under all bolt heads and nuts.
2.5.2 Pipe Hangers
Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, and pipe type and sized to be supported.
2.5.3 Valves
2.5.3.1 Control Valve and Gate Valve
Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or FM APP
GUIDE.
2.5.3.2 Check Valve
Check valve 2 inches and larger shall be listed in UL Bld Mat Dir or FM APP
GUIDE. Check valves 4 inches and larger shall be of the swing type with flanged cast iron body and flanged inspection plate, shall have a clear waterway and shall meet the requirements of MSS SP-71, for Type 3 or 4.
2.5.3.3 Hose Valve
Valve shall comply with UL 668 and shall have a minimum rating of 300 psi.
Valve shall be non-rising stem, all bronze, 90 degree angle type, with 2-1/2 inch American National Standard Fire Hose Screw Thread (NH) male outlet in accordance with NFPA 1963. Hose valve shall be provided with 2-1/2 to 1-1/2 inch reducer. Hose valves shall be equipped with lugged cap with drip drain, cap gasket and chain. Valve finish shall be polished brass.
2.6 ALARM CHECK VALVE ASSEMBLY
Assembly shall include an alarm check valve, standard trim piping, pressure gauges, bypass, retarding chamber, testing valves, main drain, and other components as required for a fully operational system.
Section 21 13 13.00 10 Page 10
2.7 WATERFLOW ALARM
Electrically operated, exterior-mounted, waterflow alarm bell shall be provided and installed in accordance with NFPA 13. Waterflow alarm bell shall be rated 24 VDC and shall be connected to the Fire Alarm Control
Panel(FACP) in accordance with Section 28 31 76 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM.
2.8 ALARM INITIATING AND SUPERVISORY DEVICES
2.8.1 Sprinkler Waterflow Indicator Switch, Vane Type
Switch shall be vane type with a pipe saddle and cast aluminum housing. The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe. The device shall sense water movements and be capable of detecting a sustained flow of 10 gpm or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges. The switch shall be tamper resistant and contain two SPDT (Form C) contacts arranged to transfer upon removal of the housing cover, and shall be equipped with a silicone rubber gasket to assure positive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.
2.8.2 Sprinkler Pressure (Waterflow) Alarm Switch
Pressure switch shall include a metal housing with a neoprene diaphragm, SPDT snap action switches and a 1/2 inch NPT male pipe thread. The switch shall have a maximum service pressure rating of 175 psi. There shall be two SPDT
(Form C) contacts factory adjusted to operate at 4 to 8 psi. The switch shall be capable of being mounted in any position in the alarm line trim piping of the alarm check valve.
2.8.3 Valve Supervisory (Tamper) Switch
Switch shall be suitable for mounting to the type of control valve to be supervised open. The switch shall be tamper resistant and contain one set of
SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.
2.9 FIRE DEPARTMENT CONNECTION
Fire department connection shall be freestanding 4-inch Storz inlet type with cast brass body, matching wall escutcheon lettered "Auto Spkr Standpipe" with a polished brass finish per NFPA 1963.
2.10 SPRINKLERS
Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be ordinary. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13. Extended coverage sprinklers shall not be used.
file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/28%2031%2076.docx
Section 21 13 13.00 10 Page 11
2.10.1 Concealed Sprinkler
Concealed sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.
2.10.2 Recessed Sprinkler
Recessed sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2 inch or 17/32 inch orifice.
2.10.3 Pendent Sprinkler
Pendent sprinkler shall be of the fusible strut or glass bulb type, quick-response type with nominal 1/2 inch orifice. Pendent sprinklers shall have a polished chrome finish.
2.10.4 Upright Sprinkler
Upright sprinkler shall be chrome-plated and shall have a nominal 1/2 inch or
17/32 inch orifice.
2.10.5 Sidewall Sprinkler
Sidewall sprinkler shall have a nominal 1/2 inch orifice. Sidewall sprinkler shall have a polished chrome finish. Sidewall sprinkler shall be the quick-response type.
2.10.6 Dry Sprinkler Assembly
Dry sprinkler assembly shall be of the sidewall type as indicated. Assembly shall include an integral escutcheon. Maximum length shall not exceed maximum indicated in UL Fire Prot Dir. Sprinklers shall have a polished chrome finish.
2.11 ACCESSORIES
2.11.1 Sprinkler Cabinet
Spare sprinklers shall be provided in accordance with NFPA 13 and shall be packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed. At least one wrench of each type required shall be provided.
2.11.2 Pendent Sprinkler Escutcheon
Escutcheon shall be one-piece metallic type with a depth of less than 3/4 inch and suitable for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.
2.11.3 Pipe Escutcheon
Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.
Section 21 13 13.00 10 Page 12
2.11.4 Sprinkler Guard
Guard shall be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards shall be provided on sprinklers located in mechanical rooms, electrical rooms, elevator machine room, and at all locations where sprinklers may be subject to damage.
2.11.5 Identification Sign
Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024 inch aluminum with red letters on a white background or white letters on red background.
Wording of sign shall include, but not be limited to "main drain," "auxiliary drain," "inspector's test," "alarm test," "alarm line," and similar wording as required to identify operational components.
2.12 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY
Double-check backflow prevention assembly shall comply with ASSE 1015. The assembly shall have a bronze, cast-iron or stainless steel body with flanged ends. The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-positive-seating check valve for continuous pressure application, and four test cocks. Assemblies shall be rated for working pressure of 175 psi The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly. A test port for a pressure gauge shall be provided both upstream and downstream of the double check backflow prevention assembly valves.
PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION REQUIREMENTS
The installation shall be in accordance with the applicable provisions of
NFPA 13, NFPA 24 and publications referenced therein. Installation of in-rack sprinklers shall comply with applicable provisions of NFPA 13.
3.3 INSPECTION BY FIRE PROTECTION SPECIALIST
Prior to ceiling installation and concurrent with the Final Acceptance Test
Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports. The
Fire Protection Specialist shall: 1) inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements, 2) witness the preliminary and final tests, and sign the test results, 3) after completion of the system inspections and a successful final test, certify in writing that the system has been installed in accordance with the contract requirements. Any discrepancy shall be brought to the attention of the
Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
Section 21 13 13.00 10 Page 13
3.4 ABOVEGROUND PIPING INSTALLATION
3.4.1 Protection of Piping Against Earthquake Damage
Seismically protect the system piping against damage from earthquakes. This requirement is not subject to determination under NFPA 13. Install the seismic protection of the system piping in accordance with UFC 3-310-04, NFPA
13 and Annex A. Include the required features identified therein that are applicable to the specific piping system.
3.4.2 Piping in Exposed Areas
Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.
3.4.3 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the…