Amendment_0007.pdf

PDF 192 KB Posted

Attached to
Renovation and Modernization of Bradley Barracks, West Point, New York
Solicitation number
W912DS19B0008
Issued by

About this file

Amendment 0007

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W912DS19B0008-0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_0008_28_50_00_Emergency_Radio_Communicaiton_Enhanced_System.pdf PDF
Amendment_0007_Q22_RFI_8134159.pdf PDF
Amendment_0007_Q8_Geotechnical_Report_Bradley_Barracks.pdf PDF
Amendment_0007_Q21_Tube_Bundle_Sizing_Form.pdf PDF
Amendment_0007_Q16_corian_lav_810p_RFI_8137732.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
W912DS19B0008-Amendment_00004.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Specs_Book_1_of_4_v1.pdf PDF
Specs_Book_4_of_4_v1.pdf PDF
Specs_Book_2_of_4_v1.pdf PDF
Specs_Book_3_of_4_v1.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF
Amendment_0002.pdf PDF
W912DS-19-B-0008_Solicitation.pdf PDF
W912DS-19-B-0008_Specs_Book_4_of_4.pdf PDF
W912DS-19-B-0008_Specs_Book_3_of_4.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_4_of_5.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_5_of_5.pdf PDF
W912DS-19-B-0008_Specs_Book_1_of_4.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_3_of_5.pdf PDF
W912DS-19-B-0008_Specs_Book_2_of_4.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_1_of_5_v1.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_2_of_5.pdf PDF
Bradley_Barracks_West_Point_Security_Manifest.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0007is:

1) Bid opening date remains 27 August 2019 at 2:00 P.M. EST (Room 16-300)

2) Answ er questions for Informational puposes only.

3) Please see continuation page.

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS19B0008

X 9B. DATED (SEE ITEM 11)

12-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2019

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS19B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

a. None

2. The following DRAWINGS have been REVISED but NOT REISSUED:

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

Attachment – (Q8 Geotechnical_Report_Bradley_Barracks) is hereby incorporated into the solicitation.

Attachment – (Q16 corian_lav_810p_RFI_8137732) is hereby incorporated into the solicitation.

Attachment – (Q21 Tube_Bundle_Sizing_Form) is hereby incorporated into the solicitation.

Attachment – (Q22 RFI_8134159) is hereby incorporated into the solicitation.

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.)

Question 1: As shown on drawings S‐101 to S‐105, this scope of work includes slab on grade replacement at all trenches required for subgrade plumbing and slab on grade spall repairs, where required. The slab replacement at all trenches is quantified (4,000 sq. feet), however the slab on grade spall repairs, where required is not quantified. Can you please clarify, if the 4,000 sq. feet quantity includes both the slab on grade replacement at all trenches and spalls or is it only for the slab on grade replacement at trenches. If later is the case, then please provide a quantity for slab on grade spall repairs, where required.

Answer 1: The cross‐hatch pattern is used to represent the unknown areas of removal and replacement required for completion of the scope for all disciplines. The estimated quantity of slab‐on‐grade removal and replacement for the purposes of bidding should be 5,000 square feet and include all structural repair requirements of detail 1/S‐301. The 5,000 square feet is inclusive of the trenching shown with a linear hatch pattern.

Question 2: Please provide a list of proprietary item which equivalent manufactures can't be entertained by the government.

Answer 2:

Monaco Fire Alarm System Best Hardware Lock Cylinders & Cores Unicor System 2/90 Interior Storage Hirsch and Altronix Card Access System by William Electric Company Ironsmith Salem Bollards Onicon BTU Meter

Question 3: Please advise iff perimeter spray insulation is required on the inside of the building exterior walls.

Answer 3:

Yes, (R‐17 min.) closed cell spray foam as shown in the drawings and specifications.

Question 4: Please advise if any temporary sidewalks are required.

Answer 4:

No temporary sidewalks are required.

Question 5: Please advise if any self leveling is required.

Answer 5:

See overall architectural floor plans, for each floor, for slab topping quantities. These are in addition to the structural repair quantities noted.

Question 6: Please provide the thickness of the existing slabs.

Answer 6:

Please review as‐built drawings for additional information. Slab thicknesses are called out on partial structural plans indicated as "EXIST X" C.S." the X being the thickness.

Question 7: Please provide the existing footing elevations.

Answer 7:

Information is contained in the As‐Builts

Question 8: Please provide the Geotechnical Report Answer 8:

Provided the Geo Tech Report (attached)

Question 9: Please confirm that there is no project labor agreement for this project.

Answer 9:

Confirmed – there is no PLA

Question 10: Drawing A-431 is showing insulated metal wall panels located at the penthouse.

Specification 074213/pg 4/ 1.3 references non-insulated metal panels at the penthouse and mechanical screen.

Please confirm the type and the thickness of the panels that are to be used for the penthouse and mechanical screen-wall enclosure.

Answer 10:

Metal panel at screen‐wall (open to elements/unconditioned) is an uninsulated 12"w. x 1 ½"d. panel.

Metal panel at stair penthouse and elevator vestibule penthouse is a 12"w. x 2"d. insulated (R‐13 min.)

panel. Both panel types are intended to match in appearance and color (with the single "V" stiffening groove) and installed vertically to comply with SHPO requirements, and to provide uniformity with other recently installed roof screens at West Point.

Question 11: Drawing CU-101 calls out Castings RS and RH however the RS casting has no description. Please provide more information for the RS casting.

Answer 11:

Contract drawing CU101 lists RS in the legend. "RS – Replace and set new frame and grate to proposed grade"

Question 12: Hazardous Materials Survey (by Global Consulting, Inc.) has been issued in the contract specifications. We have noticed that the only quantities accounted for in the specifications (028200) are the items listed as part of Table 1: Summary of Positively-Identified Asbestos Abatement Containing Materials- Hazardous Materials Survey. There are additional items listed in the survey as being of hazardous materials:

-Metal Fire Doors (107 ea) -All Roofing Components (membrane, patching, sealants etc.)

-All window caulking ( PCB's) -Various Smoke detectors Are we to include in our base bid the costs to abatement/remove and dispose of the above items?

Answer 12:

The response to 8136765 is "yes. Assume the cost of removal and disposal of these items in the base bid."

Question 13: In the basement, the storage lockers are labeled as TA-50. The elevation is A7/A- 704 and the section is A9/A-704. The unit is labeled "SL1" on the elevation & section. Is this furniture or millwork?

Answer 13:

Yes, SL1 "Storage Locker 1" is a model type "TA‐50" locker as per west point standards for cadet trunk rooms, metal locker spec has BOD for the TA‐50 storage locker to match other Barrack trunk rooms for uniformity

Question 14: In the basement, the open shelve units are labeled as SS1. The elevation is A1/A- 704 and the section is A5/A-704. The unit is labeled "SS1" on the elevation & section. Is this furniture or millwork?

Answer 14:

SS1 "Storage Shelf 1" Is a metal storage shelf to be CFCI and is detailed on A1/A5 of A‐704 as per west point standards for cadet trunk room trunk storage shelving, metal shelf spec has performance criteria for this trunk shelf to match other Barrack trunk rooms for uniformity.

Question 15: "L-3" is to be a solid surface integral sink as per the Plumbing Fixture Schedule on page P-600, however the only information is to see the architectural drawings. What is the intended Make, Model and color of the L-3 Sink bowl?

Answer 15:

Please refer to the attached data sheet for the basis of design. Please also reference "SS2" on Finish Schedule on I‐001 for the color. (attached)

Question 16: At the cadet wardrobes a saber hook and a sash hook are called out (see E8/A- 703). Is there information on the manufacture and model number or will this be a custom metal piece? What is the intended finish?

Answer 16:

This is a custom piece as shown on E8/A‐703 that matches installations in recently renovated Barracks.

To be Stainless Steel with satin finish.

Question 17: At the latrine cubbies (A7, B7, B9/A-703), is there a call out for the phenolic manufacture and color?

Answer 17:

The phenolic cubbies are tagged as XS1 on the finish plans, and the manufacturer and color are called out on Finish Schedule on I‐001.

Question 18: At the cadet Weapons Rack (A1 & D1/A-702) a steel locking bar is called out. Is there information on the manufacture and model number or will this be a custom metal piece?

What is the intended finish? Will this be secured with a pad lock supplied by USMA?

Answer 18:

This is a custom piece that matches installations in recently renovated Barracks as detailed on D1/E1 of A‐702, it has a powder coated black finish to match other weapons rack installations. Padlock is supplied by owner.

Question 19: Can you please confirm the total number of rooms? We have 384 two bed units and 50 three bed units.

Answer 19:

These totals are correct, NOTE** (these include the orderly rooms (Bx050, Floors 1‐6), note these rooms have different furniture but the same millwork as a cadet room.)

Question 20: FRI #5 mentions the 1100 Gallon Storage Tank can be custom made to contract specifications however the vendor still needs additional information to quote the tank. Please find attached Tube Bundle Sizing List and provide the information requested.

Answer 20:

The vendor requested additional information to provide a quote for the 1100 gal. tank. See attachment for the responses to the Tube Bundle Sizing information. (attached)

Question 21: 1.) Drawing S-308 frame type 3 does not the framing members identified. Please provide sizes for steel members 2.) Drawing S-308 designates Frame Type 5. No frame type is listed on S-177. Please confirm that Frame Type 5 will not be used.

Answer 21:

The posts for Frame Type 3 should be HSS6x6x1/4 as typical, with the kick braces being HSS6x6x1/8 and the remaining framing as called out on the plan. Frame Type 4 should be HSS6x6x1/2 posts and HSS6x6x1/4 top rail. Frame Type 5 is a slight modification to Frame Type 1 and is for the end of the long wing screen wall, located between Gridlesn 26/27 C/E. (attached)

Question 22: Please clarify which VFD'S require Harmonic wiring.

Answer 22:

Harmonic filters (HPF) shall be provided for VFD's serving motors 10HP or greater.

Question 23: Page 5 of the Hazardous Materials Survey provided in the specifications states that all Roofing Materials (membranes, patching, sealants etc.) are presumed to be asbestos-containing materials. However, no quantity is provided or listed under Table 1: Summary of Positively- Identified Asbestos- Containing Materials. Please confirm that the entire roof and components are to be treated and priced as asbestos abatement removal as identified.

Answer 23:

Assume that the entire roof and components are to be treated and priced as asbestos abatement removal as identified.