Specs_Book_1_of_4_v1.pdf

PDF 2 MB Posted

Attached to
Renovation and Modernization of Bradley Barracks, West Point, New York
Solicitation number
W912DS19B0008
Issued by

About this file

Specs Book 1 of 4_v1

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W912DS19B0008-0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_0008_28_50_00_Emergency_Radio_Communicaiton_Enhanced_System.pdf PDF
Amendment_0007_Q22_RFI_8134159.pdf PDF
Amendment_0007.pdf PDF
Amendment_0007_Q8_Geotechnical_Report_Bradley_Barracks.pdf PDF
Amendment_0007_Q21_Tube_Bundle_Sizing_Form.pdf PDF
Amendment_0007_Q16_corian_lav_810p_RFI_8137732.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
W912DS19B0008-Amendment_00004.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Specs_Book_4_of_4_v1.pdf PDF
Specs_Book_2_of_4_v1.pdf PDF
Specs_Book_3_of_4_v1.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF
Amendment_0002.pdf PDF
W912DS-19-B-0008_Solicitation.pdf PDF
W912DS-19-B-0008_Specs_Book_4_of_4.pdf PDF
W912DS-19-B-0008_Specs_Book_3_of_4.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_4_of_5.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_5_of_5.pdf PDF
W912DS-19-B-0008_Specs_Book_1_of_4.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_3_of_5.pdf PDF
W912DS-19-B-0008_Specs_Book_2_of_4.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_1_of_5_v1.pdf PDF
W912DS-19-B-0008_Drawings_-_Volume_2_of_5.pdf PDF
Bradley_Barracks_West_Point_Security_Manifest.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TABLE OF CONTENTS - Page 1 of 4

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 COVER SHEET

00 00 02 CHECK LIST FOR BIDDERS

00 10 00 SF 1442 AND BIDDING SCHEDULE

00 21 13 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

00 22 20 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

00 24 00 EVALUATION FACTORS FOR AWARD

00 72 00 CONTRACT CLAUSES

00 75 95 ROOF SYSTEM 20-YEAR DIAGNOSTICS / PERFORMANCE WARRANTY

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 22 00.00 10 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 32 33 PHOTOGRAPHIC DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 91 HISTORIC TREATMENT PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 20.00 18 TESTING FOR MECHANICAL AND ELECTRICAL SYSTEMS

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS (WEST POINT)

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 FACILITY DATA REQUIREMENTS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

02 85 00 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 01 00 REHABILITATION OF CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

PROJECT TABLE OF CONTENTS - Page 2 of 4

DIVISION 04 - MASONRY

04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY

4 20 00 UNIT MASONRY

DIVISION 05 - METALS

5 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

5 72 00 DECORATIVE METAL RESTORATION

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

6 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 11 13 BITUMINOUS DAMPPROOFING

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 14 00 FLUID-APPLIED WATERPROOFING

07 17 00 BENTONITE WATERPROOFING

07 21 13 BOARD (TYP.) INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND TRAFFIC DECK INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 42 13 METAL WALL PANELS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 62 13 COPPER SHEET METAL FLASHING AND TRIM

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

09 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 LATH

09 23 00 GYPSUM PLASTERING

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

PROJECT TABLE OF CONTENTS - Page 3 of 4

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 66 16 TERRAZZO FLOOR TILE

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

9 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS AND SOLID PHENOLIC CASEWORK

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 56 13 STEEL SHELVING

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PLUMBING PIPING INSULATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 05 15 COMMON PIPING FOR HVAC

23 05 48.19 BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 21 23 HYDRONIC PUMPS

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM

HEAT EXCHANGERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

PROJECT TABLE OF CONTENTS - Page 4 of 4

DIVISION 25 - INTEGRATED AUTOMATION

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 09 13 POWER MONITORING SYSTEM

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

26 56 10 HISTORIC EXTERIOR LIGHTING RESTORATION

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 16.23 STAMPED CONCRETE PAVING

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 01 30.16 TV INSPECTION OF SEWER PIPELINES

33 01 30.72 RELINING SEWERS33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents

Document 00 00 01 Page 1

SECTION 00 00 01

COVER SHEET

01/18

PART 1 GENERAL

NEW YORK DISTRICT

U.S. ARMY CORPS OF ENGINEERS

NEW YORK, NEW YORK 10278-0090

INVITATION FOR BIDS

FOR

Bradley Barracks

Renovation and Modernization

United States Military Academy

West Point, NY

1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-19-B-0008

2. BIDS MUST BE SET FORTH full, accurate, and complete information as required by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed under Title 18, United

States Code, Section 1001.

3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO

BIDDERS (Section 00 21 13 of the Solicitation).

4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation.

(See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of the Solicitation).

5. REPRESENTATIONS AND CERTIFICATIONS - SECTION 00 45 00 of the Solicitation

Bidders and Offerors are required to complete the REPRESENTATIONS AND

CERTIFICATIONS and submit them with their bids.

Within Section 00 72 00 of the Solicitation, note in particular the

PROHIBITION SEGREGATED FACILITIES. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding

$10,000 which are not exempt from the provisions of the Equal Opportunity

Clause of this contract.

6. THIS PROJECT IS A MILITARY PROGRAM PROCUREMENT AND IS FUNDED BY THE

DEPARTMENT OF DEFENSE. BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (OCT 2016) IN ACCORDANCE WITH FAR 52.225-11 APPLIES.

7. Please review all bonds and accompanying documents required to be submitted. Bonds, Powers of Attorney, statements of authenticity and continuing validity, and all related documents MUST NOT bear computer printer-generated signatures and/or seals. Documents bearing signatures file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/00%2021%2016.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/00%2021%2016.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/00%2045%2000.docx file://coe-nannv001nyc.nan.ds.usace.army.mil/USERS/E3/e3enmazy/SPECSINTACT/Jobs/20180320BRADLEY6/prntdata/Word/00%2045%2000.docx

Document 00 00 01 Page 2 and/or seals generated as part of a document, as opposed to being affixed to the document after its generation, will not be accepted. Submission of such documents may render the bid or offer non-responsive and ineligible for award.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

-- End of Document --

Document 00 00 02 Page 1

SECTION 00 00 02

CHECK LIST FOR BIDDERS

01/18

ATTACHED IS IFB NO. W912DS-19-B-0008

Bradley Barracks

Renovation and Modernization

United States Military Academy

West Point, NY

ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE FURNISHED.

MISTAKES OR OMISSIONS MAY RENDER YOUR OFFER INELIGIBLE FOR AWARD. IMPORTANT

ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW.

THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A PROPER BID

____HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?

____HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00

45 00) PORTION OF THE SOLICITATION?

____IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?

____IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND

ARE ALL SEALS AFFIXED?

____DO THE BID BOND AND ACCOMPANYING DOCUMENTS BEAR SIGNATURES AND SEALS

AFFIXED AFTER THE DOCUMENT WAS GENERATED, AS OPPOSED TO COMPUTER PRINTER-

GENERATED SIGNATURES AND/OR SEALS?

____HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR OFFER BY ALTERING THE

PROVISIONS OF THE SOLICITATION?

____WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH PRICE ITEM? (THE

SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)

____ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES

LEGIBLE?

____IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY INITIALED

BY THE PERSON SIGNING THE BID?

____DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT ISA

SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID

OPENING TIME?

____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS,

CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 13 OF THE

SOLICITATION.)

____WILL YOUR OFFER ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE

SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS,

Document 00 00 02 Page 2

CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 13 OF THE

SOLICITATION.)

NOTE: THERE ARE INCREASED SECURITY MEASURES AT JACOB K. JAVITS FEDERAL

BUILDING, 26 FEDERAL PLAZA THAT MAY AFFECT THE TIME IT TAKES TO ENTER THE

BUILDING. BIDDERS IS RESPONSIBLE TO ENSURE THAT ITS BID IS SUBMITTED

TIMELY.

Document 00 10 00 Page 1

SECTION 00 10 00

SF 1442 AND BIDDING SCHEDULE

12/17

1.1 SF 1442 SOLICITATION, OFFER, AND AWARD

SEE SECTION 00 10 00 OF THE SOLICITATION.

LEFT BLANK INTENTIONALLY

Document 00 21 13 Page 1

SECTION 00 21 13

INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS

09/16

1.1 NOTE:

SEE SECTION 00 21 13 OF THE SOLICITATION.

Document 00 72 00 Page 1

SECTION 00 72 00

CONTRACT CLAUSES

09/16

1.1 NOTE:

SEE SECTION 00 72 00 OF THE SOLICITATION.

Document 00 75 95 Page 1

SECTION 00 75 95

ROOF SYSTEM 20-YEAR DIAGNOSTICS / PERFORMANCE WARRANTY

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and

Supplementary Conditions and all Specification Sections, apply to this

Section.

1.2 SUMMARY

A. This Section includes the following:

1. Inspection

2. Diagnostics

3. Scope of Work

4. Estimated Budget

5. Preventative Maintenance

6. Housekeeping

7. Web Based Information Management Tool

B. A 20-year Diagnostics/Performance Warranty that transfers the financial risk of maintaining a dry Environment to the Warrantor at a firm fixed price. The building will not require any additional funds from the owner to do repairs or maintenance during the term of this Warranty period.

1.3 DEFINITIONS

A. Warrantor: It is the intention of this specification to have a single company responsible for the performance of the complete Roof System analysis, design, material, labor and continued 1- year maintenance program under a Diagnostics/Performance Warranty contract. In addition, all roof asset information related to the installation and ongoing maintenance shall be recorded and updated regularly through a password protected web site provided by the Warrantor. The Government Agency shall have full access to their private web site.

B. Roof Systems: All metal roofing components, membranes, asphalts, mastics, flashing, metal trim, penetrations, curbs, cover boards, substrate boards, insulation, components and accessories for a complete and secure a watertight roofing system.

C. Roofing Terminology: Refer to ASTM D 1079 and glossary of NRCA's "The

NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section.

1.4 PERFORMANCE REQUIREMENTS

General: Deliver diagnostics and a roof system performance warranty that includes a proactive methodology for managing and maintaining a dry building environment that transfers all technical responsibility and financial risk to the warrantor.

Document 00 75 95 Page 2

1.5 SUBMITTALS

Warranty: Sample of the Performance Warranty contract.

1.6 QUALITY ASSURANCE

A. Warrantor Qualifications:

1. The Warrantor must be ISO 9001 certified.

2. The Warrantor shall provide all aspects of this warranty as a single source warranty provider.

1.7 WARRANTY

A. General: The Diagnostics/Performance Warranty, as specified in this

Article, shall not deprive the Government Agency of other rights the

Government Agency may have under other provisions of the Contract

Documents. The warranty shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the

Contract Documents.

B. The Warrantor shall deliver a 20-year Diagnostics/Performance Warranty on all components and accessories related to the roof system asset to the

Government Agency.

1. This 20-year Performance Warranty transfers the risk of maintaining a

“Dry Environment” to the Warrantor at a firm fixed price included within this contract. The building will not require any additional funds from the owner to do repairs or maintenance during the term of this Performance Warranty.

a. The Diagnostic/Performance Warranty shall be a computer-implemented solution that is a hybrid of diagnostics, materials and services to guarantee a leak free roofing system. The

Diagnostics/Performance Warranty shall consist of:

1) Diagnostics, which includes a condition assessment, infrared scan, membrane core sample analysis and the development of a Scope of work to reach a watertight start-up standard of performance;

2) Implementation of Maintenance Schedule to include preventive maintenance and housekeeping; and

3) Emergency Leak Response at no additional cost to the government to maintain the roofing system in a watertight condition.

C. The Performance Warranty shall include labor & material coverage against leakage on all roofing system components installed by the contractor;

including those manufactured by others. Included are the following:

1. Sheet metal flashing and trim.

2. Base sheet and fasteners.

3. Roof decking.

4. Insulation materials and adhesives.

5. Cover boards and adhesives.

6. Substrate boards and adhesives.

7. Roof membrane components and adhesives.

8. Wood blocking and fastening components.

Document 00 75 95 Page 3

9. Flashing, counter-flashing and metal trim.

10. Tapered edge and cant strips.

11. Surface mastics, coatings and stripping.

12. All drain assemblies, scuppers, expansion joints, pitch pans and other components, excluding interior plumbing.

13. Any leaks or other problems caused by substrate movement, excluding decks.

14. Cover against damages from wind speeds as specified.

D. The Performance Warranty must include a Web Based Information Database

Program for use by Government Personnel and Contractor. This web-based, password-protected program allows the owner to view and print the

AutoCAD® drawings, photographs, and roof reports, as well as update all information within the database. This software must perform database queries as well as manage capital and maintenance budgets and cost projections over the duration of the roof maintenance plan.

E. Roof Management and Maintenance: The following services will be provided to the Government Agency at the beginning of the warranty period, at no additional cost. This information shall be entered into the Database

Program.

1. Roof Inspection Report: Provide report of roof conditions based upon roof inspections.

2. Storm Reports, Monitoring and Follow-up: Roof inspection at building owner request of roof areas after major storm activity.

3. Roof Top Housekeeping:

a. Remove, bag and properly dispose of all debris from the roof membrane, drains, gutters and scuppers at an approved project site location.

4. Roof Preventative Maintenance and Repair shall include, but is not limited to the following:

a. Roof System Flashing Components

b. Equipment/Projection Flashing Components

c. Drains, Gutters and Scupper

5. Leak responsibilities of the Warrantor to the Government

Agency:

a. In the event that a leak should occur:

1) Provide toll free number to call in leak report. Number will be monitored twenty-four (24) hours a day, 365 days a year.

2) Provide a response on all leak calls within twenty-four (24) hours from when the call is made.

3) Provide a repair crew, at the building site, within two (2) business days of the call.

4) Provide follow-up inspection to ensure that repairs were made properly.

b. Monitor all leak events and response and provide a written quarterly summary if leaks have occurred. Deliver to Government

Agency at the end of each quarter when leaks have occurred.

Document 00 75 95 Page 4

PART 2 WARRANTY PROVIDER

2.1 WARRANTOR

A. Roof System Performance Warranty Provider: Subject to compliance with requirements, provide the Performance Warranty by the Warrantor specified.

A. Execute the Diagnostic/Performance Warranty as outlined.

Section 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

08/15

1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. The Contractor shall be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the

Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use, not later than 720 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. (FAR 52.212-3)

b. All work shall be in accordance with the drawings and specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.

c. Contract requirements may be specified, in part or in whole, within the

Solicitation package, referenced Codes and other publications. Restating of a requirement (in part or whole) does not relieve the Contractor of full compliance with all parts of the Solicitation package, referenced Codes and other publications, as well as, all parts of requirements, below. The contractor shall comply with the mandatory and advisory criteria of all contract-referenced Codes and publications except, when inter-related and/or conflicted requirements are encountered, the more stringent contract requirements shall govern. All contract requirements shall be implemented, and adhered to, by the Contractor and at the Contractor's expense. Unless specifically stated otherwise, all items and work required to complete the contract shall be provided and performed by the contractor.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes a full renovation of Bradley Barracks and its supporting facilities to include surrounding paving, landscape and utility infrastructure tie-ins. Interior improvements will replace a dated design, improve life safety, and resolve utility system issues to provide modern living conditions. The interior construction will consist of all new walls, ceilings and floors. The improvements will address deficiencies of programmed spaces including new Cadet rooms, laundry rooms, storage, information technology and communications, day rooms, collaboration rooms, TAC offices and new uni-sex restroom along with new Men’s and Women’s latrines. In addition to the many interior improvements, this project will also include (2) new 5,000 lbs. passenger elevators to replace the (2) original passenger elevators that were installed back in 1972. The building’s exterior and envelope scope of work will include new windows, spray-applied insulation, new roof insulation, finished roofing system, rooftop equipment with structural dunnage and metal panel screening of equipment. Hazardous building materials such as asbestos, lead, and radon are known to exist and any mold or mildew that is present due to water

Section 01 11 00 Page 2 infiltration or improper ventilation will be abated. Demolition will be phased between Bradley Long and Bradley Short.

In addition, all digging within the historically sensitive areas of post is to be done with the oversight of DPW Cultural Resources. All incidental work associated with the above is also included.

1.2.2 Location

The work is located at the United States Military Academy at West Point, New

York, 10996, Bradley Barracks. The exact location is indicated within the project construction drawings. The site of the work is on a military reservation and all rules and regulations issued by the Commanding Officer covering general safety, security, and sanitary requirements, etc., shall be observed by the Contractor.

1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS

This project is estimated between $100 Million to $150 Million.

1.4 AUTHORIZED CONSTRUCTION AREA AND TRESPASSING

Do not inflict damage upon land and properties outside the authorized construction area by unwarranted entry upon, passage through, damage to, or disposal of, material on such land or property. The Contractor may make a separate agreement with any other party, regarding the use of, or right to, land or facilities outside the contract area. If such an agreement is made, it must be in writing and a copy shall be provided to the Contracting

Officer. The Contractor must hold and save the Government, its officers, and agents free from liability arising from trespassing or damage occasioned by his operations.

1.5 DEMOLITION PHASING

Demolition will be phased amongst the two wings; Bradley Short and Bradley

Long. The Contractor shall receive the long wing of Bradley Barracks (Bradley

Long) upon Notice to Proceed. The contractor shall not anticipate receiving the construction area for Bradley Short demolition until 30 June, 2020. Refer to the contract drawings for phasing and demolition details. Include demolition phasing for Bradley Long and Bradley Short in the Preliminary

Project Schedule, Initial Project Schedule, and Periodic Schedule Update.

1.6 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

Section 01 11 00 Page 3

c. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to tHexisting piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone).

d. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

1.7 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with

Installation requirements for locating and marking underground utilities. No excavation whether minor or major including trenching, sidewalk replacement, etc. will be permitted without an approved digging permit. Contractor shall apply for renewal of work permits as required if the work continues beyond the original permit expiration date. Contact local utility locating service a minimum of 15 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday.

Verify existing utility locations indicated on contract drawings, within area of work. Work on or near roadways shall be flagged in accordance with the safety requirements in Safety and Health Requirements Manual EM 385-1-1, which forms a part of these specifications. Work located along the alert force route shall not cause blockage, and the Contractor shall maintain unobstructed access for alert force traffic at all times.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar

(GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered.

Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.7.1 Notification Prior to Excavation

Notify the Contracting Officer at least 30 days prior to starting excavation work. The Contractor shall be responsible for obtaining a digging permit prior to commencing any excavation. The digging permit is referred to as the

"Dig-Safe Permit" and the procedure for obtaining this permit is as follows:

a. The Contractor shall notify the Contracting Officer in writing 30 working days prior to commencing any excavation. Notification letter and a completed

Dig Safe Permit Request will be submitted to the Contracting Officer and must include areas to be excavated, reason for excavation, depth of excavation, and any supporting information such as drawings to allow the processing of permit. A copy of the Dig Safe Permit Request is attached below. The top portion of the request must be filled out by the Contractor. The Contractor shall not be compensated for any delay caused by failure to notify government on timely basis to obtain the digging permit.

Section 01 11 00 Page 4

b. Once the permit is approved and signed by the Chief of the Utilities

Division a Dig-Safe Permit will be issued to the contractor. From the issuance of the Dig-Safe permit, the Contractor has two weeks to commence excavation, after that the permit will no longer be valid and will have to be re-submitted.

c. Once utilities have been identified and marked, it is the responsibility of the contractor to maintain markings throughout the duration of the project.

d. In the event that any utility line is damaged, all excavation will stop, and the Contracting Officer and U&FD (845-938-2818) will be contacted immediately. The U&FD will take appropriate action to effect safe repair.

If utility lines are uncovered which were not identified in the Dig-Safe, the

U&FD will be contacted, and a determination will be made as to which utility is involved and whether the lines are active or abandoned. When an unknown line is uncovered, it will be treated as "live" until determined otherwise.

e. The Dig-Safe permit may be received by the requestor with special instructions. These instructions must be complied with. These instructions will involve procedures that are determined safe by the Chief, Utilities and

Facilities Division and will have to be followed.

f. Excavation may generate further actions depending upon each situation.

Unknown utility locations must be recorded and drawings changed to show location.

g. There are no exceptions to the Dig-Safe Permit process.

h. See SOP 11-7 ANNEX V for additional requirements to obtain a Dig Safe

Permit.

1.8 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within five miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

Not used.

Not used.

-- End of Section --

Section 01 14 00 Page 1

SECTION 01 14 00

WORK RESTRICTIONS

11/11

1.1 SPECIAL SCHEDULING REQUIREMENTS

a. The cadet formation will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

c. The contractor is also responsible for maintaining the operation of the

"Big Voice" speaker during all phases of the construction process and if interruption of this service is required, permission must be requested in writing a minimum of 15 calendar days prior to desired date of interruption.

d. See Specification Section 01 11 00 for Demolition Phasing. Phase I selective demolition shall only occur between 0700 and 1530, M-F.

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Visitor Access/Contractor Badging

See (attached) the Local Area Credential Application (LARC) request. Complete these forms and submit at the West Point Vistors' Center. Ensure that COR information is included on the LAC request form. Keep reference to Personnel

Entry Approval. Failure to obtain entry approval of contractor and subcontractor employees will not affect the contract price or period of performance.

All vehicles and personnel are subject to search at gate to the installation.

All foreign nationals shall be escorted by a CAC holder at all times.

1.2.1.1 Installation Policy Letter

Adhere to West Point Policy Letters at https://home.army.mil/westpoint/index.php/about/b-troop-leadership

1.2.2 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry.

Mark Contractor equipment for identification.

https://home.army.mil/westpoint/index.php/about/b-troop-leadership

Section 01 14 00 Page 2

1.2.2.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.2.2.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.2.3 Working Hours

Regular working hours must consist of an 8 1/2 hour period , between 7 a.m.

and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.2.4 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the

Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.2.5 Exclusionary Period

No work must be performed during the activities listed below without prior written approval of the Contracting Officer. These periods have been considered in computing the time allowed for the performance of this contract.

(1) Graduation Week: Three days in May 2020, May 2021 and so forth.

(2) Reception Day: One day in July 2020, July 2021 and so forth.

(3) Exam week(s): One week in May 2020, May 2021, May 2021, Dec 2019, Dec 2020, Dec 2021 and so forth.

(4) All Government Holidays: Ten (10) days per Calendar year.

(5) Football Home Games: Five (5) home football games per year.

Exact dates will be furnished to the Contractor on request in the year that they will occur.

(6) The Contractor should anticipate six (6) additional days each calendar year on which no physical work shall be performed. These will be at the Governments discretion. The actual "No Work" days

Section 01 14 00 Page 3 will be confirmed by the Government during the work phase in conjunction with the construction plan approval. The Contractor's schedule must reflect the above anticipated "no work" days.

These dates ARE considered in computing the time allowed for the performance of this contract.

1.2.5.1 Adverse Weather

Contractor is to adhere to the Installation's Adverse Weather Policy. On-site construction is not allowed during CODE RED and these times/days are to be considered adverse weather days as described by the contract. Contractor may work during CODE WHITE. Refer to USMA Adverse Weather Policy (Attached).

1.2.6 Occupied Buildings

For Phase I, demolition will take place within an occupied building. All utilities are to remain fully operational in all occupied portions of the building with no interruptions. A hard barrier is to be constructed between the occupied spaces and construction areas. Adequate dust protection shall be installed over ventilation and other penetrations between the occupied space and the construction zone.

Throughout project duration, the Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times.

Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the project site during the construction period.

Leave attached equipment in place, and protect them against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.

1.2.7 Utility Cutovers and Interruptions

(1) The Contractor is advised that the existing utilities service other buildings or areas adjacent to the specific work sites. These buildings will be active and utilized for the entire period of this contract. The

Contractor shall maintain all utilities and systems operational at all times except outages approved by the Contracting Officer.

(2) All utility outages shall be scheduled by the Contractor and approved by the Contracting Officer in coordination with the system owner,USMA DPW and/or Privatized Utility provider. No outage will be approved which will adversely affect the current operation or mission accomplishment. Outages shall only be approved to perform tie-ins of new or temporary utilities to existing lines. No electric or gas outages will be approved during the heating season. "Live"/"hot" utility connections shall be used whenever possible as to minimize end user down time. At USMA, electric service has been privatized and that entity will be responsible for all utility outages, disconnects and connections. Contractor shall submit a written work plan and have it approved by the Contracting Officer 30 days prior

Section 01 14 00 Page 4 to planned outage to ensure proper union notification. The Contractor shall also be responsible for any repairs or start-up procedures in the affected facilities caused by the outages. The Contractor shall coordinate with the Contracting Officer and representatives of the

Installation regarding the work that the Contractor must accomplish in various buildings to re-establish the utilities to proper working conditions. The request for the approval of a utility outage shall include, at minimum, the following: description of the utility; time and duration of the outage; areas and systems affected; proof that all preparatory work is complete; proof that all necessary materials, equipment and manpower are in place; utility lines have been verified;

and a contingency plan is in place.

(3) Utility outage work shall be scheduled at the convenience of the

Government. Night and weekend work may be required and should be anticipated by the Contractor.

(4) The Contractor shall have on-site all materials, equipment, manpower, etc. to complete all work during the approved duration of the outage. All utilities and systems shall be fully tested and operational prior to the end of the approved outage. Unscheduled outages shall be repaired immediately. Repairs and corrective actions shall proceed continuously in a diligent manner until all services and utilities are restored to their original condition.

1.3 SECURITY REQUIREMENTS

AT/FP-INDENTIFICATION FOR CONTRACOR PERSONNEL

For contractors that do not require CAC, but require access to a DoD facility or the installation, the contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the

National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13).

This is also for all employees who will be entering Army-controlled installations or facilities (Central Area/Restricted area). Applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative) must be adhered to. Documentation of these checks will be made available to the COR and security personnel upon request.

The company will provide to the COR, ten days in advance of the event, names, Date of Birth, and Social Security numbers of all employees who will be entering Army-controlled installations or facilities.

The company will ensure that its employees entering Army-controlled installations or facilities have obtained local access badges and passes (if required) in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

The company will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a contractor employee no longer requires access to the installation or facility.

Section 01 14 00 Page 5

*** DOD LEVEL I ANTITERRORISM (AT) STANDARDS CLAUSE (AS OF 1 JULY 14)

When annotated on the AT/OPSEC cover sheet Contractors are required to complete this training.

(a) Pursuant to Department of Defense Instruction Number 2000.16, "DoD

Antiterrorism (AT) Standards," dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT

Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at http://jko.jten.mil/ follow the below instructions:

1. Click - DOD CAC or No DOD CAC

2. Next click - I am a U.S. mil, government civil servant, or contract employee

3. Next click - I've been directed to take required training on JKO

4. Next click - Courses

5. I do not have a .MIL, .GOV, or .NDU.EDU address or I am a Multi-National

Student

6. Fill out the contact sheet and email to sponsor (COR)

7. Sponsor (COR) will email to the JKO help desk

When annotated on the AT/OPSEC cover sheet Contractors are required to complete this training.

iWATCH Training: The Contractor shall brief all personnel performing work under this contract on the local iWATCH program training standards provided by the requiring activity Antiterrorism Office (ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award with the results reported to the COR NLT 45 calendar days after contract award.

New employees/contractors shall complete the training within 10 calendar days of commencing performance of work under this contract.

The COR and contractor are responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer and the Contracting

Officer's Representative (if appointed) within five working days after contract award or prior to access to a Federally-controlled installation or information system.

(b) In the event that the automated system is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT

Awareness Instructor qualification must be coordinated with the Installation

Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided the contracting officer or designee along with all associated cost or schedule impacts to the contract.

(c) Antiterrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

Section 01 14 00 Page 6

(c) Documentation of this training will be made available to the Installation

Antiterrorism Officer upon request.

CONTRACTING OFFICIAL REPRESENTATIVE (COR)-as required

(1) Will ensure that all contractors/subcontractors are processed for a background check or National Agency Check with Inquiry (NACI) as needed. The background check is the minimal investigation to be adjudicated for a USMA

Identification Card (Local Access Badge) versus the NACI, which requires fingerprinting and submission of EQIP. NACIs are required for contractors/subcontractors that require a CAC and/or government computer accounts.

(2) Will ensure that the USMA Form 13-16, Personnel Background Check, is correctly completed and signed by the COR who is a properly cleared Federal

Employee.

(3) Will ensure that the USMA Form 13-16, Personnel Background Check, is submitted within 10 days prior to personnel starting projects on West Point, depending on when contract is awarded and work is scheduled to start.

Waivers are made for the 10 day suspense on a case by case basis, in emergency situations as needed only.

(4) Will ensure that all identified contractors requiring a CAC and/or government computer access, submit fingerprints and complete a NACI investigation submission via EQIP, prior to being issued a CAC and/or given access to the government computer network.

(5) Will ensure that all government issued identification and vehicle stickers are confiscated from contractors/subcontractors upon termination of employment or end of project. These items will be returned to MPD and DES.

(6) Will ensure that all contractors requiring access to the Installation have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer

1.3.1 Force Protection Conditions (FPCON's) Clause

a. During higher Force Protection Conditions (FPCON's) Contract personnel are required to comply with all Antiterrorism policies and procedures while on the installation. Contract personnel may be directed to enter the installation through certain access control points where they can best be identified and searched. Contractor personnel may be prohibited from certain portions of the installation during exercises and actual emergencies.

b. Contractors will comply with parking restrictions and will not park in unauthorized parking areas or within 82 feet of an inhabited building when directed.

c. Access control roster (personnel and vehicles) must be provided.

Names/vehicles verified by the company and received background screening.

Substitutes receive same vetting process prior to work.

Section 01 14 00 Page 7

d. All contractor personnel and vehicles are subject to search while on the installation

e. In the event of an identified restricted/exclusion area, the contractor personnel will not be authorized without specific permission or an escort.

f. Access may be denied during increased readiness or Force Protection

Conditions (FPCON's).

Alien Employment

The contractor shall not employ any alien who does not have a valid US

Immigration I-551 or I-94. The contractor shall provide valid social security numbers and citizenship status of all employees to the Government, upon request.

1.3.2 E-Verify

E-Verify is an Internet based system operated by the Department of Homeland

Security (DHS) in partnership with the Social Security Administration (SSA) that allows participating employers to electronically verify the employment eligibility of their newly hired employees. E-Verify is currently free to employers and is available in all 50 states. E-Verify provides an automated link to federal databases to help employers determine employment eligibility of new hires and the validity of their Social Security numbers. E-Verify are the best means for determining employment eligibility of new hires and the validity of their Social Security numbers.

Contractors shall use E-Verify on all employees that will be working on this installation, under this contract. This shall be done prior to the employee starting work on the installation.

For E-Verify information: www.dhs.gov/E-Verify 1-888-464-4218

The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Additional information about trafficking in persons may be found at the website for the Department of State's Office to Monitor and Combat Trafficking in Persons' at http://www.state.gov/g/tip. Government contracts shall -

(a) Prohibit contractors, contractor employees, subcontractors, and subcontractor employees from -

(1) Engaging in severe forms of trafficking in persons during the period of performance of the contract;

(2) Procuring commercial sex acts during the period of performance of the contract; or

(3) Using forced labor in the performance of the contract;

(b) Require contractors and subcontractors to notify employees of the prohibited activities described in paragraph (a) of this section and the actions that may be taken against them for violations; and

(c) Impose suitable remedies, including termination, on contractors that fail to comply with the requirements of paragraphs (a) and (b) of this section.

Section 01 14 00 Page 8

1.3.3 Contractor Vehicles - Ensure The Contractor Understands…