AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Revise CLINs 0001, 0006, 0007 and 0008 and reissue the entire Price Schedule.
2. Make changes to the Draw ings.
3. Make changes to the Specifications.
Continued on CONTINUATION PAGE...
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Apr-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-12-B-0002
X 9B. DATED (SEE ITEM 11)
13-Dec-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Apr-2012
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-12-B-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0008
Only those contractors who submitted bids for IFB W912DS-12-B-0002 will be permitted to enter into negotiations. Revised technical proposals and price proposals are due no later than 10:30 a.m. EST (NY Time) / 1630 hrs. Denmark Time on 13 April 2012, and may be sent via facsimile at 212-264-3013 OR by e-mail to all of the following:
Francis.Cashman@usace.army.mil, Loretta.E.Parris@usace.army.mil, Matthew.Lubiak@usace.army.mil, and Ivan.V.Damaso@usace.army.mil. Discussions may be conducted following review of the proposals. The proposals must be valid until 30 April 2012.
NOTE: Offeror must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the following methods: in the space provided on SF1442, by separate letter, or by telegram by signing block 15 below. FAILURE TO ACKNOWLEDGE
AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION
OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION,
REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).
Dormitory (72 Person) Thule Air Base, Greenland
W921DS-12-B-0002
Amendment 0008
AMENDMENT 0008 to DRAWINGS and SPECIFICATIONS for Dormitory (72 Person), Thule Air Base, Greenland.
TO OFFORERS
The Offerors are advised that the Government reserves the right to continue discussions after Revised Fianl Proposals are evaluated.
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
None
2. The following DRAWINGS have been REVISED and REISSUED:
Drawing A-101B
3. The following DRAWINGS have been ADDED:
None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: NONE
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety: None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- Section 00010 – Solicitation Contract Form is replaced in its entirety.
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 26 23 00 SWITCHBOARDS - replace paragraph 2.2.2.3 - Main Section, in its entirety with the following: “The main section shall consist of 100% rated insulated-case circuit breaker.”
- Section 26 23 00 SWITCHBOARDS - replace paragraph 2.2.2.4 - Distribution Sections, in its entirety with the following: “The distribution sections shall consist of individually mounted insulated-case circuit breakers and molded-case circuit breakers, and fusible switches as indicated. Circuit breakers larger than 1600 amps trip shall be adjustable trip, insulated case type.”
- Section 26 23 00 SWITCHBOARDS - add paragraph 2.2.3.2 - Distribution Insulated- Case Breaker, as follows: ”UL listed, 100 percent rated, stationary, electrically operated, low voltage, insulated-case circuit breaker, with a short-circuit current rating as indicated at 208 volts. Breaker frame size is to be as indicated. Equip electrically operated breaker with motor-charged, stored-energy closing mechanism to permit rapid and safe closing of the breaker against fault currents within the short time rating of the breaker, independent of the operator's strength or effort in closing the handle.”
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0001
The CLIN extended description has changed from All work (includes all plant, labor, and material) for the FY12 Dormitory as described in the plans and specifications, except the 3rd floor will not be finish-out (Option 1 and Option 2, CLIN 0006 and 0007, respectively, will be the finish-out effort for the 3rd floor, thus not included in this line item). Please refer to Drawings U-003 and U-004 for further description of the Basic Work. to FY12 Dormitory Thule Air Base: All work complete (includes all plant, labor, and material) except for the items listed below for the FY12 Dormitory as described in the plans and specifications..
CLIN 0002
The CLIN extended description has changed from Site work, all work outside the five-foot line of the building perimeter, inclusive of demolition (As defined by the Civil (C-series) drawings and specifications) to FY12 Dormitory Thule Air Base: Site work, all work outside the five-foot line of the building perimeter, inclusive of demolition (As defined by the Civil (C-series) drawings and specifications).
CLIN 0003
The CLIN extended description has changed from All work for the Final Record Drawing Submission (See paragraph 11 of Section 00800). to FY12 Dormitory Thule Air Base: All work for the Final Record Drawing Submission (See paragraph 11 of Section 00800)..
CLIN 0004
The CLIN extended description has changed from Transportation: All Government Furnished Transportation From Norfolk, Virginia to Thule Air Base. to FY12 Dormitory Thule Air Base: Transportation: All Government Furnished Transportation From Norfolk, Virginia to Thule Air Base. Transportation from the supplier to port of Norfolk, VA. See Section 00800 paragraph 75, page 88 of 94 and Appendix K for rates.If using Government provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base ___________________(MT)Volume from Thule Air Base to Norfolk, Virginia ___________________(MT).
SUBCLIN 0004AA
The CLIN description has changed from From Norfolk to Thule (Volume) to NOT USED.
The unit of issue Metric Ton has been deleted.
The cost constraint NSP has been added.
SUBCLIN 0004AB
The CLIN description has changed from From Thule to Norfolk (Volume) to NOT USED.
The unit of issue Metric Ton has been deleted.
CLIN 0005
The CLIN extended description has changed from Transportation: From Denmark to Thule AB and Thule Air Base to Denmark to FY12 Dormitory Thule Air Base: Transportation: From Denmark to Thule AB and Thule AB to Denmark.
CLIN 0006
The CLIN description Defense Base Act (DBA) Insurance has been deleted.
The CLIN extended description has changed from The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors, multiplied by the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Rutherfoord invoice submitted by the offeror after contract award. In the event of recalculation of the premium by CNA based on actual payroll amounts, the Contracting Officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.(SEE SECTION "C" OF THE CONTINUATION PAGE BELOW.) to FY12 Dormitory Thule Air Base: Defense Base Act (DBA) Insurance is only required for certain workforce; refer to Notes and Appendix L..
CLIN 0007
The CLIN description has changed from OPTION 1 to NOT USED.
The CLIN extended description has changed from All labor and materials for all interior finish-out work, complete, for the 3rd floor EAST Side (Part B as defined on the plans) of the Dormitory. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB. Please refer to Drawings U-003 and U-004 for further description of the Optional Items. If using Government Provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base _______________(TON)Volume from Thule Air Base to Norfolk, Virginia _______________(TON) to FY 12 Dormitory Thule Air Base: NOT USED.
The unit of issue Lump Sum has been deleted.
CLIN 0008
The CLIN description has changed from OPTION 2 to NOT USED.
The CLIN extended description has changed from All labor and materials for all interior finish-out work, complete, for the 3rd floor WEST Side (Part A as defined on the plans) of the Dormitory inclusive of the Central Area. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB. Please refer to Drawings U- 003 and U-004 for further description of the Optional Items. If using Government Provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base _______________(TON)Volume from Thule Air Base to Norfolk, Virginia _______________(TON) to FY 12 Dormitory thule Air Base: NOT USED.
The unit of issue Lump Sum has been deleted.
CLIN 0009
The CLIN extended description has changed from Deduct labor and materials for all work associated with removal of 6 “B” Type units, as shown on the plans. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB. If using Government Provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base _______________(TON)Volume from Thule Air Base to Norfolk, Virginia _______________(TON) to FY12 Dormitory Thule Air Base: Deduct labor and materials for all work associated with removal of 6 “B” Type units, as shown on the plans. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark..If using Government provided Transportation, provide reduction in Tonnage:Volume from Norfolk, Virginia to Thule Air Base
CLIN 0010
The CLIN extended description has changed from Deduct labor and materials for all work associated with removal of 12 “D” Type units, as shown on the plans. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB. If using Government Provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base _______________(TON)Volume from Thule Air Base to Norfolk, Virginia _______________(TON) to FY12 Dormitory Thule Air Base: Deduct labor and materials for all work associated with removal of 12 “D” Type units, as shown on the plans. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark..If using Government provided Transportation, provide reduction in Tonnage:Volume from Norfolk, Virginia to Thule Air Base
CLIN 0011
The CLIN extended description has changed from Purchase, deliver, and install Furnishings and Appliances, per CID Package. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB. If using Government Provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base _______________(TON)Volume from Thule Air Base to Norfolk, Virginia _______________(TON) to FY12 Dormitory Thule Air Base: Purchase, deliver, and install Furnishings and Appliances, per CID Package. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark.**NOTE: All items included in the CID package, i.e. refrigerators, microwaves, dishwashers, washers, dryers … are only to be included in this Line Item and no other, on this Bid Schedule.If using Government provided Transportation, provide Tonnage:Volume from Norfolk, Virginia to Thule Air Base
CLIN 0012 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0012 1 Lump Sum
OPTION OPTION 6
FFP
FY12 Dormitory Thule Air Base: Deduct purchase, delivery, and installation of CID items, Furnishings and Appliances, per reduction of building’s occupancy per Option #3. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark.
If using Government provided Transportation, provide Tonnage:
Volume from Norfolk, Virginia to Thule Air Base
___________________(MT)
Volume from Thule Air Base to Norfolk, Virginia
___________________(MT)
FOB: Destination
NET AMT
CLIN 0013 is added as follows:
0013 1 Lump Sum
OPTION OPTION 7
FFP
FY12 Dormitory Thule Air Base: Deduct purchase, delivery, and installation of CID tems, Furnishings and Appliances, per reduction of building’s occupancy per Option #4. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark.
If using Government provided Transportation, provide Tonnage:
Volume from Norfolk, Virginia to Thule Air Base
___________________(MT)
Volume from Thule Air Base to Norfolk, Virginia
CLIN 0014 is added as follows:
0014 1 Lump Sum
OPTION OPTION 8
FFP
FY12 Dormitory Thule Air Base: Deduct Transportation of all laborers from Denmark to Thule and Thule to Denmark. (Transportation may be provided by Government, see Appendix J for schedule of flights.)
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0012:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0013:
The following Acceptance/Inspection Schedule was added for CLIN 0014:
The following have been added by full text:
REVISED PRICE SCHEDULE 4/5/12
BID SCHEDULE
FY12 Dormitory (72 Room) Thule AB, Greenland
ITEM
NO 0001
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
1 Lump Sum
FY12 Dormitory Thule Air Base: All work complete (includes all plant, labor, and material) except for the items listed below for the FY12 Dormitory as described in the plans and specifications.
AMOUNT
ITEM
NO 0002
FY12 Dormitory Thule Air Base: Site work, all work outside the five-foot line of the building perimeter, inclusive of demolition (As defined by the Civil (C-series) drawings and specifications)
NO 0003
FY12 Dormitory Thule Air Base: All work for the Final Record Drawing Submission (See paragraph 11 of Section 00800).
_________83,700 DKK
NO 0004
FY12 Dormitory Thule Air Base: Transportation: All Government Furnished Transportation From Norfolk, Virginia to Thule Air Base.
Transportation from the supplier to port of Norfolk, VA. See Section 00800 paragraph 75, page 88 of 94 and Appendix K for rates.
If using Government provided Transportation, provide Tonnage:
Volume from Norfolk, Virginia to Thule Air Base
Volume from Thule Air Base to Norfolk, Virginia
NO 0005
FY12 Dormitory Thule Air Base: Transportation: From Denmark to Thule AB and Thule AB to Denmark
NO 0006
FY12 Dormitory Thule Air Base: NOT USED
NO 0007
OPTION OPTIONAL BID ITEM No. 1
_________________N/A
NO 0008
OPTION OPTIONAL BID ITEM No. 2
_________________N/A
NO 0009
OPTION OPTIONAL BID ITEM No. 3
FY12 Dormitory Thule Air Base: Deduct labor and materials for all work associated with removal of 6 “B” Type units, as shown on the plans.
Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark..
If using Government provided Transportation, provide reduction in Tonnage:
NO 0010
OPTION OPTIONAL BID ITEM No. 4
FY12 Dormitory Thule Air Base: Deduct labor and materials for all work associated with removal of 12 “D” Type units, as shown on the plans.
Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark..
If using Government provided Transportation, provide reduction in Tonnage:
NO 0011
OPTION OPTIONAL BID ITEM No. 5
FY12 Dormitory Thule Air Base: Purchase, deliver, and install Furnishings and Appliances, per CID Package. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark.
**NOTE: All items included in the CID package, i.e. refrigerators, microwaves, dishwashers, washers, dryers … are only to be included in this Line Item and no other, on this Bid Schedule.
NO 0012
OPTION OPTIONAL BID ITEM No. 6
FY12 Dormitory Thule Air Base: Deduct purchase, delivery, and installation of CID items, Furnishings and Appliances, per reduction of building’s occupancy per Option #3. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark.
NO 0013
OPTION OPTIONAL BID ITEM No. 7
FY12 Dormitory Thule Air Base: Deduct purchase, delivery, and installation of CID tems, Furnishings and Appliances, per reduction of building’s occupancy per Option #4. Inclusive of transportation from Norfolk, Virginia and/or Denmark to Thule AB and return to Norfolk, Virginia and/or Denmark.
NO 0014
OPTION OPTIONAL BID ITEM No. 8
FY12 Dormitory Thule Air Base: Deduct Transportation of all laborers from Denmark to Thule and Thule to Denmark. (Transportation may be provided by Government, see Appendix J for schedule of flights.)
TOTAL AND NOTES
TOTAL BID
TOTAL BASE BID PRICE FOR LINE ITEMS 0001- 0006
TOTAL BASE BID WITH OPTIONAL BID LINE ITEMS 0001 – 0014
NOTES:
1. All goods must be wrapped accordingly. It should be protected to withstand handling as well as storage and transportation by sea. Due to packing in containers, in warehouse and on ship every package must be able to withstand a pressure from above of at least it's own weight. If you have any questions please contact Royal Arctic Line, Helle Christensen, by phone: 99 30 32 26 or by e-mail: hch@ral.dk.
2. “Transportation from Denmark” means that the U.S. Embassy will provide a ship from Denmark to Thule AB,GL; however, it is not free. This is not considered Government Furnished Transportation.
3. Bids must be in Danish Kroners.
4. Contractors not utilizing Government Furnished Transportation shall include shipping costs in their Base Bid Items, as applicable. In such cases, the price schedule should be marked “NOT
APPLICABLE”.
5. The Contractor shall be billed for all quantities over the tonnage stated in the bid items for Government Furnished Transportation or shall ship at his own expense through private carrier all items over the amounts stated in the bid items.
6. CLIN 0004 and optional items 1 thru 7 also include non monetary estimates of anticipated volume being shipped using government provided sealift. Since the sealift is free to use by the contractors the port needs to know the anticipated volume of goods being shipped so that adequate space is reserved on the vessel being chartered.
7. CLIN 0004 will be used in the evaluation of proposals but will not be included as part of the award amount. The contractors are required to price this line item, refer to Appendix K for rates.
8. The Basis of evaluation will be the lowest responsive/responsible bidder calculated based on ABSOLUTE VALUES of each CLIN: Base Bid (sum of CLIN 0001 thru 0006) minus Option No 3 (CLIN 0009) minus Option No 4 (CLIN 0010) plus Option No 5 (CLIN 0011) minus Option No 6 (CLIN 0012) minus Option No 7 (CLIN 0013) minus Option No 8 (CLIN 0014) .
9. Bidders are required to bid on the Base Bid and all Optional Bid Items or their bids will be rejected.
10. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself thereto may render the bid non-responsive and be cause for its rejection.
11. CLIN 0006 DBA Insurance: A waiver of Defense Base Act insurance has been obtained for employees covered under compulsory workers' compensation laws of Greenland. Please see waiver attached as Appendix L for additional details.
12. Options #1 and Option #2 are no longer being considered.
13. Option #3, Option #4 and Option #8 may be exercised any time prior to 30 calendar days after award of the contract.
14. Option #5, Option #6 and Option #7: At any time prior to 420 calendar days after award of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.
15. All pallets and containers used for the transportation of contractor’s cargo from Denmark shall be the contractor’s responsibility and the contractor’s expense.
16. Line Item Number 0003 is pre-priced at 83,700 DKK, it’s a firm fixed line item, and the price shown may not be changed, see paragraph 11(i) of Section 00800.
17. All items listed in the CID package (i.e. refrigerators, microwaves, dishwashers, stoves, washers, dryers…) are ONLY to be priced under line item 0011 (Option No. 5) and no other line Item.
The following have been deleted:
REVISED PRICE SCHEDULE
(End of Summary of Changes)
File details come from the government source that posted it. Updated .