FY12 Dormitory (72 Person), Thule Air Base, Greenland THULEDOR
SECTION 13 48 00.00 10
SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
10/07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2005) Steel Construction Manual
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1650 (2008) Seismic Restraint Manual Guidelines for Mechanical Systems, 2nd Edition
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-310-04 (2007; Change 1) Seismic Design for Buildings
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
Apply the requirements for seismic protection measures described in this section to the mechanical equipment and systems listed below.
1.2.2 Mechanical Equipment
Mechanical equipment to be seismically protected shall include the following items to the extent required on the drawings or in other sections of these specifications:
Mechanical Skid Packages Cabinet Unit Heaters Heat Exchangers Steam, Water, and Condensate Piping Expansion & Air Separator Tanks Valves and Fittings for Piping Plumbing Piping Radiators & Radiator Panels Pumps with Motors Air Handling Units Dryers and Washers Ducts & Duct Plenum Exhaust and Return Fans Unit Heaters
1.2.3 Mechanical Systems
Install the following mechanical systems as required on the drawings and other sections of these specifications and seismically protect them in accordance with this specification:
a. All Piping Inside the Building Except as Specifically Stated Below Under "Items Not Covered By This Section".
SECTION 13 48 00.00 10 Page 1
b. Fuel Piping Outside of Buildings.
c. All Water Supply Systems.
d. Sanitary Sewer Systems.
e. All Process Piping (steam, condensate, and hydronic).
f. Heat Distribution Systems (Supply, Return, and Condensate Return) Outside of Buildings.
g. Entire Fire Protection Piping System
1.2.4 Contractor Designed Bracing
Submit copies of the design calculations with the drawings. Calculations shall be approved, certified, stamped and signed by a registered Professional Engineer. Calculations shall verify the capability of structural members to which bracing is attached for carrying the load from the brace. Design the bracing in accordance with UFC 3-310-04 and additional data furnished by the Contracting Officer. Resistance to lateral forces induced by earthquakes shall be accomplished without consideration of friction resulting from gravity loads. UFC 3-310-04 uses parameters for the building, not for the equipment in the building;
therefore, corresponding adjustments to the formulas shall be required.
Loadings determined using UFC 3-310-04 are based on strength design;
therefore, AISC 325 Specifications shall be used for the design. The bracing for the following mechanical equipment and systems shall be developed by the Contractor: All systems and equipment listed under Paragraphs 1.2.2 and 1.2.3.
1.2.5 Items Not Covered By This Section
1.2.5.1 Fire Protection Systems
Seismic protection of piping for fire protection systems shall be installed as specified in Section 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION.
1.2.5.2 Items Requiring No Seismic Restraints
Seismic restraints are not required for the following items:
a. Piping in boiler and mechanical equipment rooms less than 32 mm inside diameter.
Interior piping and ducts not listed above shall be seismically protected in accordance with the provisions of this specification.
1.3 EQUIPMENT REQUIREMENTS
Submit copies of the design calculations with the detail drawings.
Calculations shall be stamped by a registered engineer and shall verify the capability of structural members to which bracing is attached for carrying the load from the brace.
SECTION 13 48 00.00 10 Page 2
1.3.1 Rigidly Mounted Equipment
The following specific items of equipment: heat exchanger and pump skid frame packages and air handling units to be furnished under this contract shall be constructed and assembled to withstand the seismic forces specified in UFC 3-310-04. Each item of rigid equipment shall be entirely located and rigidly attached on one side only of a building expansion joint. Piping, duct, electrical conduit, etc., which cross the expansion joint shall be provided with flexible joints that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions.
Air-Handling Units All Tanks and Vessels Household Appliances (dryers, washers, refrigerators, kitchen hoods)
1.3.2 Nonrigid or Flexibly-Mounted Equipment
The following specific items of equipment to be furnished: Unit Heater and Cabinet Unit Heater shall be constructed and assembled to resist a horizontal lateral force of 1.0 times the operating weight of the equipment at the vertical center of gravity of the equipment.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Coupling and Bracing Flexible Couplings or Joints Equipment Requirements Contractor Designed Bracing; G, RO.
SD-03 Product Data
Coupling and Bracing; G, RO.
Equipment Requirements; G, RO.
Contractor Designed Bracing; G, RO.
SD-07 Certificates
Flexible Ball Joints.
PART 2 PRODUCTS
2.1 FLEXIBLE COUPLINGS
Flexible couplings shall have same pressure and temperature ratings as adjoining pipe.
2.2 FLEXIBLE BALL JOINTS
Flexible ball joints shall have cast or wrought steel casing and ball parts
SECTION 13 48 00.00 10 Page 3 capable of 360-degree rotation with not less than 15-degree angular movement. Flexible ball joints shall be certified to be suitable for the service intended by the manufacturer. Information verifying experience at not less than 3 locations of 2 years' satisfactory operation in a similar application shall be submitted.
2.3 FLEXIBLE MECHANICAL JOINTS
a. Mechanical couplings for steel or cast iron pipe shall be of the sleeve type and shall provide a tight flexible joint under all reasonable conditions, such as pipe movement caused by expansion, contraction, slight settling or shifting of the ground, minor variations in trench gradients, and traffic vibrations. Where permitted in other sections of these specifications, joints utilizing split-half couplings with grooved or shouldered pipe ends may be used.
b. Sleeve-type couplings shall be used for joining plain-end pipe sections. The coupling shall consist of one steel middle ring, two steel followers, two gaskets, and necessary steel bolts and nuts to compress the gaskets.
2.4 MANUFACTURED BALL JOINTS
Manufactured ball joints shall be as recommended by the manufacturer for the intended use, and shall be approved by the Contracting Officer before installation.
2.5 SWAY BRACING MATERIALS
Sway bracing materials (e.g. rods, plates, rope, angles, etc.) shall be provided as required.
PART 3 EXECUTION
3.1 COUPLING AND BRACING
a. Submit detail drawings, as specified here and throughout this specification, along with catalog cuts, templates, and erection and installation details, as appropriate, for the items listed. Submittals shall be complete in detail; shall indicate thickness, type, grade, class of metal, and dimensions; and shall show construction details, reinforcement, anchorage, and installation with relation to the building construction.
b. Coupling installation shall conform to the details shown on the drawings. Provisions of this paragraph apply to all piping within a
1.5 m line around outside of building unless buried in the ground.
Piping grouped for support on trapeze-type hangers shall be braced at the most frequent interval as determined by applying the requirements of this specification to each piping run on the common support.
c. Bracing components shall be sized as required for the total load carried by the common supports. Bracing rigidly attached to pipe flanges, or similar, shall not be used where it would interfere with thermal expansion of piping.
3.2 BUILDING DRIFT
Joints capable of accommodating seismic displacements shall be provided for
SECTION 13 48 00.00 10 Page 4 vertical piping between floors of the building, where pipes pass through a building seismic or expansion joint, or where rigidly supported pipes connect to equipment with vibration isolators. Horizontal piping across expansion joints shall accommodate the resultant of the drifts of each building unit in each orthogonal direction. For threaded piping, swing joints made of the same piping material shall be provided. For piping with manufactured ball joints the seismic drift shall be 0.015 meters per meter of height above the base where the seismic separation occurs; this drift value shall be used in place of the expansion given in the manufacturer's selection table.
3.3 FLEXIBLE COUPLINGS OR JOINTS
3.3.1 Building Piping
Flexible couplings or joints in building piping shall be provided at bottom of all pipe risers for pipe larger than 90 mm in diameter. Flexible couplings or joints shall be braced laterally without interfering with the action of the flexible coupling or joint. Cast iron waste and vent piping need only comply with these provisions when caulked joints are used.
Flexible bell and spigot pipe joints using rubber gaskets may be used at each branch adjacent to tees and elbows for underground waste piping inside of building to satisfy these requirements.
3.4 PIPE SLEEVES
Pipe sleeves in interior non-fire rated walls shall be sized as indicated on the drawings to provide clearances that will permit differential movement of piping without the piping striking the pipe sleeve. Pipe sleeves in fire rated walls shall conform to the requirements in Section
07 84 00 FIRESTOPPING.
3.5 SPREADERS
Spreaders shall be provided between adjacent piping runs to prevent contact during seismic activity whenever pipe or insulated pipe surfaces are less than 100 mm apart. Spreaders shall be applied at same interval as sway braces at an equal distance between the sway braces. If rack type hangers are used where the pipes are restrained from contact by mounting to the rack, spreaders are not required for pipes mounted in the rack. Spreaders shall be applied to surface of bare pipe and over insulation on insulated pipes utilizing high-density inserts and pipe protection shields in accordance with the requirements of Section 23 07 00 THERMAL INSULATION FOR
MECHANICAL SYSTEMS.
3.6 SWAY BRACES FOR PIPING
Sway braces shall be provided to prevent movement of the pipes under seismic loading. Braces shall be provided in both the longitudinal and transverse directions, relative to the axis of the pipe. The bracing shall not interfere with thermal expansion requirements for the pipes as described in other sections of these specifications.
3.6.1 Transverse Sway Bracing
Transverse sway bracing for steel and copper pipe shall be provided. All runs (length of pipe between end joints) shall have a minimum of two transverse braces. Transverse sway bracing for pipes of materials other than steel and copper shall be provided at intervals not to exceed the
SECTION 13 48 00.00 10 Page 5 hanger spacing as specified in Section 22 00 00 PLUMBING, GENERAL PURPOSE.
3.6.2 Longitudinal Sway Bracing
Longitudinal sway bracing shall be provided at 12 m intervals unless otherwise indicated. All runs (length of pipe between end joints) shall have one longitudinal brace minimum. Sway braces shall be constructed in accordance with the drawings. Branch lines, walls, or floors shall not be used as sway braces.
3.6.3 Vertical Runs
Run is defined as length of pipe between end joints. Vertical runs of piping shall be braced at not more than 3 m vertical intervals. Braces for vertical runs shall be above the center of gravity of the segment being braced. All sway braces shall be constructed in accordance with the drawings. Sway braces shall attach to the structural system and shall not be connected to branch lines, walls, or floors.
3.6.4 Clamps and Hangers
Clamps or hangers on uninsulated pipes shall be applied directly to pipe.
Insulated piping shall have clamps or hangers applied over insulation in accordance with Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.
3.7 SWAY BRACES FOR DUCTS
3.7.1 Braced Ducts
Bracing details and spacing for rectangular and round ducts shall be in accordance with SMACNA 1650, including Appendix E or UFC 3-310-04 procedures. However, the design seismic loadings for these items shall not be less than loadings obtained using the procedures in UFC 3-310-04.
3.7.2 Unbraced Ducts
Hangers for unbraced ducts shall be attached to the duct within 50 mm of the top of the duct in accordance with SMACNA 1650. Unbraced ducts shall be installed with a 150 mm minimum clearance to vertical ceiling hanger wires.
-- End of Section --