SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 65 PAGES
FY12 Dormitory (72 Person), Thule Air Base, Greenland
01 32 01.00 18 G ROInitial Project Schedule G ROPreliminary Project Schedule G ROPeriodic Project Schedule G RONarrative Report
01 32 01.00 18 SD-07 Certificates Qualifications Statement
01 35 26 SD-01 Preconstruction Submittals
1.6 G ROAccident Prevention Plan (APP)
1.7 G ROActivity Hazard Analysis (AHA)
1.6.1 G ROCrane Critical Lift Plan
1.5.1.2 G ROCrane Operators
SD-06 Test Reports 1.11Reports 1.11.1Accident Reports 1.11.3Monthly Exposure Reports 1.11.4Crane Reports
Gas Protection SD-07 Certificates
1.8Confined Space Entry Permit 1.8Hot work permit
01 45 04.00 18 SD-01 Preconstruction Submittals G ROContractor Quality Plan (CQC)
01 52 60.00 18 SD-01 Preconstruction Submittals G ROConstruction Indoor Air Quality
(IAQ) Management Plan SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 65 PAGES
01 52 60.00 18 Photographs G ROFiltration Media
SD-11 Closeout Submittals G ROConformance with IAQ
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 G ROEnvironmental Protection Plan
01 74 19 SD-01 Preconstruction Submittals
1.6 G ROWaste Management Plan
SD-11 Closeout Submittals 1.7Records
01 78 00.00 18 SD-02 Shop Drawings G ROAs-Built Drawings
SD-03 Product Data G ROAs-Built Record of Equipment and Materials
1.3.1 G ROWarranty Management Plan
G ROWarranty Tags
1.6 G ROFinal Cleaning
03 20 00.00 10 SD-02 Shop Drawings
3.1 G ROReinforcement
SD-03 Product Data Welding
SD-07 Certificates 2.3Reinforcing Steel
03 40 00.00 10 SD-01 Preconstruction Submittals
1.4.1.2 G ROQuality Control Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 65 PAGES
03 40 00.00 10 SD-02 Shop Drawings
1.2.1 G ROStandard Precast Units
1.2.2 G ROCustom-Made Precast Units
SD-03 Product Data
1.2.1 G ROStandard Precast Units
1.2.3 G ROProprietary Precast Units
3.1.3 G ROEmbedded Items
2.1.11 G ROAccessories
SD-05 Design Data
1.2.2 G RODesign Calculations
1.2.5.1 G ROConcrete Mix Proportions
SD-06 Test Reports
1.4.1.2 G ROTest Reports
SD-07 Certificates
1.4.1.2 G ROQuality Control Procedures
03 41 16 SD-02 Shop Drawings 1.3Fabrication Drawings 1.3Installation Drawings 2.1.1Precast Concrete Slabs
Cast-in-Place Curb Units SD-03 Product Data
2.1.1Precast Concrete Slabs Packaged Concrete Materials
2.5Absorption Cover 2.5Moisture-Retaining Cover
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 65 PAGES
03 41 16 2.1.1Precast Concrete Slabs SD-06 Test Reports
2.1.1Test Reports 2.1.1Strength Tests
SD-07 Certificates 2.1.1Precast Concrete Slabs
Clips 2.2Threaded Fasteners 2.3Cement Grout Joint Sealing
Materials Bituminous Joint Sealing Materials
SD-08 Manufacturer’s Instructions 2.1.1Installation Instructions
05 05 23 SD-03 Product Data
1.5 G ROWelding Procedure Qualifications
1.5.4Welder, Welding Operator, and
Tacker Qualification 1.5.5Inspector Qualification 1.5.1Previous Qualifications 1.5.2Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control
Quality Assurance 05 12 00 SD-02 Shop Drawings
1.5.2.1 G DOErection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 65 PAGES
05 12 00 1.5.1 G DOFabrication drawings SD-03 Product Data
2.4Shop primer
2.2.5 G DOLoad indicator bolts
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.4Shop Primer 2.3.1Welding Electrodes and Rods 2.3.2Nonshrink Grout 2.5Galvanizing 1.5.2.2Welding procedures and qualifications 05 21 19 SD-02 Shop Drawings
1.5.1 G ROSteel joist framing
SD-07 Certificates
G ROSteel joist 05 30 00 SD-02 Shop Drawings
1.3.5 G ROFabrication Drawings
SD-03 Product Data
2.2 G ROAccessories
2.3.1 G RODeck Units
2.2.11 G ROMechanical Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 65 PAGES
05 30 00 SD-05 Design Data
2.3.1 G RODeck Units
2.2 G ROAccessories
SD-07 Certificates G ROWelding Procedures
1.3.4.1 G ROFire Safety
G ROQualification of Welders
2.3.1 G RODeck Units
2.2 G ROAccessories
1.3.4.2 G ROWind Storm Resistance
05 40 00 SD-02 Shop Drawings
1.6.1 G DOFraming Components
SD-03 Product Data 2.1studs,joists
SD-05 Design Data
1.6.2 G DOMetal framing calculations
SD-07 Certificates 1.4Load-bearing cold-formed metal framing 3.1.1Welds
05 50 13 SD-02 Shop Drawings G ROFloor gratings G ROGalvanized Steel Fence/Security
Grille SD-03 Product Data
2.3Access doors and panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 65 PAGES
05 50 13 Cover plates and frames 2.4Control-joint covers
Galvanized Steel Fence/Security Grille
Expansion joint covers Floor gratings Structural steel door frames
SD-04 Samples Expansion joint covers
2.4Control-joint covers 05 50 14 SD-02 Shop Drawings
1.4.2 G RODetail Drawings
SD-03 Product Data
2.2.2.1 GWelding of Structural Steel
1.4.1 GWelding of Aluminum
GStructural Steel Welding Repairs 2.1.1Materials Orders 2.1.2Materials List 2.1.3Shipping Bill
SD-06 Test Reports 2.3Tests, Inspections, and
Verifications SD-07 Certificates
1.4.1Qualification of Welders and Welding Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 65 PAGES
05 50 14 2.2.2.3 GApplication Qualification for Steel Studs
1.4.1 GWelding of Aluminum
05 51 00 SD-02 Shop Drawings
2.1Iron and Steel Hardware 2.1Steel Shapes, Plates, Bars and
Strips 2.16Metal Stair System
SD-03 Product Data 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.6Hot-Rolled Carbon Steel Sheets and Strips 2.5Cold Finished Steel Bars 2.4Hot-Rolled Carbon Steel Bars 2.7Cold-Rolled Carbon Steel Sheets 2.8Galvanized Carbon Steel Sheets 2.9Cold-Drawn Steel Tubing 2.10Gray Iron Castings 2.11Malleable Iron Castings 2.13Concrete Inserts 2.14Masonry Anchorage Devices 2.17Protective Coating 2.18Steel Pan Stairs
Steel Stairs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 65 PAGES
05 51 00 Steel Stairs, Circular SD-07 Certificates
1.3Welding Procedures 1.3Welder Qualification
SD-08 Manufacturer’s Instructions 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing 2.6Hot-Rolled Carbon Steel Sheets and Strips 2.5Cold Finished Steel Bars 2.4Hot-Rolled Carbon Steel Bars 2.7Cold-Rolled Carbon Steel Sheets 2.8Galvanized Carbon Steel Sheets 2.9Cold-Drawn Steel Tubing 2.10Gray Iron Castings 2.11Malleable Iron Castings 2.17Protective Coating 2.14Masonry Anchorage Devices
05 52 00 SD-02 Shop Drawings
1.2.1 G ROFabrication Drawings
2.1 G ROIron and Steel Hardware
3.1 G ROIron and Steel Hardware
2.1Steel Shapes, Plates, Bars and
Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 65 PAGES
05 52 00 3.1Steel Shapes, Plates, Bars and Strips
SD-03 Product Data
1.2.1 G ROStructural Steel Plates, Shapes, and Bars
2.3 G ROStructural Steel Plates, Shapes, and Bars
1.2.1 G ROStructural Steel Tubing
2.4 G ROStructural Steel Tubing
1.2.1 G ROCold-Finished Steel Bars
2.6 G ROCold-Finished Steel Bars
1.2.1 G ROHot-Rolled Carbon Steel Bars
2.5 G ROHot-Rolled Carbon Steel Bars
1.2.1 G ROCold-Drawn Steel Tubing
2.7 G ROCold-Drawn Steel Tubing
1.2.1 G ROConcrete Inserts
2.9 G ROConcrete Inserts
1.2.1 G ROMasonry Anchorage Devices
2.10 G ROMasonry Anchorage Devices
1.2.1 G ROProtective Coating
2.12 G ROProtective Coating
1.2.1 G ROSteel Railings and Handrails
2.13 G ROSteel Railings and Handrails
1.2.1 G ROAnchorage and Fastening
Systems SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 65 PAGES
05 52 00 1.4.1 G ROWelding Procedures
1.4.2 G ROWelder Qualification
SD-08 Manufacturer’s Instructions
3.1 G ROInstallation Instructions
06 10 00 SD-03 Product Data Adhesives
SD-05 Design Data
1.9.2 G ROModifications of structural
members SD-06 Test Reports
1.4.3Preservative-treated SD-07 Certificates
1.11.2Forest Stewardship Council (FSC) Certification
1.9.3Certificates of grade 1.7Preservative treatment
SD-10 Operation and Maintenance Data
1.4.6Plastic 3.2Take-back program
SD-11 Closeout Submittals Local/Regional Materials Adhesives
1.11.1Certified Wood 1.11.2Certified Wood
06 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 65 PAGES
06 20 00 1.3Detail Drawings SD-03 Product Data Wood
SD-04 Samples Moldings
2.2Fascias and Trim SD-07 Certificates
1.4Certificates of grade 1.4Certificates of compliance
06 61 16 SD-02 Shop Drawings
1.4.2 G RODetail Drawings
3.1 G ROInstallation
SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications 1.4.3Certification
SD-04 Samples
2.1 G ROMaterial
2.3.6 G ROCounter and Vanity Tops
SD-06 Test Reports 2.1Solid polymer material
SD-07 Certificates 2.3Fabrications 1.4.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 65 PAGES
06 61 16 SD-10 Operation and Maintenance Data
3.2Clean-up 07 21 16 SD-03 Product Data
2.1Blanket insulation Sill sealer insulation
2.3Vapor retarder 2.4Pressure sensitive tape 2.5Accessories 1.3Certification
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 41 13 SD-02 Shop Drawings
1.4.5 G RORoofing Panels
1.4.5 G ROFlashing and Accessories
SD-03 Product Data
2.1 G RORoof panels
1.4.5 G ROFactory-Applied Color Finish
2.4 G ROAccessories
1.4.5 G ROFasteners
1.4.5 G ROPressure Sensitive Tape
2.7 G ROUnderlayments
2.8 G ROGaskets and Sealing/Insulating
Compounds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 65 PAGES
07 41 13 LEED Submittals Credit MR 4:
Product data indicating the following:
G ROa. Percentage by weight of post-consumer and pre-consumer recycled content
G ROb. Total weight of products provided
G ROc. Include statement indicating costs for each product having recycled content
SD-04 Samples
2.1 G RORoof Panels
1.4.5 G ROFactory-applied Color Finish
2.4 G ROAccessories
1.4.5 G ROFasteners
1.4.5 G ROGaskets and Sealant/Insulating
Compounds SD-05 Design Data
1.2.1.2 G ROWind Uplift Resistance
SD-06 Test Reports
1.2.1.1Leakage Test Report 1.2.1.2Wind Uplift Test Report
Fire Rating Test Report 2.2Factory Finish and Color
Performance Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 65 PAGES
07 41 13 SD-07 Certificates
2.1 G RORoof Panels
1.4.1 G ROQualification of Manufacturer
1.4.2 G ROQualification of Applicator
SD-08 Manufacturer’s Instructions
G ROINSULATION
1.4.5 G ROINSTALLATION MANUAL
SD-09 Manufacturer’s Field Reports
3.9.1Manufacturer's Field Inspection Reports
SD-11 Closeout Submittals 1.8Warranties 3.10Information Card 3.11Date Of Installation Wall-Mounted
Placard 07 41 63 SD-01 Preconstruction Submittals
1.5.1 G ROQualification of Manufacturer
1.5.3 G ROQualification of Manufacturer
1.5.1 G ROQualification of Installer
1.5.1Qualifications for Welding
SD-02 Shop Drawings
1.5.1 G RORoofing Panels
1.5.1 G ROFlashing and Accessories
G ROGutter/Downspout Assembly SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 65 PAGES
07 41 63 G ROInsulation Roof Panel (structural)
1.5.1 G ROCoil Stock
1.5.1 G ROFactory Color Finish
1.5.1 G ROSub-girts and Formed Shapes
1.5.1 G ROClosure Materials
1.5.1 G ROInsulation
1.5.1 G ROPressure Sensitive Tape
1.5.1 G ROSealants and Caulking
1.5.1 G RORated Wall Assembly
1.5.1 G ROAccessories
SD-04 Samples
1.5.1 G ROCoil Stock
1.5.1 G RORoofing Panels
2.2.2 G ROFasteners
2.4.1 G ROMetal Closure Strips
1.5.1 G ROInsulation
1.5.1 G ROManufacturer s color charts and
chips SD-05 Design Data
1.5.1 G ROWind design analysis
1.5.1 G ROSeismic design analysis
SD-06 Test Reports
2.1.4 G ROtest reports
3.7.2 G ROLeakage Tests
1.5.1 G ROFire Rating Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 65 PAGES
07 41 63 3.1 G ROCoatings and base metals of metal roofing
1.5.1 G ROFactory Finish and Color
Performance Requirements
1.5.1 G ROWind Uplift Test Report
1.5.1 G ROSeismic Test Report
SD-07 Certificates
1.5.1 G ROCoil Stock
2.2.2 G ROFasteners
1.5.1 G ROGalvanizing Repair Paint
1.5.1 G ROEnamel Repair Paint
SD-08 Manufacturer’s Instructions
1.5.1 G ROInstallation of Roof panel
assemblies SD-11 Closeout Submittals
1.8 G ROWarranty
3.10 G ROInformation Form and Placard
3.9.1 G ROManufacturer's field inspection
reports
1.5.1 G ROInstructions
1.5.1 G ROMaterial Safety Data Sheets
3.12 G RODate Of Installation Wall-Mounted
Placard
1.8.1 G RO20 year 'No-Dollar-Limit' warranty
for labor and materials 07 42 13 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 65 PAGES
07 42 13 1.5.3 G ROQualification of Manufacturer
1.5.4 G ROQualification of Installation
Contractor
1.5.4.1 G ROQualification of Welders
1.8 G ROWarranty
SD-02 Shop Drawings
1.5.1.1 G ROInstallation Drawings
SD-03 Product Data Recycled Content;
2.3.1 G ROWall Panels
2.3.2Factory Color Finish 1.5.5Closure Materials 2.6.4.4Pressure Sensitive Tape 2.6.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 2.8Aluminized Steel Repair Paint 1.5.5Accessories 2.6Accessories
SD-04 Samples
2.3.1 G ROWall Panels
1.5.3.1 GFasteners
2.6.3 G ROMetal Closure Strips
G ROColor chart SD-05 Design Data
1.5.1.2 G ROWind load design analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 65 PAGES
07 42 13 SD-06 Test Reports
3.7.2 G ROLeakage Tests
1.3.2 G ROWind Load Tests
2.3.2.2 G ROCoating
2.3.2.2 G ROChalking
1.3.2 G ROSeismic Tests
SD-07 Certificates
1.5.3.1 G ROCoil Stock
1.5.3.1 G ROFasteners
1.5.3.1 G ROGalvanizing Repair Paint
1.5.3.1 G ROEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
SD-09 Manufacturer’s Field Reports
3.8.1 G ROManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 G ROWarranty
1.5.6 G ROMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material 07 60 00 SD-02 Shop Drawings
3.1.22 G ROCovering on flat, sloped, or
curved surfaces
3.1.23 G ROExpansion joints
3.1.15 G ROGravel stops and fascias
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 65 PAGES
07 60 00 3.1.11 G ROBase flashing
3.1.12 G ROCounterflashing
3.1.24 G ROFlashing at roof penetrations
3.1.13 G ROReglets
G ROScuppers
3.1.27 G ROCopings
3.1.16 G RODrip edge
3.1.19Conductor heads
3.1.20 G ROOpen valley flashing
3.1.21 G ROEave flashing
SD-11 Closeout Submittals 3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SD-07 Certificates 1.4.2Manufacturer's Technical
Representative 2.1Firestopping Materials 1.4.1Installer Qualifications 3.3Inspection
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 65 PAGES
07 92 00 3.3.6Sealant 08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.6 G ROFrames
2.6 G ROFrames
2.4Accessories 2.8Weatherstripping
G RODoor Frames SD-03 Product Data
2.1 G RODoors
2.6 G ROFrames
2.4Accessories 2.8Weatherstripping
SD-04 Samples
2.10.4 G ROFactory-applied enamel finish
08 14 00 SD-02 Shop Drawings
2.1 G RODoors
SD-03 Product Data
2.1 G RODoors
2.2Accessories 2.3.7Water-resistant sealer 1.5warranty
2.1.2 G ROSound transmission class rating
G ROFire resistance rating 1.3Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 65 PAGES
08 14 00 SD-04 Samples 2.1Doors
2.3.6.3 G RODoor finish colors
SD-06 Test Reports 2.4Split resistance 2.4Cycle-slam 2.4Hinge loading resistance
08 53 00 SD-02 Shop Drawings
2.2.1 G ROWindows
2.2.1 G ROWindows
SD-03 Product Data
2.2.1 G ROWindows
2.4.8Fasteners 2.4.4Hardware 2.4.6Screens 2.4.5Weatherstripping 2.4.9Accessories 2.2.5Adhesives
Environmental Data SD-04 Samples
2.2.1 G ROWindows
SD-06 Test Reports
2.2.1 G ROWindows
SD-07 Certificates
2.2.1Windows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 65 PAGES
08 53 00 SD-10 Operation and Maintenance Data
2.2.1 G ROWindows
1.6.1Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 G ROHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 G ROHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 G ROHardware Schedule
SD-11 Closeout Submittals Key Bitting
08 81 00 SD-02 Shop Drawings Installation
SD-03 Product Data 1.6.1Insulating Glass 1.3Glazing Accessories
Environmental Data SD-08 Manufacturer’s Instructions
2.3Setting and sealing materials 3.2Glass setting
09 06 90 SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 65 PAGES
09 06 90 2.2 G ROColor Schedule 09 29 00 SD-03 Product Data
Cementitious backer units Glass Mat Water-Resistant Gypsum Tile Backing Board
Water-Resistant Gypsum Backing Board
Glass Mat Covered or Reinforced Gypsum Sheathing
Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
Impact Resistant Gypsum Board 2.1.6Accessories 1.3Certification 2.1.1Gypsum Board 2.1.4Adhesives 2.1.3Joint Treatment Materials
SD-07 Certificates
2.1 G ROAsbestos Free Materials
SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
Waste Management
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 65 PAGES
09 29 00 SD-11 Closeout Submittals 2.1.1Gypsum Board 2.1.4Adhesives
09 30 00 SD-02 Shop Drawings
1.4 G RODetail Drawings
SD-03 Product Data
2.1 G ROTile
2.1 G ROTile
2.2 G ROSetting-Bed
2.4 G ROMortar, Grout, and Adhesive
2.2.6Reinforcing Wire Fabric 1.2.2Certification
SD-04 Samples
2.1 G ROTile
2.1.3 G ROAccessories
G ROMarble Thresholds
2.4 G ROGrout
SD-06 Test Reports 3.7Testing
SD-07 Certificates
2.1 G ROTile
2.4 G ROMortar, Grout, and Adhesive
SD-11 Closeout Submittals 2.1Tile 2.2.6Reinforcing Wire Fabric 2.4Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 65 PAGES
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data 1.2.1Acoustical Ceiling Systems 1.4Certification
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
SD-06 Test Reports 1.2.1Fire Resistive Ceilings 1.2.2Ceiling Attenuation Class and
Test SD-07 Certificates
2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.9 G ROResilient Flooring and
Accessories SD-03 Product Data
2.9 G ROResilient Flooring and
Accessories
2.5Adhesives Vinyl Composition Tile Sheet Vinyl Flooring Rubber Tile Rubber Sheet Flooring
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 65 PAGES
09 65 00 Solid Vinyl Tile Cement-Fiber Board
2.2Wall Base 2.3Stair Treads, Risers and
Stringers Environmental Data Sheet Linoleum Linoleum Tile Cork
1.4Certification SD-04 Samples
2.9 G ROResilient Flooring and
Accessories
SD-06 Test Reports
3.3 G ROMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.9 G ROResilient Flooring and
Accessories
SD-11 Closeout Submittals 2.9Resilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 65 PAGES
09 65 00 2.5Adhesives Sheet Linoleum Linoleum Tile Cork
09 68 00 SD-02 Shop Drawings 3.4Installation 2.5Moldings
SD-03 Product Data 2.1Carpet 2.3Carpet Cushion 2.5Moldings 3.1Surface Preparation 3.4Installation
1.4 G RORegulatory Requirements
2.1.1Physical Characteristics
SD-04 Samples 2.1Carpet 2.5Moldings
SD-06 Test Reports
3.2 G ROMoisture and Alkalinity Tests
SD-07 Certificates 2.1Carpet
SD-10 Operation and Maintenance Data
2.1Carpet 3.5Cleaning and Protection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 65 PAGES
09 68 00 Maintenance Service SD-11 Closeout Submittals
2.1Carpet 2.4Adhesives and Concrete Primer
09 72 00 SD-03 Product Data
2.1 G ROWall Coverings and Accessories
2.3Primer and Adhesive
Vinyl Wall Covering 1.3Certification
SD-04 Samples
2.1 G ROWall Coverings and Accessories
2.1 G ROWall Coverings
SD-07 Certificates 2.1Wall Coverings and Accessories
SD-08 Manufacturer’s Instructions 2.1Wall Coverings and Accessories
SD-10 Operation and Maintenance Data
G ROVinyl Wall Covering 09 90 00 SD-02 Shop Drawings
Piping identification stencil
SD-03 Product Data 1.4.4Certification
Environmental Data 2.1Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 65 PAGES
09 90 00 2.1 G ROCoating 2.1Manufacturer's Technical Data
Sheets Sealant
SD-04 Samples
1.10 G ROColor
1.4.2 G ROTextured Wall Coating System
1.4.3 G ROSample Textured Wall Coating
System Mock-Up SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 G ROQualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.4.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
G ROCoatings 10 14 01 SD-02 Shop Drawings
3.1 G ROApproved Detail Drawings
SD-03 Product Data
3.1Installation
1.2 G ROExterior Signage
Wind Load Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 65 PAGES
10 14 01 SD-04 Samples
1.2 G ROExterior Signage
SD-10 Operation and Maintenance Data
3.1.2Protection and Cleaning 10 14 02 SD-02 Shop Drawings
1.2 G RODetail Drawings
SD-03 Product Data
3.1 G ROInstallation
SD-04 Samples
1.2Interior Signage Software
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 26 13 SD-02 Shop Drawings
2.2 G ROCorner Guards
G ROWall Guards (Bumper Guards) G RODoor Protectors G ROWall Covering/Panels
SD-03 Product Data 1.3Certification
SD-04 Samples 2.4Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 65 PAGES
10 26 13 SD-06 Test Reports 2.2Corner Guards
Wall Guards (Bumper Guards) Door Protectors Wall Covering/Panels
SD-07 Certificates 2.2Corner Guards
Wall Guards (Bumper Guards) Door Protectors Wall Covering/Panels
10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items
SD-04 Samples 2.1.2Finishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
SD-10 Operation and Maintenance Data Electric Hand Dryer
10 44 16 SD-01 Preconstruction Submittals 2.1Manufacturer's Data
SD-02 Shop Drawings 2.1Fire Extinguishers 2.4Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 65 PAGES
10 44 16 2.5Cabinets SD-03 Product Data
2.1Fire Extinguishers 2.4Accessories 2.5Cabinets 3.2.1Replacement Parts
SD-04 Samples 2.1Fire Extinguisher 2.1Cabinet
Wall Brackets 2.4Accessories
SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 11 13 13 SD-02 Shop Drawings
1.4.1 G RODetail Drawings
SD-03 Product Data
G RODock Bumpers SD-04 Samples
2.2Fastening Materials 2.2Angles 2.2Rods 2.2Fastening Hardware
Dock Bumpers 2.2Rubber
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 65 PAGES
11 13 13 2.2Rubberized Fabric SD-07 Certificates
2.2Fastening Materials 2.2Rubberized Fabric 2.2Steel Angles 2.2Hardware Items
SD-11 Closeout Submittals
1.4.2 G RORecord Drawings
12 22 00 SD-02 Shop Drawings
1.3 GDrawings
SD-03 Product Data 1.5Certification
SD-04 Samples
2.1.1.1 GDrapery fabric
GMotor and Controller 3.2Finished drapery
SD-06 Test Reports 2.1.1.3Flame resistance
SD-08 Manufacturer’s Instructions 2.1.4Drapery hardware
Motor and Controller 2.2.1fabrication
SD-10 Operation and Maintenance Data
1.4 GDrapery system
12 24 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 65 PAGES
12 24 13 2.1Window Shades 1.4.5Certification
SD-04 Samples 2.1Window Shades
SD-06 Test Reports 2.1Window Shades
SD-08 Manufacturer’s Instructions 2.1Window Shades
SD-10 Operation and Maintenance Data
2.1Window Shades SD-11 Closeout Submittals Recycled Content (LEED)
1.4.4Shade Cloth (LEED) 13 48 00.00 10 SD-02 Shop Drawings
3.1Coupling and Bracing 3.3Flexible Couplings or Joints 1.3Equipment Requirements 1.2.4Contractor Designed Bracing
G RO;
SD-03 Product Data
3.1 G ROCoupling and Bracing
1.3 G ROEquipment Requirements
1.2.4 G ROContractor Designed Bracing
SD-07 Certificates 2.2Flexible Ball Joints
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 65 PAGES
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.9As-Built Drawings
SD-03 Product Data 1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.8 G ROPreliminary Tests
3.9 G ROFinal Acceptance Test
3.10 G ROOnsite Training
1.4.1 G ROFire Protection Specialist
1.4.2Sprinkler System Installer
SD-05 Design Data 1.4.3Sway Bracing 1.2.1.3Hydraulic Calculations
SD-06 Test Reports
3.9 G ROPreliminary Test Report
3.9 G ROFinal Acceptance Test Report
SD-07 Certificates 3.3Inspection by Fire Protection
Specialist SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 65 PAGES
21 13 13.00 10 3.10Operating and Maintenance Instructions
22 00 00 SD-02 Shop Drawings
3.7.1 G ROPlumbing System
SD-03 Product Data 2.4Fixtures 2.4.2Flush tank water closets
Wall hung lavatories 2.4.4Kitchen sinks
Plastic bathtubs
2.9 G ROPumps
3.7.1.1 G DOBackflow prevention assemblies
2.6.2 G ROShower Faucets
3.7.1Plumbing System
SD-06 Test Reports 3.7Tests, Flushing and Disinfection
3.7.1.1 G ROTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.7.1 G ROPlumbing System
23 00 00 SD-02 Shop Drawings
1.4.5 G RODetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 65 PAGES
23 00 00 SD-03 Product Data 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.9.1.2Duct Connectors
2.9.2 G RODuct Access Doors
2.9.3Fire Dampers
2.9.4 G ROManual Balancing Dampers
2.9.5 G ROManual Balancing Dampers
Automatic Smoke-Fire Dampers Automatic Smoke Dampers
2.9.10Sound Attenuation Equipment 2.9.10Acoustical Duct Liner 2.9.11.1Diffusers 2.9.11.2Registers and Grilles
Louvers Air Vents, Penthouses, and Goosenecks
2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Axial Flow Fans 2.10.1.4Panel Type Power Wall
Ventilators 2.10.1.5Centrifugal Type Power Wall
Ventilators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 65 PAGES
23 00 00 2.10.1.6Centrifugal Type Power Roof Ventilators
Propeller Type Power Roof Ventilators
Air-Curtain Fans 2.10.1.7Ceiling Exhaust Fans
2.11 G ROAir Handling Units
G ROCabinet Unit Heaters & Unit Heaters
2.12 G ROEnergy Recovery Devices
1.4.6Test Procedures
1.2.1.2 G RODiagrams
SD-06 Test Reports
3.12 G ROPerformance Tests
3.10 G RODamper Acceptance Test
SD-07 Certificates 1.4.1Bolts 1.4.7Certification
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.14.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 65 PAGES
23 00 00 3.14.1Operation and Maintenance Manuals
2.9.3 G ROFire Dampers
2.9.4 G ROManual Balancing Dampers
2.9.5 G ROManual Balancing Dampers
G ROAutomatic Smoke-Fire Dampers G ROAutomatic Smoke Dampers
2.10.1.1 G ROCentrifugal Fans
2.10.1.2 G ROIn-Line Centrifugal Fans
2.10.1.3 G ROAxial Flow Fans
2.10.1.4 G ROPanel Type Power Wall
Ventilators
2.10.1.5 G ROCentrifugal Type Power Wall
Ventilators
2.10.1.6 G ROCentrifugal Type Power Roof
Ventilators G ROPropeller Type Power Roof
Ventilators
2.10.1.7 G ROCeiling Exhaust Fans
2.11 G ROAir Handling Units
G RORoom Fan-Coil Units G ROCeiling Terminal Units G ROReheat Units
2.12 G ROEnergy Recovery Devices
G ROUnit Heaters & Cabinet Unit
Heaters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 65 PAGES
23 00 00 G RORadiation Panels 23 05 93 SD-01 Preconstruction Submittals
1.3 G RORecords of Existing Conditions
1.3.3 G RORecords of Existing Conditions
1.5.4.1 G ROTAB Firm
1.2 G ROTAB team assistants
1.2 G ROTAB team engineer
1.5.4.2 G ROTAB Specialist
1.2 G ROTAB team field leader
SD-02 Shop Drawings
1.3.3 G ROTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 G ROEquipment and Performance
Data
1.5.4.4 G ROTAB Related HVAC Submittals
1.5.2 G ROTAB Procedures
1.5.2 G ROCalibration
1.3.3 G ROSystems Readiness Check
1.5.5 G ROTAB Execution
1.5.5.3 G ROTAB Verification
SD-06 Test Reports
3.7 G RODALT and TAB Work Execution
Schedule
3.7 G RODALT and TAB Procedures
Summary
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 65 PAGES
23 05 93 1.3.3 G RODesign review report
1.7.3.1 G RODesign review report
3.7 G RODesign review report
1.5.3 G ROPre-Final DALT report
1.7.3 G ROPre-Final DALT report
3.3.5 G ROPre-Final DALT report
1.5.3 G ROFinal DALT report
1.7.3 G ROFinal DALT report
3.3.8 G ROFinal DALT report
1.5.6.2 G ROTAB report for Season 1
3.7 G ROTAB report for Season 1
1.5.6.2 G ROTAB report for Season 2
3.7 G ROTAB report for Season 2
SD-07 Certificates
1.5.1 G ROIndependent TAB agency and
personnel qualifications
1.5.1 G ROIndependent TAB agency and
personnel qualifications
3.3.2 G ROAdvance notice of Pre-Final
DALT field work
3.7 G ROCompleted Pre-Final DALT Work
Checklist
3.7 G ROCompleted Pre-Final DALT Work
Checklist
3.7 G ROAdvance Notice of Season 1 TAB
Field Work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 65 PAGES
23 05 93 3.7Completed Season 1 Pre-TAB Work Checklist
3.7Completed Season 1 Pre-TAB Work Checklist
G ROAdvance Notice of Season 2 TAB Field Work
Completed Season 2 Pre-TAB Work Checklist
1.5.4.1 G ROTAB Firm
1.7.1 G RODALT and TAB Submittal and
Work Schedule
1.7.3 G RODALT and TAB Submittal and
Work Schedule
1.3.3 G RODesign review report
1.7.3.1 G RODesign review report
3.7 G RODesign review report
1.7.3.2 G ROPre-field DALT preliminary
notification
1.7.3.3 G ROPre-field TAB engineering report
1.7.3 G ROAdvanced notice for Season 1
TAB field work
1.7.3 G ROPrerequisite HVAC Work Check
Out List For Season 1 G ROAdvanced notice for Season 2
TAB field work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 65 PAGES
23 05 93 G ROPrerequisite HVAC Work Check Out List For Season 2
23 07 00 SD-02 Shop Drawings
3.2.2.4 G ROMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data 1.4.2Certification
2.3 G ROPipe Insulation Systems
3.2 G ROPipe Insulation Systems
3.3 G RODuct Insulation Systems
3.4 G ROEquipment Insulation Systems
SD-04 Samples
2.2.1.3 G ROThermal Insulation
SD-08 Manufacturer’s Instructions
2.3 G ROPipe Insulation Systems
3.2 G ROPipe Insulation Systems
3.3 G RODuct Insulation Systems
3.4 G ROEquipment Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 G DOCommissioning Plan
SD-03 Product…