90 Design - Mechanical Part 3
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
R E F
CA
CC
CD
CF
CG
CB
CH
C1C2C4 C1.9C4.1 C3
CONF RM/TECH
JOURN
E-119
SR FACULTY
E-112
SR FACULTY
E-111
SR FACULTY
E-110
SR FACULTY
E-113
FACULTY
E-117
FACULTY
E-116
FILES
E-102
CORRIDOR
E-1C3
CORRIDOR
E-1C2
CORRIDOR
E-1C1
OFFICE
E-103
FC-14
FC-14
FC-2
FC-1
FC-2
FC-12 FC-12
FACULTY
E-118
FC-14
FC-14
3/4"ø CHWR
3/4"ø CHWS
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWR 3/4"ø CHWS
3/4"ø HWS
3/4"ø HWR
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWR 3/4"ø CHWS
3/4"ø HWS 3/4"ø HWR 3/4"ø CHWS 3/4"ø CHWR
1 1/2"ø HWS 1 1/2"ø HWR 1 1/2"ø CHWS 1 1/2"ø CHWR
3/4"ø HWS 3/4"ø HWR 3/4"ø CHWS 3/4"ø CHWR
3/4"ø HWR 3/4"ø CHWS 3/4"ø CHWR
3/4"ø HWS
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWS 3/4"ø CHWR
1 1/4"ø CHWR 1 1/4"ø CHWS
2" HWS/HWR DOWN
2" CHWS/CHWR DOWN
3/4"ø HWS 3/4"ø HWR 3/4"ø CHWS 3/4"ø CHWR
1 1/4"ø HWS 1 1/4"ø HWR 1 1/2"ø CHWS 1 1/2"ø CHWR
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWS 3/4"ø CHWR
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWR 3/4"ø CHWS
FC-1
1 1/4"ø HWS 1 1/4"ø HWR
FC-12
3/4"ø HWS
3/4"ø HWR
3/4"ø CHWR 3/4"ø CHWS
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
SHEET
REFERENCE
NUMBER
SHEET OF
D E S
IG
N E D B Y
D W N B Y
C H K B Y
S U B M
IT
T E D B Y
D A T E
S O L
IC
IT
A T
IO
N N O
C O N T R A C T N O
F
IL
E N A M E
P L O T T E D B Y
S
IZ
E
P L O T D A T E
D A T E
D E S C R
IP
T
IO
N
M A R K
A P P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W
E S T N A T
IO
N W
ID
E B L V D
C O L U M B U S O H
IO
.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m
S C
IE
N C E C E N T E R
(F Y -B L D G
U N
IT
E D S T A T E S M
IL
IT
A R Y A C A D E M Y
W E S T P O
IN
T N Y
A R C H D
P A R K A V E N U E S O U T H
N E W Y O R K N Y -1
.7 .4 f a x .5 .5 w w w .s tv in c .c o m
W D S -1 -D -0
/3 /2 :0 :4 P M
M-203E
F
IR
S T F L O O R P L A N A R E A E H V A C P
IP
IN
G
F J T
M A C
J D V
A P R
IL
0 4 8 162
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - AREA
E HVAC PIPING
PLAN
NORTH
F O R C O N T
IN
U A T
IO
N S E E D W G M -2 D
F O R C O N T
IN
U A T
IO
N S E E D W G M -2 C
F O R C O N T
IN
U A T
IO
N S E E D W G M -2 B
FOR CONTINUATION SEE DWG. M-203B
AREA A - NIC
DN UP
DN UP
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
1. 4" REFRIGERANT RELIEF VENT.
2. 5" STEAM PRESSURE RELIEF VENT.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
3. FOR CONTINUATION SEE DWG. M-204C.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
4. FCU SERVING ELEC ROOM AND COMM ROOM CRAC UNIT FOR COOLING ONLY.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E A2A2.5A3A4
AF
A6
A7
AG
AH
AJ
AK
A8
A5
AA
AD
AE
AC
AB
AL
A5.4
A4.7
A10
A9
AA.6
A9.5
A10.8A11.5A12.3 A12 A11 A10.5
COMM
B-214
JAN
B-215
JAN
B-213
INSTRUCTN LAB
STOR
B-203
CORRIDOR
B-2C2
PHYSICS
WORKRM
B-206
PHYSICS
CLASSRM
B-207
CORRIDOR
B-2C3
ASSISTED INSTR
RM
B-211
PHYSICS
WORKRM
B-208
WOMEN
B-212
TOILET
B-210
CORRIDOR
B-2C1
STAIR B2
B-2S2
ELEC
B-201
STAIR B1
B-2S1
MEN
B-204INSTR TEACHING
LAB
B-205
3"ø HRS
3"ø HRR
FC-9
FC-4
3/4"ø HWR 3/4"ø HWS
1 1/2"ø CHWS 1 1/2"ø CHWR 1"ø HWS 1"ø HWR
1"ø HWR 1"ø HWS
1 1/2"ø CHWR 1 1/2"ø CHWS
1 1/4"ø CHWS 1 1/4"ø CHWR 3/4"ø HWS 3/4"ø HWR
4"ø CH VENT 5"ø ST VENT
FC-6
FC-6
FC-10
FC-5
FC-3
1 1/4"ø HWS
2"ø HWR 2"ø HWS
4"ø CHWR 4"ø CHWS
1 1/4"ø CHWS 1 1/4"ø CHWR
3/4"ø HWS 3/4"ø HWR
2 1/2"ø CHWS 2 1/2"ø CHWR 1 1/2"ø HWS
1 1/2"ø HWR 1"ø CHWS2"ø CHWS
2"ø CHWR
1 1/4"ø CHWS 1 1/4"ø CHWR
3/4"ø HWS 3/4"ø HWR
3/4"ø HWR 3/4"ø HWS
1 1/4"ø CHWR 1 1/4"ø CHWS
2"ø CHWS 2"ø CHWR
1 1/4"ø HWR
2"ø CHWS
2"ø CHWR
1 1/4"ø HWS 1 1/4"ø HWR
3"ø CHWS 3"ø CHWR 1 1/2"ø HWS 1 1/2"ø HWR
1"ø CHWR 3/4"ø HWS 3/4"ø HWR
F O R C O N T
IN
U A T
IO
N S E E D W G M -2 C
3/4"ø HWR 3/4"ø HWS 1"ø CHWR 1"ø CHWS
FC-5
FC-5
FC-3
CRACU-14
FC-4
1"ø HWR 1"ø HWS 1 1/2"ø CHWR 1 1/2"ø CHWS
1"ø HWR
1"ø HWS 1 1/2"ø CHWR 1 1/2"ø CHWS
1"ø CHWR 1"ø CHWS
3/4"ø HWS 1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/4"ø CHWR 1 1/4"ø CHWS
3/4"ø HWR
3/4"ø HWR
3/4"ø HWS
CUH-16
CUH-15
3/4"ø HWR 3/4"ø HWS
COMP SPEC
WRKSHP
B-202
PHYSICS
CLASSRM
B-209
CORRIDOR
B-2C4
SHEET
REFERENCE
NUMBER
SHEET OF
D E S
IG
N E D B Y
D W N B Y
C H K B Y
S U B M
IT
T E D B Y
D A T E
S O L
IC
IT
A T
IO
N N O
C O N T R A C T N O
F
IL
E N A M E
P L O T T E D B Y
S
IZ
E
P L O T D A T E
D A T E
D E S C R
IP
T
IO
N
M A R K
A P P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W
E S T N A T
IO
N W
ID
E B L V D
C O L U M B U S O H
IO
.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m
S C
IE
N C E C E N T E R
(F Y -B L D G
U N
IT
E D S T A T E S M
IL
IT
A R Y A C A D E M Y
W E S T P O
IN
T N Y
A R C H D
P A R K A V E N U E S O U T H
N E W Y O R K N Y -1
.7 .4 f a x .5 .5 w w w .s tv in c .c o m
W D S -1 -D -0
/1 /2 :2 :2 P M
M-204B
S E C O N D F L O O R P L A N A R E A B H V A C
P
IP
IN
G
F J T
J E N
J D V
A P R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN -
AREA B HVAC PIPING
UP
UPDN
DN
DN
UP
UPDN
GENERAL NOTES:
1. FOR CONTINUATION REFER TO SHEET M-204B.
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BU
BT
BS
BR.7
BQ.5
BQ
BP
BN
BM
BR
BR.8
BS.8
BV
B1B7 B6 B5 B4 B3 B2
INSTR LAB STOR
C-207
INSTR LAB STOR
C-208
PHYSICS
WORKRM
C-212
PHYSICS
WORKRM
C-210
PHYSICS
CLASSRM
C-209
CORRIDOR
C-2C3
PHYSICS
CLASSRM
C-211
COMM
C-205
ELEC
C-206
CLASSROOM
C-201
BLDG STOR SPT
C-202
Space
C-B292
PHYSICS
WORKRM
C-203
PHYSICS
CLASSRM
C-204
CORRIDOR
C-2C1
STAIR D2
D-2S2
3"ø CHWR 3"ø CHWS
3"ø HWR 3"ø HWS
3/4"ø HWS 1"ø CHWR 1"ø CHWS
3/4"ø HWR
3"ø HWS
3"ø HWR 4"ø CHWS 4"ø CHWR
4"ø CHWR 4"ø CHWS 2"ø HWR 2"ø HWS
1 1/2"ø CHWR 1 1/2"ø CHWS
1 1/4"ø HWR 1 1/4"ø HWS
1 1/2"ø CHWR 1 1/2"ø CHWS
3/4"ø HWR 3/4"ø HWS
1 1/2"ø CHWS 1 1/2"ø CHWR
3/4"ø HWR 3/4"ø HWS
2 1/2"ø PGR 2 1/2"ø PGS
PGS/R DN TO 1ST FLOOR
SEE DWG. M-203C FOR CONTINUATION
PGS/R FROM CRACU-7 IN SUB-BASEMENT CONTINUES
INTO EAST WING, AND UP TO DC-1 ON EAST WING ROOF
SEE DWG. M-204B FOR CONTINUATION
4" HWS UP/DN
4" HWR UP/DN
8" CHWS UP/DN
8" CHWR UP/DN
5" STEAM,
3" CONDENSATE UP/DN
FC-5
FC-4
FC-1
3/4"ø HWS
3/4"ø HWR
1"ø CHWR 1"ø CHWS
1"ø CHWR 1"ø CHWS
1"ø HWR 1"ø HWS
1"ø HWS 1"ø HWR
1"ø CHWR 1"ø CHWS
1"ø CHWR
1"ø CHWS
1"ø HWR 1"ø HWS
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWS 3/4"ø CHWR 3/4"ø CHWR
3/4"ø CHWS
3/4"ø HWR
3/4"ø HWS
FC-12 FC-12
FC-4FC-4
1"ø CHWR 1"ø CHWS
1"ø HWR 1"ø HWS
4"ø PGS 4"ø PGR
PGS/R DN TO 1ST FLOOR
SEE DWG. M-203C FOR
CONTINUATION
3"ø PGS 3"ø PGR
AHU-6A
AHU-6B
HX-6 3"ø LPS
5"ø LPS
3"ø PC
3" PGS/PGR UP/DN
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
A T
E
D A
T E
D
E S
C R
IP
T
IO
N
M
A R
K
A P
P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
N E
W Y
O R
K h tt p
\w w w
.n a n .u s a c e
.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W E
S T
N A
T
IO
N W
ID
E
B L
V D
C
O L
U M
B U
S O
H
IO
.4
.4 f a x
.4
.0 h tt p /w w w
.u rs c o rp .c o m
S C
IE
N
C E
C E
N T
E R
(F Y
-B
L D
G
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W E
S T
P O
IN
T
N
Y
A R
C H
D
P
A R
K A
V E
N U
E S
O U
T H
N E
W Y
O R
K N
Y
-1
.7
.4 f a x
.5
.5 w w w
.s tv in c .c o m
W
D
S -1
-D
-0
/1
/2
:1
:0
A
M
M-204C
S E
C O
N D
F L O
O R
P L A
N
A R
E A
C H
V A
C P
IP
IN
G
F J T
M A
C J D
V
A P
R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN -
AREA C HVAC PIPING
FOR CONTINUATION SEE DWG. M-204B
F O
R C
O N
T
IN
U A
T
IO
N S
E E
D W
G M
-2
B
FOR CONTINUATION SEE DWG. M-204D
UPDN
UP
UPDN
DN
UP
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BL
BK
BJ
BH
BG
BF
BE
BD
BC
BB
BA
PHYSICS
WORKRM
D-202
PHYSICS
WORKRM
D-205
PHYSICS
CLASSRM
D-201
PHYSICS
CLASSRM
D-204
JAN
D-206
CLASSROOM
D-208
CLASSROOM
D-209 PHYSICS
WORKRM
D-211
Space
C-B292
Space
C-B295
PHYSICS
CLASSRM
D-210
STAIR D2
D-2S2
CORRIDOR
D-2C3
INTERACTIVE
LEARNING
D-203
CORRIDOR
D-2C1
2"ø HWR
2"ø HWS
1 1/4"ø HWS 1 1/4"ø HWR
1 1/4"ø CHWS 1 1/4"ø CHWR
1"ø HWS 1"ø HWR
1"ø CHWS 1"ø CHWR
3/4"ø HWS 3/4"ø HWR
1 1/2"ø CHWS
1 1/2"ø CHWR
1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/4"ø HWR 1 1/4"ø HWS
1 1/4"ø HWS 1 1/4"ø HWR
1 1/4"ø CHWS 1 1/4"ø CHWR
1"ø HWS 1"ø HWR
1"ø CHWR 1"ø CHWS
1 1/4"ø CHWR
1 1/4"ø CHWS
3/4"ø HWR
3/4"ø HWS
2 1/2"ø CHWR
2 1/2"ø CHWS
2 1/2"ø HWR
2 1/2"ø HWS
FC-4
FC-5
FC-5
FC-5
3/4"ø HWS 3/4"ø HWR
1 1/2"ø CHWS 1 1/2"ø CHWR
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
A T
E
D A
T E
D
E S
C R
IP
T
IO
N
M
A R
K
A P
P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
N E
W Y
O R
K h tt p
\w w w
.n a n .u s a c e
.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W E
S T
N A
T
IO
N W
ID
E
B L
V D
C
O L
U M
B U
S O
H
IO
.4
.4 f a x
.4
.0 h tt p /w w w
.u rs c o rp .c o m
S C
IE
N
C E
C E
N T
E R
(F Y
-B
L D
G
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W E
S T
P O
IN
T
N
Y
A R
C H
D
P
A R
K A
V E
N U
E S
O U
T H
N E
W Y
O R
K N
Y
-1
.7
.4 f a x
.5
.5 w w w
.s tv in c .c o m
W
D
S -1
-D
-0
/1
/2
:1
:0
A
M
M-204D
S E
C O
N D
F L O
O R
P L A
N
A R
E A
D H
V A
C P
IP
IN
G
F J T
M A
C J D
V
A P
R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN -
AREA D HVAC PIPING
FOR CONTINUATION SEE DWG. M-204C
A R
E A
A
N
IC
DN
UP
DN
UP
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
1. 4" REFRIGERANT RELIEF VENT.
2. 5" STEAM PRESSURE RELIEF VENT.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
3. FOR CONTINUATION SEE DWG. M-205C.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
4. 4" PGS/R UP TO 4TH FLOOR. FOR CONTINUATION SEE DWG. M-206B.
5. 6" HRS/R DN TO 2ND FLOOR. FOR CONTINUATION SEE DWG. M-204B.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
6. FCU SERVING ELEC ROOM AND COMM ROOM CRAC UNIT FOR COOLING ONLY.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E A2A2.5A3A4
AF
A6
A7
AG
AH
AJ
AK
A8
A5
AA
AD
AE
AC
AB
AL
A5.4
A4.7
AS
AR
A10
A9
AS.5
AA.6
A9.5
A10.8A11.5A12.3
AT
A12 A11 A10.5
COMM
B-315
JAN
B-314
COMPUTER
CLASSRM
B-303
MOLEC SCI
COMPUTER LAB
B-306
MOLEC SCI
COMPUTER LAB
B-307
MEN
B-313
PARA COMP
CLASSRM
B-312
JAN
B-316
CLASSROOM
B-310
TOILET
B-311
CORRIDOR
B-3C4
CLASSROOM
B-308
CLASSROOM
B-304
CLASSROOM
B-309
STAIR B2
B-3S2
CORRIDOR
B-3C3
CORRIDOR
B-3C2
STAIR B1
B-3S1
ELEC
B-301
FC-4
FC-5
3"ø HRR
3"ø HRS
3/4"ø HWR
3/4"ø HWS
1"ø CHWR 1"ø CHWS
2"ø CHWS 2"ø CHWR 1 1/4"ø HWS 1 1/4"ø HWR
1 1/2"ø HWS 1 1/2"ø HWR
3"ø CHWS 3"ø CHWR
3/4"ø HWR 3/4"ø HWS 1 1/4"ø CHWR 1 1/4"ø CHWS
3/4"ø HWR 3/4"ø HWS 1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/2"ø CHWS 1 1/2"ø CHWR
1"ø HWS 1"ø HWR
3/4"ø HWS 1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/4"ø CHWS 1 1/4"ø CHWR 3/4"ø HWS 3/4"ø HWR
3"ø CHWS 3"ø CHWR 1 1/2"ø HWS 1 1/2"ø HWR
3"ø CHWS 3"ø CHWR 2"ø HWS 2"ø HWR
6" HRR/S UP TO 4TH FLOOR
SEE DWG. M-206B
3/4"ø HWR
2"ø HWR 2"ø HWS 3"ø CHWR 3"ø CHWS
4"ø CHWS 4"ø CHWR 2"ø HWS 2"ø HWR
4"ø CHWS 4"ø CHWR 2"ø HWS 2"ø HWR
3/4"ø HWR 3/4"ø HWS 1"ø CHWR 1"ø CHWS
2"ø CHWR 2"ø CHWS
2"ø HWR 2"ø HWS 4"ø CHWR 4"ø CHWS
4"ø CH VENT 5"ø ST VENT
FC-9
FC-4
1 1/4"ø CHWS
1 1/4"ø CHWR
3/4"ø HWS
SERVER RM
B-305
F O R C O N T
IN
U A T
IO
N S E E D W G M -2 C
4"ø PGS 2 1/2"ø PGS4"ø PGR 2 1/2"ø PGR
2 1/2"ø PGR 2 1/2"ø PGS
3/4"ø HWR
2-1/2" PGS/R RUNS
BELOW 2" HWS/R PIPES
2 1/2"ø PGR 2 1/2"ø PGS BELOW HWS/R PIPES
BELOW HWS/R PIPES
CRACU-8A
CRACU-8B
CRACU-14 3/4"ø HWR 3/4"ø HWS 1"ø CHWR
1"ø CHWS
FC-5FC-9
FC-4
FC-9
FC-9
FC-5
1 1/2"ø PGR 1 1/2"ø PGS 1"ø CHWR 1"ø CHWS
1 1/2"ø CHWS 1 1/2"ø CHWR
1"ø CHWR
1"ø CHWS
FC-2
1 1/4"ø HWR 1 1/4"ø HWS
2"ø CHWR 2"ø CHWS
1"ø CHWR 1"ø CHWS
2"ø CHWS 2"ø CHWR
CUH-17
1 1/2"ø HWR
1 1/2"ø HWS
SHEET
REFERENCE
NUMBER
SHEET OF
D E S
IG
N E D B Y
D W N B Y
C H K B Y
S U B M
IT
T E D B Y
D A T E
S O L
IC
IT
A T
IO
N N O
C O N T R A C T N O
F
IL
E N A M E
P L O T T E D B Y
S
IZ
E
P L O T D A T E
D A T E
D E S C R
IP
T
IO
N
M A R K
A P P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W
E S T N A T
IO
N W
ID
E B L V D
C O L U M B U S O H
IO
.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m
S C
IE
N C E C E N T E R
(F Y -B L D G
U N
IT
E D S T A T E S M
IL
IT
A R Y A C A D E M Y
W E S T P O
IN
T N Y
A R C H D
P A R K A V E N U E S O U T H
N E W Y O R K N Y -1
.7 .4 f a x .5 .5 w w w .s tv in c .c o m
W D S -1 -D -0
/1 /2 :2 :2 P M
M-205B
T H
IR
D F L O O R P L A N A R E A B H V A C P
IP
IN
G
F J T
J E N
J D V
A P R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
THIRD FLOOR PLAN - AREA
B HVAC PIPING
DN UP
UPDN
DN UP
GENERAL NOTES:
1. FOR CONTINUATION REFER TO SHEET M-205B.
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BU
BT
BS
BR.7
BQ.5
BQ
BP
BN
BM
BR
BR.8
BS.8
B7
COMP SPEC
WRKSHP
C-307
GEN STOR
C-309
PHYSICS
CLASSRM
C-310
PHYSICS
WORKRM
C-311
PHYSICS
WORKRM
C-313
CORRIDOR
C-3C3
PHYSICS
CLASSRM
C-312
COMM
C-305
FACULTY OFFICE
C-302
ELEC
C-306
CLASSROOM
C-301
PHYSICS
WORKRM
C-303
PHYSICS
CLASSRM
C-304
CORRIDOR
C-3C1
STAIR D2
D-3S2
2 1/2"ø HWR
2 1/2"ø HWS
3 1/2"ø CHWR 3 1/2"ø CHWS
3 1/2"ø HWR 3 1/2"ø HWS
4"ø CHWR 4"ø CHWS 2"ø HWR 2"ø HWS
3 1/2"ø HWS 3 1/2"ø HWR 4"ø CHWS
4"ø CHWR
1"ø HWS 1"ø HWR
1"ø CHWS 1"ø CHWR
1 1/2"ø CHWR 1 1/2"ø CHWS 1 1/2"ø HWR 1 1/2"ø HWS
1"ø HWS
1"ø HWR
1"ø CHWR 1"ø CHWS
FC-16FC-16
FC-6
FC-5
FC-12
1"ø CHWR 1"ø CHWS
1"ø HWR 1"ø HWS
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWS 3/4"ø CHWR
1"ø HWS 1"ø HWR
1"ø CHWR 1"ø CHWS
1 1/4"ø CHWR 1 1/4"ø CHWS
3/4"ø HWS 3/4"ø HWR
1 1/4"ø HWS 1 1/4"ø HWR
1 1/2"ø CHWR 1 1/2"ø CHWS
3/4"ø CHWR 3/4"ø CHWS
3/4"ø HWS 3/4"ø HWR
4" HWS UP/DN
4" HWR UP/DN
8" CHWS UP
8" CHWR UP
1"ø HWS 1"ø HWR
1"ø CHWS 1"ø CHWR
1"ø HWR
1"ø HWS
1"ø CHWS 1"ø CHWR
1 1/4"ø CHWR
1 1/4"ø CHWS
1 1/4"ø HWR 1 1/4"ø HWS
2 1/2"ø HWR
2 1/2"ø HWS
FC-9 FC-9
FC-9
FC-4
FC-5
FC-8
FC-1
2 1/2"ø CHWS
2 1/2"ø CHWR
2 1/2"ø CHWS 2 1/2"ø CHWR
2 1/2"ø CHWR
2 1/2"ø CHWS 2 1/2"ø HWR
2 1/2"ø HWS
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
A T
E
D A
T E
D
E S
C R
IP
T
IO
N
M
A R
K
A P
P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
N E
W Y
O R
K h tt p
\w w w
.n a n .u s a c e
.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W E
S T
N A
T
IO
N W
ID
E
B L
V D
C
O L
U M
B U
S O
H
IO
.4
.4 f a x
.4
.0 h tt p /w w w
.u rs c o rp .c o m
S C
IE
N
C E
C E
N T
E R
(F Y
-B
L D
G
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W E
S T
P O
IN
T
N
Y
A R
C H
D
P
A R
K A
V E
N U
E S
O U
T H
N E
W Y
O R
K N
Y
-1
.7
.4 f a x
.5
.5 w w w
.s tv in c .c o m
W
D
S -1
-D
-0
/1
/2
:1
:1
A
M
M-205C
T H
IR
D
F L O
O R
P L A
N
A R
E A
C H
V A
C P
IP
IN
G
F J T
M A
C J D
V
A P
R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
THIRD FLOOR PLAN - AREA
C HVAC PIPING
FOR CONTINUATION SEE DWG. M-205D
F O
R C
O N
T
IN
U A
T
IO
N S
E E
D W
G M
-2
DN DN
UPDN
UPDN
UPDN
UP
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BL
BK
BJ
BH
BG
BF
BE
BD
BC
BB
BA
PHYSICS
WORKRM
D-302
PHYSICS
CLASSRM
D-301
PHYSICS
WORKRM
D-305
PHYSICS
CLASSRM
D-304
Space
C-B196
CLASSROOM
D-308
CLASSROOM
D-307
PHYSICS
WORKRM
D-310
PHYSICS
CLASSRM
D-309
STAIR D2
D-3S2
CORRIDOR
D-3C3
INTERACTIVE
LEARNING
D-303
CORRIDOR
D-3C1
1"ø HWS
1"ø HWR 1"ø CHWS
1"ø CHWR
3/4"ø HWS 3/4"ø HWR
1 1/2"ø CHWS 1 1/2"ø CHWR
1"ø HWS 1"ø HWR
1"ø CHWS 1"ø CHWR
1 1/4"ø HWS 1 1/4"ø HWR
1 1/4"ø CHWS 1 1/4"ø CHWR
1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/4"ø HWS 1 1/4"ø HWR
3/4"ø CHWR
3/4"ø CHWS
3/4"ø HWR
3/4"ø HWS
1"ø HWS
1"ø HWR
1"ø CHWS
1"ø CHWR
1"ø HWS
1"ø HWR
1"ø CHWS
1"ø CHWR
1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/4"ø HWR 1 1/4"ø HWS
2 1/2"ø CHWR
2 1/2"ø CHWS
2 1/2"ø HWR
2 1/2"ø HWS
FC-9FC-4
FC-4
FC-5
FC-9
FC-9
FC-5
FC-1
FC-5
1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/4"ø HWR
1 1/4"ø HWS
2"ø CHWR
2"ø CHWS
2"ø HWR
2"ø HWS
2"ø CHWR
2"ø CHWS 2"ø HWR 2"ø HWS
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
A T
E
D A
T E
D
E S
C R
IP
T
IO
N
M
A R
K
A P
P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
N E
W Y
O R
K h tt p
\w w w
.n a n .u s a c e
.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W E
S T
N A
T
IO
N W
ID
E
B L
V D
C
O L
U M
B U
S O
H
IO
.4
.4 f a x
.4
.0 h tt p /w w w
.u rs c o rp .c o m
S C
IE
N
C E
C E
N T
E R
(F Y
-B
L D
G
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W E
S T
P O
IN
T
N
Y
A R
C H
D
P
A R
K A
V E
N U
E S
O U
T H
N E
W Y
O R
K N
Y
-1
.7
.4 f a x
.5
.5 w w w
.s tv in c .c o m
W
D
S -1
-D
-0
/1
/2
:1
:1
A
M
M-205D
T H
IR
D
F L O
O R
P L A
N
A R
E A
D H
V A
C P
IP
IN
G
F J T
M A
C J D
V
A P
R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
THIRD FLOOR PLAN - AREA
D HVAC PIPING
FOR CONTINUATION SEE DWG. M-205C
A R
E A
A
UP
DN
UP
DN
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
1. 4" REFRIGERANT RELIEF VENT.
2. 5" STEAM PRESSURE RELIEF VENT.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
3. FOR CONTINUATION SEE DWG. M-206C.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
EA2A2.5A3A4
AF
A6
A7
AG
AH
AJ
AK
A8
A5
AA
AD
AE
AC
AB
AL
A5.4
A4.7
AS
AR
A10
A9
AS.5
AA.6
A9.5 A10.8A11.5A12.3
AT
A12 A11 A10.5
SR FACULTY
B-430
ANTE
B-428
ANTE
B-426
FACULTY
B-422
SR FACULTY
B-416
FACULTY
B-415
SR FACULTY
B-412
ANTE
B-414
SR FACULTY
B-411
ANTE
B-419SR FACULTY
B-417
SR FACULTY
B-418
WOMEN
B-421
MEN
B-420
ELEC
B-404
FACULTY
B-431
COPY
B-432
ANTE
B-406
FACULTY
B-413
SR FACULTY
B-405
CLOSET
B-438
SR FACULTY
B-423
SR FACULTY
B-424
SR FACULTY
B-425
SR FACULTY
B-429
FACULTY
B-436
SR FACULTY
B-434
SR FACULTY
B-435
TECH JOURNALS
B-437
COMM
B-433
CLOSET
B-402A
ANTE
B-402
KITCHENETTE
B-408
DEPT DEPUTY
B-403
DEPT CHAIR
B-401
CORRIDOR
B-4C2
STAIR B2
B-4S2
FACULTY
B-427
CORRIDOR
B-4C1
WRK/ MAIL/ OFC/
RES
B-410
OFFICE
B-407
ADMIN OFFICE
B-409
1-1/4" CHWR/S, 1-1/4"HWR/S
UP TO 5TH, 6TH FLOOR
CLASSROOMS AND OFFICES
SEE DWG. M-207B
1-1/2" CHWR/S, 1" HWR/S
UP TO ROOF ELEC ROOMS
SEE DWG. M-208B
1-1/4" CHWR/S, 3/4" HWR/S
UP TO 5TH FLOOR
SEE DWG. M-207B
1 1/4"ø CHWS 1 1/4"ø CHWR 3/4"ø HWS 3/4"ø HWR
2"ø HWR
2"ø HWS
6" HRR/S DN TO 3RD FLOOR
SEE DWG. M-205B
3"ø CHWS 3"ø CHWR
2"ø HWS 2"ø HWR
2"ø CHWR 2"ø CHWS
4"ø CHWS 4"ø CHWR 2 1/2"ø HWS 2 1/2"ø HWR
1 1/4"ø CHWS 1 1/4"ø CHWR
3/4"ø HWS 3/4"ø HWR
1 1/4"ø CHWS 1 1/4"ø CHWR
3/4"ø HWS 3/4"ø HWR
1 1/2"ø CHWS 1 1/2"ø CHWR
1"ø HWS 1"ø HWR
4"ø CH VENT 5"ø ST VENTF
O R C O N T
IN
U A T
IO
N S E E D W G M -2 C
4"ø PGS 4"ø PGR
PGS/R UP TO 4TH FLOOR LOFT SPACE
SEE DWG. M-207B
1 1/2"ø CHWS
1 1/2"ø CHWR 1"ø HWS
1"ø HWR
FC-3
FC-3
FC-3
FC-1
FC-3
FC-5
FC-4
FC-3
FC-2
FC-11
CRACU-16
FC-5
FC-1
FC-1
FC-2
3/4"ø HWR 3/4"ø HWS
1 1/4"ø CHWR 1 1/4"ø CHWS
1 1/2"ø CHWS 1 1/2"ø CHWR
1"ø HWS 1"ø HWR
3/4"ø HWR 3/4"ø HWS
1 1/4"ø CHWS 1 1/4"ø CHWS
1 1/4"ø HWR 1 1/4"ø HWS 1 1/4"ø CHWR 1 1/4"ø CHWS
SEE DWG. M-206B FOR CONTINUATION
2 1/2"ø HWR 2 1/2"ø HWS 4"ø CHWR 4"ø CHWS
1"ø CHWS 1"ø CHWR 3/4"ø HWS 3/4"ø HWR
3/4"ø HWR 3/4"ø HWS 1"ø CHWR 1"ø HWR
3/4"ø HWR 3/4"ø HWS 1"ø CHWR 1"ø CHWS
3"ø CHWS 3"ø CHWR
1"ø CHWS
1"ø CHWR
3/4"ø HWS
3/4"ø HWR
1 1/4"ø CHWS
3/4"ø HWS 3/4"ø HWR
1 1/4"ø CHWR
1 1/2"ø HWR
1 1/2"ø HWS 2"ø CHWR 2"ø CHWS
1 1/4"ø CHWS 1 1/4"ø CHWR 1"ø HWS 1"ø HWR
2"ø CHWR 1 1/2"ø HWS
1 1/2"ø HWR
2"ø CHWS
1 1/2"ø HWR 1 1/2"ø HWS 2"ø CHWR 2"ø CHWS
2"ø HRS
2"ø HRR
WEST WING HEAT RECOVERY
PIPING UP TO ERU-3
SHEET
REFERENCE
NUMBER
SHEET OF
D E S
IG
N E D B Y
D W N B Y
C H K B Y
S U B M
IT
T E D B Y
D A T E
S O L
IC
IT
A T
IO
N N O
C O N T R A C T N O
F
IL
E N A M E
P L O T T E D B Y
S
IZ
E
P L O T D A T E
D A T E
D E S C R
IP
T
IO
N
M A R K
A P P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W
E S T N A T
IO
N W
ID
E B L V D
C O L U M B U S O H
IO
.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m
S C
IE
N C E C E N T E R
(F Y -B L D G
U N
IT
E D S T A T E S M
IL
IT
A R Y A C A D E M Y
W E S T P O
IN
T N Y
A R C H D
P A R K A V E N U E S O U T H
N E W Y O R K N Y -1
.7 .4 f a x .5 .5 w w w .s tv in c .c o m
W D S -1 -D -0
/1 /2 :2 :3 P M
M-206B
F O U R T H F L O O R P L A N A R E A B H V A C
P
IP
IN
G
F J T
J E N
J D V
A P R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN -
AREA B HVAC PIPING
DN
UPDN
DN
GENERAL NOTES:
1. FOR CONTINUATION REFER TO SHEET M-206B.
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BU
BT
BS
BR.7
BQ.5
BQ
BP
BN
BM
BR
BR.8
BS.8
COMM
C-404
STAIR C3
C-4S3
AV ROOM
C-414
STAIR D2
D-4S2
SUP PHYST/ PHYS
S TECH/ ELECT-M
EQ
C-401
CLASSROOM
C-402
ELEC
C-405
Space
D-2C189
CONFERENCE
ROOM
C-403
FACULTY
D-426
CORRIDOR
C-4C1
SR FAC
D-427
CORRIDOR
C-4C3
PREP
C-412
STOR
C-411
Space
D-2C218
Space
D-2C221
STAIR C1
C-4S1
WOMEN
C-408
JAN
C-407
STORAGE
C-413
CORRIDOR
C-4C4
MEN
C-406
ANTE
C-409
LECTURE-1
C-410-1
LECTURE-2
C-410-2
3"ø HWS 3"ø HWR
4"ø CHWS
4"ø CHWR
1 1/2"ø HWS 1 1/2"ø HWR 1 1/2"ø CHWS 1 1/2"ø CHWR
2"ø CHWR 2"ø CHWS
2"ø HWR 2"ø HWS
2"ø CHWR
2"ø CHWS
2"ø HWR 2"ø HWS
1 1/4"ø HWR 1 1/4"ø HWS
1 1/4"ø CHWS 1 1/4"ø CHWR
4"ø CHWR 4"ø CHWS 2"ø HWR 2"ø HWS
4" HWS DN
4" HWR DN
8" CHWS DN
8" CHWR DN
5" STEAM,
3" CONDENSATE DN
FC-4
FC-1
3/4"ø CHWS 3/4"ø CHWR
3/4"ø HWR 3/4"ø HWS
FC-8
CRACU-17
2 1/2"ø CHWR 2 1/2"ø CHWS 2 1/2"ø HWR 2 1/2"ø HWS
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
A T
E
D A
T E
D
E S
C R
IP
T
IO
N
M
A R
K
A P
P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
N E
W Y
O R
K h tt p
\w w w
.n a n .u s a c e
.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W E
S T
N A
T
IO
N W
ID
E
B L
V D
C
O L
U M
B U
S O
H
IO
.4
.4 f a x
.4
.0 h tt p /w w w
.u rs c o rp .c o m
S C
IE
N
C E
C E
N T
E R
(F Y
-B
L D
G
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W E
S T
P O
IN
T
N
Y
A R
C H
D
P
A R
K A
V E
N U
E S
O U
T H
N E
W Y
O R
K N
Y
-1
.7
.4 f a x
.5
.5 w w w
.s tv in c .c o m
W
D
S -1
-D
-0
/1
/2
:1
:1
A
M
M-206C
F O
U R
T H
F L O
O R
P L A
N
A R
E A
C H
V A
C P
IP
IN
G
F J T
M A
C J D
V
A P
R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN -
AREA C HVAC PIPING
FOR CONTINUATION SEE DWG. M-206D
F O
R C
O N
T
IN
U A
T
IO
N S
E E
D W
G M
-2
R E
F
DN
UP
DN
DN
DN
DN
GENERAL NOTES:
1. REFER TO SHEET M-207D FOR CONTINUATION
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BL
BK
BJ
BH
BG
BF
BE
BD
BC
BB
BA
Space
D-2C159
ANTE
D-421
SR FAC
D-417
SR FAC
D-413
SR FAC
D-412
SR FAC
D-422
STAIR D1
D-4S1
STAIR D2
D-4S2
FACULTY
D-423
ANTE
D-415
FACULTY
D-414
FACULTY
D-418
STOR/FILE EXAM
REC/ BRK RM
D-416
ELEV MACHINE
D-428
ANTE
D-425
CORRIDOR
D-4C2
SR FAC
D-424
ANTE
D-420SR FAC
D-419 2"ø CHWR 2"ø CHWS
2"ø HWR
2"ø HWS
1 1/2"ø CHWR
1 1/2"ø CHWS 1 1/2"ø HWR 1 1/2"ø HWS
1"ø CHWR 1"ø CHWS
1"ø HWR 1"ø HWS
3/4"ø HWS 3/4"ø HWR
3/4"ø CHWR 3/4"ø CHWS
3/4"ø 3/4"ø HWR
3/4"ø CHWS 3/4"ø CHWR
FC-1FC-1
FC-1
FC-4
FC-3
1"ø CHWR 1"ø CHWS
1"ø HWR 1"ø HWS
2"ø CHWR
2"ø CHWS 2"ø HWR 2"ø HWS
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
A T
E
D A
T E
D
E S
C R
IP
T
IO
N
M
A R
K
A P
P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
N E
W Y
O R
K h tt p
\w w w
.n a n .u s a c e
.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W E
S T
N A
T
IO
N W
ID
E
B L
V D
C
O L
U M
B U
S O
H
IO
.4
.4 f a x
.4
.0 h tt p /w w w
.u rs c o rp .c o m
S C
IE
N
C E
C E
N T
E R
(F Y
-B
L D
G
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W E
S T
P O
IN
T
N
Y
A R
C H
D
P
A R
K A
V E
N U
E S
O U
T H
N E
W Y
O R
K N
Y
-1
.7
.4 f a x
.5
.5 w w w
.s tv in c .c o m
W
D
S -1
-D
-0
/1
/2
:1
:1
A
M
M-206D
F O
U R
T H
F L O
O R
P L A
N
A R
E A
D H
V A
C P
IP
IN
G
F J T
M A
C J D
V
A P
R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN -
AREA D HVAC PIPING
FOR CONTINUATION SEE DWG. M-206C
A R
E A
A
UP
UP
UP
UP
DN
GENERAL NOTES:
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
1. 4" REFRIGERANT RELIEF VENT.
2. 5" STEAM PRESSURE RELIEF VENT.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
3. MECHANICAL EQUIPMENT HOUSEKEEPING PAD TO EXTEND 6" BEYOND EQUIPMENT
FOOTPRINT ON ALL SIDES, AND SHALL BE 6" TALL. SEE STR. DETAIL A1 ON S-004 FOR
PAD CONSTRUCTION DETAILS. (TYP)
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
4. HRWP-3,4 SERVE EAST BUILDING ENERGY RECOVERY LOOP BETWEEN AHU-5 AND
ERU-2,4.
A
B
D
C
E A2A2.5A3A4
AF
A6
A7
AG
AH
AJ
AKA8
A5
AA
AD
AE
AC
AB
ALAM
A5.4
A4.7
AS
AR
A10
A9
AS.5
AA.6
A9.5
A10.8A11.5A12.3
AT
A12 A11 A10.5
STAIR B1
B-5S1
CLASSROOM
B-501
STOR.
B-505
ELEV MACH RM
B-504
1-1/4" CHWR/S, 3/4" HWR/S UP TO 6TH
FLOOR OFFICES.SEE DWG. M-208B
1-1/4" CHWR/S, 1-1/4" HWR/S DN TO
4TH FLOOR.SEE DWG. M-206B
1-1/4" CHWR/S, 3/4" HWR/S
UP TO ROOF ELEC ROOMS
SEE DWG. M-208B
1-1/4" CHWR/S, 3/4"HWR/S
DN TO 4TH FLOOR
SEE DWG. M-206B
2" HRR/S UP TO ERU-2 ON ROOF
SEE DWG. M-208B
RHC-1
5"ø ST VENT
4"ø CH VENT
F O R C O N T
IN
U A T
IO
N S E E D W G M -2 C
4" PGR/S UP TO DC-1 ON ROOF
SEE DWG. M-209B
AC-3
SEE DWG. M-206B FOR CONTINUATION
1"ø HWS 1"ø HWR
ERU-4HRWP-4
HRWP-3
3"ø HRR
3"ø HRS
2"ø HRR 2"ø HRS
AIR SEPARATOR
TO ERU-4
TO ERU-4
4TH FLOOR LOFT SPACE
4"ø PGS 4"ø PGR
ET-10
ET-8
GLYCOL MAKEUP UNIT FOR DRY
COOLER AND EAST BUILDING
ENERGY RECOVERY LOOP
UH-10
MECHANICAL EQUIPMENT
HOUSEKEEPING PAD (TYP)
FC-4
CUH-14
CUH-13
SV-8"
1 1/2"ø PGR
3/4"ø HWR 3/4"ø HWS 1 1/4"ø CHWR
1 1/4"ø CHWS
3/4"ø HWR 3/4"ø HWS
3/4"ø HWR 3/4"ø HWS
3/4"ø HWR 3/4"ø HWS
SHEET
REFERENCE
NUMBER
SHEET OF
D E S
IG
N E D B Y
D W N B Y
C H K B Y
S U B M
IT
T E D B Y
D A T E
S O L
IC
IT
A T
IO
N N O
C O N T R A C T N O
F
IL
E N A M E
P L O T T E D B Y
S
IZ
E
P L O T D A T E
D A T E
D E S C R
IP
T
IO
N
M A R K
A P P R
US ARMY CORPS
OF ENGINEERS
NEW YORK DISTRICT
1 2 3 4 5
D
C
B
A
U .S A R M Y E N G
IN
E E R D
IS
T R
IC
T
N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs
W
E S T N A T
IO
N W
ID
E B L V D
C O L U M B U S O H
IO
.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m
S C
IE
N C E C E N T E R
(F Y -B L D G
U N
IT
E D S T A T E S M
IL
IT
A R Y A C A D E M Y
W E S T P O
IN
T N Y
A R C H D
P A R K A V E N U E S O U T H
N E W Y O R K N Y -1
.7 .4 f a x .5 .5 w w w .s tv in c .c o m
W D S -1 -D -0
/1 /2 :2 :3 P M
M-207B
F
IF
T H F L O O R P L A N A R E A B H V A C P
IP
IN
G
F J T
J E N
J D V
A P R
IL
PLAN
NORTH
0 4 8 162
SCALE: 1/8" = 1'-0"
FIFTH FLOOR PLAN - AREA
DNDN
GENERAL NOTES:
1. PGS & PGR PIPING ON TOP OF CHWS & CHWR PIPING. ALL FOUR PIPES ARE LOCATED
BELOW DUCTWORK. COORDINATE WITH M-107C DUCTWORK INSTALLATION
2. CHWS & CHWR MOUNTED ALONG WALL
3. PGS & PGR PIPING TO LEF-7/8. COORDINATE WITH M-209B
CODED NOTES:
1. COORDINATE INSTALLATION OF PIPING WITH ALL OTHER TRADES INCLUDING
PNEUMATIC TUBE VENDOR BEFORE FABRICATION. PROVIDE ADDITIONAL OFFSETS TO
AVOID INTERFERENCES.
2. ALL HEATING HOT WATER RUN OUTS TO AIR VALVES AND UNIT HEATERS SHALL BE 3/4"
UNLESS NOTED OTHERWISE ON THE PLANS.
3. ALL CONTROL VALVES TO HEATING HOT WATER COILS AT TERMINAL BOXES AND UNIT
HEATERS SHALL BE 2-WAY UNLESS NOTED ON THE PLANS AS 3-WAY.
4. PROVIDE ACCESS DOORS FOR PROPER ACCESS TO ALL PIPING COMPONENTS AND
SPECIALTIES. COORDINATE THE LOCATIONS AND THE REQUIREMENTS FOR ALL
ACCESS DOORS WITH THE GENERAL CONTRACTOR.
5. ALL STEAM AND CONDENSATE PIPING SHALL HAVE A MINIMUM PITCH OF 1% DOWN IN
THE DIRECTION OF FLOW. ALL STEAM VENT PIPING SHALL ROUTED TO THE EXTERIOR
6. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY
LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,
ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE
UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING
STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL
FRAMING MEMBERS.
7. ALL FCU'S SHALL BE PROVIDED WITH AN AUXILIARY GALVANIZED STEEL CONDENSATE
PAN WITH LEAK DETECTION CABLE AND CONDENSATE PUMP. ON A POSITIVE SIGNAL
FOR WATER, THE LEAK DETECTION SYSTEM SHALL PROVIDE AN ALARM SIGNAL TO THE
BAS. THE PUMPED CONDENSATE PIPING SHALL CONSIST OF AN INSULATED 1"
CONDENSATE DRAIN LINE ROUTED TO THE CLOSEST JANITOR CLOSET SLOP SINK OR
NEAREST FLOOR DRAIN.
8. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER
TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.
9. CONTRACTOR SHALL FILL-IN ALL VOIDS BETWEEN SLEEVES AND PIPING WITH
NON-COMBUSTIBLE MINERAL WOOL WHERE PENETRATIONS OF WALL / ROOF
ASSEMBLIES OCCUR. REFER TO DETAIL FOR ADDITIONAL INFORMATION.
10. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE
SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD
20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.
11. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE
CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED
AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.
A
B
D
C
E
B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BU
BT
BS
BR.7
BQ.5
BQ
BP
BN
BM
BR
BR.8
BS.8
Space
C-B312
Space
C-B313
STAIR C1
C-5C1
Space
C-B315
STOR
C-503
Space
C-B317
Space
C-B318
LECTURE-3
C-410-3
HWS&R
CHWS&R
AHU-8
B12 B11.2 B9.8 B9
BM
BN
BP
BQ
BQ.5
BS
BT
BR.7
BU
B11 B10
BR
BR.8
BS.8
B8B8.2B12.7B13
B12 B11.2 B9.8 B9
BM
BN
BP
BQ
BQ.5
BS
BT
BR.7
BR
BU
B10B11B12.7B13 B-8.2 B8B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8
BU
BT
BS
BR.7
BQ.5
BQ
BP
BN
BM
BR
BR.8
BS.8
BR.2
BU
BT
BS.8
BS
BR.8
BR.7
BR
BQ.5
BQ
BP
BN
BM
B13B12.7
B12 B11.2
B11 B10
B9.8 B9
B8.2 B8
AT
CG
CF
AS.5
HRWP-6HRWP-5
FC-4
ET-9
B12 B11.2 B9.8 B9
BM
BN
BP
BQ
BQ.5
BS
BT
BR.7
BR
BU
B10B11B12.7B13 B-8.2 B8
5"ø LPS
2"ø PC
4"ø PGR
4"ø PGS
3"ø HWR
3"ø HWS
1"ø HWR 1"ø HWS
4"ø CHWR
4"ø CHWS
5"ø LPS 2"ø PC
4"ø CHWR 4"ø CHWS
3"ø HWS3"ø HWR 1"ø HWR 1"ø HWS
2"ø PC
5"ø LPS
1 1/2"ø HWR 1 1/2"ø HWS
1"ø HWR 1"ø HWS
3"ø CHWR 3"ø CHWR
AHU-7
4"ø PGS4"ø PGR
3" HWS, 3" HWR DN
5"ø LPS 5"ø LPS
2"ø PC
SHEET
REFERENCE
NUMBER
SHEET OF
D E
S
IG
N E
D B
Y
D W
N B
Y
C H
K B
Y
S U
B M
IT
T
E D
B Y
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
F
IL
E N
A M
E
P L O
T T
E D
B Y
S
IZ
E
P
L O
T D
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .