90 Design - Fire

View the file

Other files

File Type Posted
Bid Abstract W912DS-11-B-0005 Science Center.pdf PDF
Amendment 0011.pdf PDF
fbo announcement for Step Two.doc DOC document
Invitation to Step Two.doc DOC document
Amendment 4.pdf PDF
PAS Pre-Award Survey.pdf PDF
Amendment 0003.pdf PDF
Amendment No. 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 1.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 4.pdf PDF
USMA_SCICTR_PN59044-07_INT.pdf PDF
USMA_SCICTR_PN59044-16_GEN-VI.pdf PDF
Updated SF 1442 Front and Back.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 1.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 1.pdf PDF
USMA_SCICTR_PN59044-12_LABPL.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 1.pdf PDF
USMA_SCICTR_PN59044-08_GEN-III.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 3.pdf PDF
USMA_SCICTR_PN59044-13_PLUMB.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 2.pdf PDF
Amendment 1.pdf PDF
USMA_SCICTR_PN59044-10_GEN-IV.pdf PDF
USMA_SCICTR_PN59044-04_GEN-II.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 3.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 2.pdf PDF
USMA_SCICTR_PN59044-14_GEN-V.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 3.pdf PDF
USMA_SCICTR_PN59044-06_LABEQ.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 4.pdf PDF
USMA_SCICTR_PN59044-02_CIVIL.pdf PDF
USMA_SCICTR_PN59044-01_GEN-I.pdf PDF
USMA_SCICTR_PN59044-05_ARCH_Part 5.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 2.pdf PDF
Solicitation.pdf PDF
Specs 2011 04 01.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGHT HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0"A.F.F., WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMENTS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

A

B

D

C

E

AF

A6

A7

AG

AH

AJ

AK

A8

A5

AE

AL

AM

AN

A5.4

A4.7

AS

AR

A10

A9

AP

AS.5

A10.8A11.5A12.3

AT

A12 A11

A10.5

69 SF

Space

742 SF

CLASSROOM

B-S03

251 SF

OFFICE

B-S05

55 SF

TOILET

B-S09

469 SF

PLUMBING

B-S08

335 SF

CORRIDOR

B-SC2

71 SF

STOR

B-S04

27 SF

JAN

B-S10

112 SF

STAIR B2

B-SS2

319 SF

CORRIDOR

B-SC1

31 SF

Space

FIRE HOSE

VALVE IN CABINET,

SEE DWG. F-301

FLOOR CONTROL

ASSEMBLY, SEE

F301 FOR DETAIL

6"

4"

4" STORZ FIRE DEPARTMENT

CONNECTION

4" CHECK VALVE WITH

3/4" ABD

1"

6" COMBINED

FSP/SP UP

2" DRAIN

6" COMBINED

FSP/SP DN

FSP

S P

FSP

FOR CONTINUATION SEE DWG F-101E

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

FOR CONTINUATION SEE DWG F-101C

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

MOST REMOTE AREA OF

HYDRAULIC CALCULATIONS,

ORDINARY HAZARD GROUP I,

3000 SQ. FT., 0.15 DENSITY

NAS

4096 SF

MECHANICAL

B-S01

OH-1

OH-1

OH-1

OH-1

OH-1

L

L

L

L

L

L

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

TS

1" UP

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :1 :3 A M

F-101B

S U B -B A S E M E N T A R E A B

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT PLAN-

AREA B FIRE PROTECTION

B1312.7 B12 B11.2 B11 B9.8 B9 B8.2 B8

BU

BT

BS

BR.7

BQ.5

BQ

BP

BN

BM

BR

BR.8

BS.8

BV

B1B7 B6 B5 B4 B3 B2 F O R C O N T

IN

U A T

IO

N S E E D W G F -1 B

FOR CONTINUATION SEE DWG F-101B

S P

S P

CHEM

ENGINEERING

C-S01

FUTURE NMR

C-S03

DATA COMM

C-S05

WRITE UP

C-S02

PLUMBING

C-S06

CORRIDOR

C-SC2

CORRIDOR

C-SC3

OH-2

OH-2

OH-1 OH-1

L

L

LL

4" SPRINKLER

CROSS MAIN

A

B

D

C

E

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F, WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMNETS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N

C E C

E N

T E R

(F Y -B

L D

G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :4 :1 A M

F-101C

S U B -B A S E M E N T P L A N A R E A C

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT PLAN-

AREA C FIRE PROTECTION

A

B

D

C

E

CA

CC

CD

CF

CG

CB

CH

C1C2C4 C1.9C4.1 C3

NAS

STEAM TUNNEL

B - S07

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F., WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATEREQUIREMENTS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :0 :1 A M

F-101E

S U B -B A S E M E N T A R E A E

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT - AREA E

FIRE PROTECTION

D

C

E

A2A4

AF

A6

A7

AG

AH

AJ

AK

A8

A5

AA

AD

AE

AC

AB

A1

AL

AM

A5.4

AS

AR

A10

A9

AS.5

AA.6

AT

A10.5

178 SF

ELEC

B-B01 139 SF

SUPPLY TECH

B-B03

291 SF

STAIR B2

B-BS2

184 SF

GAS HOLDING

B-B02

322 SF

CORRIDOR

B-BC7

683 SF

CLASSROOM

B-B17

475 SF

BLDG MAINT/

STOR

B-B09

170 SF

SAFETY SPLY

TECH

B-B05

717 SF

CLASSROOM

B-B16

133 SF

CORRIDOR

B-BC8

83 SF

JAN BREAK

B-B04

68 SF

TOILET

B-B15

716 SF

CLASSROOM

B-B13

697 SF

CLASSROOM

B-B11

Not Enclosed

CORRIDOR

B-BC5

663 SF

CLASSROOM

B-B06

663 SF

CLASSROOM

B-B10

866 SF

CORRIDOR

B-BC6

144 SF

STOR

B-B14

643 SF

CLASSROOM

B-B12

6" COMBINED

FSP/SP UP& DN

FIRE HOSE

VALVE IN CABINET

TO SPRINKLERS

6" UP

EXISTING 6"

COMBINED FSP/SP UP

(PHASE 1) TO REMAIN

FIRE HOSE VALVE IN CABINET

SEE DWG F-301

FSP

2" DRAIN DN

TO PHASE 1

FSP

EXIST. RISER CONTROL VALVE

WITH TAMPER SWITCH TO REMAIN

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

224 SF

STAIR B1

B-BS1

178 SF

ELEC

B-B01

OH-1

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

OH-1

OH-1

OH-1

OH-1

41 43

MOST REMOTE AREA OF

HYDRAULIC CALCULATIONS,

LIGHT HAZARD, 3000 SQ. FT.,

0.1 DENSITY

1"

1"

1 1/2"

1 1/2"

1 1/2"

2"

2"

1"

1"

1"

1"

2"

1 1/2"

1"

1"

2"

4"

1" UP & DN

CONNECT NEW 6" FIRE

MAIN TO 6" EXIST. PIPING

A6

A7

A5

AL

AM

AN

A5.4

A4.7 A9

AP

A9.5

683 SF

CLASSROOM

B-B17

133 SF

CORRIDOR

B-BC8

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

L

L

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGHT HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKIN SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0"A.F.F., WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMENTS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :1 :4 A M

F-102B

B A S E M E N T A R E A B F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN-

D

C

E

B1312.7 B12 B11.2B11 B9.8 B9 B8.2 B8

BU

BT

BS

BR.7

BQ.5

BQ

BP

BN

BM

BR

BR.8

BS.8

BV

B1B7 B6 B5 B4 B3 B2

JAN

C-B06

BLDG STOR SPT

C-B05

WOMEN

C-B18

PREP/ STOR

D-B11

COMM

C-B03

ELEC

C-B04

Space

D-2C269

Space

D-2C270

PHYSICS

CLASSRM

C-B08

NUCL ENGR LAB

C-B17

CORRIDOR

C-BC1

Space

D-2C285

MAIN ELEC SERV

C-B10

PHYSICS

WORKRM

D-B12

PHYSICS

CLASSRM

C-B01

RSO LAB

C-B16

WOMEN SHOWER

ENTRY

C-B19

MODERN PHYSICS

WORKRM

C-B02

Space

D-2C304

ANTE

C-B14

SUB-CRIT NUC

FACIL

C-B15

CORRIDOR

C-BC3

CORRIDOR

C-BC4

RAD DETECT

LAB/CLSRM

C-B12

STORAGE

C-B11

CORRIDOR

C-BC5

MEN

C-B07

PHYSICS

WORKRM

C-B09

6" FSP UP

FIRE HOSE VALVE IN

CABINET, SEE DWG. F-301

FSP

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 B

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 E

FOR CONTINUATION SEE DWG F-102E

OH-2

L

OH-1

OH-1

OH-1OH-1

OH-1

OH-1

OH-1

L L

L

L

L

L

L

L

L

L

OH-1

L

OH-2

OH-2 OH-2

OH-2

OH-2

4" SPRINKLER CROSS MAIN

4"

4" 4"

FOR CONTINUATION SEE DWG F-102D GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F, WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMNETS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

14. DRAIN TROUGHS SHALL BE PROVIDED BELOW ANY PIPING ROUTED DIRECTLY OVER

ELECTRICAL EQUIPMENT.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N

C E C

E N

T E R

(F Y -B

L D

G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :4 :1 A M

F-102C

B A S E M E N T P L A N A R E A C

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT PLAN -

D

C

E

B1312.7 B12 B11 B9 B8.2 B8

BL

BK

BJ

BH

BG

BF

BE

BD

BC

BB

BA

ELECTRONICS

D-B06

WELDING RM

D-B05

MACHINE SHOP

D-B02

CORRIDOR

D-BC1

JAN

D-B08

GEN STOR

D-B07

FXD EXPERIMTL

PHYSICS

D-B09

MATL SCI ACCEL

LAB

D-B01

MODERN PHYSICS

WORKRM

D-B10

307 SF

CLEAN RM/ PREP

STOR

D-B04

WOOD SHOP

D-B03

CORRIDOR

D-BC3

6" COMBINED

FSP/SP UP

FIRE HOSE VALVE IN

CABINET, SE DWG.

F-301

SPRINKLER

CONTROL VALVE,

SEE DWG. F-301

FSP

FOR CONTINUATION SEE DWG F-102C

F O R C O N T I N U A T

IO

N S E E D W G F -1 E

OH-2

L

OH-1

L

L

L

L

OH-2

OH-2

OH-2

OH-1

OH-1

OH-1

OH-1

OH-1

4"

4" SPRINKLER CROSS MAIN

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F, WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMNETS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N

C E C

E N

T E R

(F Y -B

L D

G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :4 :1 A M

F-102D

B A S E M E N T P L A N A R E A D

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT PLAN -

AREA D FIRE PROTECTION

OS OS OS

OS

OS

OS OS

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

A

B

D

C

E

CA

CC

CD

CF

CG

CB

CH

C1C2C4 C1.9C4.1 C3

LASER RES/CHEM

E-B03

CORRIDOR

E-BC3

Space

LASER

RESEARCH

E-B05

LASER

RESEARCH

E-B04

HIGH ENERGY

LASER

RESEARCH

E-B07

CORRIDOR-1

E-BC1-1

LASER EQUIP

STOR/REPAIR

E-B06

OH-1

OH-1

OH-1

OH-1

OH-1

OH-1

L

L

L

OH-2

CORRIDOR

E-BC2

CADET PROJECT

LAB

E-B01

MATCHLINE. FOR CONTINUATION SEE DWG. F-102B

M A T C H L

IN

E F O R C O N T

IN

U A T

IO

N S E E D W G F -1 D

M A T C H L

IN

E F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

M A T C H L

IN

E F O R C O N T

IN

U A T

IO

N S E E D W G F -1 B

PHASE 1 AREA

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F., WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATEREQUIREMENTS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :0 :1 A M

F-102E

B A S E M E N T A R E A E F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT - AREA E

D

C

E

A2A4

AF

A6

A7

AG

AH

AJ

AK

A8

A5

AA

AD

AE

AC

AB

A1

AL

A5.4

AS

AR

A10

AS.5

AA.6

A9.5A10.8A11.5A12.3

AT

A12 A11

A10.5

1171 SF

PREP STOR

B-103

Redundant Space

GEN & ADVNCD

CHEM

B-104

1235 SF

GEN & ADVNCD

CHEM

B-107

1152 SF

GEN & ADVNCD

CHEM

B-108

506 SF

CADET READ RM

B-102

147 SF

COMM

B-114

673 SF

CLASSROOM

B-109

60 SF

TOILET

B-110

317 SF

STAIR B1

B-1S1

241 SF

MEN

B-112

661 SF

CLASSROOM

B-111

148 SF

CORRIDOR

B-1C4

314 SF

STAIRS B2

B-1S2

1147 SF

CORRIDOR

B-1C2

6" COMBINED

FSP/SP UP

SPRINKLER CONTROL

ASSEMBLY,

SEE F-301

RISER CONTROL

VALVE WITH TS,SEE

DRAWING F-301

CONN. 6" FIRE

MAIN DN

FIRE HOSE VALVE

IN CABINET

FOR CONTINUATION

SEE DWG F-103C

EXIST. 6"COMB. FSP/SP

RISER TO REMAIN

EXIST. SPRINKLER

CONTROL VALVE TO REMAIN

FIRE HOSE VALVE

IN CABINET, SEE DWG. F-301

2"DRAIN

FSP

F F F

F

F

F

F

6"

6"6"

FSP

S P

S P

FOR CONTINUATION SEE DWG F-103E

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

FOR CONTINUATION SEE DWG F-103C

L

OH-2

OH-2

OH-2

OH-2

OH-1

OH-1

OH-1

OH-1

L

L

L

L

L

L

L

L

MOST REMOTE AREA OF

HYDRAULIC CALCULATIONS,

ORDINARY HAZARD GROUP I,

3000 SQ. FT., 0.15 DENSITY

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

1"

2"

6"

4"

4"

2 1/2"

4" SP

1" UP & DN

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGHT HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKIN SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0"A.F.F., WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMENTS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :1 :4 A M

F-103B

F

IR

S T F L O O R P L A N A R E A B

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN -

D

C

E

B1312.7 B12 B11.2 B11 B9.8 B9 B8.2 B8

BU

BT

BS

BR.7

BQ.5

BQ

BP

BN

BM

BR

BR.8

BS.8

BV

B1B7 B6 B5 B4 B3 B2

SPRINKLER CONTROL

VALVE, SEE DWG. F-301

6" COMBINED FSP/SP

UP

FIRE HOSE VALVE

IN CABINET, SEE DWG. F-301

RISER CONTROL VALVE

WITH TAMPER SWITCH

6"

FOR CONTINUATION SEE F-103B

6" FSP

UP/DOWN

FSP

FIRE HOSE

VALVE

IN CABINET

FSP

141 SF

CORRIDOR

C-1C4

79 SF

STAIR C2

C-1S2

124 SF

COMM

C-105

199 SF

ELEC

C-106

3484 SF

QUANT

CHEM/PHYS CHEM

C-107

547 SF

PREP/ STOR

C-108

295 SF

INSTR BREAK RM

C-104

15 SF

Space

C-B49

802 SF

PHYSICS

WORKRM

C-102

622 SF

PHYSICS

CLASSRM

C-103

53 SF

VESTIBULE

C-113

578 SF

PREP/ STOR

C-110

4140 SF

GEN & ADVNCD

CHEM

C-109

619 SF

CORRIDOR

C-1C1

429 SF

CORRIDOR

C-1C3

529 SF

STAIR D2

D-1S2

112 SF

VESTIBULE

D-111

657 SF

NUC ENG

CLASSRM

C-101

RISER CONTROL VALVE W/TS

S P

6" F

F

F4 S P

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 B

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 B

FOR CONTINUATION SEE F-103B

OH-2

L

OH-1

L

L

L

L

L

L

L

L

L

OH-1

OH-1OH-1

L

L

L

OH-2

OH-2

S P K R C R O S S M A

IN

4" 4"

S P K R C R O S S M A

IN

F O R C O N T

IN

U A T

IO

N S E E D W G F -1 E

6" SP

SP SP

FOR CONTINUATION SEE DWG F-103D

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F, WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMNETS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N

C E C

E N

T E R

(F Y -B

L D

G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :4 :2 A M

F-103C

F

IR

S T F L O O R P L A N A R E A C

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

D

C

E

B1312.7 B12

B11.2

B11.2 B11

B9.8

B9 B8.2 B8

BL

BK

BJ

BH

BG

BF

BE

BD

BC

BB

BA

FIRE HOSE VALVE

IN CABINET, SEE

DWG. F-301

CONN. 6" FIRE MAIN TO

EXIST. 6" MAIN(PHASE 1)

6"

6"

FSP

1005 SF

PHYSICS

WORKRM

D-102

695 SF

PHYSICS

CLASSRM

D-101

105 SF

JAN

D-106

696 SF

PHYSICS

CLASSRM

D-104

53 SF

VESTIBULE

D-112

618 SF

CORRIDOR

D-1C3

391 SF

STAIR D1

D-1S1

180 SF

INTERACTIVE

LEARNING

D-103

448 SF

CORRIDOR

D-1C1

806 SF

PHYSICS

WORKRM

D-110

1258 SF

Space

C-B87

615 SF

PHYSICS

CLASSRM

D-109

4" DN TO FDC

CONTROL VALVE

W/ TAMPER SWITCH

S P

F

F

S P

FOR CONTINUATION SEE DWG F-103C

FOR CONTINUATION

SEE PHASE 1

FOR CONTINUATION SEE

DWG. F-103E

OH-2

L

OH-1

L

L

L

L

L

L

L

OH-2

OH-2

L

L

PHYSICS

WORKRM

D-105

S P K R C R O S S M A

IN

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION: ORDINARY GROUP I HAZARD: ALL MECHANICAL AREAS,

INCLUDING BOILERS & PLUMBING ROOMS, STORAGE ROOMS, DATA CENTER,

COMMUNICATION & ELECTRICAL ROOMS, JANITOR CLOSET, RESEARCH ROOMS, ETC.

6. SPRINKLER HEAD COVERAGE: MAXIMUM COVERAGE PER SPRINKLER HEAD SHALL BE

BASED ON 225 SQ. FT.FOR LIGHT HAZARD OCCUPANCY AND 130 SQ. FT. FOR ORDINARY

HAZARD.

8. DESIGN SHALL BE BASED ON 3000 SQ. FT.- DESIGN AREA DEDUCTION SHALL BE

PERMITTED PER NFPA-13 FOR THE LIGTH HAZARD OCCUPANCY.

9. SPRINKLER SYSTEM CALCULATIONS SHALL INCLUDE BUILDING DOMESTIC WATER

DEMANDS.

2. ALL SPRINKLER HEADS SHALL BE ORDINARY TEMPERATURE RATING (155 F)

5. PROVIDE CABINET WITH SPARE SPRINKLER HEADS OF EACH TYPE AND TEMPERATURE.

6. ADD 30% OF REMOTE AREA FOR DRY SPRINKLER SYSTEM.

7. EACH BUILDING WILL BE FULLY SPRINKLERED AND PROVIDED WITH FIRE STANDPIPE

SYSTEMS.

8. CONTRACTOR TO PROVIDE UPDATED FLOW TEST PRIOR TO STARTING SYSTEM

DESIGN.

9. PROVIDE AT NO EXTRA COST ALL ADDITIONAL PIPING AND FITTINGS REQUIRED TO

OFFSET SYSTEM TO AVOID STRUCTUTAL, ARCHITECTURAL, MECHANICAL AND

ELECTRICAL INTERFERENCES WHETHER INDICATED OR NOT, BEFORE INSTALLING

WORK.

10. ALL PIPING SHALL RUN CLOSE TO BEAMS, WALLS AND SLABS, CONCEALED ABOVE

HUNG CEILING AND WITHIN FURRED SPACES.

11. THE SPRINKLER SYSTEM IS AN AUTOMATIC WET PIPE TYPE. THE AUTOMATIC WATER

SOURCE IS A FIRE PUMP TAKING SUCTION FROM DIRECT CONNECTION TO THE FIRE

MAIN AND THE AUXILIARY WATER SOURCES ARE 4" STORZ FOR FIRE DEPARTMENT

CONNECTION.

12. CONTRACTOR SHALL COORDINATE ALL WORK INVOLVED IN SPACE CONDITIONS

BEFORE PROCEEDING.

13. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTS 4'-0" WIDE AND LARGER.

10. SPRINKLER HEADS LOCATED CLOSE TO THE HEATER, STEAM PIPING OR OTHER HEAT

SOURCE SHALL BE TEMPERATURE RATING AS REQUIRED PER NFPA-13.

3. ALL VALVES IN FIRE PROTECTION SYSTEMS SHALL BE PAINTED RED BY

MANUFACTURER.

4. INSTALL CONTROL VALVES LESS THAN 7'-0" A.F.F, WHERE POSSIBLE. WHERE CONTROL

VALVES ARE INSTALLED AT OR ABOVE 7'-0" A.F.F., INSTALL STEEL LADDER.

COORDINATE REQUIREMNETS OF STEEL LADDER WITH ARCHITECTURAL PLANS AND

SPECS.

11. WEST POINT FIRE PROTECTION SYSTEMS SHALL BE BRACED PER THE SEISMIC ZONE

AND CALCULATIONS SHALL BE SUBMITTED FOR VERIFICATION .

12. INSTALL WIRE CAGE ON SPRINKLER HEADS INSTALLED BELOW 7'-0".

13. TEST FIRE PROTECTION SYSTEMS AS REQUIRED PER NFPA.

14. IN LIGHT HAZARD OCCUPANCY SPRINKLER HEADS SHALL BE QUICK RESPONCE WITH A

K FACTOR OF 5.6.

15. COMPLY WITH THE ARMY CORPS OF ENGINEERING MANUAL EM-385-1-1, SAFETY AND

HEALTH REQUIREMENTS MANUAL AND NFPA-241, SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS AND USMA WEST POINT'S FIRE

REGULATIONS.

5. OCCUPANCY CLASSIFICATION: ORDINARY GROUP II HAZARD: MODERN PHYSICS

WORKROOM, LAB'S, MACHINE & WOOD SHOPS, ETC.

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N

C E C

E N

T E R

(F Y -B

L D

G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :4 :2 A M

F-103D

F

IR

S T F L O O R P L A N A R E A D

F

IR

E P R O T E C T

IO

N

IR N

J G

L M

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

A

B

D

C

E

CA

CC

CD

CF

CG

CB

CH

C1C2C4 C1.9C4.1 C3

SUPP T-1

E-107-1

MEN

E-105

OFC/WRK/MAIL/RES

E-109

CONF RM/TECH

JOURN

E-119

SR FACULTY

E-112

SR FACULTY

E-111

SR FACULTY

E-110

SR FACULTY

E-113

FACULTY

E-117

FACULTY

E-116

FILES

E-102

CORRIDOR

E-1C2

CORRIDOR

E-1C1

CORRIDOR

E-1C4

FACULTY

E-118

OFFICE

E-103

L

L

L

L

L

L

L

L

L

L

L

L

L

OH-1

OH-1

L

OH-1

MATCHLINE. FOR CONTINUATION SEE DWG. F-103B

M A T C H L

IN

E F O R C O N T

IN

U A T

IO

N S E E D W G F -1 D

M A T C H L

IN

E F O R C O N T

IN

U A T

IO

N S E E D W G F -1 C

1/2" 1/2"

1/2" 1/2"

1/2"

GENERAL NOTES:

CODED NOTES:

7. SPRINKLER SYSTEMS SHALL BE HYDRAULICALLY CALCULATED. EACH SYSTEM SHALL

BE CALCULATED TO PROVIDE 10 PSI SAFETY FACTOR.

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

1. FOR SYMBOLS, LEGEND AND ABREVIATIONS SEE DRAWING F-001

1. FIRE PROTECTION DESIGN SHALL BE BASED ON THE REQUIREMENTS OF UFC3-600-01

AND NFPA-13 &14.

2. EACH FLOOR WILL BE PROVIDED WITH COMBINATION CLASS I FIRE STANDPIPE SYSTEM

AND/OR SPRINKLER CONTROL VALVE ASSEMBLY.

3. OCCUPANCY CLASSIFICATION: LIGHT HAZARD:CLASSROOMS, OFFICE SPACES,

LOBBIES, CORRIDORS, TOILETS, ETC.

4. OCCUPANCY CLASSIFICATION:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .