USMA_SCICTR_PN59044-03_ARCH_Part 4.pdf

PDF 10 MB Posted

Attached to
Multipurpose Academic Building Science Facility Phase 2, which is located at the USMA West Point NY
Solicitation number
W912DS-11-B-0005
Issued by

About this file

90 Design - Architectural Part 4

View the file

Other files

File Type Posted
Bid Abstract W912DS-11-B-0005 Science Center.pdf PDF
Amendment 0011.pdf PDF
fbo announcement for Step Two.doc DOC document
Invitation to Step Two.doc DOC document
Amendment 4.pdf PDF
PAS Pre-Award Survey.pdf PDF
Amendment 0003.pdf PDF
Amendment No. 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 1.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 4.pdf PDF
USMA_SCICTR_PN59044-07_INT.pdf PDF
USMA_SCICTR_PN59044-16_GEN-VI.pdf PDF
Updated SF 1442 Front and Back.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 1.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 1.pdf PDF
USMA_SCICTR_PN59044-12_LABPL.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 1.pdf PDF
USMA_SCICTR_PN59044-08_GEN-III.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 3.pdf PDF
USMA_SCICTR_PN59044-13_PLUMB.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 2.pdf PDF
Amendment 1.pdf PDF
USMA_SCICTR_PN59044-10_GEN-IV.pdf PDF
USMA_SCICTR_PN59044-04_GEN-II.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 3.pdf PDF
USMA_SCICTR_PN59044-11_FIRE.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 2.pdf PDF
USMA_SCICTR_PN59044-14_GEN-V.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 3.pdf PDF
USMA_SCICTR_PN59044-06_LABEQ.pdf PDF
USMA_SCICTR_PN59044-02_CIVIL.pdf PDF
USMA_SCICTR_PN59044-01_GEN-I.pdf PDF
USMA_SCICTR_PN59044-05_ARCH_Part 5.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 2.pdf PDF
Solicitation.pdf PDF
Specs 2011 04 01.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

MECHANICAL

B-S01

CLASSROOM

B-S03

STOR

B-S04

JAN

B-S10

OFFICE

B-S05

VESTIBULE

B-S02

CORRIDOR

B-SC1

STAIR B2

B-SS2

TOILET

B-S09

CORRIDOR

B-SC2

PLUMBING

B-S08

WLK

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:5

P M

A-141B

S U

B -B

A S

E M

E N

T F

L O

O R

F

IN

IS

H

P L A

N

A R

E A

B

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT - FLOOR

FINISH PLAN -AREA B

PLAN

NORTH

DN

DN

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

WRITE UP

C-S02

AREA B

A R

E A

B

AREA C

A R

E A

C

DATA COMM

C-S05

PLUMBING

C-S06

CHEM ENGINEERING

C-S01

CONTAINED

VENTILATED BAY

C-S04

FUTURE NMR

C-S03 CORRIDOR

C-SC4

CORRIDOR

C-SC3

CORRIDOR

C-SC2

CORRIDOR

C-SC1

WLK

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:0

P

M

A-141C

S U

B -B

A S

E M

E N

T

F

L O

O R

F

IN

IS

H

P L A

N

A R

E A

C

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT FLOOR

FINISH PLAN - AREA C

UP

UP

DN

DN

DN

STAIR B2

B-BS2

TOILET

B-B15

CORRIDOR

B-BC7

CORRIDOR

B-BC8

CLASSROOM

B-B17

CLASSROOM

B-B16

CLASSROOM

B-B13

STOR

B-B14

CLASSROOM

B-B12

CLASSROOM

B-B10

CLASSROOM

B-B11

BLDG MAINT/ STOR

B-B09

JAN

B-B07

CLASSROOM

B-B06

CORRIDOR

B-BC5

CORRIDOR

B-BC6

VESTIBULE

B-BC4

CORRIDOR

B-BC2

STAIR B1

B-BS1

JAN BREAK

B-B04

SUPPLY TECH

B-B03

SAFETY SPLY TECH

B-B05

GAS HOLDING

B-B02

CORRIDOR

B-BC1

ELEC

B-B01

ALIGN

ALIGN

ALIGN

TYPICAL ACCENT

BAR END POINT

PLACEMENT

5' - 0" 2' - 0"

5' - 0" 2' - 0"

2' - 0" 5' - 0"

2' - 0" 5' - 0"

5' - 0"

2' - 0"

5' - 0"

5' - 0"

2' - 0"

5' - 0"

5' - 0" 2' - 0"

5' - 0"

5' - 0" 2' - 0"

5' - 0" 2' - 0"

4' - 0"

4' - 0"

4' - 0"

3' - 0"

3' - 0"

3' - 0"

E Q

E Q

WLK

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:5

P M

A-142B

B A

S E

M E

N T

F L O

O R

F

IN

IS

H

P L A

N S

A

R E

A B

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT- FLOOR FINISH

PLAN - AREA B

UP

UP

SUB-CRIT NUC FACIL

C-B15

RAD DETECT

LAB/CLSRM

C-B12

STORAGE

C-B11

VESTIBULE

C-B20

NUCL ENGR LAB

C-B17

RSO LAB

C-B16

WOMEN

C-B18

CORRIDOR

C-BC5

ANTE

C-B14

CORRIDOR

C-BC4

MAIN ELEC SERV

C-B10

PHYSICS WORKRM

C-B09

PHYSICS CLASSRM

C-B08

BLDG STOR SPT

C-B05

CORRIDOR

C-BC3

JAN

C-B06 MEN

C-B07

STAIR C1

C-BS1

MODERN PHYSICS

WORKRM

C-B02

ELEC

C-B04

COMM

C-B03

PHYSICS CLASSRM

C-B01

PHYSICS WORKRM

D-B12

PREP/ STOR

D-B11

CORRIDOR

C-BC1

AREA D

AREA C

A R

E A

E

A R

E A

B

A R

E A

C

A R

E A

B

A R

E A

E

5'-0" 2'-0"

5'-0" 2'-0"

5'-0"2'-0"5'-0"2'-0"

2'-0"5'-0"2'-0"

E Q

E

Q

TYPICAL ACCENT BAR END

POINT PLACEMENT

2'-0"

2'-0"

2'-0"

2'-0" 1'-0"1'-0" 2'-0"

/4

ALIGN

ALIGN

ALIGN

WLK

WOMEN SHOWER

ENTRY

C-B19

CORRIDOR

C-BC2

BLDG STOR

C-B13

4'-5 5/8"

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:0

P

M

A-142C

B A

S E

M E

N T

F L O

O R

F

IN

IS

H

P L A

N

A R

E A

C

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR FINISH

PLAN - AREA C

MODERN PHYSICS

WORKRM

D-B10

CORRIDOR

D-BC3

AREA D

AREA C

3'-0 1/2" 5'-0" 2'-0"

5'-0" 2'-0"

/8

/8

5'-0"2'-0"5'-0"2'-0" 3'-0"

TYPICAL

ACCENT BAR

END POINT

PLACEMENT

E Q

E

Q

" 6

2'-0" 2'-0"

ALIGN

FXD EXPERIMTL

PHYSICS

D-B09

GEN STOR

D-B07

DUST COLLECTOR MER

D-B13

STAIR D1

D-BS1

JAN

D-B08

CORRIDOR

D-BC2

CLEAN RM/ PREP STOR

D-B04

MATL SCI ACCEL LAB

D-B01

MACHINE SHOP

D-B02

WELDING RM

D-B05

ELECTRONICS

D-B06

CORRIDOR

D-BC1

WOOD SHOP

D-B03

2'-0" 2'-0"

2'-0"2'-0"

2'-0"

1'-0" 1'-0"

/8

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:0

P

M

A-142D

B A

S E

M E

N T

F L O

O R

F

IN

IS

H

P

L A

N

A R

E A

D

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR FINISH

PLAN - AREA D

LASER RES/CHEM

E-B03

LASER RESEARCH

E-B04

LASER RESEARCH

E-B05

LASER EQUIP

STOR/REPAIR

E-B06

CORRIDOR

E-BC3

CORRIDOR

E-BC2

AREA DAREA D

AREA C

A R

E A

B

ALIGN

TYPICAL ACCENT

BAR END POINT

PLACEMENT

5' - 0"

2' - 0"

5' - 0" 2' - 0"

3' - 0" 5' - 0"

2' - 0"

5' - 0"

2' - 0"

3' - 0"5' - 0"

2' - 0"

5' - 0"

2' - 0"

3' - 0"

AREA B

AREA E

HIGH ENERGY LASER

RESEARCH

E-B07

CORRIDOR

E-BC1

CADET PROJECT LAB

E-B01 LAB STOR

E-B02

EXTERIOR COURTYARD

E-B08

Space

E-108

WLK

A

B

C

D

E

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:0

:1

P M

A-142E

B A

S E

M E

N T

F L O

O R

F

IN

IS

H

P L A

N

A R

E A

E

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR FINISH

PLAN - AREA E

UP

UP

DN

COMM

B-114

MEN

B-112

CLASSROOM

B-111 STAIR B2

B-1S2

TOILET

B-110

CLASSROOM

B-109

GEN & ADVNCD CHEM

B-108

GEN & ADVNCD CHEM

B-106

GEN & ADVNCD CHEM

B-104

GEN & ADVNCD CHEM

B-107

PREP STOR

B-103

ELEC

B-101

STAIR B1

B-1S1

CADET READ RM

B-102

PREP STOR

B-105

EQT

4' - 0"

0' - 6"

0' - 6"

4' - 0"

5' - 0"

2' - 0"

5' - 0"

5' - 0" 2' - 0"

5' - 0" 2' - 0"

4' - 0" 5' - 0"

2' - 0" 5' - 0"

2' - 0"

5' - 0" 4' - 0"

2' - 0"

5' - 0"

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

TYPICAL ACCENT

BAR END POINT

PLACEMENT

CPT

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:5

P M

A-143B

F

IR

S T

F L O

O R

F

L O

O R

F

IN

IS

H

P L A

N

A

R E

A B

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

FIRST FLOOR - FLOOR

FINISH PLAN - AREA B

DNDN

UP

DN

DN

UP

UP

STAIR D2

D-1S2

PHYSICS WORKRM

C-102

NUC ENG CLASSRM

C-101

CORRIDOR

C-1C1

INSTR BREAK RM

C-104

COMM

C-105

ELEC

C-106

PHYSICS CLASSRM

C-103

CORRIDOR

C-1C2

STAIR C1

C-1S1

QUANT CHEM/PHYS

CHEM

C-107

CORRIDOR

C-1C4

PREP/ STOR

C-108

GEN & ADVNCD CHEM

C-109

PREP/ STOR

C-110

AREA D

AREA C EQT EQT

EQT

EST EST

EST

EQT

EST

EQT

EST

EST

EQT

3'-0" 5'-0" 2'-0" 5'-0" 2'-0"5'-0"

5'-0" 2'-0" 5'-0" 2'-0"

2'-0" 5'-0" 2'-0" 5'-0" 4'-0 1/2"

9" 4'-2" 9"

2'-0"2'-0"

2'-0"

9"

4'-2"

9"

2'-0"

" 2

ALIGN

9"

ALIGN

" 2

2'-0"

9"

4'-0 3/4"

9"

2'-0" 1'-0"

AREA B

AREA C

37'-0"

37'-0"

7'-6"

7'-6"

7'-0"

7'-0"10'-0"

A L

IG

N

ALIGN

ALIGN

WLK

TYPICAL ACCENT

BAR END POINT

PLACEMENT

E Q

E

Q

VESTIBULE

D-111

VESTIBULE

C-113

CORRIDOR

C-1C3

VESTIBULE

C-111 16

WLK

WLK

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:0

P

M

A-143C

F

IR

S T

F L O

O R

-F L O

O R

F

IN

IS

H

P L A

N

A R

E A

C

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

FIRST FLOOR FLOOR

FINISH PLAN - AREA C

UP

UP

DN

DN

UP

LG GRP INSTRCTN

D-107

CORRIDOR

D-1C3

PHYSICS WORKRM

D-110

STAIR D2

D-1S2

AREA D

AREA C

EQT

EQT

EQT

ESTEST

EST

EQT

EQT EQTEQT

EST EST

5'-6"7'-0"2'-0"5'-0"2'-0"

5'-6"5'-0"2'-0"

2'-0"

3'-0" 5'-0" 2'-0" 5'-0" 2'-0"

2'-0" 5'-0" 2'-0"2'-11 5/8" 5'-0"

5'-0" 2'-0"5'-0"

5'-0"

2'-0"

2'-0"5'-0"

2'-0"

9"

2'-0"

1'-0"

9"

2'-0"

ALIGN

" 2

2'-0"

9"

4'-2"

9"

2'-0"

1'-0"

2'-0"

9" 9"

2'-0"

1'-0"

ALIGN

" 6

TYPICAL ACCENT

BAR END POINT

PLACEMENT

E Q

E

Q

ALIGN

ALIGN

1'-0"

ALIGN

ALIGN

NORTH / SOUTH

ALIGNMENT,

TYP.

PHYSICS CLASSRM

D-101

PHYSICS WORKRM

D-102

INTERACTIVE LEARNING

D-103

CORRIDOR

D-1C1

PHYSICS WORKRM

D-105

PHYSICS CLASSRM

D-104

STAIR D1

D-1S1

PHYSICS CLASSRM

D-109

VESTIBULE

D-112

CORRIDOR

D-1C2

JAN

D-106

VESTIBULE

D-111

WLK

AREA A

AREA E

CPT

CPT

CPT

CPT

ALIGN VCT2 WITH

DOOR FRAME

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:1

P

M

A-143D

F

IR

S T

F L O

O R

F

L O

O R

F

IN

IS

H

P L A

N

A R

E A

D

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

FIRST FLOOR FLOOR

FINISH PLAN - AREA D

DN OFFICE

E-103

FACULTY

E-101

FILES

E-102

SR FACULTY

E-110

SR FACULTY

E-111

SR FACULTY

E-112

SR FACULTY

E-113

FACULTY

E-116

FACULTY

E-117

FACULTY

E-118

CONF RM/TECH JOURN

E-119

ADMIN OFFICE

E-104

AREA D

AREA C

A R

E A

B

AREA A

AREA D

AREA B

AREA E

CORRIDOR

E-1C2

CORRIDOR

E-1C1

CORRIDOR

E-1C4

CORRIDOR

E-1C3

A

B

C

D

E

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:0

:1

P M

A-143E

F

IR

S T

F L O

O R

F

IN

IS

H

P L A

N

A R

E A

E

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

FIRST FLOOR FINISH PLAN

AREA E

DN UP

DN UP

COMM

B-214

JAN

B-213

WOMEN

B-212

ASSISTED INSTR RM

B-211

STAIR B2

B-2S2

TOILET

B-210

PHYSICS CLASSRM

B-209

PHYSICS CLASSRM

B-207

INSTR TEACHING LAB

B-205

PHYSICS WORKRM

B-206

INSTRUCTN LAB STOR

B-203

ELEC

B-201

STAIR B1

B-2S1

JAN

B-215

MEN

B-204

COMP SPEC WRKSHP

B-202

EQT

EQT

EQT

CPTTL

ALIGN

ALIGN

ALIGN

ALIGN

3' - 0"

5' - 0"

2' - 0"

5' - 0"

5' - 0"

2' - 0"

5' - 0"

2' - 0"

2' - 0"

ALIGN

ALIGN

5' - 0"

2' - 0"

5' - 0"

4' - 0"

TYPICAL ACCENT

BAR END POINT

PLACEMENT E

Q

E Q

ALIGN

ALIGN

ALIGN

ALIGN

3' - 0" 5' - 0"

2' - 0" 5' - 0"

2' - 0"

3' - 0" 5' - 0"

2' - 0" 5' - 0"

2' - 0"

ALIGN

ALIGN

5' - 0" 2' - 0"

5' - 0" 2' - 0"

ALIGN

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/1

/2

:5

:4

A

M

A-144B

S E

C O

N D

F L O

O R

F

L O

O R

F

IN

IS

H

P L A

N A

R E

A B

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

SECOND FLOOR - FLOOR

FINISH PLAN -AREA B

UP

UPDN

STAIR D2

D-2S2

PHYSICS WORKRM

C-203

CLASSROOM

C-201

BLDG STOR SPT

C-202

COMM

C-205

ELEC

C-206

PHYSICS CLASSRM

C-204

CORRIDOR

C-2C2

CORRIDOR

C-2C1

STAIR C1

C-2S1

INSTR LAB STOR

C-207

CORRIDOR

C-2C3

INSTR LAB STOR

C-208

PHYSICS CLASSRM

C-211

PHYSICS WORKRM

C-212

PHYSICS WORKRM

C-210

PHYSICS CLASSRM

C-209 A

R E

A E

AREA D

AREA C

MECH EQUIP PLATFORM

C-213

EGR

EGR

EST

EGR

EGR

EST

EGR

EST

EST

EST

EST

EGR

EGR

EST

EST

EST

EGR

EST

EGR

EST

EST

EST

EST

EGR

EGR

EST

EST

EST

2'-0" 5'-0" 2'-0" 5'-0"

3'-0" 5'-0" 2'-0" 5'-0" 2'-0"5'-0"

5'-0" 2'-0" 5'-0" 2'-0"

A L

IG

N

3'-0"6'-0"2'-0"6'-0"

2'-0"

6'-0" 2'-0" 6'-0" 2'-0"3'-0"

1'-0"

TYPICAL ACCENT

BAR END POINT

PLACEMENT

E Q

E

Q

ALIGN

ALIGN

ALIGN

ALIGN

A R

E A

B

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

2'-0"

6'-0"

2'-0"

6'-0"

ALIGN

6'-0"2'-0"6'-0"2'-0"

1'-0" 9"

1'-0"

1'-0"

9"

1'-0"

ALIGN

4'-0"

2'-0"

ALIGN

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:1

P

M

A-144C

S E

C O

N D

F L O

O R

F

L O

O R

F

IN

IS

H

P L A

N

A R

E A

C

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

SECOND FLOOR FLOOR

FINISH PLAN - AREA C

UPDN

DN

UP

UPDN

PHYSICS WORKRM

D-211

STAIR D2

D-2S2

AREA D

AREA C

PHYSICS CLASSRM

D-201

PHYSICS WORKRM

D-202

INTERACTIVE LEARNING

D-203

CORRIDOR

D-2C1

PHYSICS WORKRM

D-205

PHYSICS CLASSRM

D-204

CLASSROOM

D-208

CLASSROOM

D-209

PHYSICS CLASSRM

D-210

JAN

D-206

CORRIDOR

D-2C3

STAIR D1

D-2S1

CORRIDOR

D-2C2

2'-0" 5'-0" 2'-0" 5'-0" 4'-0"

2'-0" 5'-0" 2'-0" 5'-0" 4'-0"

5'-6"7'-0"2'-0"5'-0"2'-0"

5'-6"5'-0"2'-0"

2'-0"

EGR

EGR

EST

EST

EGR

EST

EGR

EST

EST

EST

EST

EGR

EGR

EGR

EGR

EST

EGR

EGR

ESTEGR

EST

EGR

EST

EST

EST

3'-0" 5'-0" 5'-0" 2'-0"5'-0"

5'-0"

2'-0"

3'-0" 5'-0" 2'-0" 5'-0" 2'-0"

2'-0" 5'-0" 2'-0"

2'-0"5'-0"

2'-0"

5'-0"

1'-0"

2'-0"

1'-0"

TYPICAL ACCENT

BAR END POINT

PLACEMENT

ALIGN

ALIGN

ALIGN

9" 9"

" ALIGN

"2

" 9

2'-0"

ALIGN

ALIGN

ALIGNALIGN

ALIGN

ALIGNALIGN

3'-0"

E Q

E

Q

ALIGN

NORTH / SOUTH

ALIGNMENT,

TYP.

CFP1

QT1

ST3

SV1

SV2

VCT2

VCT3

AS NOTED ON PLANS

AND FINISH SCHEDULE

VCT6

VCT7

FLOOR FINISH LEGEND

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR SEISMIC CHORD INSTALLATION.

2. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND SLATE BASE.

3. PROVIDE NEW SLATE TILE AND QUARRY TILE BASE.

4. EXISTING QUARRY TILE AND QUARRY TILE BASE TO REMAIN AND BE CLEANED AND

REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN LINK FLOOR

FINISH STRIPPER NO. 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO. 1917

5. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN AND BE

CLEANED AND REFINISHED. EXISTING SLATE BASE TO BE REMOVED, REINSTALLED,

CLEANED AND REFINISHED. STRIP OLD FINISH AT FLOOR AND BASE WITH ZEP GREEN

LINK FLOOR FINISH STRIPPER NO 1913 AND APPLY ZEP GREEN LINK FLOOR FINISH NO.

1917.

6. EXISTING CAST FLOOR PANELS (CFP) WITH SLATE BANDING TO REMAIN. REMOVE AND

REINSTALL EXISTING SLATE BASE.

7. PROVIDE NEW SLATE TILE AND SLATE BASE.

8. PROVIDE NEW CAST FLOOR PANELS WITH SLATE BANDING AND SLATE BASE.

6. FLOOR FINISH PLANS NOT INCLUDED FOR6TH FLOOR. SEE FINISH SCHEDULE FOR

SPECIFIED FLOOR FINISHES.

9. PROVIDE NEW FLOOR MEDALLION. SEE ARCHITECTURAL FLOOR PLAN FOR MORE

INFORMATION.

10. PROVIDE NEW QUARRY TILE WITH SLATE BANDING AND QUARRY TILE BASE.

11. TRANSITION POINT BETWEEN STATE BASE AND QUARRY TILE BASE.

12. NOTE USED

13. WALK OFF CARPET TILE - RECESSED. SEE ARCHITECTURAL PLANS FOR MORE

INFORMATION.

14. CUSTOM ROLL UP CARPET MAT WITH USMA INSIGNIA GRAPHIC. PROVIDED BY GENERAL

CONTRACTOR. MAT ORIENTATION: 4'-0" WIDE AND 6'-0" LONG IN DIRECTION OF FOOT

TRAFFIC.

15. PERMANENT GRILLED ENTRYWAY SYTEM.

16. WALK OFF CARPET TILE (NOT RECESSED) TO BE INSTALLED WALL TO WALL WITH

TRANSITION STRIPS AT THRESHOLDS.

A

B

C

D

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/3

/2

:5

:1

P

M

A-144D

S E

C O

N D

F L O

O R

F

L O

O R

F

IN

IS

H

P L A

N

A R

E A

D

K S

M L

C C

L K

S

A P

R

IL

0 4 8 162

SCALE: 1/8" = 1'-0"

SECOND FLOOR FLOOR

FINISH PLAN - AREA D

DN

UP

DN

UP

COMM

B-315

JAN

B-314

MEN

B-313

PARA COMP CLASSRM

B-312

STAIR B2

B-3S2

TOILET

B-311

CLASSROOM

B-310

CLASSROOM

B-309

CLASSROOM

B-308

CLASSROOM

B-304

COMPUTER CLASSRM

B-303

SERVER RM

B-305

MOLEC SCI COMPUTER

LAB

B-306

MOLEC SCI COMPUTER

LAB

B-307

ELEC

B-301

STAIR B1

B-3S1

ASSISTED INSTR RM

B-302

JAN

B-316

EQT

EQT

EQT

ALIGN

ALIGN

ALIGN

" 4

5' - 0" 2' - 0"

5' - 0" 2' - 0"

E Q

E Q

TYPICAL ROOM

ACCENT BAR

PLACEMENT

5' - 0" 2' - 0"

5' - 0" 2' - 0"

5' - 0" 2' - 0"

5' - 0" 2' - 0"

5' - 0"

2' - 0" 5' - 0"

2' - 0"

FLOOR FINISH PLAN

GENERAL NOTES

1. CONTINUE SCHEDULED FLOOR FINISH UNDER ALL MOVABLE ITEMS. COUNTERS AND

UNDER ALL BASE UNITS BACK TO WALL. PROVICE SCHEDULED BASE AT WALLS AND

CASEWORK TOE KICKS.

2. FINISH PLANS PROVIDED TO INDICATE FLOOR PATTERNS ONLY. SEE FINISH SCHEDULE

FOR COMPLETE LISTING OF FLOORING MATERIALS AND FOR OTHER FLOOR FINISHES

NOT NOTED.

3. FLOOR TRANSITIONS OCCURRING AT DOORS SHALL BE TO CENTERLINE OF DOOR.

4. SEE FINISH SCHEDULE SHEET A621B, A-621C-D AND A-621E FOR FINISH LEGEND.

5. AT TRANSITION POINTS WHERE TWO DIFFERENT FLOORING MATERIALS MEET PROVIDE

BRONZE TRANSITION STRIP SEE DETAILS B4/A-53 AND C4/A-53.

FLOOR FINISH PLAN

CODED NOTES

1. EXISTING STONE TREADS AND RISERS TO REMAIN. EXISTING QUARRY TILE WITH SLATE

BANDING AND SLATE BASE TO REMAIN. PROVIDE NEW MATERIALS WHERE EXISTING

FLOOR AND BASE ARE REMOVED FOR…