USMA_SCICTR_PN59044-15_MECH_Part 2.pdf

PDF 18 MB Posted

Attached to
Multipurpose Academic Building Science Facility Phase 2, which is located at the USMA West Point NY
Solicitation number
W912DS-11-B-0005
Issued by

About this file

90 Design - Mechanical Part 2

View the file

Other files

File Type Posted
Bid Abstract W912DS-11-B-0005 Science Center.pdf PDF
Amendment 0011.pdf PDF
fbo announcement for Step Two.doc DOC document
Invitation to Step Two.doc DOC document
Amendment 4.pdf PDF
PAS Pre-Award Survey.pdf PDF
Amendment 0003.pdf PDF
Amendment No. 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 1.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 4.pdf PDF
USMA_SCICTR_PN59044-07_INT.pdf PDF
USMA_SCICTR_PN59044-16_GEN-VI.pdf PDF
Updated SF 1442 Front and Back.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 1.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 1.pdf PDF
USMA_SCICTR_PN59044-12_LABPL.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 1.pdf PDF
USMA_SCICTR_PN59044-08_GEN-III.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 3.pdf PDF
USMA_SCICTR_PN59044-13_PLUMB.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 2.pdf PDF
Amendment 1.pdf PDF
USMA_SCICTR_PN59044-10_GEN-IV.pdf PDF
USMA_SCICTR_PN59044-04_GEN-II.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 3.pdf PDF
USMA_SCICTR_PN59044-11_FIRE.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 2.pdf PDF
USMA_SCICTR_PN59044-14_GEN-V.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 3.pdf PDF
USMA_SCICTR_PN59044-06_LABEQ.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 4.pdf PDF
USMA_SCICTR_PN59044-02_CIVIL.pdf PDF
USMA_SCICTR_PN59044-01_GEN-I.pdf PDF
USMA_SCICTR_PN59044-05_ARCH_Part 5.pdf PDF
Solicitation.pdf PDF
Specs 2011 04 01.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

GENERAL NOTES:

CODED NOTES:

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

1. FAN COIL UNIT FOR COOLING STEAM TUNNEL LOCATED IN SUB-BASEMENT OF MOORE

WING. SEE DWG. M-101E

2. FAN COIL UNIT FOR COMFORT COOLING IN CLASSROOM. OUTSIDE AIR TO BE

PROVIDED BY AHU-5 LOCATED IN MECH ROOM B-S01.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

3. THIS SPACE WILL BE EXHAUSTED. DOOR UNDERCUTS WILL PROVIDE MAKE-UP AIR FOR

EXHAUST CFM UP TO 100 CFM. TRANSFER AIR DUCT WILL PROVIDE MAKE-UP AIR FOR

EXHAUST CFM GREATER THAN 100 CFM (TYPICAL).

4. SUPPLY AIR DUCT IN TRENCH.

5. SUPPLY AIR DUCT UP. SEE SHEET M-102B.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT AHU-5 THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY

SENSOR AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A

FOUR PIPE FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

A2.5A3A4

AF

A6A7

AG

AH

AJ

AK

A8

A5

AA

AD

AE

AC

AB

AL

A5.4

AS

AR

A10

AS.5

AA.6

A9.5

A10.8A11.5A12.3

AT

A12 A11 A10.5

CLASSROOM

B-S03

TOILET

B-S09

PLUMBING

B-S08

CORRIDOR

B-SC2

STOR

B-S04

JAN

B-S10

STAIR B2

B-SS2

CORRIDOR

B-SC1

CUH-5

T

ELEV #3

STEAM TUNNEL

B-S07

MECHANICAL

B-S01

VESTIBULE

B-S02

M-301 x6

"Ø

8"Ø

10"Ø

8"Ø

12x8

6x6

20x17 x6 x x x6

6x6 x

6x6

S-3 - 6"Ø

10 CFM

S-3 - 6"Ø

150 CFM

E4 - 8x10

250 CFM

E4 - 8x8

100 CFM

UP

UP

UP

VAV-1

VAV-1

VAV-2

300 CFM

6x6

FOR CONTINUATION SEE DWG. M-101C

FOR CONTINUATION SEE DWG. M-101E

FOR CONTINUATION SEE ABOVE

OCC

VAV-2

FC-3

FD-B2

FD-B3

T

FD-B4

FD-B5

FD-B6

8x8

8x8

6x6

S-3 - 8"Ø

250 CFM

S-3 - 6"Ø

150 CFM

S-3 - 8"Ø

250 CFM

E4 - 20x20

350 CFM

CO2

8x8 STEAM TUNNEL EXHAUST DUCT

R5 - 6x4

50 CFM

R5 - 8x6

100 CFM

ANA4.7

OFFICE

B-S05

6x6

14x12

FOR CONTINUATION SEE BELOW

OCC

FC-1

VAV-1

E4 - 8x8

60 CFM

VAV-1

125 CFM

E4 - 16x16

315 CFM

S-3 - 8"Ø

440 CFM

T

A

B

D

C

E

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :2 :2 P M

M-101B

S U B -B A S E M E N T F L O O R P L A N A R E A B

H V A C

F J T

F G

J D V

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT FLOOR

PLAN - AREA B HVAC

CODED NOTES:

1. COMPUTER ROOM AIR CONDITIONING UNIT TO COOL DATA/COMMUNICATIONS ROOM.

2. FAN COIL UNIT FOR PLUMBING EQUIPMENT ROOM COOLING.

3. CONNECT TO LAB FUME HOOD. PROVIDE DUCT TRANSITION AS REQD.

4. 24X18 LAB EXHAUST DUCT UP TO LEF-7,8

5. 10"D CONTAINED VENTILATED BAY EXHAUST UP TO LEF-7,8

6. PROVIDE LOW AND HIGH EXHAUST GRILLES. PROVIDE DEDICATED EXHAUST

CONTROLS.

7. EQUIPMENT CEILING EXHAUST. TERMINATE 4"D EXHAUST DUCT 6" BELOW CEILING

WITH TRIM COLLAR. PROVIDE MANUAL VOLUME DAMPER ABOVE CEILING.

8. SUPPLY DUCT UP TO AHU-6A

9. SUPPLY DUCT UP TO AHU-6B

10. RUN DUCTS IN DUCT CHASE

11. PROVIDE DEDICATED SWITCH FOR EQUIPMENT CEILING EXHAUST VALVE CONTROL

12. NMR QUENCH CONNECTION

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY SENSOR

AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A FOUR PIPE

FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

A

B

D

C

E

B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8

BU

BT

BS

BR.7

BQ.5

BQ

BP

BN

BM

BR

BR.8

BS.8

BV

B1B7 B6 B5 B4 B3 B2

DATA COMM

C-S05

WRITE UP

C-S02

CONTAINED

VENTILATED BAY

C-S04

CHEM

ENGINEERING

C-S01

PLUMBING

C-S06

FUTURE NMR

C-S03 x

24x18

10"Ø

T

T

T

T

T

LCP

SV-8"

RHC-1

SV-8"

SV-12"

RHC-3

RHC-3

SV-12"

SV-14"

SV-10"

RHC-2 GEV-14"

HEV-10"

GEV-18X24

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x6

250 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

S8 - 12x8

300 CFM

E7 - 10x10

350 CFM

10"Ø

18"Ø

"Ø

"Ø

12"Ø x x x

16x12 x

14x12

12x10

10x8

16"Ø

24x18

"Ø

(TYP.4)

10"Ø

FC-1

"Ø

(TYP.2)

T

E7 - 24x10

625 CFM

6x6

EEV-8"

x

10x10

SD

RHC-4

S8 - 24x8

800 CFM

12x12

20x16

18x20

16x14

E7 - 30x14

2000 CFM

(TYP.2)

24x18 10"Ø

10"Ø

16x14 x

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

R4 - 20x20

500 CFM

SD

T

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

10"Ø

10"Ø

FC-15

CRACU-7B

CRACU-7A

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/1

/2

:0

:3

A

M

M-101C

S U

B -B

A S

E M

E N

T F

L O

O R

P L A

N

A R

E A

C H

V A

C

F J T

E H

W J D

V

A P

R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT FLOOR

PLAN - AREA C HVAC

FOR CONTINUATION SEE DWG. M-101B

F O

R C

O N

T

IN

U A

T

IO

N S

E E

D W

G M

-1

E

F O

R C

O N

T

IN

U A

T

IO

N S

E E

D W

G M

-1

B

CODED NOTES:

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY SENSOR

AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A FOUR PIPE

FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

A

B

D

C

E

CA

CC

CD

CF

CG

CB

CH

C1C2C4 C1.9C4.1 C3 x x

FC-9

x

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

S7 - 6x4

100 CFM

14x12

8x8

14x12 DUCT

OPENING W/ WMS

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/3 /2 :0 :3 P M

M-101E

S U B -B A S E M E N T F L O O R P L A N A R E A E

H V A C

F J T

M A C

J D V

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

SUB-BASEMENT FLOOR

PLAN - AREA E HVAC

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 D

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 C

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 B

FOR CONTINUATION SEE DWG. M-101B

AREA A - NIC

DN

UP

DN

DN

GENERAL NOTES:

CODED NOTES:

1. NOT USED.

2. FCU SERVING ELECTRICAL ROOM FOR COOLING ONLY.

3. THIS SPACE WILL BE EXHAUSTED. DOOR UNDERCUTS WILL PROVIDE MAKE-UP AIR UP

FOR EXHAUST CFM UP TO 100 CFM. TRANSFER AIR DUCT WILL PROVIDE MAKE-UP AIR

FOR EXHAUST CFM GREATER THAN 100 CFM (TYPICAL).

4. CHILLER ROOM EXHAUST AND REFRIGERANT PURGE DUCT UP TO EF-4. DUCT OFFSETS

IN SHAFT BETWEEN SUB-BASEMENT AND BASEMENT.

5. GENERAL EXHAUST DUCT.

6. AHU-5 OUTDOOR AIR SUPPLY DUCT UP AND DOWN.

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT AHU-5 THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY

SENSOR AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A

FOUR PIPE FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

7. STEAM TUNNEL EXHAUST DUCT UP TO EF-12.

A

B

D

C

E A2A2.5A3A4

AF

A6A7

AG

AH

AJ

AK

A5

AA

AD

AE

AC

AB

AL

AM

A5.4

AS

AR

AA.6

A9.5

AT

ELEC

B-B01

JAN

B-B07

SUPPLY TECH

B-B03

GAS HOLDING

B-B02

CORRIDOR

B-BC7

BLDG MAINT/

STOR

B-B09

SAFETY SPLY

TECH

B-B05

CLASSROOM

B-B16

JAN BREAK

B-B04

TOILET

B-B15

CLASSROOM

B-B13

CLASSROOM

B-B11

CORRIDOR

B-BC5

CLASSROOM

B-B06

CLASSROOM

B-B10

CORRIDOR

B-BC6

CUH-10

T

T

T

T

T

T

T

T

T x

VAV-2

VAV-2

x x8

8x8

6x6

E4 - 8x10

235 CFM

VAV-2

VAV-2

6x6

6x6

VAV-2

E4 - 8x10

235 CFM

VAV-2

10x8

VAV-2

E4 - 8x10

235 CFM

VAV-2

6x6 VAV-1

E4 - 6x6

75 CFM

S-3 - 6" -

75 CFM

x8 x

8x10

6x6

6x4

6x4

S-3 - 6" -

75 CFM

E4 - 6x6

75 CFM

20x20

E4 - 12x12

400 CFM

S-3 - 12" -

300 CFM

CV-2

S-3 - 10" -

200 CFM

VAV-1

10"Ø

VAV-1

E4 - 6x6

75 CFM

VAV-1

S-3 - 8" -

120 CFM VAV-1

E4 - 6x8

100 CFM

E4 - 6x6

100 CFM

6x4

VAV-2

E4 - 8x10

235 CFM

6x6

E4 - 10x8

235 CFM

VAV-2

E4 - 10x8

235 CFM

6x6 16x16 x4 x1 x1

CLASSROOM

B-B12

STOR

B-B14

FC-4

FC-4

FC-1

10"Ø

10x8

10x8

6x6

FOR CONTINUATION

SEE DWG. M-101C

FOR CONTINUATION

SEE DWG. M-101E

FOR CONTINUATION SEE ABOVE

OCC

OCC

OCC

OCC

OCC

OCC

OCC

OCC

CO2

CO2

CO2

CO2

CO2

CO2

CO2

OCC

FC-2

VAV-2

VAV-2

CUH-6

FC-4

FC-1

FC-4

FC-4

FC-4

8x8 E4 - 12x12

355 CFM

E4 - 12x12

355 CFM

S-3 - 12"Ø

335 CFM12"Ø

x1

12x12

14x8

E4 - 12x12

360 CFM

E4 - 12x12

355 CFM

S4 -

250 CFM

S4 -

250 CFM

S-3 - 10"Ø

250 CFM

S-3 - 10"Ø

250 CFM

R5 - 6x4 50 CFM E4 - 8x8

125 CFM

S4 -

250 CFM

S4 -

250 CFM

S4 -

250 CFM

S4 -

250 CFM

S4 -

250 CFM

S4 -

300 CFM

S4 -

125 CFM

S4 -

225 CFM

S4 -

225 CFM

S4 -

125 CFM

S4 -

300 CFM

S4 -

100 CFM

VAV-1VAV-2

VAV-2

E4 - 12x12

285 CFM

E4 - 12x12

280 CFM

E4 - 12x12

285 CFM

E4 - 12x12

280 CFM

E4 - 12x12

285 CFM

E4 - 12x12

280 CFM

S-3 - 8"Ø

200 CFM

S-3 - 10"Ø

225 CFM

S-3 - 8"Ø

200 CFM

S-3 - 10"Ø

225 CFM

E4 - 6x6

75 CFM

E4 - 12x12

600 CFM

S-3 - 12"Ø

600 CFM

VAV-2

VAV-2

S-3 - 8"Ø

200 CFM

S-3 - 10"Ø

225 CFM

E4 - 12x12

425 CFM

E4 - 8x6

100 CFMS-3 - 8"Ø

120 CFM

S4 -

250 CFM

S4 -

250 CFM

T

VAV-1

E4 - 12x12

375 CFM

E4 - 6x4

75 CFM

S-3 - 6"Ø

75 CFM

S-3 - 8"Ø

200 CFM

R5 - 6x4

50 CFM

E4 - 12x12

360 CFM

E4 - 12x12

355 CFM

S-3 - 10"Ø

250 CFM

S-3 - 10"Ø

250 CFM

E4 - 12x12

335 CFM

E4 - 12x12

300 CFM

S-3 - 10"Ø

225 CFM

S-3 - 10"Ø

225 CFM

x x x

12x12 x

8x6

14x6

12x6

8x6

10x12

10"Ø

10"Ø

8"Ø

10x8

"Ø

18x10

16x12

16x12

12x10 x1 x1 x1 x1 x1

12x12

12x12

10"Ø

10"Ø x1 x8

"Ø

10"Ø

10"Ø

10"Ø

10"Ø

10"Ø

10"Ø

8"Ø

10"Ø

10"Ø

8"Ø

10"Ø

6"Ø

8x8

10x8 x6

6x6

6"Ø x8 x1 x1 x1 x1 x1

E4 - 8x8

125 CFM

E4 - 8x8

125 CFM

10x6

8x8

6x6

6x6

6x6

8x8 x1 x1 x1

12x12

12x12 x8

10"Ø

10"Ø

10"Ø

10"Ø

"Ø

14x10

12x12

FSD-B5

FSD-B4

FSD-B6

FD-B7

FD-B8

6x6

10x8

FD-B9

FD-B10

FD-B11

FD-B12

A5

AL

AM

AN

A5.4

AP

CLASSROOM

B-B17

T

6x

8x

6x4

8x6 x

VAV-2

VAV-2

x

8x8

6x6 DN

DN

DN

E4 - 8x10

235 CFM

FOR CONTINUATION SEE BELOW

OCC

CO2

OCC

CO2

FC-6

8x8 E4 - 12x12

355 CFM

E4 - 12x12

355 CFM

E4 - 12x12

355 CFM

S-3 - 12"Ø

335 CFM

S-3 - 12"Ø

335 CFM

S4 -

340 CFM

S4 -

340 CFM

R5 - 6x4

55 CFM

R5 - 6x4

55 CFM

12"Ø

12"Ø x1 x1 x1

12x12

14x8 x1

S4 -

250 CFM

S-3 - 10"Ø

250 CFM

x1

12x12 10"Ø

10"Ø

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :2 :3 P M

M-102B

B A S E M E N T F L O O R P L A N A R E A B H V A C

F J T

F G

J D V

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN -

AREA B HVAC

UP

UP

UP

UP

GENERAL NOTES:

CODED NOTES:

1. SUPPLY DUCT UP TO AHU-6A

5. 10"D CONTAINED VENTILATED BAY EXHAUST DUCT DOWN FROM LEF-9 TO

SUB-BASEMENT.

4. TOILET EXHAUST DUCT UP TO EF-6

6. GENERAL EXHAUST DUCT UP TO LEF-7,8

7. FUME HOOD EXHAUST UP TO LEF-7,8

2. SUPPLY DUCT DOWN FROM AHU-6A TO SUB-BASEMENT

3. SUPPLY DUCT DOWN FROM AHU-6B TO SUB-BASEMENT

8. SEE SHEET M-102E FOR CONTINUATION OF FUME HOOD EXHAUST

9. SEE SHEET M-102E FOR CONTINUATION OF AHU-6B SUPPLY

10. SEE SHEET M-102B FOR CONTINUATION OF EXHAUST

11. AHU-6B SUPPLY TO FIRST FLOOR

12. EMERGENCY POWER-OFF BREAK GLASS SWITCH FOR ALL AIR HANDLING SYSTEMS.

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY SENSOR

AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A FOUR PIPE

FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

13. NMR QUENCH VENT UP

14. NMR QUENCH VENT CONNECTION

15. SUPPLY AND EXHAUST DUCTS UP TO AHU-8

16. MECHANICAL EQUIPMENT HOUSEKEEPING PAD TO EXTEND 6" BEYOND EQUIPMENT

FOOTPRINT ON ALL SIDES AND SHALL BE 6" TALL. SEE STR. DETAIL A1 ON S-004 FOR

PAD CONSTRUCTION DETAILS. (TYP.)

A

B

D

C

E

B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8

BU

BT

BS

BR.7

BQ.5

BQ

BP

BN

BM

BR

BR.8

BS.8

BV

B1B7 B6 B5 B4 B3 B2

JAN

C-B06

BLDG STOR SPT

C-B05

PREP/ STOR

D-B11

COMM

C-B03

ELEC

C-B04

PHYSICS

CLASSRM

C-B08

NUCL ENGR LAB

C-B17

CORRIDOR

C-BC1

MAIN ELEC SERV

C-B10

PHYSICS

WORKRM

D-B12

PHYSICS

CLASSRM

C-B01

MODERN PHYSICS

WORKRM

C-B02

CORRIDOR

C-BC3

CORRIDOR

C-BC4

RAD DETECT

LAB/CLSRM

C-B12

STORAGE

C-B11

CORRIDOR

C-BC5

MEN

C-B07

PHYSICS

WORKRM

C-B09

18x12

36x14 x

T T

T

T

T

T

T

T

T

T

T

14x10

"Ø x

10"Ø

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

230 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

230 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 6"Ø

125 CFM

VAV-1

VAV-2 VAV-2

E4 - 10x10

200 CFM

R4 - 20x20

1000 CFM

E4 - 10x10

175 CFM

R4 - 20x20

1400 CFM

E4 - 10x10

250 CFM

E4 - 10x10

325 CFM

E4 - 10x10

230 CFM

R4 - 20x20

1000 CFM

E4 - 10x10

160 CFM

S2 - 6"Ø

125 CFM

S2 - 10"Ø

250 CFM

20x12

LCP

LCP

LCP

LCP

CO2 CO2

CO2

CO2

CO2

VAV-1

VAV-1

VAV-1

VAV-2

VAV-1

VAV-2

CUH-7

CUH-8

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 12"Ø

400 CFM

S2 - 10"Ø

300 CFMS2 - 10"Ø

250 CFM

S2 - 10"Ø

340 CFM

S2 - 10"Ø

330 CFM

S2 - 10"Ø

330 CFM

S2 - 10"Ø

330 CFM

E4 - 10x10

75 CFM

E4 - 20x20

1300 CFM

E4 - 20x20

1300 CFM

E4 - 20x20

900 CFM

E4 - 20x20

900 CFM

E4 - 14x14

700 CFM

E4 - 10x10

75 CFM

S2 - 8"Ø

200 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

330 CFM

E4 - 20x20

1200 CFM

E4 - 20x20

1200 CFM

RHC-4

RHC-4

RHC-1

RHC-3

RHC-1

RHC-4

18x1224x14

14x12

30x12 x x x x x x x

18x14 24x14 26x26

"Ø

"Ø

"Ø

10"Ø

10"Ø 10"Ø

"Ø

"Ø x

12x12 x

18x12 18x12

"Ø

GEV-24X12

SV-14"

SV-12"

SV-14"

SV-8"

GEV-10

SV-8"

SV-14"

GEV-14"

GEV-8"

GEV-18X12

M-354

M-354

"Ø

"Ø

(TYP.2)

36x18 30x12

16x14

12x12 x

24x12 x

10"Ø 10"Ø

8"Ø

S2 - 10"Ø

300 CFM

24x12

"Ø

VAV-2

VAV-2

S2 - 10"Ø

250 CFM

S2 - 10"Ø

235 CFM

S2 - 10"Ø

235 CFM

S2 - 10"Ø

235 CFM

S2 - 10"Ø

235 CFM

FC-1

FC-1

FC-6FC-4

FC-4

SD

FC-1

R4 - 14x14

500 CFM

E4 - 10x10

50 CFM

E4 - 10x10

150 CFM

E5 - 8x8

75 CFM

12x10

14x10 x x

24x12 20x12 12x10

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø x8

10x10

8x8

12x8 10x8 x

(TYP.2)

10"Ø 1

"Ø x

10x10

10x10

10x10 x

10x10 x

8x8

(TYP.4)

VAV-1

VAV-2

FC-9

10"Ø 10"Ø

10"Ø 10"Ø

"Ø

6"Ø x x

(TYP.6)

S2 - 6"Ø

125 CFM

14x10

14x12

10x10

20x20

16x14 x x x x

10"Ø

10"Ø

10"Ø

10x8

E4 - 10x10

50 CFM

x

10x10

12x12

10x10

"Ø

"Ø

S2 - 10"Ø

250 CFM

FC-9

VAV-3

x x x x

10"Ø 10"Ø

10"Ø10"Ø

"Ø

10"Ø 10"Ø

10"Ø 10"Ø

10x108x8

E4 - 10x10

260 CFM

R4 - 14x14

500 CFM

(TYP.8)

(TYP.2)

x

(TYP.2)

10"Ø

"Ø

14x12 x

R4 - 20x20

1000 CFM

24x14

R4 - 14x14

500 CFM

"Ø

"Ø

R7 - 36x10

1000 CFM

x x

FC-8

S8 - 36x10

1000 CFM

CRACU-9

FCU-11

S8 - 36x12

1000 CFM

S8 - 36x12

1000 CFM

S8 - 36x12

1000 CFM

S8 - 36x12

1000 CFM

VAV-2 6

"Ø

6"Ø

S2 - 6"Ø

125 CFM

10x10 x1

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/1

/2

:0

:4

A

M

M-102C

B A

S E

M E

N T

F L O

O R

P L A

N

A R

E A

C H

V A

C

F J T

E H

W F

D V

A P

R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN -

AREA C HVAC

FOR CONTINUATION SEE DWG. M-102D

F O

R C

O N

T

IN

U A

T

IO

N S

E E

D W

G M

-1

E

FOR CONTINUATION SEE DWG. M-102E

F O

R C

O N

T

IN

U A

T

IO

N S

E E

D W

G M

-1

B

FOR CONTINUATION SEE DWG. M-102B

UPUP

CODED NOTES:

1. SUPPLY DUCT UP TO AHU-9

2. EXHAUST DUCT FROM LINEAR ACCELERATOR LAB UP TO EF-11

3. EXHAUST DUCT UP TO AHU-9

4. EXHAUST DUCT FROM WELDING ROOM UP TO EF-8

5. EXHAUST DUCT FROM JAN. CLOSET UP TO EF-7

6. MOORE WING TOILET EXHAUST DUCT UP TO EF-10

7. SUPPLY DUCT UP TO AHU-9

8. EXHAUST DUCT UP TO AHU-9

9. EXHAUST DUCT TO MOORE WING. FOR CONTINUATION SEE M-102E

10. SUPPLY DUCT TO MOORE WING. FOR CONTINUATION SEE M-102E

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY SENSOR

AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A FOUR PIPE

FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

11. EXHAUST DUCT TO MOORE WING. FOR CONTINUATION SEE M-102E

12. SUPPLY AND EXHAUST DUCTS UP TO AHU-10

13. EQUIPMENT CEILING EXHAUST. TERMINATE 4"D EXHAUST DUCT 6" BELOW CEILING

WITH TRIM COLLAR. PROVIDE MANUAL VOLUME DAMPER ABOVE CEILING.

14. MECHANICAL EQUIPMENT HOUSEKEEPING PAD TO EXTEND 6" BEYOND EQUIPMENT

FOOTPRINT ON ALL SIDES AND SHALL BE 6" TALL. SEE STR. DETAIL A1 ON S-004 FOR

PAD CONSTRUCTION DETAILS. (TYP.)

15. 6"Ø EXHAUST DUCT TO PANEL SAW

16. 3"Ø FLEX DUCT TO PANEL SAW

17. 4"Ø EXHAUST DUCT TO ROUTER TABLE

18. 5"Ø EXHAUST DUCT TO TABLE SAW

19. 5"Ø EXHAUST DUCT TO CHOP SAW

20. 4"Ø EXHAUST DUCT TO BELT/DISK SANDER

21. 4"Ø EXHAUST DUCT TO BAND SAW

22. 48X36 TRANSFER DUCT

23. 3" ARTICULATED EXHAUST ARM CONNECTION. PROVIDE DUCT TRANSITION AS REQD.

24. WELDING EQUIPMENT EXHAUST DUCT CONNECTION

25. EXHAUST DUCT TO HIGH/LOW EXHAUST GRILLES

26. SULFUR HEXAFLUORIDE SENSOR. INTERLOCK WITH EF-11

A

B

D

C

E

B13 12.7 B12 B11.2B11 B10B9.8 B9 B8.2 B8

BL

BK

BJ

BH

BG

BF

BE

BD

BC

BB

BA

ELECTRONICS

D-B06

WELDING RM

D-B05

MACHINE SHOP

D-B02

CORRIDOR

D-BC1

JAN

D-B08

GEN STOR

D-B07

FXD EXPERIMTL

PHYSICS

D-B09

MATL SCI ACCEL

LAB

D-B01

MODERN PHYSICS

WORKRM

D-B10

CLEAN RM/ PREP

STOR

D-B04

WOOD SHOP

D-B03

CORRIDOR

D-BC3

20x12

T

T

T

S2 - 6"Ø

125 CFM

S2 - 10"Ø

285 CFM

VAV-2

VAV-3

S2 - 6"Ø

125 CFM

CO2

CO2

CO2

VAV-2

"Ø

DCS-1

SF6

LCP

VAV-6

VAV-2

VAV-2

S2 - 8"Ø

200 CFM

S2 - 8"Ø

200 CFM

S2 - 8"Ø

175 CFM

S2 - 8"Ø

175 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

285 CFM

S2 - 10"Ø

285 CFM

S2 - 10"Ø

290 CFM

S2 - 10"Ø

285 CFM

S2 - 10"Ø

285 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFMS2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFM

E6 - 20x20

850 CFM

12x10

12x12

12x12 x

6x6 x

8x8

20x16

10"Ø

14"Ø

RHC-3

x

VAV-2

VAV-4

VAV-3

x

5" Ø

7"Ø

VAV-3

FC-9

S2 - 10"Ø

285 CFM

E4 - 10x10

180 CFM

R4 - 14x14

500 CFM

E4 - 10x10

50 CFM

S2 - 10"Ø

250 CFM

(TYP.2)

FC-1

14x12

14x12

"Ø

10"Ø

10x10 x

8x8 x x x x

12x10

R4 - 20x20

1000 CFM

(TYP.2)

x

10x6

8x6

E4 - 10x10

300 CFM

"Ø

6"Ø10"Ø

10"Ø

10"Ø

10"Ø

10"Ø

10"Ø

10"Ø

S2 - 10"Ø

250 CFM

(TYP.2)

10"Ø 10"Ø

T

FC-9

VAV-2

E4 - 14x14

260 CFM

R4 - 20x20

1000 CFM

(TYP.8)

x x x x

24x14

10"Ø 10"Ø

10"Ø10"Ø

10"Ø 10"Ø

10"Ø 10"Ø

(TYP.2)

10x8

12x8

10x10 12x10 x x

RHC-1

RHC-1

RHC-1

RHC-1

RHC-4

VAV-3

VAV-6

SV-14"

GEV-14"

EEV-8"

S2 - 10"Ø

275 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

250 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

320 CFM

S2 - 10"Ø

250 CFM

S2 - 12"Ø

450 CFM

E6 - 14x14

600 CFM

E4 - 20x20

500 CFM

E6 - 20x20

850 CFM

10"Ø

10"Ø

10"Ø

8"Ø

8"Ø

"Ø

8"Ø

"Ø

10"Ø 10"Ø

10"Ø

10"Ø

10"Ø1

"Ø

"Ø

(TYP. 2)

x x x

"Ø

8" Ø

6"Ø

(TYP. 2)

10"Ø

8"Ø

10x12

12x12

14x14

(TYP. 3)

(TYP. 2)

"Ø x x

20x16 x

0 12x12

6x6 x x

4"Ø

E4 - 20x20

450 CFM

E4 - 20x20

240 CFM

VAV-2

VAV-3

SHEET

REFERENCE

NUMBER

SHEET OF

D E

S

IG

N E

D B

Y

D W

N B

Y

C H

K B

Y

S U

B M

IT

T

E D

B Y

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

A M

E

P L O

T T

E D

B Y

S

IZ

E

P

L O

T D

A T

E

D A

T E

D

E S

C R

IP

T

IO

N

M

A R

K

A P

P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

N E

W Y

O R

K h tt p

\w w w

.n a n .u s a c e

.a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W E

S T

N A

T

IO

N W

ID

E

B L

V D

C

O L

U M

B U

S O

H

IO

.4

.4 f a x

.4

.0 h tt p /w w w

.u rs c o rp .c o m

S C

IE

N

C E

C E

N T

E R

(F Y

-B

L D

G

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W E

S T

P O

IN

T

N

Y

A R

C H

D

P

A R

K A

V E

N U

E S

O U

T H

N E

W Y

O R

K N

Y

-1

.7

.4 f a x

.5

.5 w w w

.s tv in c .c o m

W

D

S -1

-D

-0

/1

/2

:0

:4

A

M

M-102D

B A

S E

M E

N T

F L O

O R

P L A

N

A R

E A

D H

V A

C

F J T

E H

W J D

V

A P

R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN -

AREA D HVAC

FOR CONTINUATION SEE DWG. M-102C

A R

E A

E

N

IC

F O

R C

O N

T

IN

U A

T

IO

N S

E E

D W

G M

-1

E

GENERAL NOTES:

CODED NOTES:

1. SEE SHEET M-102C FOR CONTINUATION OF EXHAUST

2. SEE SHEET M-102C FOR CONTINUATION OF AHU-6B SUPPLY

3. 16X12 SUPPLY DUCT UP TO FIRST FLOOR

4. 16X12 EXHAUST DUCT UP TO FIRST FLOOR

5. 8X8 TOILET EXHAUST UP TO FIRST FLOOR

6. SEE M-102D FOR CONTINUATION

7. 4" EQUIPMENT CEILING EXHAUST. TERMINATE EXHAUST DUCT 6" BELOW CEILING WITH

TRIM COLLAR. PROVIDE MANUAL VOLUME DAMPER ABOVE CEILING. SEE QL602 FOR

CONNECTION

8. 3"x6" EXHAUST DUCT IN WALL DOWN TO A 6" DIAMETER EXHAUST DUCT W/SEALED

CONNECTION FOR VACUUM PUMP. COORDINATE WITH LABORATORY EQUIPMENT

CONTRACTOR. SEE DETAIL "VP-VACUUM PUMP CABINET" ON QL501.4

9. 3" ARTICULATED ARM EXHAUST CONNECTION. PROVIDE DUCT TRANSITION AS

REQUIRED

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY SENSOR

AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A FOUR PIPE

FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

A

B

D

C

E

CA

CC

CD

CF

CG

CB

CH

C1

C2

C4 C1.9C4.1 C3

LASER RES/CHEM

E-B03

CORRIDOR

E-BC3

LASER

RESEARCH

E-B05

LASER

RESEARCH

E-B04

HIGH ENERGY

LASER

RESEARCH

E-B07

CORRIDOR

E-BC1

CORRIDOR

E-BC2

LASER EQUIP

STOR/REPAIR

E-B06

INSTRUCTIONAL/

DEMONSTRATION

E-B08

18x12 x

8"Ø

8"Ø

14x12

FC-4

18x12 x x x x x

S2 - 10"Ø

300 CFM

R1 - 10x10

150 CFM

S2 - 10"Ø

265 CFM

S2 - 8"Ø

150 CFM

S2 - 8"Ø

125 CFM

S2 - 6"Ø

100 CFM

S2 - 6"Ø

100 CFM

S2 - 8"Ø

150 CFM

E1 - 10x10

160 CFM

E1 - 10x10

75 CFM

S2 - 10"Ø

250 CFM

"Ø x x

8x8 x

SV-18X12

S2 - 12"Ø

350 CFM

S2 - 12"Ø

350 CFM

S4 - 10"Ø

200 CFM

S4 - 10"Ø

200 CFM

S4 - 10"Ø

200 CFM

S2 - 12"Ø

350 CFM

S2 - 12"Ø

350 CFM

E1 - 20x20

895 CFM

E1 - 20x20

895 CFM

R1 - 14x14

425 CFM

R1 - 14x14

400 CFM

R1 - 20x20

850 CFM

S2 - 12"Ø

350 CFM

S2 - 12"Ø

350 CFM

S4 - 10"Ø

200 CFM

S4 - 10"Ø

200 CFM

S4 - 10"Ø

200 CFM

E1 - 10x10

625 CFM

E1 - 10x10

625 CFM

E1 - 10x10

625 CFM

E1 - 10x10

625 CFM

4' CFH -

500 CFM

4' CFH -

500 CFM

4' CFH -

500 CFM

S2 - 10"Ø

265 CFM

S2 - 10"Ø

265 CFM

S2 - 12"Ø

350 CFM

S2 - 8"Ø

125 CFM

S2 - 8"Ø

125 CFM

S2 - 8"Ø

125 CFM

S2 - 10"Ø

265 CFM

S2 - 10"Ø

265 CFM

S2 - 10"Ø

265 CFM

S2 - 10"Ø

265 CFM

S2 - 10"Ø

265 CFM

x x x

12"Ø

6' CFH -

800 CFM

GEV-12X24

VAV-1

(4")

VAV-3

(8")

VAV-2

(6")

VAV-1

(4")

40x16 x x

VAV-1

(4")

VAV-1

(4")

FC-4

FC-9

VAV-3

(8")

VAV-3

(8")

VAV-3

(8")

10"Ø

10"Ø

"Ø

10"Ø

10"Ø

12"Ø

12"Ø

10"Ø

"Ø

"Ø

12"Ø

"Ø

"Ø

"Ø

"Ø x x x x x x

CO2

CO2

T

T

LCP

CO2

T

CO2

T

T

CO2

T x

S2 - 12"Ø

400 CFM

S2 - 12"Ø

350 CFM

S2 - 8"Ø

50 CFM

S2 - 10"Ø

275 CFM

S2 - 10"Ø

275 CFM

S2 - 10"Ø

300 CFM

S2 - 10"Ø

300 CFM

FC-10

x

22x12

R1 - 20x20

870 CFM

28x16 x

R1 - 20x20

1350 CFM

R1 - 20x20

1350 CFM

x x x

20x12

6x6 x

"Ø

"Ø

8x6 x x

"Ø

"Ø

"Ø

8"Ø

VAV-2

(6")

FC-5

12"Ø

S4 - 10"Ø

200 CFM

x

VAV-3

(8") 10x10 x x

EEV-8

SEV-8

24x10 x

10"Ø

10"Ø

10"Ø10"Ø

18x12

18x14 x x

FD-E4

FD-E5

FD-E3

FD-E2

FD-E1

GEV-8

GEV-8

GEV-10

"Ø

6"Ø

S2 - 10"Ø

300 CFM

R1 - 10x10

350 CFM

"Ø

"Ø

(TYP OF 4)

SEV-8

"Ø x1 x

10x6 x

18x14

S2 - 12"Ø

400 CFM

12"Ø

10"Ø

10"Ø

"Ø

12"Ø

RHC-4

x

"Ø

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/3 /2 :0 :3 P M

M-102E

B A S E M E N T F L O O R P L A N A R E A E H V A C

F J T

M A C

J D V

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PLAN -

AREA E HVAC

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 D

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 C

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 B

F O R C O N T

IN

U A T

IO

N S E E D W G M -1 B

FOR CONTINUATION SEE DWG. M-102C

UP

UP

DN

A

B

D

C

E

GENERAL NOTES:

CODED NOTES:

1. THIS SPACE WILL BE EXHAUSTED. DOOR UNDERCUTS WILL PROVIDE MAKE-UP AIR UP

FOR EXHAUST CFM UP TO 100 CFM. TRANSFER AIR DUCT WILL PROVIDE MAKE-UP AIR

FOR EXHAUST CFM GREATER THAN 100 CFM (TYPICAL).

2. CHILLER ROOM VENTILATION DUCT UP AND DOWN.

3. GENERAL EXHAUST DUCT.

4. LAB EXHAUST DUCT.

5. AHU-5 OUTDOOR AIR SUPPLY DUCT UP AND DOWN.

6. CONTRACTOR SHALL PROVIDE DUCT TRANSITIONS BETWEEN FUME HOOD COLLARS

AND INDICATED EXHAUST DUCT SIZES.

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES. MEETS

EXISTING CONSTRUCTION.

2. FINAL LOCATION OF DIFFUSERS, REGISTERS AND GRILLES SHALL BE FROM

ARCHITECTURAL REFLECTED CEILING PLANS.

3. PROVIDE ACCESS DOORS FOR ALL AUTOMATIC CONTROL DAMPERS, FIRE DAMPERS,

FIRE/SMOKE DAMPERS, DUCT DETECTORS, ETC. COORDINATE THE LOCATIONS AND

THE REQUIREMENTS FOR ALL ACCESS DOORS WITH THE GENERAL CONTRACTOR.

4. COORDINATE FINAL LOCATION OF THERMOSTATS, SENSORS AND MONITORS WITH THE

ELECTRICAL CONTRACTOR AND OTHER TRADES FOR AN AESTHETIC, FUNCTIONAL

GROUPING.

5. BRANCH DUCT SIZES TO DIFFUSER/GRILLE SHALL BE THE SAME SIZE AS THE NECK

SIZE OF AIR DEVICE UNLESS OTHERWISE NOTED. SEE AIR DEVICE TAG OR DIFFUSER,

REGISTER AND GRILLE SCHEDULE FOR NECK SIZE.

6. SIZE OF INLET DUCT TO AIR VALVES IS SAME AS VALVE INLET UNLESS NOTED

OTHERWISE.

7. ALL EXPOSED SUPPLY AIR DUCTWORK SHALL BE DOUBLE WALL CONSTRUCTION.

8. DO NOT USE THE NEW SEISMIC CHORD FRAMING MEMBERS TO SUPPORT ANY

LABORATORY EQUIPMENT, MECHANICAL SYSTEMS, FIRE PROTECTION PIPING,

ELECTRICAL UTILITIES, OR TELECOMMUNICATION SYSTEM COMPONENTS. THESE

UTILITIES AND COMPONENTS ARE TO BE SUPPORTED FROM THE EXISTING

STRUCTURAL FRAMING MEMBERS OR FROM THE NEW NON-SEISMIC STRUCTURAL

FRAMING MEMBERS.

9. TYPICAL LAYOUT FOR CLASSROOMS AND OFFICES: OUTSIDE AIR DELIVERED FROM

THE 100% OA UNIT AHU-5 THROUGH A VAV UNIT CONTROLLED BY AN OCCUPANCY

SENSOR AND CO2 SENSOR. COMFORT COOLING AND HEATING IS PROVIDED BY A

FOUR PIPE FAN COIL UNIT.

10. INTERIOR PARTITIONS ARE FULL HEIGHT TO THE UNDER-SIDE OF SLAB ABOVE. REFER

TO WALL DUCT/PIPE PENETRATION DETAILS FOR REQUIREMENTS.

11. PROVIDE REMOTE BALANCING DAMPERS ADJUSTABLE FROM A CABLE LOCATED AT

THE DIFFUSER FACE, WHERE GYPSUM BOARD CEILINGS OR OTHER CONDITIONS DO

NOT ALLOW DIRECT ACCESS FOR BALANCING.

12. PROVIDE DOUBLE-WALL DUCTWORK CONSISTING OF I INCH THICK ACOUSTICAL LINING

AND INNER PERFORATED METAL LINER FOR THE FIRST TWENTY-FIVE (25) FEET OF

SUPPLY, RETURN, AND EXHAUST DUCTWORK FROM ALL AIR HANDLING UNITS.

13. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF SUPPLY AND RETURN DUCTWORK FROM ALL FAN COIL UNITS.

ALSO PROVIDE 1 INCH THICK ACOUSTICAL LINING IN ALL FAN COIL UNIT MIXING BOXES.

14. PROVIDE 1 INCH THICK HIGH QUALITY, EROSION-PROOF ACOUSTICAL LINING FOR THE

FIRST TEN (10) FEET OF DUCTWORK DOWNSTREAM OF ALL VAV AND CAV AIR TERMINAL

UNITS.

15. CONTRACTOR SHALL FILL-IN ALL VOIDS AROUND DUCTWORK PENETRATIONS OF WALL/

ROOF ASSEMBLIES WITH NON-COMBUSTIBLE MINERAL WOOL. REFER TO DETAIL FOR

ADDITIONAL INFORMATION.

16. EQUIPMENT MOUNTED OVERHEAD, WHICH WEIGHS 31 LBS OR MORE, SHALL BE

SUPPORTED AND LATERALLY BRACED IN ACCORDANCE WITH UFC 4-010-01 STANDARD

20. REFER TO SUPPORT DETAIL FOR REQUIREMENT.

17. ANY SPACES OR GAPS AROUND DUCTWORK AND PIPING WHICH PENETRATE

CORRIDOR WALLS REQUIRED TO RESIST THE PASSAGE OF SMOKE, SHALL BE SEALED

AIR-TIGHT TO PREVENT THE MIGRATION OF SMOKE.

A2A2.5A3A4

AF

A6A7

AG

AH

AJ

AK

A8 A5

AM

AN

A5.4

A10

A9.5

A10.8A11.5A12.3 A12 A11 A10.5

GEN & ADVNCD

CHEM

B-107

GEN & ADVNCD

CHEM

B-108

CADET READ RM

B-102

COMM

B-114

CLASSROOM

B-109

TOILET

B-110

STAIR B1

B-1S1

STAIR B2

B-1S2

CORRIDOR

B-1C2

FC-4

T T

GEN & ADVNCD

CHEM

B-106

PREP STOR

B-105

CORRIDOR

B-1C1

ELEC

B-101

CLASSROOM

B-111

MEN

B-112

CORRIDOR

B-1C3

CORRIDOR

B-1C4

6x4 x

10x6

12x8

6x4

VAV-4

285 CFM

S-3 - 8"Ø

160 CFM

VAV-4

275 CFM

E4 - 14x14

500 CFM

S-3 - 12" -

300 CFM

S-3 - 10"Ø

115 CFM

E4 - 12x12

430 CFM

S-3 - 8"Ø

110 CFM

VAV-1

125 CFM

E4 - 12x12

325 CFM

TYP FOR 2

E4 - 8x8

75 CFM

VAV-1

S-3 - 12" -

315 CFM

L C P

L C P

L C P

L C P

RHC-1

8x8

RHC-6

DN TO 6' CFH

THIS LEVEL

HEV-10"

HEV-10"

HEV-10"

DN TO 6' CFH

THIS LEVEL

DN TO 6' CFH

THIS LEVEL

10"Ø

10"Ø

8"Ø

"Ø

"Ø

S N O R K E L

E X H A U S T D U C T

S N O R K E L

E X H A U S T D U C T

S N O R K E L

E X H A U S T D U C T

S N O R K E L

E X H A U S T D U C T

FOR CONTINUATION SEE DWG. M-101C

FOR CONTINUATION SEE DWG. M-101E

CO2

OCC

T

T

T

T

OCC

CO2

OCC

CO2

SEV-8"

SEV-8"

SEV-8"

HEV-10"

L C P

CRACU-10

26x14 12x12

6"Ø

S4 - 13' - 4"

195 CFM

8"Ø 8"Ø x

E4 - 12x12

355 CFM

S-3 - 8" -

160 CFM

E4 - 10x10

235 CFM

8x6 6"Ø

10x6

R5 - 6x10

150 CFM

TYP FOR 2

10x6

R5 - 6x4

50 CFM

12x12

S-3 - 8"Ø

160 CFM

S-3 - 8"Ø

160 CFM

S-3 - 8"Ø

160 CFM

S-3 - 8"Ø

90 CFM

"Ø

14x12 12"Ø

8x6

R5 - 6x8

100 CFM

S4 - 7' - 10"

130 CFM

FC-3

S-3 - 8"Ø

100 CFM

TYP FOR 4

E4 - 14x14

530 CFM

E4 - 10x10

225 CFM

8"Ø

TYP FOR 7

S4 - 10' - 0"

450 CFM

FC-1

16x10

32x14 x1

S-3 - 6"Ø

50 CFM

VAV-1

8x8

6x6 x8 x8

6"Ø x8

RHC-3

SV-12"

"Ø

"Ø

S-3 - 10"Ø

325 CFM

TYP FOR 4

x1

8"Ø

10"Ø

S4 - 7' - 6"

330 CFM

HEV-10"

E4 - 16x16

705 CFM

TYP FOR 42

x1

"Ø

14x10 x1 x1

S4 - 7' - 6"

330 CFM

S4 - 7' - 6"

330 CFM

S4 - 7' - 6"

330 CFM

10"Ø

14"Ø

10"Ø 14"Ø

8x8

8x8

12"Ø

S-3 - 10"Ø

315 CFM

S-3 - 10"Ø

320 CFM

TYP FOR 3

8"Ø

S4 - 13' - 2"

720 CFM

S4 - 9' - 6"

555 CFM

E4 - 16x16

685 CFM

TYP FOR 2

E4 - 16x16

690 CFM

TYP FOR 2

x1 "Ø

E4 - 8x8

75 CFM

FC-3

12x12

6x6

"Ø x

6x8 x

"Ø

S-3 - 10"Ø

185 CFM

TYP FOR 2

x

4"Ø x x

10x10

"Ø

8"Ø

S4 - 16' - 3"

400 CFM

VAV-1

x

"Ø

S-3 - 12"Ø

430 CFM

TYP FOR 2

"Ø

"Ø

12"Ø x1

S4 - 7' - 0"

300 CFM

8"Ø

32x14

E4 - 16x16

860 CFM

x1 x2 x1 x2 x2 x2

12x12

8x8

10"Ø

8x8

"Ø

14"Ø 10"Ø

24x24

30x28

8x8

S4 - 8' - 0"

220 CFM

S4 - 8' - 0"

220 CFM

8"Ø

TYP FOR 4

S-3 - 10"Ø

220 CFM

TYP FOR 4

"Ø

FSD-B8

FSD-B9

10"Ø

14x10

E4 - 12x12

490 CFM

TYP FOR 4

S4 - 8' - 0"

220 CFM

S4 - 8' - 0"

220 CFM

10"Ø x1

RHC-4

INACTIVE

S4 - 3' - 4"

FSD-B10

INACTIVE

S4 - 0' - 10"

S4 - 8' - 0"

0 CFM

INACTIVE

S4 - 1' - 8"

S4 - 8' - 0"

0 CFM

INACTIVE

S4 - 6' - 4"

INACTIVE

S4 - 2' - 8"

INACTIVE

S4 - 0' - 8"

INACTIVE

S4 - 2' - 0"

INACTIVE

S4 - 2' - 0" x1

"Ø

INACTIVE

S4 - 0' - 9"

INACTIVE

S4 - 3' - 8"

INACTIVE

S4 - 1' - 0"

INACTIVE

S4 - 0' - 10"

INACTIVE

S4 - 3' - 2"

INACTIVE

S4 - 1' - 0" x8

24x12

GEV-24x12

SV-24x12

SV-24x12

GEV-24x12

RHC-6

x1

"Ø x1 x1 x1

24x12

"Ø x1

RHC-1

SV-8"

GEV-8"

10"Ø

10"Ø

8"Ø

16x24

8x8 x8

42x24

SV-8"

SEV-8"

42x24

14"Ø

8x8

8x8

8x8

RHC-5

x1 x1

GEV-14"

SV-14"

x1

10"Ø x1 x1

16x10

18x10 x1

"Ø

RHC-3

CUH-11

PREP STOR

B-103

GEN & ADVNCD

CHEM

B-104

1 HR DUCTWRAP

8"Ø

8"Ø

8"Ø

SHEET

REFERENCE

NUMBER

SHEET OF

D E S

IG

N E D B Y

D W N B Y

C H K B Y

S U B M

IT

T E D B Y

D A T E

S O L

IC

IT

A T

IO

N N O

C O N T R A C T N O

F

IL

E N A M E

P L O T T E D B Y

S

IZ

E

P L O T D A T E

D A T E

D E S C R

IP

T

IO

N

M A R K

A P P R

US ARMY CORPS

OF ENGINEERS

NEW YORK DISTRICT

1 2 3 4 5

D

C

B

A

U .S A R M Y E N G

IN

E E R D

IS

T R

IC

T

N E W Y O R K h tt p \w w w .n a n .u s a c e .a rm y .m il a rc h it e c ts e n g in e e rs p la n n e rs

W

E S T N A T

IO

N W

ID

E B L V D

C O L U M B U S O H

IO

.4 .4 f a x .4 .0 h tt p /w w w .u rs c o rp .c o m

S C

IE

N C E C E N T E R

(F Y -B L D G

U N

IT

E D S T A T E S M

IL

IT

A R Y A C A D E M Y

W E S T P O

IN

T N Y

A R C H D

P A R K A V E N U E S O U T H

N E W Y O R K N Y -1

.7 .4 f a x .5 .5 w w w .s tv in c .c o m

W D S -1 -D -0

/1 /2 :2 :4 P M

M-103B

F

IR

S T F L O O R P L A N A R E A B H V A C

F J T

F G

J D V

A P R

IL

PLAN

NORTH

0 4 8 162

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - AREA

B HVAC

DNDN

UP

DN

DN

UP

UP

DN

DNDN

UP

DN

DN

UP

UP

GENERAL NOTES:

CODED NOTES:

1. SUPPLY DUCT FROM SUB-BASEMENT UP TO AHU-6B

5. EXHAUST DUCT FROM CONTAINED VENTILATED BAY UP TO LEF-9

4. TOILET EXHUAST DUCT FROM BASEMENT UP TO EF-6

6. GENERAL EXHAUST DUCT FROM BASEMENT UP TO LEF-7,8

7. FUME HOOD EXHAUST DUCT UP TO LEF-7,8

9. AHU-6A SUPPLY UP. REFER TO DRAWING M-303 FOR CONTINUATION

2. SUPPLY DUCT FROM SUB-BASEMENT UP TO AHU-6A

3. SUPPLY DUCT FROM BASEMENT UP TO AHU-6A

8. SUPPLY DUCT DOWN TO MOORE WING

10. 3"Ø ARTICULATED EXHAUST ARM CONNECTION. PROVIDE DUCT TRANSITION AS REQD.

11. CONNECT TO FUME HOOD. PROVIDE DUCT TRANSITION AS REQD.

12. AHU-6B SUPPLY TO FAN RM. REFER TO DRAWING M-303 FOR CONTINUATION

13. EMERGENCY POWER-OFF BREAK GLASS SWITCH FOR ALL AIR HANDLING SYSTEMS.

14. NMR QUENCH VENT TO ROOF

1. COORDINATE INSTALLATION OF DUCTWORK WITH ALL OTHER TRADES BEFORE

FABRICATION. PROVIDE ADDITIONAL OFFSETS TO AVOID INTERFERENCES.