About this file

Solicitation

View the file

Other files

File Type Posted
Bid Abstract W912DS-11-B-0005 Science Center.pdf PDF
Amendment 0011.pdf PDF
fbo announcement for Step Two.doc DOC document
Invitation to Step Two.doc DOC document
Amendment 4.pdf PDF
PAS Pre-Award Survey.pdf PDF
Amendment 0003.pdf PDF
Amendment No. 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 1.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 2.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 4.pdf PDF
USMA_SCICTR_PN59044-07_INT.pdf PDF
USMA_SCICTR_PN59044-16_GEN-VI.pdf PDF
Updated SF 1442 Front and Back.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 1.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 1.pdf PDF
USMA_SCICTR_PN59044-12_LABPL.pdf PDF
USMA_SCICTR_PN59044-17_ELEC_Part 1.pdf PDF
USMA_SCICTR_PN59044-08_GEN-III.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 3.pdf PDF
USMA_SCICTR_PN59044-13_PLUMB.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 2.pdf PDF
Amendment 1.pdf PDF
USMA_SCICTR_PN59044-10_GEN-IV.pdf PDF
USMA_SCICTR_PN59044-04_GEN-II.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 3.pdf PDF
USMA_SCICTR_PN59044-11_FIRE.pdf PDF
USMA_SCICTR_PN59044-09_STRU_Part 2.pdf PDF
USMA_SCICTR_PN59044-14_GEN-V.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 3.pdf PDF
USMA_SCICTR_PN59044-06_LABEQ.pdf PDF
USMA_SCICTR_PN59044-03_ARCH_Part 4.pdf PDF
USMA_SCICTR_PN59044-02_CIVIL.pdf PDF
USMA_SCICTR_PN59044-01_GEN-I.pdf PDF
USMA_SCICTR_PN59044-05_ARCH_Part 5.pdf PDF
USMA_SCICTR_PN59044-15_MECH_Part 2.pdf PDF
Specs 2011 04 01.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE11175116

Multipurpose Academic Building Science Facility Phase 2, w hich is located at the USMA West Point NY.

This project w ill construct a Multipurpose Academic Building Science Facility Phase 2, w hich is located at the USMA West Point NY. The fully renovated facility w ill provide approximately 245,000 gross square feet of the existing Science Building, Bartlett Hall (753) into an expanded and modernized science center for biology, chemistry and physics programs. The project includes a complete upgrade to meet the functional requirements of the Dean’s office and all relevant codes including, but not limited to life safety and seismic upgrade requirements. The facility has been designed in accordance w ith the Unif ied Facilities Criteria (UFC) 4-510-01, DoD Minimum Anti-terrorism Standards UFC 4-010-01, and the Uniform Federal Accessibility Standards/Americans w ith Disabilities Act Accessibility Guidelines (UFAS/ADAAG).

This acquisition is proceeding as Unrestricted Full and Open Competition Tw o Step Sealed Bid (IFB).

Estimated Cost Range is greater than $50,000,000.

X

JASON L PARKER (917)790-8080

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Jun-2011

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________1320 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________26 Jul 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

212 264-3013FAX:TEL: 212 264-0238 TEL: FAX:

W912DS-11-B-0005 98

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

E3CT9JLP

Typewritten Text

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or at tached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DS-11-B-0005

Section 00010 - Solicitation Contract Form

SOLICITATION CONTRACT FORM

CONTINUATION OF STANDARD FORM 1442

BLOCK 20D:

(1) IF THE OFFEROR IS A JOINT VENTURE, EACH PARTICIPANT IN THE JOINT

VENTURE

MUST COMPLETE THE FOLLOWING:

Company Name Signature Title

Company Name Signature Title

Company Name Signature Title

NOTE: If a corporation is participating as a member of a Joint Venture, the certificate below must also be completed and signed.

CORPORATION AUTHORIZATION TO PARTICIPATE IN JOINT VENTURE

CERTIFICATE

I, _______________________, certify that I am the Secretary of the corporation

(name) named as a participant in a Joint Venture on this offer; that _____________________, who signed said offer on behalf of the corporation, was

(name) then ______________________ of said corporation; that the signature thereto is

(title) genuine; that said contract was duly signed, sealed and attested for and in behalf of said corporation by authority of its governing body; and that the corporation is authorized to participate in the Joint Venture on this offer.

(Name of Corporation)

(Secretary)

(2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS

BELOW. SIGNATURES BY ALL PARTNERS HERE SIGNIFY THAT THE INDIVIDUAL

WHO SIGNED THE OFFER IN BLOCK 20B HAS THE AUTHORITY TO BIND THE

PARTNERSHIP.

Name Signature

Name Signature

Name Signature

(3) IF THE OFFEROR IS A CORPORATION, THE OFFER SHALL BE SIGNED IN THE

CORPORATE NAME FOLLOWED BY THE WORD "BY" AND THE SIGNATURE OF THE

PERSON AUTHORIZED TO SIGN THE OFFER IN BLOCK 20B. PROVIDE PROOF THAT

THE PERSON SIGNING FOR THE CORPORATION HAS THE AUTHORITY TO BIND

THE CORPORATION BY COMPLETING THE FOLLOWING CERTIFICATE:

CONTINUATION OF STANDARD FORM 1442

CORPORATION AUTHORIZATION CERTIFICATE

I, ___________________________________, certify that I am the Secretary of the (name) corporation named as offeror in the within offer; that ______________________, (name) who signed said offer on behalf of the corporation, was then _____________________________________ of said corporation, that the signature

(title) thereto is genuine; that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.

(Name of Corporation)

(Secretary)

(4) IF THE OFFEROR IS AN INDIVIDUAL DOING BUSINESS AS A FIRM, THE OFFER

SHALL BE SIGNED BY THAT INDIVIDUAL IN BLOCK 20B FOLLOWED BY THE

WORDS "AN INDIVIDUAL DOING BUSINESS AS

____________________________________ (INSERT NAME OF FIRM).

(5) WHEN AN AGENT SIGNS THE OFFER, PROVIDE PROOF OF THE AGENT'S

AUTHORITY TO BIND THE PRINCIPAL.

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO BIDDERS

00100 INSTUCTIONS STEP ONE & EVALUATION

SECTION 00100

INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

AND EVALUATION CRITERIA FOR AWARD

NOTE TO OFFERORS: Appendix A will include 90% Plans and Specifications for information purposes only to prepare your technical proposal. 100% Plans and Specifications will be issued in Step II for preparation of you bid.

The following documents must be returned with your Step one Proposal.

--The completed Step One Technical Proposal Volume cover sheet.

--The Step One Technical Proposal Volume.

INQUIRIES:

Prospective bidders should submit inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for bid opening, please check http://www.fbo.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via E-Mail to jason.l.parker@usace.army.mil The Solicitation Number is: W912DS-11-B-0005

c. The point of contact for this solicitation is:

Contract Specialist: Jason L Parker Telephone: (917) 790-8080 E-MAIL: jason.l.parker@usace.army.mil

DIRECTIONS FOR SUBMITTING BIDS FOR STEP 1:

Envelopes containing Technical proposals must be sealed, marked and addressed as follows:

MARK ENVELOPES:

Solicitation No. W912DS-11-B-0005 Technical Proposal Opening Date: 26 July 2011 Technical Proposal Opening Time: 2:00 PM EST

ADDRESS ENVELOPES TO:

Department of the Army U.S. Army Corps of Engineers, New York District ATTN: Contracting Division 26 Federal Plaza Room 1843 New York, NY 10278-0090

SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED BIDS:

Hand-carried bids must be delivered to: Room 1843, 26 Federal Plaza, New York, NY 10278- 0090 PRIOR to 26 July 2011 @ 2:00 PM EST .

Due to security precautions, PLEASE ALLOW AMPLE TIME TO GET THROUGH

AIRPORT TYPE SECURITY.

Please ensure that all courier and delivery personnel should be aware of these procedures in order to submit a timely Bid.

CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY:

In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work (see Attachments, Preaward Survey). The Preaward Survey is attached to the solicitation for information purposes only. It will be required from only the low bidder. After the Bid Opening, the Government will request this information from the low bidder if the low bidder has not had a contract with the New York District within the last twelve months and the Government will set a due date for its submission. The Preaward Survey is not required as part of the bid package.

In order to be determined to be responsible a prospective contractor must:

a. Have adequate financial resources to perform the contract or the ability to obtain them.

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.

c. Have a satisfactory performance record. In making the determination of responsibility, the Government Contracting Officer shall consider relevant past performance information. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history except when there are special standards set forth in the solicitation which applies to all bidders that must be met in order to receive the award. These special standards may be necessary when unusual expertise or specialized facilities are necessary in the performance of the contract; therefore, in order to be determined to be responsible for that particular contract, the offeror must be able to meet those special standards. A prospective contractor that is or recently has been seriously deficient in contract performance shall be presumed to be nonresponsible unless the Contracting Officer determines that the circumstances were beyond the contractor's control or that the contractor has taken appropriate corrective action. Other responsibility considerations by the Contracting Officer will include past efforts by the contractor to apply sufficient tenacity and perseverance to perform acceptably, to meet quality requirements of contracts, and the contractor's past compliance with subcontracting plans (if required) under recent contracts.

d. Have a satisfactory record of integrity and business ethics.

e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).

f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations. If the contractor or subcontractor does not already have sufficient resources demonstrated in the completed

Preaward Survey, acceptable evidence of "the ability to obtain" the required, adequate resources (all of the resources discussed in subparagraphs a, e, and f above) normally consists of a commitment or explicit arrangement that will be in existence at the time of contract award to rent, purchase or otherwise acquire the needed facilities, equipment, other resources, or personnel.

EVALUATION FOR AWARD:

The TEB will be established to conduct the evaluation of Step 1 proposals received in response to this solicitation. Offerors should submit proposals that are acceptable without additional explanation or information. The evaluation will be based on the content of the proposal and any subsequent clarifications required, as well as information obtained from other sources, e.g. past performance information. The TEB will not consider any information incorporated by reference.

Only acceptable proposals from Step 1 will be eligible for Step II and considered for award.

100% plans and specifications will be issued during Step II.

TELEGRAPHIC BIDS:

Telegraphic Bid/Offers ARE NOT ACCEPTABLE.

FACSIMILE BIDS/OFFERS:

Facsimile bids/offers, modifications thereto, or cancellations of bids/offers will NOT BE ACCEPTED.

PREPARATION OF SUBCONTRACTING PLAN:

(a) See FAR 52.219-9, Section 00700, of this solicitation. Subcontracting Plans will be developed considering only the subcontracts actually to be awarded. Subcontracting Plans are required from other than small businesses if the contract price is over $1,500,000; they are not required from small business firms regardless of the contract price.

(b) For information on the evaluation of subcontracting plans, see Army Federal Acquisition Regulation Supplement, Appendix DD.

(c) The Corps of Engineers highly encourages all bidders/offerors to meet the recommended subcontracting goals as follows:

Small Businesses 70.0% Small Disadvantaged Businesses 6.2% Women-Owned Small Businesses 7.0% HUBZone Small Business 9.8% Veteran-Owned Small Business 3.5% Service Disabled Veteran Owned Small Business 2.0%

The goals are calculated as a percentage of the TOTAL SUBCONTRACTING DOLLARS, NOT

THE TOTAL CONTRACT AMOUNT.

PERFORMANCE AND PAYMENT BONDS:

The bidder/offeror whose bid/offer is accepted will, within the time established in the contract, furnish performance and payment bonds in accordance with FAR 52.228-15 located in Section 00700.

INDIVIDUAL SURETIES IN SUPPORT OF BID BONDS:

Bidders/offerors utilizing individual sureties in support of a bid bond shall include a Standard Form (SF) 28 (Affidavit of Individual Surety), accompanied by a pledge of acceptable assets from each person acting as an individual surety, and include these with the SF 24 (Bid Bond), and the bid itself (see clause titled "Pledges of Assets," FAR 52.228-11). Pledges of acceptable assets shall be in the form of (1) evidence of an escrow account and/or (2) a recorded lien on real estate. If this is an IFB, failure to provide pledges of acceptable assets, with the bid, in the specified form, accompanied by a properly executed SF 24 and SF 28, will render the bidder nonresponsible and thus ineligible for award. If this is an RFP, failure to provide required documentation described herein may cause the offeror to be deemed "unacceptable".

ACCEPTANCE OF OFFERS:

A written award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Data Universal Numbering System (DUNS) Number APR 2008 52.211-2 Availability of Specifications, Standards, and Data Item

Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

JAN 2006

52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-23 Late Submission, Modifications, And Withdrawals Of

Technical Proposals Under Two-Step Sealed Bidding

NOV 1999

52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.217-5 Evaluation Of Options JUL 1990 52.225-12 Notice of Buy American Act Requirement - Construction

Materials Under Trade Agreements

FEB 2009

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed-Price Construction contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, New York District ATTN: Contracting Officer, Room 1843 26 Federal Plaza Rm 1843 New York, NY 10278

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/FAR/

(End of provision

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

N/A

STEP ON INSTRUCTIONS AND EVAL

STEP ONE INSTRUCTIONS & EVALUATION

SECTION 00101

TWO-STEP PROCUREMENT ACQUISITION

BASIS OF AWARD,

BID SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,

AND BASIS OF AWARD – TWO STEP SEALED BIDDING

1.0 NOTICE TO OFFERORS

1.1 Acquisition

1.1. This is a Two Step Sealed Bid “solicitation, in accordance with FAR 14.5 for the Construction of the Science Center Phase II at the USMA, West Point, NY The Government will evaluate technical proposals submitted in Step 1 in accordance with the criteria described herein, and determine which Offerors proceed to Step 2. The Government may make a final determination regarding a proposals acceptability solely on the basis of the proposal in Step 1 as submitted and may proceed to Step 2 without requesting further information from any Offeror.

1.2 N/A

1.3 Who May Submit - UNRESTRICTED

1.4 Professional Registration - Not Used.

1.5 Page Limit and Size of Printed Materials

In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly address submission requirements as outlined below.

The written portion of the proposal (Volume I - Technical Proposal), however, shall not exceed 90 pages. A page printed on two sides will be counted as two pages. Pages containing text shall be submitted on 8-1/2 x 11 inch paper. Each page shall be minimally single spaced with a minimum 12-point font and one inch margins all around.

2.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

2.1 Proposal Requirements and Submission

Proposals should be submitted initially on the most favorable terms from a technical standpoint. A technical proposal will be submitted for Step 1. Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

Do not submit any material not required by this solicitation (such as company or system brochures).

Offerors must meet all technical portions (construction criteria) of the RFP. The fact that the technical specifications and the drawings are not evaluated factors during Phase 1 of the solicitation does not relieve the Offerors from meeting all technical, or other, requirements of the RFP.

2.2 Where to Submit

Offerors shall submit their proposal packages to the Corps of Engineers (USACE) at the address shown in Block 7 of Standard Form 1442.

2.3 Submission Deadline

The USACE must receive proposals not later than the time and date specified in Block 13 of Standard Form 1442.

2.4 Incurring Costs

The Government is not liable for any costs incurred by the Offerors submitting an offer in response to this solicitation.

2.5 Format Requirements

Submit one (1) original plus six (6) copies. All proposals shall contain the volume number and the name, address and telephone number of the Prime and Subcontractors, Joint Venture, or other entity identified on the cover. The original proposal must be clearly marked as “ORIGINAL” and the original signatures must be in blue ink. Copies of the proposals must also be clearly marked as “COPY x of y (i.e. COPY 1 of 6)”. Proposal clarity and material organization in each volume are mandatory. No material shall be incorporated by reference. Each volume will be submitted separately bound. The proposal shall address and contain the information listed below.

The information will be used by the Technical Evaluation Board to evaluate each proposal. Offerors are advised that conciseness and relevance of the proposal is important and unrelated information will not be evaluated. Proposals that provide only superficial coverage of the information required below, may not receive additional consideration and may be excluded from the competitive range.

Additionally, should the proposal include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be determined to be "unacceptable" and thus ineligible for award.

3.0 FACTORS FOR EVALUATION FOR STEP 1:

3.1. VOLUME 1 -TECHNICAL PROPOSAL (FACTOR 1, 2 and 3)

Factor Location Description

FACTOR 1 Vol. 1 TAB A Contractor Past Relevant Experience

FACTOR 2 Vol. 1 TAB B Contractor Past Performance

FACTOR 3 Vol. 1 TAB C Qualifications of the Offeror’s Team

3.1.1. FACTOR 1 - CONTRACTOR PAST RELEVANT EXPERIENCE -

The Offeror will demonstrate past experience of construction by providing recent and relevant Design- Build Experience and/or Design-Bid-Build Experience.

The Contractor shall each demonstrate relevant project experience by providing not less than two (2) relevant projects with the last seven (7) years, of which one (1) project must be 100% complete and one

(1) project must be no less than 50% complete . No more than five (5) relevant projects shall be submitted. Relevant projects are those which are similar in scope, magnitude and complexity. Offerors submitting under Joint Ventures or Teaming Arrangements may not combine individual experience to meet the requirement to have not less than one (1) project completed within the last seven (7) years and no less than one (1) project at least 50% complete within the last seven (7) years. At least one entity must meet the relevant experience requirements independently, and that entity must participate substantially in the execution and management of this project.

1. Similar scope is defined as major modernization/renovation of academic facilities including classrooms and laboratories or commercial laboratory facilities, of at least 50,000

GSF.

2.Similar complexity is defined as management/coordination of a multi-disciplined construction team to complete projects that include the majority of the following types of work/complexities: historic preservation/restoration,; reinforced concrete; seismic mitigation;

steel erection; roofing; plumbing; electrical; HVAC; fire protection; communications;

equipment installation; and involving phased construction on a constrained site adjacent to occupied facilities.

3.Similar magnitude is defined as a construction contract with a value of at least $45,000,000.

Offerors shall provide a brief description of project, completion date, customer name, contact information and dollar value of construction contract. Information shall be provided on the form found in Paragraph 6.0, Relevant Project Information Sheet. A minimum of two (2) and no more than five

(5) total project information sheets shall be submitted. If more than five (5) project information sheets are submitted, only the first five (5) will be considered.

Rating Guidelines for Factor 1:

Satisfactory : At least one (1) relevant construction project of similar scope, magnitude and complexity, and one (1) project of similar magnitude and complexity.

Unsatisfactory : The Offeror has not submitted one (1) relevant construction project of similar scope, magnitude and complexity, and one (1) project of similar magnitude and complexity.

3.1.2. FACTOR 2 - CONTRACTOR PAST PERFORMANCE

Offerors are required to provide a Past Performance questionnaire to their previous Client(s) for their past Client’s input regarding their firm’s and/or that of any past Team Association or sub-contractor’s Past

Performance. Offerors shall submit Past Performance questionnaires for each project submitted under factor 1. Instructions will be included in the RFP informing offerors to fax or Email their completed questionnaires directly to the Corps of Engineers, Contract Specialist.

In addition to the questionnaires, the Offeror is required to provide information on past projects (within the past seven (7) years) in which they have been issued a CURE NOTICE and provide accompanying information as to the details for such action(s) with an explanation of why they were issued a cure notice.

Rating Guidelines for Factor 2

Satisfactory : Based on Offeror’s past performance record, no doubt exists that Offeror will successfully perform the required effort.

Unsatisfactory : Based on the Offeror’s past performance record, some doubt exists that the Offeror will successfully perform the required effort.

Unknown : No relevant past performance is identifiable upon which to base a meaningful performance risk prediction. A search was unable to identify any relevant past performance information for the Offeror or the key team members/subcontractors or their key personnel. This is neither a negative nor positive assessment. Unknown past performance shall be considered Satisfactory.

3.1.3 FACTOR 3 - QUALIFICATIONS OF THE OFFEROR’S TEAM

The Offeror shall provide the following to show qualifications of the team:

The Offeror shall identify the areas and percent of work (construction) they intend to self-perform and the areas and percent of work (construction) intend to subcontract along with the names of significant subcontractors. Offerors shall perform the amount of work required to be self-performed, in accordance with paragraph 5, section 00800.

Provide an Organization Chart showing Key Personnel for the Offeror's Construction Team. At a minimum, the organizational chart shall identify the Key Personnel, the contractor and significant subcontractor entities, their responsibilities, structure and lines of authority. At a minimum, the following Key personnel shall be identified by name within the chart: Contractor’s (Offeror’s) Project Manager;

Construction Quality Control Manager; and Superintendent,. A sample organizational chart is provided in Attachment A for information only. The Contractor (Offeror) shall develop its own chart, unique to and specific to their organization and team. Individual resumes in the format found in Attachment 8.0, Key Personnel Resume Form, shall be provided and that includes the following information:

a. Name.

b. Management title on this project.

c. Number of years with firm and other firms.

d. Number of years in this management title or role.

e. Specialization.

f. Education, apprenticeship, and relevant training.

g. Professional registration.

h. Specific experience and qualifications relevant to this project. Show dates so that the Government can determine if the minimum number of years required for the position is met. Indicate the scope, magnitude and complexity of the experiences.

Expected roles and responsibilities of Key Personnel:

Contractor's Project Manager: (Overall Manager of the Project)

(1) Performs all project management duties of the project.

(2) Serves as the Governments' sole point of contact in all matters relating to work including, but not limited to, contract compliance, progress of work, overall project scheduling, financial matters, and change orders.

(3) Attends all job meetings.

(4) On-site a minimum of 80% of the time.

(5) The Overall Project Manager shall have a minimum of ten (10) years of project management experience in construction on projects of comparable complexity, scope and cost.

Construction Quality Control Manager: (Principal in Charge of Construction Quality Issues and Coordination of Construction Quality Control)

(1) The Contractor shall identify the Construction Quality Control Manager as an individual within his organization that is completely responsible for all Construction Quality Issues and shall perform coordination between the contractor, subcontractors, and any Independent Testing Labs and have the authority to act in all construction quality control matters for the prime contractor.

During construction this person shall be onsite at all times performing Construction Quality Control duties to include, but not limited to, implementation of the three-phase inspection system for all aspects of the construction work specified. This person shall have complete authority in all aspects of Construction Quality control. The Construction Quality Control Manager shall have no other duties except Construction Quality Control Manager.

(2) The Construction Quality Control Manager shall meet one of the following requirements:

a) Have a Bachelors of Science from an accredited engineering, architecture, or a construction management college and a minimum of two years experience in construction.

OR

b) Shall have a minimum of four years of construction experience at a minimum level of a project superintendent.

(3) Attends a bi-monthly coordination meeting during the construction phase to discuss coordination and quality issues.

(4) On-site at all times during construction performing construction quality control duties.

(5) Has no other duties except construction Quality Control but they may also serve as the safety manager.

(6) Directly employed by the prime contractor, or will be at the time of award with a signed letter of intention included.

(7) Reports directly to the President/Owner of the Prime Contractor.

Superintendent / Subcontractor Manager: (Overall Field Manager Responsible for Construction)

(1) Performs all superintendent duties required of the Contractor.

(2) Serves as the Governments’ On-site point of contact in all matters relating to the work including, but not limited to, scheduling of work, utility interruptions, and testing.

(3) Attends all job meetings.

(4) On-site at all time during all construction activities.

(5) Serves under, and reports directly to, the Contractor's Project Manager.

(6) The On-Site Construction Superintendent shall have a minimum of six years construction experience on projects of comparable complexity, scope and cost.

(7) Shall have no other duties except Superintendent.

Rating Guidelines for Factor 3

Satisfactory : Proposal meets most of the solicitation requirements with the exception of minor deficiencies that leave no doubt as to the qualifications of the team’s ability to meet the solicitation requirements.

Unsatisfactory : The minimum education/years experience on comparable projects are not met for any one of the following: Project Manager, Superintendent, Construction Quality Control Manager.

RATING GUIDELINES FOR - STEP 1 (FACTORS 1,2,3):

ACCEPTABLE – All three Factors are rated satisfactory.

REASONABLY SUSECTIBLE OF BEING MADE ACCEPTABLE – One Factor is rated Unsatisfactory and remaining Factors are rated satisfactory.

UNACCEPTABLE – More than one Factor is rated unsatisfactory.

The contracting officer may proceed directly with step two if there are sufficient acceptable proposals to ensure adequate price competition under step two, and if further time, effort and delay to make additional proposals acceptable and thereby increase competition would not be in the Government’s interest. If this is not the case, the contracting officer shall request bidders whose proposals may be made acceptable to submit additional clarifying or supplementing information.

The contracting office shall identify the nature of the deficiencies in the proposal or the nature of the additional information required. The contracting officer may also arrange discussions for this purpose. No proposal shall be discussed with any offeror other than the submitter.

3.3. PRICE - STEP 2

Factor/Sub Factor

Location Description

N/A Vol. 2 TAB A Price (Standard Form 1442 and Proposal Bid Schedules)

N/A Vol. 2 TAB B Bid Bond

3.3.1 GENERAL

Sealed bidding procedures will be utilized except that invitation for bids shall –

a. Only be issued to those offerors submitting acceptable technical proposals in step one

b. Include provisions prescribed in FAR 14.201-6(t)

c. State that the bidder will comply with the specifications and bidders technical proposal and,

d. Not be synopsized in FBO.

3.3.2 TAB A - PRICE (STANDARD FORM 1442 AND CONTRACT LINE ITEM SCHEDULE)

3.3.2.1. Submission Requirements:

3.3.2.2. Submit the properly filled out and executed SF 1442, along with the CLIN Schedule, containing proposed line item and total pricing, as well as the proposed contract duration.

4.0 EVALUATION PROCEDURES

4.1. TECHNICAL EVALUATION BOARD (TEB)

4.1.1. The TEB will be established to conduct the evaluation of Step 1 proposals received in response to this solicitation. Offerors should submit proposals that are acceptable without additional explanation or information. The evaluation will be based on the content of the proposal and any subsequent clarifications required, as well as information obtained from other sources, e.g. past performance information. The TEB will not consider any information incorporated by reference. Only acceptable proposals from Step 1 will be eligible for Step II and considered for award. 100% plans and specifications will be issued during Step II.

4.2. EVALUATION

4.2.1. Evaluations of technical proposal by the technical evaluation board shall be based on the criteria in the request for proposals but not considerations of responsibility and shall be categorized as (1) acceptable or (2) reasonably susceptible of being made acceptable or (3) unacceptable based on the evaluation factors described above. .

4.2.2. The Government may hold discussions for the purposes of clarification only with only those bidders that it considers reasonably susceptible of being made acceptable Any proposal which modifies, or fails to conform to the essential requirements of the request for technical proposals, shall be considered nonresponsive and categorized as unacceptable. The Contracting Officer may proceed directly to Step 2 if there is adequate number of acceptable proposals to ensure adequate price competition. The Contracting Officer may extend time and request additional information and thereby increase competition if in the best interest of the Government. 4.2.3. If discussions are held, the Government may engage in a broad give and take with each bidder in Step 1 in accordance with FAR 14.5. The Government will provide each bidder the general nature of their deficiencies and give adequate time for them to address. .

During discussions, the Government may ask the bidders for additional information to be included in their revised proposals. 4.2.4. Upon conclusion of discussions, those bidders that are deemed unacceptable will be promptly notified of the basis of the determination and that revised proposals will not be accepted.

The bidders will be debriefed upon request. If necessary to discontinue two step sealed bidding the Contracting Officer shall document the facts and circumstances in the contract file. If Step 1 results in only one or no acceptable technical proposal the acquisition may be continued by negotiation,

4.4. EVALUATION RATING SYSTEM -

4.4.1. General: The Government will review the proposals and rate the quality of each evaluation factor.

The TEB will rate each proposal against the specified evaluation criteria in the Solicitation requirements.

They will not compare proposals at this time. After all proposals are rated, the Government will compare the ratings and relative advantages and disadvantages of proposals against each other.

4.4.2. Review Write-up: The Government will support each rating with a narrative, separately listing all strengths or advantages, weaknesses or disadvantages, deficiencies, and required clarifications.

5.0 BASIS OF AWARD

5.1. The Government will evaluate bids in response to the Step 2 solicitation and will award a contract to that responsible bidder whose bid, conforming to the invitation, is the lowest.

6.0 REVELANT PROJECT INFORMATION SHEET

PRIME CONTRACTOR/SUBCONTRACTOR EXPERIENCE

Offeror’s Name: _______________________________________________________________________

Project Name: ________________________________________________________________________

Project Location: ______________________________________________________________________

Project Size (i.e.; square foot area):

Project Description (scope and complexity):

Facility Type (i.e.; office, educational, etc.):

Role (i.e. prime, joint venture, sub-contractor) and work Company/Firm self-performed on this project:

Project Award Amount: _________________ Project Completion Amount: ______________________

Project Original Contract Duration and Completion Date: ______________________________________

Project Final Contract Duration and Completion Date:

Client/Agency (if Government, give contract number and name of Contracting Officer):

Client/Agency Point of Contact, Phone Number and Address (if Government, give contract number and name of Contracting Officer):

Construction Contractor and Subcontractor(s): ______________________________________________

7.0 PAST PERFORMANCE CUSTOMER QUESTIONNAIRE

The Offeror/Contractor listed is being considered in a Source Selection by the US Army Corps of Engineers, New York District. This is a request for past performance information on a project the Offeror has identified as being relevant to this solicitation. This information will be used in the evaluation of the Offeror's performance of that project. The following information, once submitted, will be treated as confidential and will not be released. This information will only be used to evaluate this Offeror for this solicitation. Please complete the following questionnaire utilizing the following guidance:

a. Handwritten responses are sufficient.

b. Circle a rating as listed below and provide a brief supporting narrative for your area of administrative responsibility. In the event of any unsatisfactory performance, please describe the cause and corrective actions, and any other pertinent information relative to the contractor's inadequate performance.

c. The assessment questions contained in this questionnaire shall be rated pursuant to the following definitions:

Exceptional (E) - Indicates the contractor's performance exceeded the contractual requirements.

Satisfactory (S) - Indicates there were no major problems that were not quickly and effectively solved by the contractor, and the contractor was meeting all contractual requirements.

Marginal (M) - Indicates the area of evaluation contained major problems that were not effectively solved by the contractor. The contractor met basic contract requirements with assistance from the customer. Please include any written documentation supporting this rating.

Unsatisfactory (U) - Indicates a serious problem existed on the part of the contractor that precluded the contractor from meeting the contractual requirement(s). Please include any written documentation supporting this rating.

N/A - Not applicable or observed.

d. Please return the completed forms to the US Army Corps of Engineers, New York District at the following mailing address or via fax to (212) 264-3013 (Attn: Albert Rumph):

US Army Corps of Engineers, New York District Attn: Contracting Division, Room 1843 Jacob K. Javits Federal Building 26 Federal Plaza New York, NY 10278-0090

Albert.C.Rumph@usace.army.mil

PAST PERFORMANCE CUSTOMER QUESTIONNAIRE

PROJECT: Guns and Weapons System Tech Data at Picatinny Arsenal, Picatinny, NJ

“The U.S. Army Corps of Engineers, New York District, is interested in your assessment of the name company’s “past performance”. Past performance refers to the company’s record of conforming to contract requirements and to standards of good workmanship; the company’s record of forecasting and controlling costs; the company’s adherence to contract schedules including administrative aspects of performance; the company’s history of reasonable and cooperative behavior and commitment to customer satisfaction; and the company’s general business-like concern for the interest of the customer. These questions relate to work performed by:

Contractor under review: (Insert Company Name) Name and Location of Project:

Respondent Identification:

Name Date Company/Organization Position/Job Title Telephone Number

Questionnaire:

1. Is the information provided by the contractor on the attached Project Information Sheet accurate and correct to the best of your knowledge? Yes ( ) No ( )

2. What type of work did the contractor perform?

3. How would you rate the contractor's overall performance?

E S M U N/A

4. How would you rate the contractor's overall corporate management, integrity, reasonableness, and cooperative conduct?

E S M U N/A

5. How would you rate the contractor's quality control program and performance on delivery of quality work?

E S M U N/A

6. How effective was the contractor in meeting completion requirements including punch list items and warranty work?

E S M U N/A

7. How efficient and timely were the services performed (compliance with the schedules of completion)?

E S M U N/A

8. Please circle the statement that best describes your feelings with regard to the contractor.

a. They were an outstanding contractor in every respect. Problems were solved in a spirit of teamwork. Quality work, timely actions, and complete documentation were routinely achieved.

We would pay a premium price to contract with them again.

b. They were an above average contractor to whom we would not hesitate to award to again.

Problems encountered were minor and solutions were found with little difficulty.

c. They were an average contractor meeting the minimum requirements of the contract.

Performance deficiencies improved when identified by the client/agency.

d. They were a below average contractor. Numerous problems developed that were a result of their lack of cooperation and failure to perform as required. An aggressive inspection program was required to ensure compliance.

e. They were a poor contractor who we would not want again under any circumstances. We would have been within our rights to terminate them for default.

f. None of the above. Please provide your statement.

9. Was the contractor given any of the following (or anything of a similar nature)?

Cure Notice: Yes No Show Cause Notice: Yes No Termination for Default: Yes No

10. If there are any additional comments, information, etc. that you would like to add to the survey that does not fall into any of the above categories, please indicate below:

Return to:

U.S. Army Corps of Engineers, New York District 26 Federal Plaza Room 1843 Attn: Contracting Division New York, N.Y. 10278-0090

917-790-8172 (Phone) 212-264-3013 (Fax)

8.0 KEY PERSONNEL RESUME FORM

Name:________________________________________________________________________

Title:_________________________________________________________________________

Number of Years: With this firm _______________________ With other firms______________

Number of Years in this position or role: ___________________________________________

Specialization: _________________________________________________________________

Professional Registration (Type and State of Registration): _____________________________

Experience and Qualifications Relevant to this Project (provide dates and how it is comparable to the solicitation): ___________________________________________________________________

Section 00600 - Representations & Certifications

52.204-8 Annual Representations and Certifications JAN 2011 52.209-5 Certification Regarding Responsibility Matters APR 2010 52.209-7 Information Regarding Responsibility Matters JAN 2011 52.223-4 Recovered Material Certification MAY 2008 52.223-9 Estimate of Percentage of Recovered Material Content for

EPA-Designated Items

MAY 2008

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.225-12 Notice of Buy American Act Requirement - Construction Materials Under Trade Agreements

FEB 2009

252.209-7001 Disclosure of Ownership or Control by the Government of a Terrorist Country

JAN 2009

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (JAN 2011)

(a) Definitions. See 13 CFR 125.6(e) for definitions of terms used in paragraph (d).

(b) Evaluation preference. (1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except--

(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and

(ii) Otherwise successful offers from small business concerns.

(2) The factor of 10 percent shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors described in the solicitation shall be applied before application of the factor.

(3) A concern that is both a HUBZone small business concern and a small disadvantaged business concern will receive the benefit of both the HUBZone small business price evaluation preference and the small disadvantaged business price evaluation adjustment (see FAR clause 52.219-23). Each applicable price evaluation preference or adjustment shall be calculated independently against an offeror's base offer.

These individual preference amounts shall be added together to arrive at the total evaluated price for that offer.

(4) When the two highest rated offerors are a HUBZone small business concern and a large business, and the evaluated offer of the HUBZone small business concern is equal to the evaluated offer of the large business after considering the price evaluation preference, award will be made to the HUBZone small business concern.

(c) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes. The agreements in paragraphs

(d) and (e) of this clause do not apply if the offeror has waived the evaluation preference.

___ Offeror elects to waive the evaluation preference.

(d) Agreement. A HUBZone small business concern agrees that in the performance of the contract, in the case of a contract for

(1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other HUBZone small business concerns;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .