25_-_MILFORD_WEST_ROLLING_HILLS_CUSTODIAN_PWS.pdf

PDF 403 KB Posted

Attached to
Park Attendants, Park Custodians, Facilities Cleanup, and Park Attendants/Custodians Services - W912DQ18R1000
Solicitation number
W912DQ18R1000
Issued by

About this file

MILFORD

View the file

Other files

File Type Posted
A.07.24_Amendment_W912DQ18R1000_00003.pdf PDF
SCA_Wage_Rates_WD_15-5751_WILSON_LAKE.pdf PDF
SCA_Wage_Rates_WD_15-5753_KANOPOLIS_LAKE.pdf PDF
SCA_Wage_Rates_WD_15-5087_STOCKTON_LAKE_-_POLK_COUNTY.pdf PDF
SCA_Wage_Rates_WD_15-5089_TRUMAN_LAKE_-_HENRY_COUNTY.pdf PDF
SCA_Wage_Rates_WD_15-5093_TRUMAN_LAKE_-_BENTON_&_ST._CLAIR_COUNTIES.pdf PDF
SCA_Wage_Rates_WD_15-5093_POMME_DE_TERRE_LAKE_-_HICKORY_COUNTY.pdf PDF
SCA_Wage_Rates_WD_15-5339_MELVERN_POMONA_PERRY_LAKES.pdf PDF
SCA_Wage_Rates_WD_15-5343_MILFORD_LAKE.pdf PDF
A.07.24_-_0002_AMENDMENT_ADD_SCA_WAGE_RATES_20180108.pdf PDF
SCA_Wage_Rates_WD_15-5003_RATHBUN_LAKE.pdf PDF
SCA_Wage_Rates_WD_15-5357_HARLAN_COUNTY_LAKE.pdf PDF
SCA_Wage_Rates_WD_15-5335_CLINTON_LAKE.pdf PDF
SCA_Wage_Rates_WD_15-5337_TUTTLE_CREEK_LAKE.pdf PDF
A.07.24_08_-_0001_AMENDMENT_POMONA_Combined_Custodian_PWS.pdf PDF
A.07.24_W912DQ18R1000_AMENDMENT_0001_Solicitation.pdf PDF
A.07.24_Soliciation_and_Combined_Synopsis_20171218.pdf PDF
38_-_TUTTLE_CREEK_PA_Custodian_PWS_.pdf PDF
46_-_HARRY_TRUMAN_TP_OB_FF_SC_Custodian_PWS.pdf PDF
13_-_PERRY_Rock_Creek_Park_Attendant_PWS_2018.pdf PDF
11_-_WILSON_Minooka-Park_Attendant_PWS_10272017.pdf PDF
47_-_HARRY_TRUMAN_Sparrowfoot_Custodian_PWS.pdf PDF
01_-_CLINTON_Hickory_Custodian_PWS.pdf PDF
30_-_RATHBUN_ISLAND_DAY_USE_CUSTODIAN_PWS.pdf PDF
36_-_STOCKTON_Area_1_Custodian_PWS.pdf PDF
07_-_MELVERN_Park_Attendant_-_Turkey_Point_PWS.pdf PDF
03_-_MELVERN_Custodian_-_Outlet_North_PWS.pdf PDF
24_-_MILFORD_WEST_ROLLING_HILLS_ATTENDANT_PWS.pdf PDF
17_-_POMME_DE_TERRE_PARK_ATTENDANT_PWS.pdf PDF
42_-_HARRY_TRUMAN_Long_Shoal_Park_Attendant_PWS.pdf PDF
40_-_HARRY_TRUMAN_Talley_Bend_PA_Custodian_PWS.pdf PDF
26_-_RATHBUN_BRIDGE_VIEW_CUSTODIAN_PWS.pdf PDF
32_-_STOCKTON_Hawker_Point_Park_Attendant_Custodian_PWS.pdf PDF
06_-_MELVERN_Park_Attendant_-_Outlet_PWS.pdf PDF
16_-_PERRY_Day_Use_Area_Park_Custodian_PWS.PDF PDF
41_-_HARRY_TRUMAN_Thibaut_Point_Park_Attendant_PWS.pdf PDF
Past_Performance_Questionnaire.pdf PDF
18_-_HARLAN_COUNTY_Facility_Cleaup_PWS.pdf PDF
20_-_HARLAN_COUNTY_Hunter_Custodian_PWS.pdf PDF
05_-_MELVERN_Custodian_-_Upstream_PWS.pdf PDF
02_-_KANOPOLIS_RIVERSIDE_Park_Attendant_Custodian_PWS.pdf PDF
29_-_RATHBUN_ISLAND_CAMPGROUND_CUSTODIAN_PWS.pdf PDF
43_-_HARRY_TRUMAN_Long_Shoal_Osage_Bluff_Relief_PA_PWS.pdf PDF
19_-_HARLAN_COUNTY_Hunter_COVE_PARK_ATTENDANT_PWS.pdf PDF
Related_Experience_Form.pdf PDF
23_-_MILFORD_FARNUM_CREEK_PA_CUSTODIAN_PWS.pdf PDF
14_-_PERRY_Slough_Creek_Park_Custodian_PWS.PDF PDF
15_-_PERRY_Rock_Creek_Park_Custodian_PWS.PDF PDF
31_-_RATHBUN_BRIDGE_VIEW_PA_PWS.pdf PDF
34_-_STOCKTON_Relief_Park_Attendant_Custodian_Hawker_Point_and_Crabtree_Cove_PWS.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 7, 2017 1

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Season

Custodian – Base Period

FFP

The contractor shall furnish all park attendant and custodian services for West Rolling Hills Custodian at Milford Lake as defined in the Performance Work Statement (PWS) located in Section C of this contract. The service period for this contract will be from 15 April 2018 through 31 October 2018.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Season OPTION Custodian – Option Period 1

FFP

The contractor shall furnish all park attendant and custodian services for West Rolling Hills Custodian at Milford Lake as defined in the Performance Work Statement (PWS) located in Section C of this contract. The service period for this contract will be from 15 April 2019 through 31 October 2019.

FOB: Destination

NET AMT

ITEM NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Season OPTION Custodian – Option Period 2

FFP

The contractor shall furnish all park attendant and custodian services for West Rolling Hills Custodian at Milford Lake as defined in the Performance Work Statement (PWS) located in Section C of this contract. The service period for this contract will be from 15 April 2020 through 31 October 2020.

FOB: Destination

NET AMT

PARK CUSTODIAN

WEST ROLLING HILLS PUBLIC USE AREA

MILFORD PROJECT

Performance Work Statement

C.1 General Information

C.1.1 Background.

Milford Project is the largest lake in Kansas, with a shoreline of 163 miles at multipurpose pool. Recreational development is extensive. Eleven parks and access areas, managed by or leased from the U.S. Army Corps of Engineers, are conveniently located around the reservoir. Park areas at Milford offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, sand and swimming beaches. The Kansas Department of Wildlife and Parks operate a fish hatchery and conservation education center in the Outlet area below the dam. Many routine maintenance items are contracted to the private sector. Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps.

C.1.2 Scope of Work The Contractor shall serve as a live-in Park Custodian and must be over 21 years of age. The Contractor shall furnish labor, equipment, and supplies to provide custodial services in the West Rolling Hills Public Use Areas at Milford Project, near Junction City, Kansas as described in the attached performance work statement (PWS) and elsewhere in the contract.

C.1.3 Period of Performance

The contract shall begin 15 April 2018 and continue through 30 September 2018 with a renewal options for 1 October 2018 through 31 October 2018; 15 April 2019 through 30 September 2019, and 1 October 2019 through 31 October 2019, 15 April 2020 through 30 September 2020 and 1 October 2020 through 31 October 2020. The contractor must reside at the work site during the period of performance, and must remove all personal property from the site within 7 days after checkout. Park custodian campsites are for use by one camping unit only.

C1.4 Required Insurance

C1.4.1 The contractor shall obtain and maintain during the period of performance under this contract Commercial Automobile Liability insurance according to the applicable Kansas State statutes.

THE FOLLOWING SCHEDULE OF INSURANCE IS APPLICABLE

A. Order’s of $10,000.00 to $25,000.00 Type Amount Worker’s Compensation Coverage complying with Applicable State Statute Employer’s Liability Minimum amounts of $100,000 Commercial General Liability Minimum amounts of $300,000 Commercial Automobile Liability Minimum limits of $100,000 per

Person & $300,000 per accident for Bodily injury, & $100,000 per

Accident for property damage

B. Orders under $10,000 Type Amount Worker’s Compensation In accordance with applicable State Statute.

Employer’s Liability In accordance with applicable State Statute.

Commercial General Liability In accordance with applicable State Statute.

Commercial Automobile Liability In accordance with applicable State Statute.

NOTE: Coverage required under A & B (above) are minimums. If higher limits of coverage are required by State Statute, the Contractor shall be responsible for State requirements may be obtained by contacting:

KANSAS: Insurance Commissioner, Toll Free, 1-800-432-2484 Division of Workers Compensation, 785-296-3441

Proof of insurance shall be provided to the Contracting Officer’s Representative prior to commencement of duties.

C.1.5 Hours of Operation Services shall be performed in accordance with the following schedule, between the hours of 6:00 a.m. and 11:00 a.m. Service scheduled twice daily shall be: first cleanup between the hours of 6:00 a.m. and 10:00 a.m. and the second cleanup between 1:00 p.m. and 3:00 p.m.

C.1.6 Post-Award Conference After award, but prior to commencement of work, the Contractor shall contact the Contracting Officer, to arrange a mutually agreeable time to meet at the Milford Project Office to review the requirements and details of the work.

C.1.7 Documents and Correspondence

C.1.7.1. The Contractor shall designate, in writing, a responsible on-site representative of each work crew who shall serve as the contact for matters involving quality and performance or nonperformance of the required work assigned to that crew.

C.1.7.2 As each item of work is completed, the Contractor's representative at the job shall enter the time that the item of work was completed on a Contractor's Daily Worksheet.

Completed and signed worksheets shall be delivered each day work is performed, as directed by the Contracting Officer. Contractor Daily Worksheet forms shall be furnished by the Government.

C.1.8 Post Award Conference After award, but prior to commencement of work, the Contractor shall contact the Contracting Officer’s Representative, to arrange a mutually agreeable time to meet at the Milford Project Office to review the requirements and details of the work

C.1.9 Quality Control The Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the project. The Quality Control Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspection work performed by the contractor must be maintained and made available to the government during contract performance.

C.1.10 QUALITY ASSURANCE:

C.1.10.1 Performance Assessment Plan.

A Performance Assessment Plan (PAP) will be used during the life of the contract to ensure that the Service Provider is performing the services required by this PWS in an acceptable manner. The Government develops the PAP and the Project Office administers the Plan through Quality Assurance Evaluators (QAE)s.

C.1.10.2 The Government will monitor the Contractor’s performance under this contract using quality assurance procedures developed by the Government. Typical procedures might include random sampling, checklists and customer complaints. This should not be considered an exhaustive list. A primary objective of Government Quality Assurance will be to determine the effectiveness of the Contractor’s quality control system.

C.1.10.3 The government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government will perform inspections and tests in a manner that will not unduly delay the work.

C.1.10.4 If any of the services do not conform to contract requirements, the government will request the contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount.

When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

C.1.10.5 If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the government may by contract, or otherwise: (1) perform the services and charge to the Contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.

C.1.11 Personnel

C.1.11.1 All Contractor personnel shall be fully clothed, at all times, while performing these services. Clothing shall be clean and neat in appearance.

C.1.11.2 On holiday weekends and the 4th of July holiday time period, the contractor will be required to have a two member crew, a man and woman, who will be required to perform the duties.

C.1.11.3 Contractor personnel shall utilize tact, diplomacy and courtesy at all times during contact with the public.

C.1.11.4 The contractor shall present a neat appearance when dealing with the public.

A government-furnished nametag must be worn while on duty. The Contractor shall not display or offer for sale on Government property personal property items, crafts, or like items.

C.1.11.5 The contractor must turn in to the park attendant all lost and found articles at the fee booth. Any article unclaimed after the two-week period must be turned over to project personnel.

C.1.11.6 The contractor must not consume any alcohol or drugs (except prescription drugs) during duty hours or when meeting the public.

C.1.12 Coordination with the Project Office

C.1.12.1 As each item of work is completed, the Contractor's representative at the job shall enter the time that the item of work was completed on a Contractor's Daily Worksheet.

Completed and signed worksheets shall be delivered each day work is performed, as directed by the Contracting Officer's Representative. Contractor Daily Worksheet forms shall be furnished by the Government.

C.1.12.2 Day to day contact with Government personnel, and telephone communication shall normally provide adequate information exchange. The Government reserves the right to schedule meetings at the Project Office as necessary to insure strict compliance with the terms of this contract. Such meetings shall be scheduled, to the extent possible, at mutually convenient times. However, upon notice, the Contractor shall attend meetings regarding matters affecting this contract.

C.1.12.3 To assist the visiting public in reclaiming lost articles, all property left by visitors and found during cleanup operations shall be turned in to the Project Office or Park Attendant.

C.1.12.4 Any evidence of vandalism, instances of facilities not operating properly, or are in need of repair, shall be promptly reported to project personnel.

C.1.13 Other Contractors The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work shall be carefully planned and fitted not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by Government employees.

C.1.14 Safety The contractor shall immediately report any situation that could affect the health or safety of visitors to a park ranger, including maintenance needs, utility problems, accidents, or violations of laws and regulations.

C.1.14.1 The contractor shall report all disturbances that cannot be diplomatically resolved to a park ranger. The contractor will be given an after-hours phone number (at the post award conference) for use by him and his staff only.

C.1.14.2 The contractor must notify the COR of any required prescription drugs which might affect the contractor's ability to perform the requirements of this contract.

C.1.14.3 The contractor shall display a sign reading "CLOSED FOR CLEANING" at the entrance doors of all facilities during cleaning operations.

C.2 Definitions and Acronyms: The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.

The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.

Clean: As used generally, means free of all foreign matter, film, spots, streaks, dirt or impurities. As used for acceptance of work means gleaming, free from dirt, contamination, or impurities, unsoiled, unstained, neat and tidy.

Contracting officer's representative means an individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.

Debris: Any articles, or parts thereof, such as paper, gum, litter, strings, cigarette butts, leaves, and sand.

Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, tar, liquid stains, vomit, and/or ashes.

Foreign Matter: Any articles, or parts thereof, not belonging to the place found.

Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times: except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.

Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.

Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement. (Added) (Agree)

Quality Assurance Surveillance Plan (QASP): An organized written document used by Government for quality assurance surveillance. Document contains sampling/ evaluation guides, checklists, and the performance requirements summary (PRS). (Added)

Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.

Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

"Service contract" means a contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply. A service contract may cover services performed by either professional or nonprofessional personnel whether on an individual or organizational basis. Some of the areas in which service contracts are found include the following:

(a) Maintenance, overhaul, repair, servicing, rehabilitation, salvage, modernization, or modification of supplies, systems, or equipment.

(b) Routine recurring maintenance of real property.

(c) Housekeeping and base services.

(d) Operation of Government-owned equipment facilities, and systems.

C.3 Government-Furnished Materials and Supplies. Government-Furnished materials and supplies are provided to the Contractor only for use in performing work specified in this Contract.

C.3.1 The Government will provide a campsite for the Contractor’s trailer, and utility hookups, during the service period, consisting of water, electricity, and sewer. In addition, the campsite will include a storage building, picnic table, and a small garden plot. The site will be provided for a period of 5 days prior and 7 days after the period of performance. The Contractor shall maintain these facilities in accordance with Park rules

C.3.2 The Government will furnish to the Contractor the following identified property to be used in performing the contract. When the property is delivered, the Contractor shall verify its quantity and condition in writing to the Contracting Officer or his authorized representative on Memorandum Receipt, ENG Form 4866, within 24 hours of receipt.

Damages or loss while in the Contractor's possession shall be reported in writing, to the Contracting Officer or his authorized representative within 72 hours.

Approx.

Item (Description) Quantity Where Available Value

(1) Campsite with Utilities 1 West Rolling Hills PUA N/A

(2) Storage Building 1 Campsite N/A

(3) Picnic Table 1 Campsite N/A

(4) Refuse Container 1 Campsite N/A

(5) Park keys. 1 N/A

(6) Toilet paper dispenser tool. 1 $5.00

C.3.3 Government-Furnished Consumable Items - The following consumable items, shall be furnished to the Contractor by the Government from stock. The Government shall retain control of expendables, to be dispensed on an as-needed basis for use in performance of the contract.

1. Baseball cap and name tags

2. Water for cleaning

3. Contractor Daily Worksheets

4. Odor Control Product

C.4 Contractor Furnished Equipment and Supplies

The Contractor shall furnish all equipment and supplies not identified in section C.3 of this Performance Work Statement as Government-Furnished supplies and equipment and as specifically identified in this section. All contractor-furnished equipment and supplies must be approved by the Project Manager prior to initial use.

C.4.1 All manpower and tools necessary to accomplish the required work.

C.4.2 All supplies and materials necessary to accomplish the required work; such as but not limited to: toilet paper, paper towels, trash bags, cleaning supplies, etc.

C.4.3 At the Contractor’s option, a mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation. Tents or "Pop-Up" type tent campers shall not be permitted. The unit shall present a neat appearance when parked at a location designated by the Project Manager. If self-propelled units are utilized, they shall remain on jacks (blocked up for the duration of contract), and shall not be used as transportation.

C.4.4 Transportation vehicle(s), other than specified in C.4.1 above, for use in performing the requirements of this contract.

C.4.5 A pressure water pump and tank for water supply that is approved by the Project Manager. The pump shall be capable of delivering an adequate stream of water at 150 psi to flush/rinse facilities being serviced.

C.4.6 The contractor shall display a sign reading "CLOSED FOR CLEANING" at the entrance (doors) of all facilities during cleaning operations.

C.5 Specific Tasks

C.5.1 General Information

Cleanup of facilities is directly related to public health and sanitation; therefore, it is essential that all facilities be serviced as specified. In the event that an area or facilities within an area are missed, or are not properly cleaned, the Contractor shall reclean the area or affected facilities immediately upon receipt of such notice from the Contracting Officer or his Authorized Representative. Failure to correct noted deficiencies may result in withholding payment for the work not performed. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.

C.5.2 Scheduled Services

C.5.2.1 Scheduled services, shall begin on 15 April 2018 through 30 September 2018, and 1 October through 31 October 2018 and 15 April 2019 through 30 September 2019, and 1 October 2019 through 31 October 2019, 15 April 2020 through 30 September 2020 and 1 October 2020 through 31 Oct 2020, if renewal option is exercised.

C.5.3 Schedule. The following schedule is subject to change with one (1) week’s advance notice.

C.5.3.1 Schedule of Duties

REGULAR FACILITIES CLEANUP SCHEDULE S M T W T F S

Shower/Latrine, Comfort Station, Vault Toilets, ----------* 2 *1 0 0 1 1 2

Dump Station, Refuse Collection,Water Fountains, Sidewalks, Litter Pickup.

Fish Cleaning Station --------------------------------------- 1 1 0 0 1 1 1

Playground --------------------------------------------------- - - 0 0 1 - -

Grills and Fire Rings --------------------------------------- - - 0 0 1 - -

Picnic Tables ------------------------------------------------ - - 0 0 1 - -

Free Loop (Vault toilet/fire rings/Litter Pickup)-------------- - 1 0 0 - 1 -

(0) – Normal day off except for holiday periods as noted below.

(1)– Facility Cleanup once daily starting at 6:00am and completed by 10:00am

NOTE: Additional facility cleanup, once daily on the Tuesday following the Memorial Day and Labor Day holiday weekends for 2018, 2019, and 2020.

(2) - Facility Cleanup twice daily. First cleanup starting at 6:00am and completed by 10:00am and then the second cleanup between 1:00pm to 3:00pm.

The twice daily cleanups are scheduled for: Saturday and Sunday of normal weekends; the Mondays for the Memorial Day and Labor Day holidays for 2018, 2019, and 2020.

NOTE: Additional twice daily are scheduled for: Wednesday July 4th 2018, Thursday July 4th 2019 and Saturday July 4th 2020.

First time period is for a complete facility cleanup according to written standards.

C.5.3.2 The second cleanup period is a partial facility cleanup to include only the shower/latrine, comfort station and vault toilets with specific regards to facility cleanup standards in Paragraphs C.5.3.1 and 6(stools, wash basins and mirrors). It should also include the general cleanup of the remaining portions to ensure that the entire facility is clean i.e. remove spider webs, wash out shower stalls and remove debris from floor drains, squeegee excess water from the floors, and remove trash and litter from the adjacent area and place in refuse containers.

C.5.3.3 All work shall be accomplished within the time frames specified above.

Services rendered outside the time periods specified will not be compensated unless specifically approved in writing by the Contracting Office or his approved representative.

C.5.3.4 All scheduled services, including weekly services, shall begin on April 15 regardless of the day of the week. .

C.5.3.5 Daily Perform cleanup each day services are required to include the Shower/latrine, comfort station, vault toilets, dump station, water fountains, litter pickup, interior refuse containers, water hydrants, and sidewalks. (See Section C.2 Definitions)

C.5.3.6 Weekly Provide services once weekly on Thursday to clean the following areas: playgrounds, fire rings, picnic tables, (including beach area debris removal).

C.5.3.7 All work shall be accomplished within the timeframes specified above. Services rendered outside the time periods specified shall not be compensated unless specifically approved in writing by the Contracting Officer or his authorized representative.

C.5.4 Service Facilities / Areas

Facilities/Areas Quantities

Picnic Tables 80 * Shower/Latrine 1 Comfort Stations 2 Charcoal Grills 80 * Fire Rings 80 * Vault Toilet (sets) 3 Water Fountains 1 Sanitary Dump Station 1 Fish Cleaning Station 1 Playground 1 Litter Pickup 65 acres ** (Roadways and Park areas) Refuse Collection 8 containers (Containers inside Facilities)

* NOTE: Quantities shown for Picnic Tables (80), Charcoal Grills (80), and Fire Rings (80) shall be subject to a variation of + 10 units each at no change to price.

** All acreages are estimated. The Contractor shall be responsible for determining exact acreages and conditions affecting performance of this work.

C.5.5 Shower/latrines, vault and flush-type toilets, and change houses:

C.5.5.1 Ceilings - Clean ceilings on inside and overhang on outside of buildings to remove spider webs, dust, bird and insect nests, dirt, and insect spots. If soap or disinfectant is used, rinse with clean water and wipe dry.

C.5.5.2 Walls, shower stalls, benches, partitions, stools (flush-type), wash basins, doors and refuse containers – Clean and disinfect to ensure a free of all dirt, oil, lotions, soap residue, calcium deposits or other foreign matter. All surfaces including soap trays, faucets, stool lids, handicap bars, etc. shall be present a dried polished appearance free of cleaning solution, disinfectant, water spots, etc. Exterior walls shall have spider webs, dust, bird and insect nests, debris and grass clippings removed.

C.5.5.3 Floors and floor drain plates – Shall be disinfected and free of all foreign matter, trash, and excess water.

C.5.5.4 Mirrors – Shall be free of dirt, dust, smudges and streaks.

C.5.5.5 Stools – Non-waterborne (vault-type) - Risers inside and outside, seats and lids shall be cleaned and disinfectant to provide a surface free of foreign matter. Seats shall present a dry appearance free of disinfectant and water spots

C.5.5.6 Washer and dryers – Both the inside and outside shall be maintained in a clean condition free of dirt or detergent residue. Lint screens of dryers shall be cleaned during each major cleanup.

C.5.5.7 Light Fixtures - Remove all dirt, dust, bugs, cobwebs, smudges, and streaks from fixtures, bulbs and grill. Reinstall grillwork.

C.5.5.8 Metal louvers – Maintain a clean appearance free of spider webs, dust, bird and insect nests, bird droppings, or other foreign matter.

C.5.5.9 Toilet Paper Dispensers - All toilet paper dispensers on structures serviced under this contract shall be kept fully supplied.

C.5.5.9.1 All paper shall be protected to prevent wetting during cleaning operations. Care shall be taken to avoid wetting of hand dryers, and electrical fixtures during cleaning.

C.5.6 Refuse and litter handling (facilities):

C.5.6.1 All trash, litter, debris or residue (including but not limited to cigarette butts, match books, bottle caps, snap tabs and paper) within or immediately adjacent to the facility being services shall be removed. At no time shall trash or debris be swept or washed out of a facility and left.

C.5.6.1.1 Refuse containers located within the facility being serviced shall have all trash, litter, debris or residue removed. The containers shall present a clean and odor free condition. Plastic liners shall be replaced.

C.5.6.1.2 Interior refuse containers (excluding dumpsters) placed at various locations throughout the park area shall be cleaned and emptied and the refuse placed in centrally located dumpsters. A new plastic liner shall be installed in containers (as needed) and the lids reinstalled on the containers. Interior refuse containers and holders shall present a clean odor free condition. When odor becomes prevalent in trash containers or they become full prior to regular scheduled major servicing the Contractor shall empty and wash containers and holders as needed to provide sanitary conditions for the public.

C.5.6.2 Refuse and litter handling (park areas, roadways, beaches, playgrounds, boat ramps, and parking areas):

C.5.6.2.1 All mowed park areas, on and adjacent to roadways, and parking areas, and on and adjacent roadways and parking areas, and on and adjacent to beach and boat ramp areas (including boat ramp riprap areas) shall be free of litter and debris. Litter and debris shall be placed in the nearest refuse container

C.5.6.2.2 Campers are given trash bags and asked to deposit their trash in the trash dumpster located at the park entrance. There are occasions when some campers do not comply with this request. The contractor shall ensure that campsites are free of all trash and debris left on or near the site.

C.5.6.3 Sidewalks:

C.5.6.3.1 All sidewalks shall be free of debris, stains, and residue (any) excess water shall be removed.

C.5.6.3.2 Cracks between sidewalk sections, and along buildings and/or graveled or paved areas within 10 feet of facility being serviced shall be kept free of grass and weeds.

Grass and weeds removed shall be disposed of in brush or wooded areas outside the normal park mowing areas. Grass or weeds shall not be placed in a refuse container or dumpster.

C.5.6.4 Water fountains: Shall be cleaned and disinfected to remove all residue and stains

C.5.6.5 Water hydrants: shall be cleaned to remove all cobwebs and debris from the fixtures and from the immediate vicinity.

C.5.7 Charcoal grills, fire rings, and picnic tables:

C.5.7.1 Grills, fire rings, and cooking surfaces shall be cleaned of debris, ashes, food particles, and other foreign matter. Remove all debris, litter, ashes and coals on the ground in the immediate vicinity of grills and fire rings. Grills and fire-rings containing live ashes or warm coals shall be left undisturbed and shall be cleaned at the next regularly scheduled cleaning.

C.5.7.2 Picnic tables on unoccupied campsites and unoccupied tables in visitor areas shall be checked each day services are performed to ensure that clean conditions exist.

Tables shall be cleaned by removing all foreign matter to include cleaning solution residue.

NOTE: Past experience indicates that an average of five (5) percent of the tables shall require cleaning on any given day depending on the amount of visitation.

C.5.7.3 Park benches, playground equipment, shall be kept clean and free from cobwebs, bird droppings, insect nests foreign matter, and debris.

C.6 Applicable Publications and Forms

C.6.1 MAP: Information on Milford Lake can be found on the Internet at http://www.nwk.usace.army.mil/milford/milford_home.htm

File details come from the government source that posted it.