Area of Interest - TIGER Hackathon - 29 MAY 2026.pdf

PDF 130 KB Posted

Attached to
ACC-DTA Commercial Solutions Opening (CSO)
Solicitation number
W912CH-26-S-0001
Issued by

About this file

This is an Area of Interest (AoI) announcement for a TIGER Hackathon focused on supply chain resilience and advanced manufacturing for the Abrams Main Battle Tank's AGT 1500 engine, issued under the ACC-DTA Ground Maneuver Commercial Solutions Opening (CSO) by the Department of the Army's Integrated Logistics Support Center (ILSC) and Capability Program Executive (CPE) Ground.

The Government seeks innovative solutions to address critical sourcing and manufacturing bottlenecks for approximately 166 critical and single-source AGT 1500 engine components currently constrained by the Original Equipment Manufacturer. Solutions must include technical data rights, unrestricted diagnostic access, and intellectual property to enable organic or third-party maintenance, repair, and manufacturing capabilities. Vendors must explicitly identify which of three core objectives their solutions address: Objective 1 (Traditional Second Source) requires detailed manufacturing infrastructure, machining tolerances, experience with Technical Data Packages and First Article Testing, production scalability, and testing/inspection capabilities; Objective 2 (Advanced Manufacturing) requires specification of advanced manufacturing technologies (additive manufacturing, automated precision machining, digital twin integration), capability to convert legacy 2D TDPs to 3D models, material equivalency strategies, post-processing infrastructure, and DoW/FAA qualification experience; Objective 3 (Material Provision) requires foundry and forge capabilities, Trade Agreements Act and Buy American Act compliance confirmation, lead time reduction strategies, and independent tooling design/manufacturing capability. The Industry Day event is scheduled for 14 July 2026 at DEVCOM Ground Vehicle Systems Center (GVSC) in Detroit Arsenal, Michigan, with a registration deadline of 18 June 2026 at 1200 EST. Interested vendors must submit a 2-page Statement of Interest and Quad Chart by 1200 EST on 18 June 2026. Submissions require a valid DD Form 2345 (Militarily Critical Technical Data Agreement) and verified CAGE code for TDP data access. This is an Unclassified/CUI event limited to U.S. Citizens only, and vendors must provide current quality management certifications (AS9100, ISO 9001, NADCAP) and NIST SP 800-171 compliance status. Submissions should be sent to Jamie M. Waszak, Christine Marr, Jeffrey Sholy, or Jonathan Taylor at their respective Army email addresses.

View the file

Other files

File Type Posted
ACC DTA GROUND MANEUVER CSO_Amendment 40.docx DOCX document
Attachment 1 - Required Domestic Tools.xlsx XLSX spreadsheet
AoI Domestic Hand Measuring Tools.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 39.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 38.docx DOCX document
FALCONS AOI - Amendment 1 v2.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 37.docx DOCX document
FALCONS AOI - Amendment 1.pdf PDF
Attachment 1 - FALCONS Government Performance Specification - Amendment 1.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 36.docx DOCX document
FALCONS AoI Questions - Government Responses 10-16-26.pdf PDF
Rev 01 MCS Area of Interest Armor Formation.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 35.docx DOCX document
AOI CUAS Detection.docx DOCX document
PdM VPS Sensor CSO Questionnaire-(VendorNameHere).xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 34.docx DOCX document
MCS Area of Interest Armor Formation.docx DOCX document
Attachment 2 - Performance Specification Compliance Matrix.xlsx XLSX spreadsheet
Attachment 1 - FALCONS Government Performance Specification.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 33.docx DOCX document
FALCONS AOI - Posted 06 OCT 2026.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 32.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 31.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 30.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 29.docx DOCX document
Rev 02Area of Interest (AoI) - Phase II TIGER Readiness REV 02.docx DOCX document
TIGER Readiness Q and A 06 AUG 26.docx DOCX document
Average Monthly Demand 166 Critical and Single Source Components.pdf PDF
Aiming Circle CSO AOI.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 28.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 27.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness REV 01.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 26.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness Vendor Response.xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 25.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 24.docx DOCX document
Revision 03 Area of Interest - TIGER Hackathon.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 23.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 22.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 21.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 20.docx DOCX document
LTT HC_Area of Interest.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 19.docx DOCX document
Attachment 002 LTT HC Desired Attributes Impact Table_11May26.xlsx XLSX spreadsheet
Attachment 001 LTT-HC Desired Attributes.pdf PDF
Revision 02 Area of Interest - TIGER Hackathon.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 18.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 17.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 16.docx DOCX document
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area of Interest (AoI): TIGER Hackathon – Supply Chain Resilience and Advanced

Manufacturing

Agency: Department of the Army

Program: Integrated Logistics Support Center (ILSC) and Capability Program Executive (CPE)

Ground

Platform: Abrams Main Battle Tank –Total InteGrated Engine Revitalization (TIGER) of the

Automotive Gas Turbine (AGT) 1500 Engine

1.0 Background and Problem Statement

Section Description

Background Issued under the ACC-DTA Ground Maneuver Commercial Solutions Opening (CSO), this

AoI seeks innovative solutions to resolve critical sourcing and manufacturing bottlenecks for the AGT 1500 engine while establishing comprehensive Right to Repair capabilities for the Government. The system's Original Equipment Manufacturer (OEM) is currently experiencing severe supply chain constraints regarding approximately 166 critical and single source components directly impacting delivery timelines and fleet readiness. To mitigate future vendor lock-in, proposed solutions must include provisions for delivering the necessary technical data rights, unrestricted diagnostic access, and intellectual property required to enable organic or competitive third-party maintenance, repair, and manufacturing.

Problem

Statement

The Army requires resilient, diversified, and modernized supply chain solutions for these

166 critical and single source components. We are seeking industry partners capable of providing alternative manufacturing, supply, and raw material solutions to radically improve production timelines, bypass current bottlenecks, and maintain operational readiness for the Abrams platform.

2.0 Industry Day Engagement

To facilitate direct collaboration, the Government will host an Industry Day. Participants will have the opportunity to physically inspect the AGT 1500 engine and available components, and engage in technical discussions directly with ILSC, CPE Ground, and OEM subject matter experts.

Event Element Details

Event Name TIGER Hackathon - Supply Chain Resilience and Advanced

Manufacturing

Date & Time 14 July 2026, Start Time TBD

Location DEVCOM, Ground Vehicle Systems Center (GVSC) 6501 E. Eleven Mile Road, Detroit Arsenal, Michigan 48397

Registration Deadline 18 June 2026, 1200 EST

3.0 Core Objectives and Vendor Response Requirements

To effectively evaluate potential partners, vendors must explicitly identify which of the following three objectives its solutions address from the 166 Critical and Sole Sourced

Components List. Responses must include the specific capability details outlined under each targeted objective.

Objective 1: Traditional Second Source

Description: Establish reliable, secondary manufacturing and supply lines for any or all of the

166 critical and single source components. The goal is to diversify the industrial base, reduce supply bottlenecks, and ensure continuous availability of these components.

Requirement

Category

Specific Information Required from Vendor

Targeted

Component

Families

Identification of which specific components (or types of components, e.g., gears, shafts, housing) from the 166 Critical and Sole Sourced Components List your company has the capability to manufacture.

Machining &

Tooling

Capacity

Detailed list of traditional manufacturing infrastructure (e.g., multi-axis CNC milling, turning, grinding) and tolerances your company can reliably hold (e.g., +/- .0001 inches).

Machining &

Tooling

Capability

Capability to fabricate parts using legacy 2D TDP.

Past

Performance

Proven experience executing complex Department of War (DoW) or aerospace

Technical Data Packages (TDPs), including taking a Government TDP through First

Article Testing (FAT) to full-rate production.

Production

Scalability

Estimated monthly or annual production throughput for the targeted components, including surge capacity management.

Testing &

Inspection

In-house capabilities for Coordinate Measuring Machine (CMM) inspections, non-destructive inspection (NDI), and material hardness testing.

Objective 2: Advanced Manufacturing

Description: Leverage advanced manufacturing technologies (e.g., additive manufacturing, automated precision machining, digital twin integration) to rapidly produce components from the

166 critical and single source components list while strictly adhering to specifications and quality standards.

Requirement

Category

Specific Information Required from Vendor

Technology

Modality

Specification of the exact Advanced Manufacturing technologies utilized (e.g., Laser

Powder Bed Fusion, Directed Energy Deposition, Cold Spray) and available build envelope sizes.

Digital

Engineering

Demonstrated capability to convert 2D legacy TDPs into 3D solid models, including the use of Digital Twins to simulate thermal and mechanical stresses.

Material

Equivalency

Strategy detailing how the vendor will prove that its advanced manufactured component meets or exceeds the mechanical properties of the originally specified cast or forged component.

Post-Processing Specific infrastructure for critical post-print operations, such as Hot Isostatic Pressing

(HIP), advanced heat treating, and final precision CNC machining.

Adv Mfg

Qualification

Experience with existing DoW or FAA qualifications and certification pathways for additively manufactured components in critical propulsion systems.

Objective 3: Material Provision

Description: Supply critical raw materials, forgings, castings, and structural elements. Solutions in this category must demonstrate how the provision of these materials will unlock constraints, accelerate production cycles, and improve overall delivery times for the targeted components.

Requirement

Category

Specific Information Required from Vendor

Foundry & Forge

Capabilities

Details on domestic pouring capacity, press tonnage, maximum component sizing, and specific alloy expertise (e.g., high-temperature superalloys, titanium).

Supply Chain

Mapping

Confirmation of compliance with the Trade Agreements Act (TAA) and Buy

American Act, explicitly stating no reliance on adversarial foreign nations for critical minerals.

Lead Time

Reduction

Narrative explaining how material provision will accelerate the current production cycle (e.g., strategic stockpiles, faster tooling/die creation methods).

Tooling

Independence

Capability to rapidly design and manufacture new molds, dies, or patterns for castings/forgings without relying on the OEM's proprietary tooling.

Material

Traceability

Processes for maintaining end-to-end lot traceability, providing certified mill test reports, and ensuring adherence to military material specifications (MIL-SPEC).

4.0 Submission Instructions and Security Requirements

Attendance at the Industry Day is limited and requires Government approval. Interested vendors must submit a 2-Page Statement of Interest (SOI) and a Quad Chart directly addressing their chosen objective(s) and the specific capability requirements listed in Section 3.0.

Security & Access

Category

Requirement Details

Restricted

Components List

Access

The associated TDP data is restricted. Vendors must submit a valid DD Form

2345 (Militarily Critical Technical Data Agreement) and provide a verified CAGE code to receive the TDP data prior to the Industry Day.

Facility Clearance The Industry Day will be held at a secure military facility. Base access protocols apply. This is an Unclassified/CUI event. U.S. Citizens only.

Quality &

Cybersecurity

Vendors must state their current quality management certifications (e.g., AS9100, ISO 9001, NADCAP) and NIST SP 800-171 compliance status for CUI data handling in their SOI.

5.0 Please provide input on other considerations for the US Government or additional information that would be needed to provide a thorough response.

6.0 White Paper Submission Closing Information

Industry submission of white papers is due NLT 1200 EST on 18 June 2026.

7.0 Government POCs

Submissions shall be sent via email to the following Points of Contact:

Jamie M. Waszak, jamie.m.waszak.civ@mail.mil

Christine Marr, christine.m.marr.civ@army.mil

Jeffrey Sholy, jeffrey.r.sholy.civ@army.mil

Jonathan Taylor, jonathan.s.taylor.civ@army.mil

Area of Interest (AoI): TIGER Hackathon – Supply Chain Resilience and Advanced Manufacturing
3.0 Core Objectives and Vendor Response Requirements
Objective 1: Traditional Second Source
Objective 3: Material Provision

4.0 Submission Instructions and Security Requirements

File details come from the government source that posted it. Updated .