Area of Interest (AoI) - Phase II TIGER Readiness.docx

DOCX document 35 KB Posted

Attached to
ACC-DTA Commercial Solutions Opening (CSO)
Solicitation number
W912CH-26-S-0001
Issued by

About this file

This is an Area of Interest (AoI) document for Phase II of the TIGER (Total Integrated Engine Revitalization) program, sponsored by the Department of the Army's Integrated Logistics Support Center and Capability Program Executive for the Abrams Main Battle Tank's AGT 1500 engine. The Phase II initiative seeks vendor proposals to transition from capability assessment to actionable execution by manufacturing or supplying critical and single-source engine components identified during the Phase I Hackathon Industry Day.

Vendors must submit detailed Execution Plans by August 5, 2026 at 1600 EST addressing five core requirements: (1) Technical Execution Strategy detailing component selection, manufacturing approach (traditional second source or advanced manufacturing), historical production capabilities, TDP translation methodology, and quality/testing alignment; (2) Prototype Timeline and Production Roadmap with realistic phased milestones (Initial, Validation, Transition, and Scale) within 12 months of contract award; (3) Supply Chain and Material Sourcing documentation confirming 100% Buy American Act compliance, domestic or bilateral material sources, end-to-end lot traceability, and bottleneck mitigation strategies; (4) Financial and Capacity ROM including itemized Non-Recurring Engineering costs, unit cost breakouts with yield rates, minimum/maximum order quantities, maximum monthly/annual production capacity, and IP rights specifications; and (5) Risk Assessment identifying process risks. Submissions shall be formatted as white papers (5 pages introduction plus 5 pages per component) with CUI data handled per NIST SP 800-171 standards, and submitted via email to Jamie M. Waszak (jamie.m.waszak.civ@army.mil) and Christine Marr (christine.m.marr.civ@army.mil). This AoI is part of the broader ACC-DTA Commercial Solutions Opening (CSO) authorized under DFARS Subpart 212-70, which may result in fixed-price or fixed-price incentive fee contracts through 2028.

View the file

Other files

File Type Posted
AoI UAS Test Support Services.docx DOCX document
ACC DTA CSO_Amendment 41.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 40.docx DOCX document
Attachment 1 - Required Domestic Tools.xlsx XLSX spreadsheet
AoI Domestic Hand Measuring Tools.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 39.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 38.docx DOCX document
FALCONS AOI - Amendment 1 v2.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 37.docx DOCX document
FALCONS AOI - Amendment 1.pdf PDF
Attachment 1 - FALCONS Government Performance Specification - Amendment 1.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 36.docx DOCX document
FALCONS AoI Questions - Government Responses 10-16-26.pdf PDF
Rev 01 MCS Area of Interest Armor Formation.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 35.docx DOCX document
AOI CUAS Detection.docx DOCX document
PdM VPS Sensor CSO Questionnaire-(VendorNameHere).xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 34.docx DOCX document
MCS Area of Interest Armor Formation.docx DOCX document
Attachment 2 - Performance Specification Compliance Matrix.xlsx XLSX spreadsheet
Attachment 1 - FALCONS Government Performance Specification.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 33.docx DOCX document
FALCONS AOI - Posted 06 OCT 2026.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 32.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 31.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 30.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 29.docx DOCX document
Rev 02Area of Interest (AoI) - Phase II TIGER Readiness REV 02.docx DOCX document
TIGER Readiness Q and A 06 AUG 26.docx DOCX document
Average Monthly Demand 166 Critical and Single Source Components.pdf PDF
Aiming Circle CSO AOI.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 28.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 27.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness REV 01.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 26.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness Vendor Response.xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 25.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 24.docx DOCX document
Revision 03 Area of Interest - TIGER Hackathon.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 23.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 22.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 21.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 20.docx DOCX document
LTT HC_Area of Interest.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 19.docx DOCX document
Attachment 002 LTT HC Desired Attributes Impact Table_11May26.xlsx XLSX spreadsheet
Attachment 001 LTT-HC Desired Attributes.pdf PDF
Revision 02 Area of Interest - TIGER Hackathon.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 18.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 17.docx DOCX document
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area of Interest (AoI): Phase II: TIGER Readiness Agency: Department of the Army Program: Integrated Logistics Support Center (ILSC) and Capability Program Executive (CPE) Ground Platform: Abrams Main Battle Tank – Total Integrated Engine Revitalization (TIGER) of the Automotive Gas Turbine (AGT) 1500 Engine

1.0 Background and Phase II Objectives

Following the successful completion of the TIGER Hackathon Industry Day and the initial review of the Technical Data Packages (TDP), the Government is initiating Phase II this AoI. Vendors have now physically inspected the AGT 1500 engine and some components, engaged with subject matter experts, and identified the specific critical and single-source components they are interested in manufacturing or supplying.

The objective of Phase II is to move from capability assessment to actionable execution. The Government requires detailed, time-bound production roadmaps, technical execution strategies, and clear commercial/qualification metrics from vendors for their down-selected components.

2.0 Vendor Response Requirements for Phase II

Vendors who choose to participate in Phase II must submit a Detailed Execution Plan addressing the following criteria for each component they intend to produce:

2.1 Technical Execution Strategy (TDP Alignment)

Based on the TDP information provided and reviewed post-Industry Day, vendors must detail exactly how they will execute on the components they are interested in. This section must include:

· Component Down-Selection and Government Data Requirements:

· Component Selection: Clearly identify which specific components are targeted for production.

· Government Furnished Data (GFD): Specify what additional data, models, test parameters, or technical assistance is required from the Government to initiate manufacturing.

· Manufacturing & Sourcing Approach: Detailed technical approach to fabricating the selected components. Specify how these components will be sourced, explicitly confirming whether the selected method falls under:

· Traditional Second Source

· Advanced Manufacturing

· Historical Production & Capabilities:

· Detail prior organizational experience producing similar components or components of equivalent complexity. Provide past performance references for similar components or components produced through similar methods. Include details quantifying the complexity of other components they have produced, such as materials, tolerances achieved, and special processes used.

· Provide a summary of the facility's inherent capabilities to produce these specific components (e.g., machine footprints, processing limits).

· TDP Translation: How the vendor will utilize the legacy 2D TDP data. If utilizing Advanced Manufacturing, detail the process for converting 2D data into 3D solid models and establishing material equivalency.

· Tooling and Infrastructure: Explicit confirmation of the tooling, molds, or specialized infrastructure that will be utilized or needs to be designed to meet the TDP specifications.

· Quality, Testing & Supplier Qualifications:

· Alignment of in-house testing capabilities (e.g., Coordinate Measuring Machine (CMM), Nondestructive Inspection (NDI, etc.)) to the specific tolerances and mechanical properties requirements outlined in the TDP.

· Provide proof of standard aerospace and defense supplier qualifications (e.g., AS9100, ISO9001 certifications) and detail how these quality management systems will govern the production process. State whether you have previously gone through the process of qualifying components with the Army.

2.2 Prototype Timeline, Costs, and Production Roadmap (Flexible Milestones < 12 Months) Provide a comprehensive, time-bound roadmap detailing realistic execution timelines over the performance period. Proposals must incorporate a structured, phased progression organized around the milestone categories below.

Note: For each proposed phase and milestone, vendors must populate the expected durations (expressed in months from contract award) within the designated fields in the Area of Interest (AoI) - Phase II TIGER Readiness Vendor Response.xlsx (Excel Template).

· Prototype Phase: Assign the number of months required to complete prototype development and deliver initial articles for evaluation, including all associated prototyping costs.

· Initial Milestones: Assign the number of months required to complete project initiation activities, including tooling design and acquisition, material sourcing, initial digital engineering (if applicable), and facility readiness.

· Validation Milestones: Assign the number of months required to complete quality assurance and verification benchmarks, including First Article Testing (FAT) production, initial quality validation, and preliminary Government inspection.

· Transition Milestones: Assign the number of months required to execute the transition from prototype to production, including the completion of FAT, integration testing, and transition to Low-Rate Initial Production (LRIP).

· Scale Milestones: Assign the number of months required to establish full-rate production scalability, implement sustained delivery schedules, and successfully demonstrate surge capacity.

2.3 Supply Chain, Material Sourcing, and Rough Order of Magnitude (ROM) Building upon Objective 3 (Material Provision) from the AoI - TIGER Hackathon - Supply Chain Resilience and Advanced Manufacturing, vendors must provide:

· Material Readiness: Confirmed sources for critical raw materials, forgings, or castings required for the selected components. Map the supply chain back to the domestic or bilateral mine/smelter to demonstrate 100% compliance with the Buy American Act and Specialty Metals clause (DFARS 252.225-7009).

· Traceability: Established processes for maintaining end-to-end lot traceability and compliance with relevant specifications for the specific components chosen.

· Bottleneck Mitigation: Identified risks in the proposed 12-month roadmap (including raw material lead times and machinery constraints) and the vendor's strategy to mitigate them.

2.4 Financial & Capacity ROM: Provide realistic pricing and capability ranges for the selected components, including:

· Non-Recurring Engineering (NRE): Total start-up, engineering design, tooling, and qualification costs.

· NRE Cost Breakout: Break out total NRE into distinct, itemized lines for engineering hours, manufacturing tooling/fixtures, software licensing, and first-article qualification testing, etc.

· Estimated Unit Cost: Target unit pricing at specified volume thresholds, including expected yield rates for new components you have developed.

· Unit Price Component Breakout: Break out the estimated unit price into separate cost lines for raw materials, direct labor, manufacturing overhead, scrap/yield loss allocations, and profit margin, etc.

· Order Quantities: Explicitly state your minimum and maximum order quantities (MOQ).

· Max Capacity: Define your facility’s maximum production capacity per month/year for the down-selected components.

· Intellectual Property (IP): Specify what level of IP rights you are willing to provide to the Government.

2.5 Risk Assessment

· Process Risks: Identify any risks foreseen with the overall process outlined in this AoI and your proposed approach.

3.0 Submission Instructions

· Format: Submissions should be provided as a standard White Paper, not exceeding 5 pages for an Introduction and 5 pages per component proposed.

· Security: Ensure all submissions containing Restricted Components List data or TDP references comply with NIST SP 800-171 standards for CUI data handling.

· Deadline: No later than 1600 EST on 05 August 2026

· Submission Method: Submissions shall be sent via email to the following Points of Contact:

· Jamie M. Waszak, jamie.m.waszak.civ@army.mil

· Christine Marr, christine.m.marr.civ@army.mil

File details come from the government source that posted it. Updated .