Area of Interest (AoI) - Phase II TIGER Readiness Vendor Response.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
ACC-DTA Commercial Solutions Opening (CSO)
Solicitation number
W912CH-26-S-0001
Issued by

About this file

This is a vendor response template for Phase II TIGER (Technology Integration for Growth and Readiness) Readiness, designed to collect detailed manufacturing capability and capacity information from potential suppliers for the Army Contracting Command - Detroit Arsenal (ACC-DTA) Commercial Solutions Opening (CSO).

The template captures critical vendor capabilities across three primary sections: Vendor Capability, Vendor Schedule, and Vendor Risk Assessments. The Vendor Capability section requests detailed information on proposed manufacturing methods, materials, testing plans, tooling requirements, quality capabilities, aerospace and defense certifications, production schedule, non-recurring engineering (NRE) costs, unit pricing, minimum and maximum order quantities, and intellectual property rights terms. The Vendor Schedule section requests milestone dates for initial validation, validation completion, transition, and scale-up phases, measured in months from contract award. The Vendor Risk Assessments section requires vendors to identify risk areas, provide risk statements describing potential events and consequences, rate likelihood and consequence severity using defined scales (1-5 for both dimensions), and propose mitigation methods and plans. The template is structured to support the Army's rapid acquisition strategy under DFARS Subpart 212-70, which aims to modernize the organic industrial base through streamlined competitive processes and fixed-price contract awards. This vendor response mechanism enables the government to efficiently evaluate commercial manufacturing capabilities and readiness for ground vehicle systems modernization throughout 2028.

View the file

Other files

File Type Posted
ACC DTA CSO_Amendment 43.docx DOCX document
FALCONS AOI - Amendment 2 - Posted 30 OCT 2026.pdf PDF
SUWP AoI (Experimentation and Test Assets)_10-29-2026.docx DOCX document
ACC DTA CSO_Amendment 42.docx DOCX document
FALCONS AoI Questions - Government Responses 10-30-2026.pdf PDF
AoI UAS Test Support Services.docx DOCX document
ACC DTA CSO_Amendment 41.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 40.docx DOCX document
Attachment 1 - Required Domestic Tools.xlsx XLSX spreadsheet
AoI Domestic Hand Measuring Tools.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 39.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 38.docx DOCX document
FALCONS AOI - Amendment 1 v2.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 37.docx DOCX document
FALCONS AOI - Amendment 1.pdf PDF
Attachment 1 - FALCONS Government Performance Specification - Amendment 1.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 36.docx DOCX document
FALCONS AoI Questions - Government Responses 10-16-26.pdf PDF
Rev 01 MCS Area of Interest Armor Formation.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 35.docx DOCX document
AOI CUAS Detection.docx DOCX document
PdM VPS Sensor CSO Questionnaire-(VendorNameHere).xlsx XLSX spreadsheet
ACC DTA GROUND MANEUVER CSO_Amendment 34.docx DOCX document
MCS Area of Interest Armor Formation.docx DOCX document
Attachment 2 - Performance Specification Compliance Matrix.xlsx XLSX spreadsheet
Attachment 1 - FALCONS Government Performance Specification.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 33.docx DOCX document
FALCONS AOI - Posted 06 OCT 2026.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 32.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 31.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 30.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 29.docx DOCX document
Rev 02Area of Interest (AoI) - Phase II TIGER Readiness REV 02.docx DOCX document
TIGER Readiness Q and A 06 AUG 26.docx DOCX document
Average Monthly Demand 166 Critical and Single Source Components.pdf PDF
Aiming Circle CSO AOI.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 28.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 27.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness REV 01.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 26.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 25.docx DOCX document
Area of Interest (AoI) - Phase II TIGER Readiness.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 24.docx DOCX document
Revision 03 Area of Interest - TIGER Hackathon.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 23.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 22.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 21.docx DOCX document
ACC DTA GROUND MANEUVER CSO_Amendment 20.docx DOCX document
LTT HC_Area of Interest.pdf PDF
ACC DTA GROUND MANEUVER CSO_Amendment 19.docx DOCX document
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR Capability Additional Data required? Part Number NSN Nomenclature Current Method Current Material Proposed Manufacturing Method Christine K. Brennan: Christine K. Brennan:

The primary technical process used to fabricate the component (e.g., additive, traditional machining, casting). Proposed Material Christine K. Brennan: Christine K. Brennan:

The specific metal, alloy, casting, or forging material selected to manufacture the part. Proposed Test Plan Christine K. Brennan: Christine K. Brennan:

The primary inspection or qualification method used to validate that the part meets technical requirements. History of Proposed Manufacturing Method Christine K. Brennan: Christine K. Brennan:

A summary of the vendor's prior experience producing similar parts or components of equivalent complexity. Tooling?

Christine K. Brennan: Christine K. Brennan:

A confirmation of whether the specialized tooling, molds, or infrastructure required to produce the component already exist at the vendor's facility or if they need to be developed or outsourced. In House Quality Capabilities Christine K. Brennan: Christine K. Brennan:

The primary inspection equipment and testing systems available internally to verify part tolerances. Current Aerospace and Defense Qualifications Christine K. Brennan: Christine K. Brennan:

Active facility and quality certifications held by the vendor (e.g., AS9100, Nadcap). Overall Schedule (Months) Christine K. Brennan: Christine K. Brennan:

The estimated duration in months from contract award to delivery of the final parts. NRE ROM Christine K. Brennan: Christine K. Brennan:

The Rough Order of Magnitude (ROM) cost for one-time, upfront engineering and tooling setups. Estimated Unit Cost Christine K. Brennan: Christine K. Brennan:

The projected price per individual part once production is established. Minimum order quantities Christine K. Brennan: Christine K. Brennan:

The minimum number of units the vendor requires per individual production order. Maximum order quantity Christine K. Brennan: Christine K. Brennan:

The vendor's maximum production capacity limit per order or time period. Intellectual Property/Government Rights?

Christine K. Brennan: Christine K. Brennan:

The specific category of data rights and IP access the vendor is willing to grant the government.

0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000

VENDOR Schedule

Part NumberNSNNomenclatureInitial Milestone (in months)Validation Milestone (in months)Transition Milestone (in months)Scale Milestone (in months)
0ERROR:#N/AERROR:#N/A
00
00
00
00
00
00
00
00
00
00
00
00

VENDOR Risk Assessments

Part NumberRisk AreaRisk StatementLikelihoodConsequenceRisk LevelMitigation MethodMitigation Plan
0
0
0
0
0
0
0
0
0
0

DEFINITIONS

Risk StatementA good risk statement contains two elements: the potential event and the associated consequences. If known, the risk statement should include a third element: an existing contributing circumstance (cause) of the risk.
LikelihoodThe evaluated probability an event will occur given existing conditions
LikelihoodProbability of Occurrence
1 - Not Likely> 80% to ≤ 99%
2 - Low Likelihood> 60% to ≤ 80%
3 - Likely> 40% to ≤ 60%
4 - Highly Likely> 20% to ≤ 40%
5 - Near Certainty> 1% to ≤ 20%
ConsequenceImpact to the program (effect of the event on program cost, schedule, and performance) should the risk be fully realized
ConsequenceDefinition
1 - Minimal ImpactMinimal to no impact to cost or schedule. Minimal to no consequences to meeting technical performance requirements.
2 - Minor ImpactLess than 30 days slip in schedule, < 5% increase in cost. Reduced technical performance with little impact on objectives.
3 - Moderate Impact1 -6 month slip in schedule, 5 <x< 10% increase in cost. Minor performance impact affecting component or system-of-systems interdependencies. Work-arounds required to achieve required performance.
4 - Significant Impact6-12 month slip in schedule, 10 <x< 20% increase in cost. Significant performance impact affecting component or system-of-systems interdependencies. Work-arounds required to meet required performance.
5 - Critical ImpactGreater than 12 month slip in schedule, 20% <x increase in cost. Unable to achieve required performance.
Risk MitigationThe options or combination of options and the specific implementation approach. It answers the question, What is the plan to address the risk?
StrategyDefinition
Risk AvoidanceReduces or eliminates the risk event or condition by taking an alternate path.
Risk AcceptanceAcknowledge that the risk event or condition may be realized and is prepared to accept the consequences
Risk TransferReassigning or delegating responsibility for tasks to mitigate a risk to another entity.
Risk ControlSeeks to actively reduce risk to an acceptable level. Control generally entails taking action to reduce the likelihood, or the consequence, of a risk to as low as practical in order to minimize potential impacts.

REFERENCE

NSNOrdnance
Part NumberNomenclatureCurrent MethodCurrent MaterialAdditional Data required?Proposed Manufacturing MethodHistory of Proposed Manufacturing MethodTooling?Risk AreaLikelihoodConsequenceMitigationLikelihoodConsequenceRisk Level
2835-01-160-260512284355INLET HOUSINGYesCastingNew CapabilityFully In-HouseGovernment PurposeMaterial1 - Not Likely1 - Minimal ImpactAcceptance1 - Not Likely1 - Minimal ImpactLow Risk
2835-01-074-378512286227HOUSING ASSY, NUMBER 2 BEARINGNoForgingProven (In-Production)No In-House Will ProduceLimited/ProprietarySupply Chain2 - Low Likelihood2 - Minor ImpactAvoidance1 - Not Likely2 - Minor ImpactLow Risk
2835-01-089-918612286241DISK, COMPRESSOR ROTOR, FOURTH STAGE, HIGH PRESSURESubtractivePrototypes OnlyPartial (Subcontracted)UnlimitedEngineering3 - Likely3 - Moderate ImpactTransfer1 - Not Likely3 - Moderate ImpactLow Risk
2930-01-073-006612286303IMPELLER, HPCAdditiveSpecial LicensingManufacturing4 - Highly Likely4 - Significant ImpactControl1 - Not Likely4 - Significant ImpactLow Risk
3040-01-073-010012271245SHAFT 2ND TURBINE ROTOR, LOW PRESSUREOtherProgrammatic5 - Near Certainty5 - Critical Impact1 - Not Likely5 - Critical ImpactMedium Risk
2835-01-084-726312472668NOZZLE ASSEMBLY - SECOND STAGEOther2 - Low Likelihood1 - Minimal ImpactLow Risk
No NSN Honeywell Source12488638NOZZLE, FIRST STAGE GAS PRODUCER2 - Low Likelihood2 - Minor ImpactLow Risk
2835-01-072-996012271565TURBINE ROTOR TURBINE ENGINE 3RD STAGE, FIRST POWER TURBINE2 - Low Likelihood3 - Moderate ImpactLow Risk
2835-01-072-996112271566TURBINE ROTOR, TURBINE ENGINE - 4TH STAGE, SECOND POWER TURBINE2 - Low Likelihood4 - Significant ImpactMedium Risk
2835-01-089-918512286915SHROUD ASSY, OUTER, THIRD STAGE TURBINE2 - Low Likelihood5 - Critical ImpactMedium Risk
3040-01-487-370212488557HOUSING, NO. 5 BEARING3 - Likely1 - Minimal ImpactLow Risk
3040-01-073-010112271524ACTUATOR, INLET GUIDE VANE3 - Likely2 - Minor ImpactLow Risk
2835-01-140-425812302277HEADER , REAR, ASSY OF RECUPERATOR3 - Likely3 - Moderate ImpactMedium Risk
3040-01-197-809812286779FWD. HEADER, REGENERATOR3 - Likely4 - Significant ImpactMedium Risk
NHA: 2835-01-548-291012551199HOUSING, BEARING PT - MACHINED3 - Likely5 - Critical ImpactHigh Risk
2835-01-074-002212286392DIFFUSER VANE ASSY.4 - Highly Likely1 - Minimal ImpactLow Risk
4730-01-076-437312286061FLANGE, OIL IN4 - Highly Likely2 - Minor ImpactMedium Risk
2835-01-073-075212302480STATOR VANE, LPC 34 - Highly Likely3 - Moderate ImpactMedium Risk
2835-01-161-777212302430STATOR VANE, LPC14 - Highly Likely4 - Significant ImpactHigh Risk
2835-01-073-016812286257STATOR VANE, HPC14 - Highly Likely5 - Critical ImpactHigh Risk
2835-01-074-379012286268STATOR VANE, HPC45 - Near Certainty1 - Minimal ImpactLow Risk
2835-01-074-001412488546CYLINDER HP5 - Near Certainty2 - Minor ImpactMedium Risk
2835-01-074-378912286464VANE, PT VARIABLE GUIDE5 - Near Certainty3 - Moderate ImpactHigh Risk
4730-01-422-956612388312SWIVEL JOINT, PJAS5 - Near Certainty4 - Significant ImpactHigh Risk
2835-01-073-016612286314HOUSING, HPC5 - Near Certainty5 - Critical ImpactHigh Risk
2835-01-180-554912488613HOUSING & CARRIER ASSY, RGB
5365-01-073-788912286205SPACER, SLEEVE
2835-01-073-072912302366HOUSING ASSY, LPC
2835-01-073-073312271531SHROUD, 4T
2835-01-074-000812286233SHROUD ASSY., INNER, IGV
NHA: 2835-01-073-778612642603COMPRESSOR ROTOS, HP-STAGE 1 AND 2
4710-01-266-398612345252TUBE ASSEMBLY
3110-01-154-780212284303PLATE, BEARING RETAINING
2835-01-073-805712286183DISC, LPC1
2835-01-074-344412286223SHROUD ASSY. ,IGV
2835-01-391-439612324846DISC, LPC 2/3
2835-01-390-820812324847DISC LPC 4/5
2835-01-074-378412286240DISC, HPC3
3040-01-073-074412286265SHAFT, HPC
2835-01-446-620212286282DISC, HPC 1&2
3040-01-073-072112302392INTERMEDIATE HOUSING
3130-01-074-349112286323HOUSING ASSY, #3 BRG.
2835-01-073-777512286339DISC ASSY., HPT
2835-01-098-516412271176DISC ASSY, LPT
2835-01-201-348012284658DIFFUSER ASSY.
2835-01-625-046012488567LINER, COMBUSTION
2835-01-074-344712286562SEAL
3120-01-073-789012286580ROD END ASSY.
5365-01-074-368212271204SPACER, INTERNAL GUIDE VANE
3110-01-078-600412286821BEARING, #6A/B & #7
3110-01-091-553212286828BEARING, POS #5
No NSN12551116BEARING, #4
4820-01-083-574212286985CHECK VALVE
2835-01-074-349312286940HOUSING & BELLOWS ASSY.
3110-01-161-213212284392BEARING, POS #2 & #3
5330-01-139-358312551125SEAL, POS #1, #2, & #3
4710-01-719-630812551193TUBE, SCAVENGE
4710-01-719-635612551194TUBE, AIR SUPPLY
4710-01-719-636112551195TUBE, OIL SUPPLY
6645-01-537-311412488550TIMER MODULE ASSEMBLY
No NSN12286994-32REDUCED HEAD BOLT
2835-01-074-001512488590OUTSIDE TURBINE LINER
6150-01-073-073612286829IGNITION LEAD
4730-01-074-376212286922ELBOW
5315-01-074-362012286672PIN, OIL TANK
5975-01-074-344512286547CLAMP
3040-01-074-377112286046RING GEAR ASSY, RGB
5365-01-073-794812286361-15SHIM, HPC ROTOR / HPT
No NSN Honeywell Source12551162LINER, DIFFUSER
5340-01-193-678512284659PLATE, NBC PORT
5365-01-074-000912286267SPACER-SET
3020-01-073-785912286076GEAR, SPUR, #3, AGB
3040-01-076-434912286913SHAFT, INPUT, VGM
3120-01-171-004112284312LINER, #1 BRG.
2990-01-279-791112324737HYDROMECHANICAL UNIT
4720-01-099-644312271136HOSE ASSY., FUEL PRESSURE, PTS
2590-01-074-349412286932CABLE FEEDBACK, PTS
5365-01-073-778912286423PLATE, SEALING, CURL
4720-01-191-622812302439HOSE, AGB AIR/OIL VENT
4710-01-075-497212271111TUBE ASSY., FUEL PRESS., IGV
No NSN12642609FILTER ASSY.
3040-01-099-645912271203LINK, SLOT, IGV
2920-01-286-568512284648IGNITION EXCITER
5340-01-074-001212286364PLATE ASSY., HPT
2920-01-159-185312472667HARNESS, T7 AVERAGING
2835-01-232-970912472687NOZZLE ASSY, SECOND POWER TURBINE, FOURT
2835-01-214-264212488624COVER, COMBUSTOR
2835-01-074-001312488588FLANGE, FIRST TURBINE NOZZLE
2835-01-477-786812472658DEFLECTOR, RGB
No NSN Honeywell Source12551204CURL, DIFFUSER
2835-01-073-075112286149COMPRESSOR VANE SET, 2ND STAGE LOW PRESS
2835-01-074-379112286161VANE SET- 4TH COMPRESSOR STATOR, LOW PRE
2835-01-073-017012302429VANE SET, 5TH STG COMPRESSOR STATOR, LOW
2835-01-073-075012286261VANE SET- 2ND COMPRESSOR STATOR, HIGH PR
2835-01-087-111112286266VANE SET - 3RD COMPRESSOR STATOR HIGH PR
2835-01-073-775512271560SPLITTER ASSY, INTAKE SCREEN
2835-01-138-386512472711SEAL, IMPELLER
2835-01-074-378812286663OIL TANK ASSY
2835-01-074-344312286224RING ASSY,UNISON IGV
2835-01-074-377912286222VANE AND LEVER ASSY,IG
NHA: 2835-01-084-726312472674SUPPORT AFT
NHA: 2835-01-084-726312472673SUPPORT
2990-01-333-315412271138PUMP, ROTARY, POWER DRIVEN INTERNAL GEAR
4320-01-723-573412551122PUMP, FLUID
9330-01-274-898112286877-1SLEEVE-CHAFING
9330-00-688-785712286877-3SLEEVE-CHAFING
6680-01-249-976312488562DIPSTICK OIL
4710-01-200-615012284632TUBE ASSY,COOLING AI
No NSN Honeywell Source12472697SEAL FIRST TURB NOZ
5340-01-074-495012302010BRACKET,RING GEAR
4820-01-400-274212325002VALVE ASSY
2910-01-101-414512287953FILTER ELEMENT
4710-01-413-885712387906TUBE ASSEMBLY ENGINE
4730-01-254-538312345080ADAPTER ASSEMBLY
8140-01-124-408912302107-1WOOD RUNNER
No NSN Honeywell Source12551198HOUSING, PT - MACHINED
No NSN Honeywell Source12551196Housing, PT-Casting
2590-01-385-263412347491MODIFICATION KIT, FIELD SERVICE ENGINE
5340-01-320-228912316316-2RETAINER (PART OF 12347491)
6150-01-3201-290312346214CONTROL CABLE ASSY (PART OF 12347491)