ATT0067 Estimated Work Breakout.pdf

PDF 113 KB Posted

Attached to
TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV
Solicitation number
W9128Z-20-R-0001
Issued by

About this file

This document provides an estimated work breakdown structure and description for the TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV federal contract opportunity. The contract will provide information systems engineering and information technology support services to the United States Army Information Systems Engineering Command. Services will include engineering support across all phases of information and communication systems projects from planning through retirement. Worldwide support is required, primarily at secure and adequately equipped sustained locations, though some work may take place in remote or hostile environments involving various clearance levels. The estimated work breakdown allocates effort across various functional areas, with the largest estimated percentages allocated to information systems integration/installation, engineering and site surveys, cybersecurity, and software.

View the file

Other files

File Type Posted
W9128Z20R0001-0004.pdf PDF
W9128Z20R0001-0003.pdf PDF
ATT0064 REVISED 2 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
W9128Z20R0001-0002.pdf PDF
ATT0011 REVISED CDRL A001.pdf PDF
ATT0065 REVISED Small Business Participation Commitment Document (SBPCD).pdf PDF
ATT0010 REVISED 2.5 item f USAISEC CyberSecurity Assessment and CE Eng Manual V2.1.1.pdf PDF
W9128Z20R0001-0001.pdf PDF
ATT0037 REVISED ST-1 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0021REVISED Sample Task Cybersecurity Pkg.pdf PDF
ATT0061 REVISED Past Performance Reference List (PART A).docx DOCX document
ATT0032 REVISED ST-1 CDRL SE003 Pre Deployment Meeting.pdf PDF
ATT0051 REVISED Sample Task-Satellite Communications.pdf PDF
ATT0060 REVISED ST-3 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
ATT0062 REVISED Past Performance Information Summary (PART B).docx DOCX document
ATT0063 REVISED Past Performance Questionnaire.pdf PDF
ATT0064 REVISED CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0059 REVISED Sample Task-Technologies.pdf PDF
ATT0019 TEIS IV - REVISED Labor Category Descriptions.pdf PDF
All final Q and A.xlsx XLSX spreadsheet
ATT0036 CDRL SE007 Out-Brief.pdf PDF
ATT0021 Sample Task Cybersecurity Pkg.pdf PDF
ATT0026 1.6.2B_ITV CONOPS Diagrams.pdf PDF
ATT0066 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0068 Cochise County AZ WD 2015-5719 rev8.pdf PDF
ATT0005 2.5 item d SIPRNET_Tech_Impl_Criteria V7 - Final 12Nov13.pdf PDF
ATT0054 CDRL TS26 Project Concurrence Memo.pdf PDF
ATT0028 1.6.3A_NC HW-SW List.xlsx XLSX spreadsheet
ATT0031 CDRL SE001 Weekly Project Report.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
ATT0042 CDRL SE014 IAVA Compliance Report.pdf PDF
ATT0024 1.6.1C_ESS Ports and Protocols List.xls XLS spreadsheet
ATT0059 Sample Task-Technologies.pdf PDF
ATT0046 CDRL SE018 POAM.pdf PDF
ATT0022 1.6.1A_ESS Network HW-SW List.xlsx XLSX spreadsheet
ATT0002 2.5 item a ISEC OPSEC Plan 2017.pdf PDF
ATT0041 CDRL SE013 Data Analysis Work Products.pdf PDF
ATT0015 CDRL A005.pdf PDF
ATT0040 CDRL SE012 Test Data.pdf PDF
ATT0071 DD254 Appendix B- ICD-704.pdf PDF
ATT0003 2.5 item b 18-035 USAISEC Drafting Guide Final 24 Apr 18.pdf PDF
ATT0013 CDRL A003.pdf PDF
ATT0033 CDRL SE004 Test Readiness Review Questionnaire.pdf PDF
ATT0020 TEIS IV - DD254.pdf PDF
ATT0035 CDRL SE006 Daily Project Report.pdf PDF
ATT0004 2.5 item c 18-033 USAISEC VIS Software Design Criteria - Final 14 Mar 18.pdf PDF
ATT0044 CDRL SE016 SE Assessment Report.pdf PDF
ATT0060 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
ATT0043 CDRL SE015 STIG Compliance Report.pdf PDF
ATT0038 CDRL SE009 DCAFS.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J, Attachment 067 W9128Z-19-R-0002

ISEC Estimation of Work Break-Out by Functional Area For Informational Purposes Only

The Government estimates the following breakout of work on the TEIS IV Program according to the functional areas of the TEIS IV Performance Work Statement. This is for informational purposes and represents the Government’s best estimate. This information is provided for planning purposes only.

Work Breakdown Structure

Base Contract Tasks

TEIS IV

Work

Percentage

3.2 Engineering and Site Surveys

3.3 Information Systems Engineering

3.4 Cybersecurity

3.5 Approved Products List Certification

3.6 Information Systems Integration/Installation

3.7 Test and Evaluation

3.8 Software

3.9 Transitional Operations and Maintenance Service

3.10 Information Technology Technical Services

3.11 Information Systems Documentation

3.12 Technical Instruction

3.13 Drafting and Illustration Support

3.14 Project Services

3.15 Project Management

3.16 Systems / Network Administration

3.17 Systems Analysis

3.18 Technology Demonstration and Rapid Prototype Support

12%

15.8%

10.1%

0.1%

24.6%

7.7%

0.7%

3.6%

1.5%

2.7%

0.5%

2.1%

11.4%

6.2%

0.5%

0.2%

0.3%

File details come from the government source that posted it. Updated .