ATT0011 REVISED CDRL A001.pdf

PDF 196 KB Posted

Attached to
TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV Federal contract opportunity
Solicitation number
W9128Z-20-R-0001
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document package contains a Contract Data Requirements List (CDRL) and details for a federal contract opportunity. The CDRL outlines monthly progress reporting requirements for an engineering support services contract. Reports are due 5 business days after each period and require a narrative description of accomplishments, total pricing and staffing data by labor category, and an overview of upcoming activities. Reports must follow specified formatting guidelines and be delivered electronically to the Contracting Officer, Contracting Officer's Representative, and Technical Monitor.

The federal contract opportunity is for Total Engineering and Information Services (TEIS IV) to provide information systems engineering and IT support services to the United States Army Information Systems Engineering Command worldwide. Support is required for all phases of projects from planning through retirement. Work may take place in secure facilities with highest clearances or remote/hostile locations with little infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV, newest first.
File Type Posted
W9128Z20R0001-0004.pdf PDF
ATT0060 REVISED ST-3 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
ATT0061 REVISED Past Performance Reference List (PART A).docx DOCX document
ATT0021REVISED Sample Task Cybersecurity Pkg.pdf PDF
ATT0032 REVISED ST-1 CDRL SE003 Pre Deployment Meeting.pdf PDF
ATT0062 REVISED Past Performance Information Summary (PART B).docx DOCX document
ATT0065 REVISED Small Business Participation Commitment Document (SBPCD).pdf PDF
ATT0059 REVISED Sample Task-Technologies.pdf PDF
ATT0051 REVISED Sample Task-Satellite Communications.pdf PDF
ATT0036 CDRL SE007 Out-Brief.pdf PDF
ATT0057 CDRL TS29 Trip Report.pdf PDF
ATT0025 1.6.2A_ITV HW-SW List.xlsx XLSX spreadsheet
ATT0060 CDRL TS08 Facility Wiring Design Criteria (FWDC).pdf PDF
ATT0028 1.6.3A_NC HW-SW List.xlsx XLSX spreadsheet
ATT0007 2.5 item i UFC 4-140-03.pdf PDF
ATT0004 2.5 item c 18-033 USAISEC VIS Software Design Criteria - Final 14 Mar 18.pdf PDF
ATT0067 Estimated Work Breakout.pdf PDF
ATT0035 CDRL SE006 Daily Project Report.pdf PDF
ATT0029 1.6.3B_NC Block Diagram Layout.pdf PDF
ATT0010 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1.pdf PDF
ATT0064 CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0054 CDRL TS26 Project Concurrence Memo.pdf PDF
ATT0042 CDRL SE014 IAVA Compliance Report.pdf PDF
ATT0018 TEIS IV QASP.pdf PDF
ATT0047 CDRL SE019 Executive Summary.pdf PDF
ATT0038 CDRL SE009 DCAFS.pdf PDF
ATT0033 CDRL SE004 Test Readiness Review Questionnaire.pdf PDF
ATT0019 TEIS IV - Draft Labor Category Descriptions.pdf PDF
ATT0043 CDRL SE015 STIG Compliance Report.pdf PDF
ATT0020 TEIS IV - DD254.pdf PDF
ATT0013 CDRL A003.pdf PDF
ATT0014 CDRL A004.pdf PDF
ATT0012 CDRL A002.pdf PDF
ATT0005 2.5 item d SIPRNET_Tech_Impl_Criteria V7 - Final 12Nov13.pdf PDF
ATT0051 Sample Task-Satellite Communications.pdf PDF
ATT0040 CDRL SE012 Test Data.pdf PDF
ATT0027 1.6.2C_ITV Ports and Protocols List.xls XLS spreadsheet
ATT0015 CDRL A005.pdf PDF
ATT0050 CDRL SE023 SCA-V Rec Memo.pdf PDF
ATT0045 CDRL SE017 Documentation Evaluation Report.pdf PDF
ATT0069 Fairfax VA WD 2015-4281.pdf PDF
ATT0044 CDRL SE016 SE Assessment Report.pdf PDF
ATT0031 CDRL SE001 Weekly Project Report.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
ATT0026 1.6.2B_ITV CONOPS Diagrams.pdf PDF
ATT0021 Sample Task Cybersecurity Pkg.pdf PDF
ATT0066 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0063 Past Performance Questionnaire.pdf PDF
ATT0030 1.6.3C_NC Ports and Protocols List.xls XLS spreadsheet
ATT0017 CDRL A007.pdf PDF
Show all 50

TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

ETC 9.18.19

MODSUB CLINTask(Labor Travel, Materials, ODC)**Location or Project (if applicable)8Cost AwardFee AwardFEE %Cost Invoiced as of 31 AUG 19Fee Invoiced as of 31 AUG 19Cost ReserveFee ReserveCost To Still BillFee To Still BillCost Funds
RequiredFee Funds
RequiredNOTES

SAMPLE Award 1000AA LBR $1,883,560.44 $131,849.23 7% $1,810,838.84 $119,867.63 $72,721.60 $11,981.60 $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

ERROR:#DIV/0! $0.00 $0.00

1,883,560.44 131,849.23 1,810,838.84 119,867.63 0.00 0.00 72,721.60 11,981.60 0.00 0.00

* Note: If CLIN combines tasks (labor, travel, material, ODC) report each task as a separate row. If multiple locations or projects are part of a single CLIN report each location or project as a separate row.

Balance to still Invoice Breakout

Total Cost Fee

LBR

TVL

MAT

ODC

Fee Retention

$0.00 $0.00 $0.00

Sheet2

CurrentPrevious15 SITESMaterial
PLUG #Material
ApprovedCurrent
ShippingSUMBilled as of 12/31NCI
Loadsleftloads

BOLLING 99,291.88 99,291.88 - 0 BOLLING $121,729.28 85,477.21 $972.22 $86,449.43 $85,452.21 $14,823.68 $997.22 $149.15

FT MEADE 572,018.01 572,018.01 - 0 FT MEADE $380,634.10 498,219.54 $10,290.54 $508,510.08 $466,391.64 $72,516.34 $42,118.44 $6,299.66

FT DRUM 521,759.74 515,824.02 5,935.71 FT DRUM $1,248,827.99 453,873.75 $15,372.43 $469,246.18 $0.00 $0.00 $469,246.18 $70,185.25

FT KNOX 704,307.01 689,659.07 14,647.94 FT KNOX $378,651.57 612,886.93 $19,772.04 $632,658.97 $238,456.01 $49,437.19 $394,202.96 $58,961.02

HANSCOM 69,506.04 69,506.04 - 0 HANSCOM $70,586.64 59,820.51 $3,973.54 $63,794.05 $57,356.46 $9,873.06 $6,437.59 $962.87

SCOTT 386,990.65 385,278.36 1,712.29 SCOTT $758,490.48 337,063.34 $10,494.04 $347,557.38 $332,429.79 $51,315.97 $15,127.59 $2,262.64

TINKER 244,694.99 244,694.99 - 0 TINKER $674,461.88 209,387.96 $6,383.34 $215,771.30 $209,795.25 $37,324.76 $5,976.05 $893.84

WEST POINT 634,100.53 621,723.92 12,376.61 WEST POINT $1,042,895.82 551,597.92 $13,621.23 $565,219.15 $0.00 $0.00 $565,219.15 $84,539.94

LANDSTUHL 3,244,742.69 3,081,036.83 163,705.86 LANDSTUHL $3,444,954.81 2,828,504.74 $149,022.72 $2,977,527.46 $113.12 $15.38 $2,977,414.34 $445,332.47

BAVARIA 1,217,978.16 1,213,653.37 4,324.79 BAVARIA $1,195,724.61 1,117,584.82 $62,105.49 $1,179,690.31 $0.00 $0.00 $1,179,690.31 $176,446.52

KOREA 1,587,143.86 1,532,878.35 54,265.51 KOREA $1,049,104.83 1,380,641.09 $102,649.86 $1,483,290.95 $0.00 $0.00 $1,483,290.95 $221,856.13

RAMSTEIN 610,667.70 588,030.63 22,637.07 RAMSTEIN $650,878.54 531,213.93 $20,256.12 $551,470.05 $0.00 $0.00 $551,470.05 $82,483.49

SPANGDAHLEM 630,004.02 532,251.00 97,753.01 SPANGDAHLEM $657,152.90 575,720.70 $28,417.50 $604,138.20 $0.00 $0.00 $604,138.20 $90,361.07

KUNSAN 232,206.21 225,438.26 6,767.95 KUNSAN $268,697.63 202,248.30 $8,891.24 $211,139.54 $194,067.51 $30,539.10 $17,072.03 $2,553.47

OSAN 202,610.40 186,784.96 15,825.44 OSAN $389,925.83 183,377.81 $24,736.23 $208,114.04 $104,518.60 $21,818.22 $103,595.44 $15,494.79

ADDITIONAL 50,000.00 100,000.00 (50,000.00) Additional $50,000.00 $50,000.00 $50,000.00 $7,478.51

11,008,021.87 10,658,069.70 349,952.17 SumTotal $12,332,716.91 $9,627,618.55 $526,958.54 $10,154,577.09 $1,688,580.59 $287,663.70 $8,465,996.50 $1,266,260.81

Sheet1

30934.39 107346.14 138,280.53 72283.76 37223.2 109,506.96

30934.39 92428.59 123,362.98 70837.54 37223.2 108,060.74

30934.39 82926.39 113,860.78 81602.44 37223.2 118,825.64

30934.39 120949.7 151,884.09 140120.18 37223.2 177,343.38

30934.39 95851.53 126,785.92 80990.29 37223.2 118,213.49

30934.39 114892.19 145,826.58 77869.72 37223.2 115,092.92

30934.39 114454.38 145,388.77 78010.44 37223.2 115,233.64

30934.39 125621.19 156,555.58 76265.46 37223.2 113,488.66

30934.39 198839.07 229,773.46 221528.34 37223.2 258,751.54

30934.39 213126.7 244,061.09 155412.15 37223.2 192,635.35

30934.39 125343.53 156,277.92 112846.37 37223.2 150,069.57

30934.39 140891.82 171,826.21 147326.05 37223.2 184,549.25

30934.39 235603.89 266,538.28 267362.24 37223.2 304,585.44

30934.39 188034.96 218,969.35 262385.3 37223.2 299,608.50

30934.39 152257.27 183,191.66 155230.3 37223.2 192,453.50

30934.39 198180.05 229,114.44 263912.87 37223.2 301,136.07

30934.39 289955.43 320,889.82 398227.17 37223.2 435,450.37

30934.39 129209.4 160,143.79 101891.43 28023.2005263158 129,914.63

30934.39 163939.47 194,873.86 100296.02 28023.2005263158 128,319.22

3,477,605.11 3,553,238.87

data_item: A001
title: Contractor's Progress, Status, and Management Report
sub: Monthly Progress Report
auth:
ref: PWS paragraph 4.6.1
req_ofc: USAISEC
dd250: N/A
appcode: N/A
dist: Required
freq: Monthly
asof:
firstsub: See blk 16
subsub: See blk 16
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: TM
draft2:
reg2: 1
repro2:
addressee3: KO
draft3:
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: General: The Contractor’s Progress, Status and Management Report provides a narrative description of what the Contractor accomplished during the reporting period, total price and staffing data by labor category for the reporting period, and an overview of activit

Date of first and subsequent submissions: The progress report for each active Task Order is due not later than 5 business days following the end of each reporting period. E-Mail addresses for distribution will be provided with the individual Task Order.

Format: All reports will be developed in Microsoft Word.

(a) Report shall be written for printing on 8 ½” X 11” standard letter size paper (portrait orientation) although necessary attachments, figures, and sketches may be submitted in a size/orientation that best displays the information being presented.

(b) Font shall be Arial, size 12.

(c) Each page beyond the first page shall have a header identifying the site name or report title and date of report.

(d) Report shall be grammatically correct.

(e) All attachments shall be identified and referenced in the text of the report.

Method of delivery: One (1) soft copy of the progress report shall be submitted via email to the Technical Monitor (TM), Contracting Officer's Representative (COR) and the Contracting Officer (KO) as an attachment, fully identified, and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.

Title page:

(a) Title. The title shall identify the subject of the report, program name, or task.

(b) Name of contractor. The name and telephone number of the contractor preparing the report.

(c) Contract number. The procurement instrument identification number.

(d) Key person. The individual assigned to the task or who produced the report.

(e) Reporting period. The dates the reporting period begins and ends.

Content:

(a) Description of the progress made during the reporting period;

(b) Results, positive or negative, obtained related to previously-identified problem areas, with conclusions and recommendations.

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system:
ctr_no:
contr:
remarksb: (c) Any significant changes to the contractor’s organization or method of operation, to the project management network, or to the milestone chart.

(d) Problem areas affecting technical or scheduling elements, with background and any recommendations for solutions beyond the scope of the contract.

(e) Problem areas affecting cost elements, with background and any recommendations for solutions.

(f) Using the Government provided worksheet show, by CLIN, all costs billed as of the reporting period, all costs projected to be billed, and any available balance or costs needed as of the reporting period. If CLIN combines tasks (labor, travel, material, ODC), report each task as a separate row. If multiple locations or projects are part of a single CLIN, report each location or project as a separate row.

(g) Person-hours expended for the reporting period and cumulatively for the contract (for cost-reimbursable type task orders only).

(h) Any task-related trips and significant results.

(i) Record of all significant telephone calls and any commitments made by telephone.

(j) Summary of Engineering Change Proposal (ECP) status (if any), including identification of proposed ECPs, and approved and implemented ECPs.

(k) Contract schedule status.

(l) Plans for activities for the following reporting period.

(m) Appendices for any necessary tables, references, photographs, illustrations and charts.

(n) All mandatory training certificates/briefings for all assigned personnel, as required in the Security section of the task order Performance Work Statement, Sexual Assault and Sexual Harassment (SHARP) base contract and in accordance with AR 530-1 Chapter 6, shall be submitted within 15 days after award, or as specified in the PWS. In addition, any changes in personnel will require the mandatory training certificates be submitted with the applicable monthly report thereafter.

Page2: 2
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .