ATT0011 REVISED CDRL A001.pdf
PDF 196 KB Posted
- Attached to
- TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV Federal contract opportunity
- Solicitation number
- W9128Z-20-R-0001
About this file
This document package contains a Contract Data Requirements List (CDRL) and details for a federal contract opportunity. The CDRL outlines monthly progress reporting requirements for an engineering support services contract. Reports are due 5 business days after each period and require a narrative description of accomplishments, total pricing and staffing data by labor category, and an overview of upcoming activities. Reports must follow specified formatting guidelines and be delivered electronically to the Contracting Officer, Contracting Officer's Representative, and Technical Monitor.
The federal contract opportunity is for Total Engineering and Information Services (TEIS IV) to provide information systems engineering and IT support services to the United States Army Information Systems Engineering Command worldwide. Support is required for all phases of projects from planning through retirement. Work may take place in secure facilities with highest clearances or remote/hostile locations with little infrastructure.
View the file
Other files for this federal contract opportunity
Show all 50
TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
ETC 9.18.19
| MOD | SUB CLIN | Task(Labor Travel, Materials, ODC)* | *Location or Project (if applicable)8 | Cost Award | Fee Award | FEE % | Cost Invoiced as of 31 AUG 19 | Fee Invoiced as of 31 AUG 19 | Cost Reserve | Fee Reserve | Cost To Still Bill | Fee To Still Bill | Cost Funds | ||
| Required | Fee Funds | ||||||||||||||
| Required | NOTES |
SAMPLE Award 1000AA LBR $1,883,560.44 $131,849.23 7% $1,810,838.84 $119,867.63 $72,721.60 $11,981.60 $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
ERROR:#DIV/0! $0.00 $0.00
1,883,560.44 131,849.23 1,810,838.84 119,867.63 0.00 0.00 72,721.60 11,981.60 0.00 0.00
* Note: If CLIN combines tasks (labor, travel, material, ODC) report each task as a separate row. If multiple locations or projects are part of a single CLIN report each location or project as a separate row.
Balance to still Invoice Breakout
Total Cost Fee
LBR
TVL
MAT
ODC
Fee Retention
$0.00 $0.00 $0.00
Sheet2
| Current | Previous | 15 SITES | Material | ||||
| PLUG # | Material | ||||||
| Approved | Current | ||||||
| Shipping | SUM | Billed as of 12/31 | NCI | ||||
| Loads | left | loads |
BOLLING 99,291.88 99,291.88 - 0 BOLLING $121,729.28 85,477.21 $972.22 $86,449.43 $85,452.21 $14,823.68 $997.22 $149.15
FT MEADE 572,018.01 572,018.01 - 0 FT MEADE $380,634.10 498,219.54 $10,290.54 $508,510.08 $466,391.64 $72,516.34 $42,118.44 $6,299.66
FT DRUM 521,759.74 515,824.02 5,935.71 FT DRUM $1,248,827.99 453,873.75 $15,372.43 $469,246.18 $0.00 $0.00 $469,246.18 $70,185.25
FT KNOX 704,307.01 689,659.07 14,647.94 FT KNOX $378,651.57 612,886.93 $19,772.04 $632,658.97 $238,456.01 $49,437.19 $394,202.96 $58,961.02
HANSCOM 69,506.04 69,506.04 - 0 HANSCOM $70,586.64 59,820.51 $3,973.54 $63,794.05 $57,356.46 $9,873.06 $6,437.59 $962.87
SCOTT 386,990.65 385,278.36 1,712.29 SCOTT $758,490.48 337,063.34 $10,494.04 $347,557.38 $332,429.79 $51,315.97 $15,127.59 $2,262.64
TINKER 244,694.99 244,694.99 - 0 TINKER $674,461.88 209,387.96 $6,383.34 $215,771.30 $209,795.25 $37,324.76 $5,976.05 $893.84
WEST POINT 634,100.53 621,723.92 12,376.61 WEST POINT $1,042,895.82 551,597.92 $13,621.23 $565,219.15 $0.00 $0.00 $565,219.15 $84,539.94
LANDSTUHL 3,244,742.69 3,081,036.83 163,705.86 LANDSTUHL $3,444,954.81 2,828,504.74 $149,022.72 $2,977,527.46 $113.12 $15.38 $2,977,414.34 $445,332.47
BAVARIA 1,217,978.16 1,213,653.37 4,324.79 BAVARIA $1,195,724.61 1,117,584.82 $62,105.49 $1,179,690.31 $0.00 $0.00 $1,179,690.31 $176,446.52
KOREA 1,587,143.86 1,532,878.35 54,265.51 KOREA $1,049,104.83 1,380,641.09 $102,649.86 $1,483,290.95 $0.00 $0.00 $1,483,290.95 $221,856.13
RAMSTEIN 610,667.70 588,030.63 22,637.07 RAMSTEIN $650,878.54 531,213.93 $20,256.12 $551,470.05 $0.00 $0.00 $551,470.05 $82,483.49
SPANGDAHLEM 630,004.02 532,251.00 97,753.01 SPANGDAHLEM $657,152.90 575,720.70 $28,417.50 $604,138.20 $0.00 $0.00 $604,138.20 $90,361.07
KUNSAN 232,206.21 225,438.26 6,767.95 KUNSAN $268,697.63 202,248.30 $8,891.24 $211,139.54 $194,067.51 $30,539.10 $17,072.03 $2,553.47
OSAN 202,610.40 186,784.96 15,825.44 OSAN $389,925.83 183,377.81 $24,736.23 $208,114.04 $104,518.60 $21,818.22 $103,595.44 $15,494.79
ADDITIONAL 50,000.00 100,000.00 (50,000.00) Additional $50,000.00 $50,000.00 $50,000.00 $7,478.51
11,008,021.87 10,658,069.70 349,952.17 SumTotal $12,332,716.91 $9,627,618.55 $526,958.54 $10,154,577.09 $1,688,580.59 $287,663.70 $8,465,996.50 $1,266,260.81
Sheet1
30934.39 107346.14 138,280.53 72283.76 37223.2 109,506.96
30934.39 92428.59 123,362.98 70837.54 37223.2 108,060.74
30934.39 82926.39 113,860.78 81602.44 37223.2 118,825.64
30934.39 120949.7 151,884.09 140120.18 37223.2 177,343.38
30934.39 95851.53 126,785.92 80990.29 37223.2 118,213.49
30934.39 114892.19 145,826.58 77869.72 37223.2 115,092.92
30934.39 114454.38 145,388.77 78010.44 37223.2 115,233.64
30934.39 125621.19 156,555.58 76265.46 37223.2 113,488.66
30934.39 198839.07 229,773.46 221528.34 37223.2 258,751.54
30934.39 213126.7 244,061.09 155412.15 37223.2 192,635.35
30934.39 125343.53 156,277.92 112846.37 37223.2 150,069.57
30934.39 140891.82 171,826.21 147326.05 37223.2 184,549.25
30934.39 235603.89 266,538.28 267362.24 37223.2 304,585.44
30934.39 188034.96 218,969.35 262385.3 37223.2 299,608.50
30934.39 152257.27 183,191.66 155230.3 37223.2 192,453.50
30934.39 198180.05 229,114.44 263912.87 37223.2 301,136.07
30934.39 289955.43 320,889.82 398227.17 37223.2 435,450.37
30934.39 129209.4 160,143.79 101891.43 28023.2005263158 129,914.63
30934.39 163939.47 194,873.86 100296.02 28023.2005263158 128,319.22
3,477,605.11 3,553,238.87
| data_item: A001 |
| title: Contractor's Progress, Status, and Management Report |
| sub: Monthly Progress Report |
| auth: |
| ref: PWS paragraph 4.6.1 |
| req_ofc: USAISEC |
| dd250: N/A |
| appcode: N/A |
| dist: Required |
| freq: Monthly |
| asof: |
| firstsub: See blk 16 |
| subsub: See blk 16 |
| addressee1: COR |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: TM |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: KO |
| draft3: |
| reg3: 1 |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 3 |
| total_repro: 0 |
| remarks: General: The Contractor’s Progress, Status and Management Report provides a narrative description of what the Contractor accomplished during the reporting period, total price and staffing data by labor category for the reporting period, and an overview of activit |
Date of first and subsequent submissions: The progress report for each active Task Order is due not later than 5 business days following the end of each reporting period. E-Mail addresses for distribution will be provided with the individual Task Order.
Format: All reports will be developed in Microsoft Word.
(a) Report shall be written for printing on 8 ½” X 11” standard letter size paper (portrait orientation) although necessary attachments, figures, and sketches may be submitted in a size/orientation that best displays the information being presented.
(b) Font shall be Arial, size 12.
(c) Each page beyond the first page shall have a header identifying the site name or report title and date of report.
(d) Report shall be grammatically correct.
(e) All attachments shall be identified and referenced in the text of the report.
Method of delivery: One (1) soft copy of the progress report shall be submitted via email to the Technical Monitor (TM), Contracting Officer's Representative (COR) and the Contracting Officer (KO) as an attachment, fully identified, and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.
Title page:
(a) Title. The title shall identify the subject of the report, program name, or task.
(b) Name of contractor. The name and telephone number of the contractor preparing the report.
(c) Contract number. The procurement instrument identification number.
(d) Key person. The individual assigned to the task or who produced the report.
(e) Reporting period. The dates the reporting period begins and ends.
Content:
(a) Description of the progress made during the reporting period;
(b) Results, positive or negative, obtained related to previously-identified problem areas, with conclusions and recommendations.
| group: |
| total_price: |
| prep_name: |
| line_item: |
| exhibit: |
| xtdp: Off |
| xtm: Off |
| othercat: X |
| system: |
| ctr_no: |
| contr: |
| remarksb: (c) Any significant changes to the contractor’s organization or method of operation, to the project management network, or to the milestone chart. |
(d) Problem areas affecting technical or scheduling elements, with background and any recommendations for solutions beyond the scope of the contract.
(e) Problem areas affecting cost elements, with background and any recommendations for solutions.
(f) Using the Government provided worksheet show, by CLIN, all costs billed as of the reporting period, all costs projected to be billed, and any available balance or costs needed as of the reporting period. If CLIN combines tasks (labor, travel, material, ODC), report each task as a separate row. If multiple locations or projects are part of a single CLIN, report each location or project as a separate row.
(g) Person-hours expended for the reporting period and cumulatively for the contract (for cost-reimbursable type task orders only).
(h) Any task-related trips and significant results.
(i) Record of all significant telephone calls and any commitments made by telephone.
(j) Summary of Engineering Change Proposal (ECP) status (if any), including identification of proposed ECPs, and approved and implemented ECPs.
(k) Contract schedule status.
(l) Plans for activities for the following reporting period.
(m) Appendices for any necessary tables, references, photographs, illustrations and charts.
(n) All mandatory training certificates/briefings for all assigned personnel, as required in the Security section of the task order Performance Work Statement, Sexual Assault and Sexual Harassment (SHARP) base contract and in accordance with AR 530-1 Chapter 6, shall be submitted within 15 days after award, or as specified in the PWS. In addition, any changes in personnel will require the mandatory training certificates be submitted with the applicable monthly report thereafter.
| Page2: 2 |
| Reset: |
| prep_date: |
| app_by: |
| app_date: |
| Page: 1 |
| of_pages: 2 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .