About this file

This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity. The CDRL outlines reporting requirements for a monthly Manpower and Common Access Card Accountability Report identifying the number of contractor personnel and names of CAC holders supporting the United States Army Information Systems Engineering Command. One electronic copy of the report is due by the last day of each month to the Contracting Officer's Representative, COR Team Chief, and Contracting Officer.

The related federal contract opportunity is a solicitation for Total Engineering and Integration Services to provide information systems engineering and information technology support services to USAISEC over the full life cycle of projects. Support is required worldwide, including in remote and potentially hostile locations with limited infrastructure. Work in highly secure facilities involving top secret clearances may be necessary. The Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV, newest first.
File Type Posted
W9128Z20R0001-0004.pdf PDF
W9128Z20R0001-0003.pdf PDF
ATT0064 REVISED CONUS High CONUS OCONUS Labor Rates.xlsx XLSX spreadsheet
ATT0063 REVISED Past Performance Questionnaire.pdf PDF
ATT0010 REVISED 2.5 item f USAISEC CyberSecurity Assessment and CE Eng Manual V2.1.1.pdf PDF
W9128Z20R0001-0001.pdf PDF
ATT0037 REVISED ST-1 CDRL SE008 Post Deployment Meeting.pdf PDF
ATT0065 REVISED Small Business Participation Commitment Document (SBPCD).pdf PDF
ATT0059 REVISED Sample Task-Technologies.pdf PDF
ATT0051 REVISED Sample Task-Satellite Communications.pdf PDF
ATT0058 CDRL TS30 System Design Plan (SDP).pdf PDF
ATT0003 2.5 item b 18-035 USAISEC Drafting Guide Final 24 Apr 18.pdf PDF
FINAL SOLICITATION W9128Z20R0001.pdf PDF
ATT0065 Small Business Participation Commitment Document (SBPCD).pdf PDF
ATT0002 2.5 item a ISEC OPSEC Plan 2017.pdf PDF
ATT001 TEIS IV PWS.pdf PDF
ATT0046 CDRL SE018 POAM.pdf PDF
ATT0039 CDRL SE011 eMASS upload-download.pdf PDF
ATT0006 2.5 item e 13-033-1 Instructional Guide for Developing EIPs-Final_4JUN13.pdf PDF
ATT0041 CDRL SE013 Data Analysis Work Products.pdf PDF
ATT0055 CDRL TS27 Systems Acceptance Test Plan.pdf PDF
ATT0034 CDRL SE005 In-Brief.pdf PDF
ATT0032 CDRL SE003 Pre Deployment Meeting.pdf PDF
ATT0022 1.6.1A_ESS Network HW-SW List.xlsx XLSX spreadsheet
ATT0074 DD254 Appendix B- Army Handbook for SCI Contracts.pdf PDF
ATT0059 Sample Task-Technologies.pdf PDF
ATT0070 DD254 Appendix B- ICD-503.pdf PDF
ATT0071 DD254 Appendix B- ICD-704.pdf PDF
ATT0014 CDRL A004.pdf PDF
ATT0005 2.5 item d SIPRNET_Tech_Impl_Criteria V7 - Final 12Nov13.pdf PDF
ATT0051 Sample Task-Satellite Communications.pdf PDF
ATT0040 CDRL SE012 Test Data.pdf PDF
ATT0027 1.6.2C_ITV Ports and Protocols List.xls XLS spreadsheet
ATT0015 CDRL A005.pdf PDF
ATT0050 CDRL SE023 SCA-V Rec Memo.pdf PDF
ATT0045 CDRL SE017 Documentation Evaluation Report.pdf PDF
ATT0069 Fairfax VA WD 2015-4281.pdf PDF
ATT0044 CDRL SE016 SE Assessment Report.pdf PDF
ATT0031 CDRL SE001 Weekly Project Report.pdf PDF
ATT0009 2.5 item n DISN-EN ICAN-DI Standards Specifications v1_09f FINAL.pdf PDF
ATT0026 1.6.2B_ITV CONOPS Diagrams.pdf PDF
ATT0021 Sample Task Cybersecurity Pkg.pdf PDF
ATT0066 Joint VentureTeaming Informaiton.xlsx XLSX spreadsheet
ATT0063 Past Performance Questionnaire.pdf PDF
ATT0030 1.6.3C_NC Ports and Protocols List.xls XLS spreadsheet
ATT0017 CDRL A007.pdf PDF
ATT0016 CDRL A006.pdf PDF
ATT0049 CDRL SE022 SCAR.pdf PDF
ATT0023 1.6.1B_ESS Network Diagram.pdf PDF
ATT0053 CDRL TS25 EIP.pdf PDF
Show all 50

TOTAL ENGINEERING and INTEGRATION SERVICES-TEIS IV has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A002
title: Contractor's Manpower and CAC Accountability Report
sub: Monthly Manpower and CAC Accountability Report
auth: N/A
ref: PWS paragraph 4.6.2
req_ofc: USAISEC
dd250: N/A
appcode: N/A
dist: Required
freq: Monthly
asof:
firstsub: See Block16
subsub: See Block16
addressee1: COR Team Chief
draft1: 0
reg1: 1
repro1: 0
addressee2: COR
draft2: 0
reg2: 1
repro2: 0
addressee3: Contracting Officer
draft3: 0
reg3: 1
repro3: 0
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: General. The Contractor's Manpower and Common Access Card (CAC) Accountability Report identifies the number of Contractor personnel supporting the United States Army Information Systems Engineering Command (USAISEC) on a monthly basis. The report also identifies the names of current CAC holders supporting USAISEC.

Date of first and subsequent submissions: The report is due no later than the last day of the month following the end of each reporting period.

Format: All reports will be developed in Microsoft Word.

(a) Report shall be written for printing on 8 ½” X 11” standard letter size paper (portrait orientation) although necessary attachments, figures, and sketches may be submitted in a size/orientation that best displays the information being presented.

(b) Font shall be Arial, size 12.

(c) Each page beyond the first page shall have a header identifying the site name or report title and date of report.

(d) Report shall be grammatically correct.

(e) All attachments shall be identified and referenced in the text of the report.

Method of delivery: One (1) soft copy of the progress report shall be submitted via email to the Contracting Officer's Representative (COR), the COR Team Chief, and the Contracting Officer (KO) as an attachment, fully identified, and referenced in the subject line of the email message. The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.

Title page:

(a) Title. The title shall identify the subject of the report.

(b) Name of contractor. The name and telephone number of the contractor preparing the report.

(c) Reporting period. The dates the reporting period begins and ends.

Content: The report shall provide a break-down of the total number of personnel, including sub-contractor personnel, per active task order, and an overall grand total of the total number of personnel supporting.

The report shall also provide the names of all CAC holders currently supporting USAISEC. The report shall contain the CAC holder's full name and the task order(s) he/she is supporting.

group:
total_price:
prep_name:
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system:
ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .