Attachment 4 Questions and Answers.pdf

PDF 368 KB Posted

Attached to
Fort Sill Post Wide Pumping Services
Solicitation number
W9124L-25-B-0003
Issued by

About this file

This is a Questions and Answers document for Solicitation W9124L25B0003 for Pumping Services at Fort Sill, OK, issued by MICC Fort Sill on January 29, 2025. The document provides information about the incumbent contractor (Gill's Demolition and Backhoe, Inc.) and current contract value ($1,734,775.00).

The Q&A clarifies several operational requirements: all contents must be pumped from grease trap interceptors, pressure cleaning is required quarterly for grease trap interceptors only, contractors must provide their own environmentally safe enzymes for pit latrines, and all pumps are accessible from outside. DPW provides an open lot for 24-hour equipment parking, but there is no authorized location for washing vac trucks on post. The solicitation is a total small business set-aside with no additional socioeconomic category restrictions. All commercial vehicles must enter through Apache Gate. Section 5.4 requirements apply to Joint Ventures, and FAR Clause 52.219-14 governs subcontracting limitations.

View the file

Other files

File Type Posted
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
Attachment 7 Questions and Answers.pdf PDF
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
Amendment 0005_W9124L25B0003_Pumping Services.pdf PDF
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
0002) Amendment 0004_W9124L25B0003_Pumping Services.pdf PDF
Attachment 6 Questions and Answers.pdf PDF
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
Amendment 0003_W9124L25B0003_Pumping Services.pdf PDF
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
Amendment 0002_W9124L25B0003_Pumping Services.pdf PDF
Attachment 5 Questions and Answers.pdf PDF
Amendment 0001_W9124L25B0003_Pumping Services.pdf PDF
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
Attachment 2 Wage Determination REV 25 12.23.2024.pdf PDF
TE-E Fort Sill -Cantonment Pumping Locations.pdf PDF
Solicitation_W9124L25B0003_Pumping Services.pdf PDF
TE-C Estimated Workload - Liquid Waste Pumping.xlsx XLSX spreadsheet
TE-B Liquid Waste Pumping Services Deliverables.xlsx XLSX spreadsheet
TE-G Hazardous Waste Management Plan.pdf PDF
TE-F Fort Sill Range-Pumping Locations 50k.pdf PDF
TE-D Liquid Waste Pumping Services Performance Task and Frequency.xlsx XLSX spreadsheet
Attachment 3 Contractor Visit Itinerary for Liquid Waste Pumping Contract.pdf PDF
Attachment 1_PWS.pdf PDF
TE-A Performance Requirements Liquid Waste Pumping.xlsx XLSX spreadsheet
Attachment 2 Wage Determination REV 24 07.22.2024.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICC Fort Sill 29 January 2025

MEMORANDUM FOR RECORD

SUBJECT: Questions and Answers Regarding Solicitation W9124L25B0003 Pumping Services Recompete, Fort Sill, OK.

ATTACHMENT 5

QUESTIONS AND ANSWERS

1. QUESTION: Could you please share the name of the incumbent partner currently providing these services?

ANSWER: Gill's Demolition and Backhoe, Inc.

2. QUESTION: If available, could you provide the current contract number and the total value of that contract?

ANSWER: Contract Number is W9124L-20-C-0006. Contract Total Value is $1,734,775.00.

3. QUESTION: Are there any key areas in the current contract where performance or outcomes could be improved to better meet the Client's goals?

ANSWER: All the requirements in Solicitation, PWS, and Attachments must be met.

4. QUESTION: Does post provide a place to wash out a vac truck?

ANSWER: No, there is not a location on post that is authorized to wash out a vac truck.

5. QUESTION: Does the post provide a place to park equipment and leave 24 hrs/day?

ANSWER: Yes, DPW has an open lot where the trucks can be kept on Fort Sill.

MICC Fort Sill SUBJECT: Questions and Answers regarding solicitation W9124L-25-B-0003 Pumping Services Recompete, Fort Sill, OK

6. QUESTION: When pumping grease trap interceptors, is it necessary to pump everything, or is it acceptable to pump the grease off the top and leave the water?

ANSWER: Everything needs to be pumped from the grease trap interceptor.

7. QUESTION: Is it required to do a pressure wash on the grease trap interceptors, OWS pits, pit/latrines after every scheduled pumping?

ANSWER: No. It is only expected to have the grease trap interceptors pressure cleaned and that should be completed quarterly.

8. QUESTION: In accordance with paragraph 5.2.3.2 of the PWS, does the government provide the “environmentally safe and EQD approved enzyme” that’s to be added to pit latrines?

ANSWER: No, the government will not provide the enzyme.

9. QUESTION: On Bid Preparation Instructions – Section C (5.4), specifically part E, of Solicitation; Our company is a small business but does not hold a HUBZone designation.

However, we are considering a teaming strategy for this effort. Would Part E apply to:

a. Prime Contractors who are teaming with a subcontractor

b. If it is solely applicable to prime contractors designated as HUBZone small businesses

ANSWER: This Solicitation is a total small business set side and has not been set aside further for any other social economic categories.

10. QUESTION: If teaming with a subcontractor, would the requirements under Section 5.4

(Section C on Solicitation) regarding Joint Ventures extend to subcontracting agreements?

ANSWER: Section 5.4 would apply to Joint Ventures. Reference FAR Clause 52.219-14 Limitations on Subcontracting if subcontracting.

11. QUESTION: Are all pumps accessible from the outside at each location?

ANSWER: Yes, all pumps are accessible from the outside.

SUBJECT: Questions and Answers regarding solicitation W9124L-25-B-0003 Pumping Services Recompete, Fort Sill, OK

12. QUESTION: Are there delays getting commercial vehicles through the Gate?

ANSWER: Please refer to Addendum to 52.212-4 Contract Terms and Conditions in the Solicitation. As it currently stands, all delivery trucks, transportation trucks, vehicle pulling trailers, every type of cargo or construction vehicle must enter through Apache Gate.

Jesslyan Ortiz-Albino