5b Attachment 5b
| Price Schedule/CLIN Structure |
| Sample Task for Small Business (SB) Suite |
| Environmental Remediation Services |
| Fort Irwin, CA |
Instructions: Offerors shall return pricing information in this MS Excel as unlocked/unprotected copy. Amounts shall be in whole dollars only. Offerors may discount their maximum cap labor rates in the preparation of their price proposal.
IAW PWS section 1.5, POP shall not exceed 60 months from award of Task Order (TO), inclusive of any exercised options. Projected POP is 01 November 2023 – 31 October 2028.
| CLIN Description | Completion Date | Projected POP | Quantity & Unit | Unit Price | Contractor Proposed Price |
| CLIN 0001 (Base Period) Project Management Plan to include UFP-QAPP(s) | Draft planning documents due within 30 days from award of TO. | 01 Nov 2023 – 31 Mar 2024 | 1 | $ 1.00 | $ 1.00 |
| Planning/Development/ Execution of Kick-Off Meeting; Monthly Project Meetings, PMP, UFP-QAPP, Health & Safety Plan, Project Schedule, SSWPs/SSWPA | Final documents due within 30 days from receipt of COR comments on the draft. Annual updates. | ||||
| IAW SB Suite PWS table 5.1, task 5.1 | |||||
| CLIN 0002 (Base Period) Supplemental Site Inspection (SSI): On- Installation PFAS for the following AOPIs: | 18 months from award of TO. | 01 Nov 2023 – 31 May 2025 | 1 | $ 1.00 | $ 1.00 |
| · Active Recreational Ball Fields | |||||
| · Bulk POL Contaminant Basins | |||||
| · Fire Hose Pressure Testing Area | |||||
| · Fire Station 2 (Bldg P6101) | |||||
| · Former Fire Station | |||||
| · FTIR Helipad | |||||
| · RUFMA Drainage Basins | |||||
| · RUFMA Former Fire Training Area | |||||
| · RUFMA Wash-Rack | |||||
| · J Stand Fire Truck Pump Flush Area | |||||
| · NASA Goldstone Former Microwave Test Facility | |||||
| Complete Supplemental Sampling and Final SSI Report | |||||
| IAW SB Suite PWS table 5.1, task 5.2 | |||||
| CLIN 0003 (Base Period) Remedial Investigation (RI): On- Installation PFAS for the following AOPIs: | 24 months from award of TO. | 01 Nov 2023 – 31 Oct2025 | 1 | $ 1.00 | $ 1.00 |
| · AFFF Storage Shed (Bldg P358) | |||||
| · Bulk POL Tanker Fire Response | |||||
| · DES Training Complex | |||||
| · Fire Station 1 (Bldg P400) and Former AFFF Storage (Building P411) | |||||
| · BLAAF – Fire Extinguisher Training Area | |||||
| · BLAAF - Helipad | |||||
| · FTIR-20 Former Fire Training Area | |||||
| Complete RI Fieldwork and Final RI Report | |||||
| IAW SB Suite PWS table 5.1, task 5.3 | |||||
| CLIN 0004 (Base Period) Remedial Investigation (RI): Off Installation PFAS for the following sites: | 24 months from award of TO. | 01 Nov 2023 – 31 Oct 2025 | 1 | $ 1.00 | $ 1.00 |
| · East Drainage Basin | |||||
| · Fire Station | |||||
| · Helipad – South End | |||||
| · North Drainage Basin | |||||
| Complete RI Fieldwork and Final RI Report | |||||
| IAW SB Suite PWS table 5.1, task 5.3 | |||||
| CLIN 0005 (Base Period) Remedial Investigation (RI): Active/ Inactive Landfill for the following site: | 24 months from award of TO. | 01 Nov 2023 – 31 Oct 2025 | 1 | $ 1.00 | $ 1.00 |
| FTIR-01/CCFTIR-01 | |||||
| Complete RI Fieldwork and Final RI Report | |||||
| IAW SB Suite PWS table 5.1, task 5.3 | |||||
| CLIN 0006 (Base Period) Long Term Monitoring (LTM): FTIR-02/04 | 12 months from award of TO. | 01 Nov 2023 – 31 Oct 2024 | 1 | $ 1.00 | $ 1.00 |
| Complete annual LTM requirements and annual report | |||||
| IAW SB Suite PWS table 5.1, task 5.7 | |||||
| Base Period Total Price: | 6 | ||||
| Options |
| CLIN Description | Completion Date | Projected POP | Quantity & Unit | Unit Price | Contractor Proposed Price |
| CLIN 0007 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Shallow monitoring well installation without mobilization. | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Three (3) monitoring wells installed | Option may be exercised up to 10 times. | ||||
| IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 | |||||
| CLIN 0008 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Shallow monitoring well installation with mobilization. | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Three (3) monitoring wells installed and sampled | Option may be exercised up to 10 times. | ||||
| IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 | |||||
| CLIN 0009 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Deep monitoring well installation with mobilization. | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Three (3) monitoring wells installed and sampled | Option may be exercised up to 10 times. | ||||
| IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 | |||||
| CLIN 0010 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Soil boring for subsurface soil investigation without mobilization. | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Two (2) soil borings and sampled | Option may be exercised up to 10 times. | ||||
| IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 | |||||
| CLIN 0011 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Soil boring for subsurface soil investigation with mobilization. | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Two (2) soil borings and sampled | Option may be exercised up to 10 times. | ||||
| IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 | |||||
| CLIN 0012 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Fence, landfill cap repair, erosion repair, and soil stability repair | The contractor shall achieve minor site maintenance no later than three (3) months after exercising option. Minor site maintenance includes, but is not limited to, minor erosion repair, animal burrowings repair, sign replacement, lock replacement, fence replacement/repair, tortoise-proof fabric replacement, vegetation and/or sediment clearing from drainage. Contractor shall perform such repairs equal to two 10-hour days. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Completed 12 months from exercising of option. | |||||
| IAW SB Suite PWS 5.1.2.4 | Option may be exercised up to 10 times. | ||||
| CLIN 0013 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Monitoring well repair | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Repairs include surface completion replacement of steel monument standpipe, concrete foundation, and bollards; replacing submersible low-flow pumps and tubing, and repainting/labeling the well head and bollards. | Option may be exercised up to 10 times. | ||||
| IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 | |||||
| CLIN 0014 (Option) | 10 | $ 1.00 | $ 10.00 | ||
| Gas well repair | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| Soil gas well repairs shall include surface completion replacement of steel monument standpipe, concrete foundation, and billards; replacing soil gas well caps and O-ring seals; and installing new sampling tubing within the well casing and replacing the well cap setup. | |||||
| IAW SB Suite PWS 5.1.2.3. | Option may be exercised up to 10 times. | ||||
| CLIN 0015 (Option) | 1 | $ 1.00 | $ 1.00 | ||
| Settlement survey for FTIR-02 and FTIR-04. | Completed 12 months from exercising of option. | May be exercised any time after task order award but no later than 01 Nov 2027 | |||
| IAW the RA report, Remedial Action Plan, Fort Irwin Abandoned Landfills (Montgomery Watson, June 1997). | |||||
| IAW SB Suite PWS 5.1.3.9 | |||||
| CLIN 1005 (Option) | 1 | $ 1.00 | $ 1.00 | ||
| Feasibility Study/ Proposed Plan/ Decision Document for the following site: | Completed 18 months from exercising of option. | To be exercised upon regulatory acceptance of Final RI Report for FTIR-01/CCFTIR-01 | |||
| Active/ Inactive Landfill. FTIR-01/CCFTIR-01 | |||||
| IAW SB Suite PWS 5.1.2.4 | |||||
| CLIN 1006 (Option) | Completed 12 months from exercising of option. | 01 Nov 2024 – 31 Oct 2025 | 1 | $ 1.00 | $ 1.00 |
| Long Term Monitoring (LTM): FTIR-02/04 | |||||
| Complete annual LTM requirements and annual report | Performance shall start upon completion of CLIN 0006. | ||||
| IAW SB Suite PWS 5.1.2.5 | |||||
| CLIN 2006 | Completed 12 months from exercising of option. | 01 Nov 2025 – 31 Oct 2026 | 1 | $ 1.00 | $ 1.00 |
| Long Term Monitoring (LTM): FTIR-02/04 | |||||
| Complete annual LTM requirements and annual report | Performance shall start upon completion of CLIN 1006. | ||||
| IAW SB Suite PWS 5.1.2.5 | |||||
| CLIN 3006 | Completed 12 months from exercising of option. | 01 Nov 2026 – 31 Oct 2027 | 1 | $ 1.00 | $ 1.00 |
| Long Term Monitoring (LTM): FTIR-02/04 | |||||
| Complete annual LTM requirements and annual report | Performance shall start upon completion of CLIN 2006 | ||||
| IAW SB Suite PWS 5.1.2.5 | |||||
| CLIN 4006 | Completed 12 months from exercising of option. | 01 Nov 2027 – 31 Oct 2028 | 1 | $ 1.00 | $ 1.00 |
| Long Term Monitoring (LTM): FTIR-02/04 | |||||
| Complete annual LTM requirements and annual report | Performance shall start upon completion of CLIN 3006. | ||||
| IAW SB Suite PWS 5.1.2.5 | |||||
| Options Total Price: | $ 86.00 | ||||
| Base Period Total Price: | $ | $ 6.00 | |||
| Base Plus Option Periods (Total Value): | $ | $ 92.00 |
Year Escalation Rate Escalation Factor Total Price
Use Base Plus Option Periods (Total Value) divided by 5 = 1 Year Average %
| Year 6 | $ 18.40 | 3% | 103% | $ 18.95 |
| Year 7 | $ 18.95 | 4% | 104% | $ 19.71 |
| Year 8 | $ 19.71 | 2% | 102% | $ 20.10 |
| Year 9 | $ 20.10 | 5% | 105% | $ 21.11 |
| Year 10 | $ 21.11 | 6% | 106% | $ 22.38 |
| Total Evaluated Price: | $ 194.25 |
| Note: Escalation Rates are for illustration purposes only |