SB Suite – Irwin Price Schedule 5a/CLIN Structure
Attachment 5a
Price Schedule/CLIN Structure Sample Task for Small Business (SB) Suite Environmental Remediation Services Fort Irwin, CA
Instructions: Do not insert prices on this sheet, offerors shall return pricing information in MS Excel as unlocked/unprotected copy. Amounts shall be in whole dollars only. Offerors must use their maximum cap labor rates “no discounts permitted” in the preparation of their price proposal.
IAW PWS section 1.5, POP shall not exceed 60 months from award of Task Order (TO), inclusive of any exercised options. Projected POP is 01 September 2023 – 31 August 2028.
| CLIN Description |
| Completion Date |
| Projected POP |
| Contractor Proposed Price |
CLIN 0001 (Base Period) Project Management Plan to include UFP-QAPP(s)
Planning/Development/ Execution of Kick-Off Meeting; Monthly Project Meetings, PMP, UFP-QAPP, Health & Safety Plan, Project Schedule, SSWPs/SSWPA
IAW SB Suite PWS table 5.1, task 5.1 Draft planning documents due within 30 days from award of TO.
Final documents due within 30 days from receipt of COR comments on the draft. Annual updates.
| 01 Sept 2023 – 30 Nov 2023 |
| $ |
CLIN 0002 (Base Period) Supplemental Site Inspection (SSI): On- Installation PFAS for the following AOPIs:
· Active Recreational Ball Fields
· Bulk POL Contaminant Basins
· Fire Hose Pressure Testing Area
· Fire Station 2 (Bldg P6101)
· Former Fire Station
· FTIR Helipad
· RUFMA Drainage Basins
· RUFMA Former Fire Training Area
· RUFMA Wash-Rack
· J Stand Fire Truck Pump Flush Area
· NASA Goldstone Former Microwave Test Facility
Complete Supplemental Sampling and Final SSI Report
IAW SB Suite PWS table 5.1, task 5.2
| 18 months from award of TO. |
| 01 Sept 2023 – 31 Mar 2025 |
| $ |
CLIN 0003 (Base Period) Remedial Investigation (RI): On- Installation PFAS for the following AOPIs:
· AFFF Storage Shed (Bldg P358)
· Bulk POL Tanker Fire Response
· DES Training Complex
· Fire Station 1 (Bldg P400) and Former AFFF Storage (Building P411)
· BLAAF – Fire Extinguisher Training Area
· BLAAF - Helipad
· FTIR-20 Former Fire Training Area
Complete RI Fieldwork and Final RI Report
IAW SB Suite PWS table 5.1, task 5.3
24 months from award of TO.
| 01 Sept 2023 – 31 Aug 2025 |
| $ |
CLIN 0004 (Base Period) Remedial Investigation (RI): Off Installation PFAS for the following sites:
· East Drainage Basin
· Fire Station
· Helipad – South End
· North Drainage Basin
Complete RI Fieldwork and Final RI Report
IAW SB Suite PWS table 5.1, task 5.3
| 24 months from award of TO. |
| 01 Sept 2023 – 31 Aug 2025 |
| $ |
CLIN 0005 (Base Period) Remedial Investigation (RI): Active/ Inactive Landfill for the following site:
FTIR-01/CCFTIR-01
Complete RI Fieldwork and Final RI Report
IAW SB Suite PWS table 5.1, task 5.3
| 24 months from award of TO. |
| 01 Sept 2023 – 31 Aug 2025 |
| $ |
CLIN 0006 (Base Period) Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report
IAW SB Suite PWS table 5.1, task 5.7
| 12 months from award of TO. |
| 01 Sept 2023 – 31 Aug 2024 |
| $ |
| Base Period Total Price: |
| $ |
Options
| CLIN Description |
| Completion Date |
| Projected POP |
| Quantity & Unit |
| Unit Price |
| Contractor Proposed Price |
CLIN 0007 (Option) Shallow monitoring well installation without mobilization.
Three (3) monitoring wells installed
IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0008 (Option) Shallow monitoring well installation with mobilization.
Three (3) monitoring wells installed
IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0009 (Option) Deep monitoring well installation with mobilization.
Three (3) monitoring wells installed
IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0010 (Option) Soil boring for subsurface soil investigation without mobilization.
Two (2) soil borings
IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0011 (Option) Soil boring for subsurface soil investigation with mobilization.
Two (2) soil borings
IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0012 (Option) Fence, landfill cap repair, erosion repair, and soil stability repair
IAW SB Suite PWS 5.1.2.4 The contractor shall achieve minor site maintenance no later than three (3) months after exercising option. Minor site maintenance includes, but is not limited to, minor erosion repair, animal burrowings repair, sign replacement, lock replacement, fence replacement/repair, tortoise-proof fabric replacement, vegetation and/or sediment clearing from drainage. Contractor shall perform such repairs equal to two 10-hour days.
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0013 (Option) Monitoring well repair
Repairs include surface completion replacement of steel monument standpipe, concrete foundation, and bollards; replacing submersible low-flow pumps and tubing, and repainting/labeling the well head and bollards.
IAW SB Suite PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN 0014 (Option) Gas well repair
Soil gas well repairs shall include surface completion replacement of steel monument standpipe, concrete foundation, and billards; replacing soil gas well caps and O-ring seals; and installing new sampling tubing within the well casing and replacing the well cap setup.
IAW SB Suite PWS 5.1.2.3.
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| 10 Each |
| $ |
| $ |
CLIN Description
Completion Date
Projected POP
Contractor Proposed Price
CLIN 0015 (Option) Settlement survey for FTIR-02 and FTIR-04.
IAW the RA report, Remedial Action Plan, Fort Irwin Abandoned Landfills (Montgomery Watson, June 1997).
IAW SB Suite PWS 5.1.3.9
| Completed 12 months from exercising of option. |
| May be exercised any time after task order award but no later than 01 Sept 2027 |
| $ |
CLIN 1005 (Option) Feasibility Study/ Proposed Plan/ Decision Document for the following site:
Active/ Inactive Landfill. FTIR-01/CCFTIR-01
IAW SB Suite PWS 5.1.2.4
| Completed 18 months from exercising of option. |
| To be exercised upon regulatory acceptance of Final RI Report for FTIR-01/CCFTIR-01 |
| $ |
CLIN 1006 (Option) Long Term Monitoring (LTM): FTIR-02/04 Complete annual LTM requirements and annual report
IAW SB Suite PWS 5.1.2.5
Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 0006.
| 01 Sept 2024 – 31 Aug 2025 |
| $ |
CLIN 2006
Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report
IAW SB Suite PWS 5.1.2.5
Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 1006.
| 01 Sept 2025 – 31 Aug 2026 |
| $ |
CLIN 3006
Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report
IAW SB Suite PWS 5.1.2.5
Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 2006
| 01 Sept 2026 – 31 Aug 2027 |
| $ |
CLIN 4006
Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report
IAW SB Suite PWS 5.1.2.5 Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 3006.
| 01 Sept 2027 – 31 Aug 2028 |
| $ |
| Options Total Price: |
| $ |
| Base Plus Option Periods (Total Value): |
| $ |
Year
| Escalation Rate |
| Total Price |
Use Base Plus Option Periods (Total Value) divided by 5 = 1 Year Average
| Year 6 |
| % |
| $ |
| Year 7 |
| % |
| $ |
| Year 8 |
| % |
| $ |
| Year 9 |
| % |
| $ |
| Year 10 |
| % |
| $ |
Total Evaluated Price: