UB Suite – Carson Price Schedule 6b/CLIN Structure
Attachment 6b
Price Schedule/CLIN Structure Sample Task for Unrestricted Business (UB) Suite Environmental Remediation Services Fort Carson, CO
Instructions: Do not insert prices on this sheet, offerors shall return pricing information in MS Excel as unlocked/unprotected copy. Amounts shall be in whole dollars only. Offerors may discount their maximum cap labor rates in the preparation of their price proposal.
IAW PWS section 1.5, POP shall not exceed 60 months from award of Task Order (TO), inclusive of any exercised options. Projected POP is 01 September 2023 – 31 August 2028.
| CLIN |
| Completion Date |
| Projected POP |
Quantity & Unit
Unit Price Contractor Total Proposed Price
CLIN 0001: PMP (Base Period)
IAW UB Suite PWS 5.9 30 days from award of TO for Draft PMP
30 days from COR comments on the Draft PMP for Final PMP.
Overall completed 12 months from award of TO.
| 12 Mo: 9/1/2023 – 8/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0002: LTM (Base Period)
FTC-023, SWMU 89 only
IAW UB Suite PWS 5.10
| Completed 10 months from award of TO. |
| 10 Mo: 9/1/2023 – 6/30/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0003: CMI(O) (Base Period)
FTC-023, SWMU 109 only
IAW UB Suite PWS 5.11
| Completed 10 months from award of TO. |
| 10 Mo: 9/1/2023 – 6/30/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0004: Pilot Study, New Remedy; E-Redox (Base Period)
FTC-023, SWMU 109 only
IAW UB Suite PWS 5.11.1
| Completed 24 months from award of TO. |
| 24 Mo: 9/1/2023 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0005: New E-Redox Remedy Implementation Post Pilot Study (Option)
FTC-023, SWMU 109 only
IAW UB Suite PWS 5.11.2 Completed 18 months from exercising of option.
Performance shall start upon completion of Pilot Study, CLIN 0004, if necessary.
| 18 Mo: 9/1/2025 – 2/28/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0006: IMP(O) (Base Period)
CC-106, PCMS Fuel Point
IAW UB Suite PWS 5.12
Completed 7 months from award of TO.
| 7 Mo: 9/1/2023 – 3/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0007: OPS Risk-Based Closure Process (Option)
CC-106, PCMS Fuel Point
IAW UB Suite PWS 5.12.1 Completed 24 months from exercising of option.
Performance shall start once DLA has completed construction of the new AST Fuel Point and removed the existing USTs – Government currently estimates this to be mid CY2024
24 Mo: 7/1/2025 – 6/30/2026
| 1 Job |
| NA |
| $ |
CLIN 0008: GAC Unit (Base Period)
Annual Maintenance
IAW UB Suite PWS 5.13
Completed 7 months from award of TO
| 7 Mo: 9/1/2023 – 3/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0009: GAC Unit (PFAS Removal) (Option)
PFAS Removal Proficiency Testing & Annual PFAS-related Maintenance
IAW UB Suite PWS 5.13.1
Completed 7 months from exercising of option.
*Option may be exercised at award of TO.
| 7 Mo: 9/1/2023 – 3/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0010: UFP-QAPP & RI (Base Period)
FTC-PFAS, Site-Wide PFAS
IAW UB Suite PWS 5.14
Completed 48 months from award of TO.
| 48 Mo: 9/1/2023 – 8/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0011: Add AOPI to RI in Base CLIN 0010 if supplemental data deems necessary (Option)
FTC-PFAS, Site-Wide PFAS (AOPI – Golf Course)
IAW UB Suite PWS 5.14.12 Completed 36 months from exercising of option.
Shall be performed in conjunction with Base CLIN 0010.
Performance shall start upon completion of supplemental SI data gathering/reporting.
| 36 Mo: 9/1/2024 – 8/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0012: Add AOPI to RI in Base CLIN 0010 if supplemental data deems necessary (Option)
FTC-PFAS, Site-Wide PFAS (AOPI – B1982)
IAW UB Suite PWS 5.14.13 Completed 36 months from exercising of option.
Shall be performed in conjunction with Base CLIN 0010.
Performance shall start upon completion of supplemental SI data gathering/reporting.
| 36 Mo: 9/1/2024 – 8/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0013: FS (Option)
FTC-PFAS, Site-Wide PFAS
IAW UB Suite PWS 5.14.14 Completed 24 months from exercising of option.
Performance shall start upon substantial completion of Base CLIN 0010
| 24 Mo: 9/1/2026 – 8/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0014: PP & DD (Option)
FTC-PFAS, Site-Wide PFAS
IAW UB Suite PWS 5.14.15 Completed 12 months from exercising of option.
Performance shall start upon substantial completion of Optional CLIN 0013
| 12 Mo: 9/1/2027 – 8/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0015: RFI (Base Period)
Former Buildings 220/221 [SWMU 171]
IAW UB Suite PWS 5.15
| Completed 36 months from award of TO. |
| 36 Mo: 9/1/2023 – 8/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0016: Interim Remedial Action: Dig-and-Haul (Option)
Former Buildings 220/221 [SWMU 171]
IAW UB Suite PWS 5.15.1
Completed 24 months from exercising of option.
Performance shall be in conjunction with RFI Base CLIN 0015
24 Mo: 9/1/2024 – 8/31/2026
| 1 Job |
| NA |
| $ |
CLIN 0017: CMS (Option)
Former Buildings 220/221 [SWMU 171]
IAW UB Suite PWS 5.15.2
Completed 18 months from exercising of option.
Performance shall start upon completion of RFI Base CLIN 0015
| 18 Mo: 9/1/2026 – 2/28/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0018: LTM (Option)
9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]
IAW UB Suite PWS 5.16
Completed 12 months from exercising of option.
Performance shall start upon completion of existing contract.
| 12 Mo: 7/1/2025 – 6/30/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0019: CMI(O) (Option)
FTC-020 [SWMU 13]
IAW UB Suite PWS 5.17 Completed 12 months from exercising of option.
Performance shall start upon completion of existing contract.
| 12 Mo: 7/1/2025 – 6/30/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0020: CMI(O) – Construct Building over GWTS (Option)
FTC-020 [SWMU 13]
IAW UB Suite PWS 5.17.1
Completed 24 months from exercising of option.
*Option may be exercised at award of TO.
| 24 Mo: 9/1/2023 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0021: Plume Delineation (Base Period)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
IAW UB Suite PWS 5.18
Completed 18 months from award of TO.
Performance shall start upon completion of existing contract.
| 18: 7/1/2025 – 12/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0022: CMI(O) (Option)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
IAW UB Suite PWS 5.18.1
Completed 12 months from exercising of option.
Performance shall start upon completion of existing contract.
| 12 Mo: 7/1/2025 – 6/30/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0023: CMI(O) – Construct Building over GWTS (Option)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
IAW UB Suite PWS 5.18.2
Completed 24 months from exercising of option.
*Option may be exercised at award of TO.
| 24 Mo: 9/1/2023 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0024: CMI(O) (Option)
FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]
IAW UB Suite PWS 5.19
Completed 12 months after exercising option.
Performance shall start after completion of existing contract.
| 12 Mo: 7/1/2025 – 6/30/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0025: CMI(O) (Option)
FTC-083 [SWMU 167]
IAW UB Suite PWS 5.20 Completed 12 months from exercising of option.
Performance shall start after completion of existing contract.
| 12 Mo: 7/1/2025 – 6/30/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0026: Interim Remedial Action (Option)
FTC-083 [SWMU 167]
IAW UB Suite PWS 5.20.1 Completed 36 months from exercising of option.
POP start date is subject to change to later date. Option may be exercised no later than 9/1/2025.
| 36 Mo: 1/1/2025 – 12/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0027: Monitoring Well Abandonment (Option)
Monitoring Well Abandonment (up to 50 wells).
IAW UB Suite PWS 5.21
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of MW abandonment.
Option may be exercised up to 50 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 50 Each |
| $ |
| $ |
CLIN 0028: Permanent Monitoring Well Installation (Option)
(up to 10 wells)
IAW UB Suite PWS 5.21
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of permanent MW installation.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 10 Each |
| $ |
| $ |
CLIN 0029: Temporary Monitoring Well Installation & Abandonment (Option)
(up to 10 wells)
IAW UB Suite PWS 5.21
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of temporary MW installation.
Option may be exercised up to 10 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 10 Each |
| $ |
| $ |
CLIN 0030: Permanent Monitoring Well Repairs (Above Ground) (Option)
Above ground portion, permanent monitoring well repair (up to 15 MWs)
IAW UB Suite PWS 5.21 Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of above-ground MW repair.
Option may be exercised up to 15 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 15 Each |
| $ |
| $ |
CLIN 0031: Permanent Monitoring Well Repairs (Below Ground) (Option)
Below ground portion, permanent monitoring well repair (up to 15 MWs)
IAW UB Suite PWS 5.21 Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of below-ground MW repair.
Option may be exercised up to 15 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 15 Each |
| $ |
| $ |
CLIN 0032: Groundwater Sampling/Analysis (Option)
(up to 40 times)
IAW UB Suite PWS 5.22
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of groundwater sampling/analysis.
Option may be exercised up to 40 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 40 Each |
| $ |
| $ |
CLIN 0033: Soil (sub-surface) Sampling/Analysis (Option)
(up to 25 times)
IAW UB Suite PWS 5.22 Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of sub-surface soil sampling/analysis.
Option may be exercised up to 25 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 25 Each |
| $ |
| $ |
CLIN 0034: Soil (surface) Sampling/Analysis (Option)
(up to 25 times)
IAW UB Suite PWS 5.22 Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of surface soil sampling/analysis.
Option may be exercised up to 25 times.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 25 Each |
| $ |
| $ |
CLIN 0035: Update Risk Module VI (Option)
Update Risk Module VI (Risk-Based Evaluation Procedures Manual, Methodology for Identifying NFA at SWMUs)
IAW UB Suite PWS 5.23
Completed 18 months from exercising of option.
Performance shall start upon first need of update.
| May be exercised any time after task order award but no later than 3/1/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0036: Update FLPM (Option)
Update FLPM (Field and Laboratory Procedures Manual)
IAW UB Suite PWS 5.24
Completed 12 months from exercising of option.
Performance shall start upon first need of update.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0037: Provide Alternate Drinking Water Source (Option)
10 Units: Alternate Water System for Private Residences
IAW UB Suite PWS 5.25
Completed 12 months from exercising of option.
| May be exercised any time after task order award but no later than 9/1/2027 |
| 10 Each |
| $ |
| $ |
CLIN 1002: LTM (Option)
FTC-023, SWMU 89 only
IAW UB Suite PWS 5.10
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2024 – 6/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2002: LTM (Option)
FTC-023, SWMU 89 only
IAW UB Suite PWS 5.10
Completed 18 months from exercising of option.
18 Mo: 1/1/2025 – 6/30/2026
| 1 Job |
| NA |
| $ |
CLIN 3002: LTM (Option)
FTC-023, SWMU 89 only
Completed 18 months from exercising of option.
18 Mo: 1/1/2026 – 6/30/2027
| 1 Job |
| NA |
| $ |
CLIN 4002: LTM (Option)
FTC-023, SWMU 89 only
Completed 18 months from exercising of option.
18 Mo: 1/1/2027 – 6/30/2028
| 1 Job |
| NA |
| $ |
CLIN 1003: CMI(O) (Option)
FTC-023, SWMU 109 only
IAW UB Suite PWS 5.11
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2024 – 6/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2003: CMI(O) (Option)
FTC-023, SWMU 109 only
IAW UB Suite PWS 5.11
Completed 18 months from exercising of option.
18 Mo: 1/1/2025 – 6/30/2026
| 1 Job |
| NA |
| $ |
CLIN 3003: CMI(O) (Option)
FTC-023, SWMU 109 only
Completed 18 months from exercising of option.
18 Mo: 1/1/2026 – 6/30/2027
| 1 Job |
| NA |
| $ |
CLIN 4003: CMI(O) (Option)
FTC-023, SWMU 109 only
Completed 18 months from exercising of option.
18 Mo: 1/1/2027 – 6/30/2028
| 1 Job |
| NA |
| $ |
CLIN 1006: IMP(O) (Option)
CC-106, PCMS Fuel Point
IAW UB Suite PWS 5.12
| Completed 15 months from exercising of option. |
| 15 Mo: 1/1/2024 – 3/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2006: IMP(O) (Option)
CC-106, PCMS Fuel Point
IAW UB Suite PWS 5.12
Completed 15 months from exercising of option.
15 Mo: 1/1/2025 – 3/30/2026
| 1 Job |
| NA |
| $ |
CLIN 3006: IMP(O) (Option)
CC-106, PCMS Fuel Point
Completed 15 months from exercising of option.
15 Mo: 1/1/2026 – 3/30/2027
| 1 Job |
| NA |
| $ |
CLIN 4006: IMP(O) (Option)
CC-106, PCMS Fuel Point
Completed 15 months from exercising of option.
15 Mo: 1/1/2027 – 3/30/2028
| 1 Job |
| NA |
| $ |
CLIN 1008: GAC Unit (Option)
Annual Maintenance
IAW UB Suite PWS 5.13
| Completed 15 months from exercising of option. |
| 15 Mo: 1/1/2024 – 3/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2008: GAC Unit (Option)
Annual Maintenance
IAW UB Suite PWS 5.13
Completed 15 months from exercising of option.
15 Mo: 1/1/2025 – 3/30/2026
| 1 Job |
| NA |
| $ |
CLIN 3008: GAC Unit (Option)
Annual Maintenance
IAW UB Suite PWS 5.13
| Completed 15 months from Option award |
| 15 Mo: 1/1/2026 – 3/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 4008: GAC Unit (Option)
Annual Maintenance
IAW UB Suite PWS 5.13
Completed 15 months from exercising of option.
15 Mo: 1/1/2027 – 3/30/2028
| 1 Job |
| NA |
| $ |
CLIN 1009: GAC Unit PFAS (Option)
Annual GAC (PFAS) Maintenance
IAW UB Suite PWS 5.13.1
| Completed 15 months from exercising of option. |
| 15 Mo: 1/1/2024 – 3/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2009: GAC Unit (PFAS) (Option)
Annual GAC (PFAS) Maintenance
IAW UB Suite PWS 5.13.1
Completed 15 months from exercising of option.
15 Mo: 1/1/2025 – 3/30/2026
| 1 Job |
| NA |
| $ |
CLIN 3009: GAC Unit (PFAS) (Option)
Annual GAC (PFAS) Maintenance
IAW UB Suite PWS 5.13.1
Completed 15 months from exercising of option.
15 Mo: 1/1/2026 – 3/30/2027
| 1 Job |
| NA |
| $ |
CLIN 4009: GAC Unit (PFAS) (Option)
Annual GAC (PFAS) Maintenance
IAW UB Suite PWS 5.13.1
Completed 15 months from exercising of option.
15 Mo: 1/1/2027 – 3/30/2028
| 1 Job |
| NA |
| $ |
CLIN 1016: Interim Remedial Action: Dig-and-Haul (Option)
Former Buildings 220/221
IAW UB Suite PWS 5.15.1
Completed 24 months from exercising option.
Completed in conjunction with RFI Base CLIN 0015.
24 Mo: 9/1/2024 – 8/31/2026
| 1 Job |
| NA |
| $ |
CLIN 2016: Interim Remedial Action: Dig-and-Haul (Option)
Former Buildings 220/221
IAW UB Suite PWS 5.15.1
Completed 24 months from exercising option.
Completed in conjunction with RFI Base CLIN 0015
24 Mo: 9/1/2024 – 8/31/2026
| 1 Job |
| NA |
| $ |
CLIN 3016: Interim Remedial Action: Dig-and-Haul (Option)
Former Buildings 220/221
IAW UB Suite PWS 5.15.1
Completed 24 months from exercising option.
Completed in conjunction with RFI Base CLIN 0015.
| 24 Mo: 9/1/2024 – 8/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 1018: LTM (Option)
9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]
IAW UB Suite PWS 5.16
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2026 – 6/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2018: LTM (Option)
9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]
IAW UB Suite PWS 5.16
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2027 – 6/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1019: CMI(O) (Option)
FTC-020 [SWMU 13]
IAW UB Suite PWS 5.17
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2026 – 6/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2019: CMI(O) (Option)
FTC-020 [SWMU 13]
IAW UB Suite PWS 5.17
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2027 – 6/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1022: CMI(O) (Option)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
IAW UB Suite PWS 5.18.1
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2026 – 6/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2022: CMI(O) (Option)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
IAW UB Suite PWS 5.18.1
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2027 – 6/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1024: CMI(O) (Option)
FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]
IAW UB Suite PWS 5.19
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2026 – 6/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2024: CMI(O) (Option)
FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]
IAW UB Suite PWS 5.19
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2027 – 6/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1025: CMI(O) (Option)
FTC-083 [SWMU 167]
IAW UB Suite PWS 5.20
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2026 – 6/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2025: CMI(O) (Option)
FTC-083 [SWMU 167]
IAW UB Suite PWS 5.20
| Completed 18 months from exercising of option. |
| 18 Mo: 1/1/2027 – 6/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1035: Update Risk Module VI (Option)
Update Risk Module VI (Risk-Based Evaluation Procedures Manual, Methodology for Identifying NFA at SWMUs)
IAW UB Suite PWS 5.23
Completed 18 months from exercising of option.
Performance shall start upon second need of update.
| May be exercised any time after task order award but no later than 3/1/2027 |
| 1 Job |
| NA |
| $ |
*Note: CLINs 0009, 0020, 0023 may be exercised at TO award IAW FAR Clause 52.217-4 however offerors are to include the price of these options under the “Options Total Price” row.
Base Period Total Price:
Options Total Price:
Base Plus Option Periods (Total Value):