Answers to questions concerning the DRAFT RFP and response to TDR requests.

View the file

Other files

File Type Posted
Attachment_0017_AF_PWS_V4.docx DOCX document
Mod_Amendment0007.docx DOCX document
Attachment0001_Army_V5.doc DOC document
April2017_RuckerMaintenanceProcurementUpdate.pdf PDF
16_FEB_2017_-_Letter_from_the_KO.pdf PDF
Answers_to_Questions_16FEB.xlsx XLSX spreadsheet
W9124G-17-R-0002-0005_Conform.docx DOCX document
Attachment_0017_AF_PWS_V3.pdf PDF
Attachment_0017_AF_PWS_V3.docx DOCX document
Answers_to_Questions_10FEB.xlsx XLSX spreadsheet
Attachment_0017_AF_PWS_V2.docx DOCX document
7_FEB_2017_-_Letter_from_the_KO.pdf PDF
Answers_to_Questions_7FEB.xlsx XLSX spreadsheet
W9124G-17-R-0002-0004_Mod.docx DOCX document
Attachment0001_ArmyPWS_v4.doc DOC document
Attachment_0010-1_V2.pdf PDF
Attachment0001_ArmyPWS_v4.pdf PDF
Attachment_0010-2_V2.pdf PDF
Answers_to_Questions_1FEB.xlsx XLSX spreadsheet
W9124G-17-R-0002-0003_mod.docx DOCX document
Attachment_0014_OptionBreakdown_v3.xlsx XLSX spreadsheet
Attachment_0020_CostWorkbook.xlsx XLSX spreadsheet
A040_USAF_V2.pdf PDF
Attachment_0015_SCA_with_CBA.pdf PDF
W9124G-17-R-0002_Amendment2.docx DOCX document
26_JAN_2017_-_Letter_from_the_KO.pdf PDF
Attachment_0001_ARMY_PWS_v3.pdf PDF
Attachment_0017_USAF_PWS_V2.pdf PDF
Answers_to_Questions_26JAN17.xlsx XLSX spreadsheet
Attachment_0008_V3.docx DOCX document
Attachment_00015_SCA.pdf PDF
W9124G-R-17-R-0002_Amendment01.docx DOCX document
Attachment_0001_PWS_ArmyV2.pdf PDF
9_JAN_2017_-_Letter_from_the_KO.pdf PDF
Attachment_0008_IncentiveDeterminationCriteriaV2.pdf PDF
Attachment_0014_OptionBreakdownV2.xlsx XLSX spreadsheet
Answers_to_Questions_6Jan17.xlsx XLSX spreadsheet
Attachment_0023_USAF_DRAFT_QASP.pdf PDF
Attachment_0019_PastPerformanceContactList.docx DOCX document
Attachment_0016_USAF_Publications.docx DOCX document
Attachment_0009-7.pdf PDF
Attachment_0014_OptionBreakdown.xlsx XLSX spreadsheet
Attachment_0010-2.pdf PDF
Attachment_0009-8.pdf PDF
Attachment_0009-13.pdf PDF
Attachment_0009-3.pdf PDF
Solicitation_W9124G-17-R-0002.docx DOCX document
Attachment_0004_DD_254.pdf PDF
Attachment_0015_CurrentCBA.pdf PDF
Attachment_0009-10.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

Draft RFP SectionParagraphComment/QuestionGovernment Response
Section F.1First Paragraph, second sentenceSection F.1, second sentence states, "The proposed contract will provide for up to six additional 12-month options and three potential 12-month award terms. We have researched the PWS and Attachment 0008 and were not able to locate the requirements to earn an Award Term. Where can we find the requirements to earn an Award Term?This language was a mistake and left over from previous versions. The contract will be one base year and nine option years. Section F.1 was updated in the final RFP.
Section LI.GGovernment requests that ' Up to 10 recent and relevant past contracts will be on a separate Past Performance Information Sheet (attachment 18)...All other recent and relevant past performances will be listed on the Past Performance Contact Sheet (attachment 19)." Has the government released Attachment 18 and 19 to industry? If not, can you please provide?Attachments 18 and 19 were previously posted in draft and were updated slightly in the released Final RFP dated 15 Dec 2016. Also, the number of recent and relevant past performances to be submitted was reduced to up to five (5) for the prime contractor and two (2) additional for major subcontractors for a total of seven (7).
Section LL.I.A.4Section L.I.A.4 only requires a Letter of Commitment for the Project Manager; however, in the Q&A issued on 1 November 25, Question 27 states: "The Section L requires a letter of commitment for each person proposed under the designation "key personnel." Question: Can the Government please confirm that the Letter of Commitment is only required for the Project Manager?The letter of commitment requirement has been deleted in the final RFP. No letters of commitment are required.
Section LL.I.E.a.2, L.I.E.a.7, L.I.E.a.8, L.I.E.a.11, L.I.E.b.3The referenced paragraphs require Offerors to detail specific changes to be made in the PWS requirements documents as well as the incentive plans. Question: For ease of evaluation, would the Government consider Red-lined passages replaced by new suggested verbiage in a different color? Given the potential lengthiness of changes that could be proposed, will the Government exclude specific changes to be made in requirements documents from the page count?The final solicatation was revised to provide for replacement pages that have been revised for incorporating enhancements as proposed strengths. These replacement pages are excluded from the page count as identifed in the page count exclusion paragraph of Section L.
L.G. Volume IV - Past PerformanceReference Section L.G. states "Each Past Performance Information Sheet is limited to one page". However, Attachment 18 requires offerors to provide explanations for four areas, which cannot be adequately addressed within the one page limit. Will the Government increase the Past Performance Information Sheet page limit to five pages?The final RFP included a page limit increase to two (2) pages each and added one question. This information is intended as summary data as details will be gathered directly from POCs listed.
Draft RFP, Section IPage 204Due to the size of the fleet and material purchases for this aviation services contract, will the Government consider including the following FAR clause in Section I of the RFP: FAR 52.246-23, Limitation of Liability.The FAR clauses 52.246-23 and 52.246-24 Alternate 1 were added. High value property applies to contractor acquired property that exceeds $5K.
Army PWS Section 3.03.1.9Will the Government be providing a plug labor hour number for backshops?Labor hours for the backshops is part of the analysis needed for responding to the solicatation. See Section L Paragraph E.
Army PWS4.3.5 - Periodic Inventory (CDRL A047)The PWS states: “The Contractor shall provide the Government a detailed inventory plan describing start and completion dates and the methodology (e.g. cycle counts, by exception, wall to wall or sampling) used to inventory GP on a fiscal year calendar (1 Oct - 30 Sept). This plan shall include the inventory of all Army or commercial material on a quarterly basis. The Contractor shall conduct special inventories as directed by the KO or GPA. The Contractor shall prepare and submit GP inventory results IAW DI-MISC-80508B, to include the following information: 1. Cover Letter identifying the location that was inventoried, 2. Spread sheet that has the following information noted for shortages and gains: a. Military Registration Number (MR#) / Asset ID Number; b. Nomenclature; c. Part Number; d. National Stock Number; e. Serial number; f. Acquisition Cost” Questions: Does this mean that the contractor shall inventory and report all GP on an annual basis on a fiscal year calendar (1-Oct-30-Sept) basis? Does this also mean that the contractor shall inventory all Army or commercial Material on a quarterly basis in addition? Will the government estimate how many and what types of ‘special inventories’ will be directed for planning purposes? Does “Military Registration Number (MR#)/Asset ID Number” refer to the asset tag number/bar code number? Please explain the use of ‘Military Registration Number (MR#)’. Is this a UID identifier? Is this affixed by the military and simply recorded on the contractor’s property records?Contractor shall report on a fiscal year basis inventory results of property not material. Contractor can submit inventory results throughout the year and does not have to wait unitl the end of the FY. The quarterly requirement is for material commerical and military. Special inventories are unforcasted events typically generated by higher headquarters. For FY16 there were two unforecasted events, but there is no way to predict the future unforecasted requests. Military Registration Number is the bar code number not IUID. MR# is the contractors means of identifying Government Property. These are applied by the contractor. Refer to 52.245-1 (f) (ii).
Attachment 4N/AWould the government update the annual flight hours table Attachment 4 to reflect the new Section L volumes for the airframes?Updated FHP data is in the Technical Data Repository as "56-Flight Hour Program for FY18-FY27."
Attachment 9PWS Attachment #9 – GF Materials #1, #2, #3, and #4There are no Locations where these Materials can be found on this listing. Will the Government be providing an Excel list at award that contains the building and physical location for each item in order to facilitate the transition inventory?If you look in the item name block it will tell your ASL, UH60 etc for the fleet that is supports or there will be a location.
Attachment 9PWS Attachment #9 – GF Materials #1, #2, #3, and #4There are many items that are repairable on these lists and they do not have populated serial numbers. Will the government be providing an Excel list at award that contains the specific serial numbers of the assets to be transitioned to the new contractor?There is no requirement for listing a serial number. Not required for the Government system used for accounting for material.
Army PWS4.3.13 - Tool Control ProgramThe PWS states: "The Contractor's Tool Control program shall include all tools utilized in support of this contract. The Contractor shall inventory: Annually: Airfield / Stage Fields all individual and crew served tool kits. Semiannually: 1. Tool Rooms and Shops (AMSS) shall have a master inventory of every piece of equipment located with-in. Inventories will be kept until the next semi-annual inventory.” Questions: For Airfield/Stage Fields – when is this inventory due; on the fiscal year schedule? For Tool Rooms and Shops (AMSS), when are these two inventories due?Contractor shall include this requirement in their Property Management System and describe how the contractor is going to accomplish this task. There are no specific inventory due dates to the government. Contractor must be able to show that these inventories are being accomplished.
Army PWS3.1.1.1.a.1Section 3.1.1.1.a.1. currently reads: Standard: The Contractor shall develop maintenance program manning requirements for CPIF/CPFF fleets prior to the start of the fiscal year based on Government provided Flying Hour Program. See CDRL A001. AQL: Staffing proposal IAW the Contractor's proposed methodology for CPIF/CPFF fleets submitted to the Government for approval NLT 30 days after receipt of Flying Hour Program. Comment: Suggest the references to “CPIF/CPFF fleets” be changed to “FPIF fleets”.Paragraph 3.1.1.1.a and 3.1.1.1.b were modified to clarify requirement to provide staffing proposal for any CPFF fleets (i.e.. Mi17). This is not a requirement for the FPIF Fleets.
Army PWS3.1.1.1.a.2Section 3.1.1.1.a.2. currently reads: Standard: The Contractor shall develop adjusted maintenance program manning requirements using updated quarterly flying hour requirements if there is a greater than 10% adjustment in program execution for CPIF/CPFF fleets. AQL: Staffing proposal changes IAW the Contractor's proposed methodology submitted for approval NLT 15 calendar days after receipt of Quarterly Flying Hour Program requirements. Comment: Recommend the references to “CPIF/CPFF fleets” be changed to “FPIF fleets”.Paragraph 3.1.1.1.a and 3.1.1.1.b were modified to clarify requirement to provide staffing proposal for any CPFF fleets (i.e.. Mi17)
Army/Air Force PWS4.3.2.1 - Life Cycle Replacement PlanWill the Government provide a more detailed definition of a “Life Cycle Replacement Plan?”Life cycle replacement plan contained in 4.3.2.1 has been removed in the final RFP.
Army/Air Force PWSIs the Contractor expected to provide vehicles under the new contract (as opposed to them being GSA under the current contract)? If so, can the Government please provide a list of required vehicles to enable the Offeror to determine the exact fleet size/capabilities and price?Yes, if the contractor deems them necessary to support their maintenance plan. The current GSA vehicle listing and utilization is listed in Technical Data Repository by vehicle type. This list also identifies the few GSA vehicles that will continue to be provided by the Govt. The Contractor shall determine the number and type of vehciles it will require for execution of this contract and include the price in its FPI(F) price.
PWS Attachment #9 – GF Materials #1, #2, #3, and #4Are all of the Materials currently IN STOCK or OUT FOR REPAIR bar coded?Materials are not bar coded.
FBO NotificationQuestions and Responses - 11/1/2016Currently, per FBO notification award date is 15 August 2017, Contract start date is 1 October 2017. Per Question 18 Response, Transition Period is 75 days. Base year is 12 full months. There are less than 75 days between award date and contract start date; therefore can the Government confirm that the transition period (75 days) is part of the contract Base Year period (1 October 2017 - 30 September 2018). If not, the contract base year will start after the transition period and end after 12 full months, resulting in a 15 December 2017 - 14 December 2018 timeframe.Award announcement is planned the first week of September with performance commencing 1 Oct 2017. The 75 days of transition begin on 1 Oct through 14 December; the base period of performance will be 15 December 2017- 30 Sep 2018.
L-27(4) (III) Volume III – Cost/Price (6) (d)Question 88 dated 11/1/2016: IAW CAS, for the plug amounts that receive material handling cost, please confirm if the material handling cost charged can encompass all applicable indirect burdens or just a material handling rate?The solicitation allows any indirect cost that is consistent with the offeror's disclosure statement.
L-27(4) (III) Volume III – Cost/Price (6) (d)Question 88 dated 11/1/2016, Please provide the complete Government Response since the response appears to be ‘cut off’ at the end of the sentence.The language was revised for clarity. If a contractor is proposing a material handling cost, then yes the Government provided amount needs to be changed to include the material handling cost. If the Government provided amount is not changed, then no material handling cost will paid and that agreement will be documented in the resultant awarded contract.
CLIN Pricing SummaryCLIN 0002 Phase InQuestion 91 dated 11/1/2016, Please provide the complete Government Response since the response appears to be ‘cut off’ at the end of the sentence.No. While the incumbent is recognized to have some advantage, the case precedence does not find it unfair. We have atempted to mitgate the risk of advantage and considered a plug number. However, without some contractually binding amount, the TEP is also affected. The incumbent will be requested to submit a phase-in cost to the follow-on contract since the follow-on contract has differences compared to the current contract.
M.84The small business participation goal is 24% of Total Contract Value. The small business socio-economic goals total 46% of the Total Contract Value (7% SDB, 9% WOSB, 3% HUBZone, 14% VOSB, and 13% SDVOSB), which is inconsistent from the recommended 24% goal. Will the Government consider lowering the socio-economic goals to match the 24% small business participation goal?The language has been clarified in the solicatation. While the numbers cumulate higher than 24%, many of the values are counted in separate categories. For instance a Women owned disabled veteran owned small business of 3% would count toward 3% of the SB and also 3% for each of the WOSB and SDVOSB individual goals yet not double or triple count the SB goal.
AF PWS3.2.2Can the Government please provide Appendix 3BAA?The reference to Appendix 3BAA is not in the final RFP.
Army PWS Section 3.03.1.9Will the Government be providing a plug labor hour number for backshops?Section L and M provide focus of this solicatation. Offeors are provided facilities, equipment types, quantiites, and location, flight hours by mission design series, and data regarding typical repairs for offerors' analysis in deriving the optimal solution using an analysis of alternatives. Therefore, a plug number for the backshops will not be provided. The number will vary depending on the contractor's integrated approach.
TDR RequestN/AARI Schedule – to include divested aircraftThe ARI and divested aircraft was in the Technical Data Repository. The ARI and divested aircraft document was deleted from the TDR because it was no longer accurate. Due to more recent changes, the number of aircraft planned for training and training hours replaced that data.
TDR RequestN/ACurrent state of the fleetsRequire a more definitive question to provide a useful answer.
TDR RequestN/AHistorical readiness rates for the fleetsThis document will be FOUO. The Government is working to present the data in the Technical Data Repository in a meaningful manner.
TDR RequestN/AArmy Precautionary Landing (PL) data CY13-19 Oct 2016 (provided in PDF; but request Excel to analyze the data)An Excel document is in theTechnical Data Repository "08-Army Precautionary Landing (PL) data CY13-19 OCT 16 (on and off base field)."
TDR RequestN/AMaintenance history by airframePlease submit a more definitive question. This involves Terabites of FOUO data that may provide no useful information.
TDR RequestN/ANumber of flight hour per month per airframe (to determine phase maintenance)The Army flight hour program is an annual program and not broken out by month. The Technical Data Repository document titled "19-FY13-FY16 Contract Requirements by fleet" provides historic data on requested aircraft, which may provide alternate data needed to provide insight on utilization.
TDR RequestN/AWill the Government provide additional maintenance requirements due to MECs and MEOs?File "34-MEC-MEO Maintenance Rollup NOV 16" was added to the Technical Data Repository. This is historic information. There is no way to predict future MECs and MEOs.
TDR RequestN/AWill the Government publish the controlled exchange rates per fleet and manhours expended?File "14-Controlled Exchange Actions and Man Hours by Fleet FY15-16" was added to the Technical Data Repository.
TDR RequestN/ATech manuals for each Model-Design-Series (MDS). To help you scope your request to the ACLC, the technical manuals (TMs) end in: -PMI, -PMS, and -23 SeriesThe Government is gathering this information to release them to potential prime contractors.
TDR RequestN/ACensus data to include: Date of Birth, Gender, Plan election, Enrollment election (Single, Family, COBRA, Retiree, Waive, etc.), Zip CodeThe Government is determining if it has this inforamtion and if any of the information will be released in the Technical Data Repository.
TDR RequestN/ACurrent plan document and summary plan descriptionRequire a more definitive question to provide a useful answer.
TDR RequestN/ARates (if self-funded, premium equivalent or funding rates) currently in place for each coverageThe Government is determining if it has this inforamtion and if any of the information will be released in the Technical Data Repository.
TDR RequestN/ACOBRA rates by coverage tier (where applicable)The Government is determining if it has this inforamtion and if any of the information will be released in the Technical Data Repository.
TDR RequestN/AAverage age and experience of the current workforce as described in Section L, Subfactor 1, paragraph 4.The Government is determining if it has this inforamtion and if any of the information will be released in the Technical Data Repository.
TDR RequestN/ACurrent on-site and off-site component repair data and federal supply system support data (included in CDRL’s below) necessary for bidders to develop an approach to Section L, Subfactor 1, paragraph 6.See answers below regarding various CDRL Technical Data Repository requests.
TDR RequestN/APartial mission capable and deferred maintenance data included in the CDRL’s below to support the response to Section L, Subfactor 1, paragraph 8.See answers below regarding various CDRL Technical Data Repository requests.
TDR RequestN/AMonthly and annual historical, as well as projected, flight hours by mission design series and airfieldProvided in Technical Data Repository "40-Planned versus executed flight hours by MDS" and "FY18-FY27 Projected FHP 14DEC16"
TDR RequestN/AList and description of vehicles the Army currently has at each location with identification of vehicles the Army plans to downsizeLocated in Technical Data Repository "21-FY16 GSA fleet data and utilization with data on which will remain GFP"
TDR RequestN/AList identifying and briefly describing the Information Systems (IT) currently in place supporting the maintenance program including Government systems and contractor provided systems and a roadmap of connectivity (if applicable)The Government is gathering this information to determine if any of the information will be released in the Technical Data Repository.
TDR RequestN/AList describing support agreements with military and federal agencies in which the contractor is required to provide support including maximum man-hours, location, type aircraft, annual flight hours supported, historical annual man-hours.External Satellit Repair data is included in the Army Technical Data Repository "20-FY16 ESR Workload". Also included is historical data on CCAD Support at Fort Rucker "11-CCAD Support", National Maintenance Program Support "38-NMP Manhours FY09-to FY16", and AR 5-9 support for transient aircraft "Transient aircraft support" Flight hours for USAACE and USAARl aircraft are in "56-FY18-FY27 Projected Flight Hour Program"
TDR RequestN/ARecent and historical examples that illustrate the typical daily flight schedule at each airfieldPosted recent daily launch data in Army TDR "16-Daily Launch Data 11OCT-19NOV 2016"
TDR RequestN/AMaintenance manuals for each MDS assigned including AH-64D/E, CH-47F, OH-58A/C, TH-67C/I, EH/UH-60A/L, UH-60M, Mi-17, and UH-72AOH58 and TH67 manuals are added. The remainder need to be released to a specific document custodian at each potential prime contractor due to restricted distribution.
TDR RequestN/ARequest the following current contract CDRL reports be posted in the TDR to provide data to bidders necessary to determine workloads, configuration, and support requirements for various areas of the contract:See answers below regarding various CDRL TDR request.
TDR RequestN/ACDRL A003, IT Inventory and Life Cycle Replacement ReportSee Army Technical Data Repository "29-IT Inventory and Life Cycle Replacement report Historic Data"
TDR RequestN/ACDRL A004, Supply Performance ReportsCDRL A004 reports on incumbent's supply metric performance and therefore will not be released.
TDR RequestN/ACDRL A005, Maintenance/Supply Status ReportNo data PMD C.3.11.3
TDR RequestN/ACDRL A006, Fleet Managers Daily Status ReportsThe data is FOUO and will be released to a specific document custodian at each potential prime contractor due to restricted distribution.
TDR RequestN/ACDRL A009, Modification Work Order and Associated Maintenance ReportUploaded to Army Technical Data Repository as "35-MOC Waiver request."
TDR RequestN/ACDRL A010, Performance and Cost Status ReportThis CDRL contains proprietary incumbent costing data and therefore will not be released.
TDR RequestN/ACDRL A012, Scheduled and Deferred Maintenance ReportProvided in TDR as "4-Aircraft Phase Data Date Entered Phase 29 April 15 to 1 DEC 16."
TDR RequestN/ACDRL A022, Hazardous Material and Industrial Hygiene ReportsThe CDRL on the current contract is the incumbent contractor's plan and is not relevant to the follow-on contract. Therefore, the current reports will not be released.
TDR RequestN/ACDRL A029, Production Control Status ReportsData pertaining to CDRL A029 was rolled up with Data being provided in reponse to information for CDRL A052 and is in the Army Technical Data Repository as "39-Open-closed Work order reports NOV 2010 - NOV 2016."
TDR RequestN/ACDRL A034, NDT/Fault Diagnosis ReportProvided in Army Technical Data Repository "36- NDT Report FY16."
TDR RequestN/ACDRL A036, Non-Mission Capable Maintenance Corrective Action PlanCDRL A036 is the incumbent contractors plan to remedy aircraft NMCM for greater than 30 days. It is due for each occurrence and shows the incuments plan to correct. Therefore, the current plans willnot be released.
TDR RequestN/ACDRL A038, GSA Vehicle Status ReportProvided in Army Technical Data Repository as "27-GSA Vehicle Status Report Historic Data."
TDR RequestN/ACDRL A046, Vehicle and Equipment Status ReportThe data is FOUO and will be released to a specific document custodian at each potential prime contractor due to restricted distribution.
TDR RequestN/ACDRL A047, NMP Program Statistical ReportsData provided in Army Technical Data Repository as "38-NMP Manhours FY09 to FY16."
TDR RequestN/ACDRL A048, IT Troubleshooting and Repair ReportsData provided in Army Technical Data Repository as "30-IT Trouble Shooting and Repair Report."
TDR RequestN/ACDRL A049, ADP Resources ReportData provided in Army Technical Data Repository as "01-ADP Inventory Report May and NOV 16."
TDR RequestN/ACDRL A050, IT Hardware and Software Configuration Status ReportThe Government is gathering this information to determine the information will be released in the Technical Data Repository.
TDR RequestN/ACDRL A052, Open/Closed Work Order ReportsData provided in Army TDR as "39-Open-closed Work order reports NOV 2010 - NOV 2016."
TDR RequestN/ACDRL A053, SARSS/GCSS-A ReportsData provided in Army Technical Data Repository as "09-AWCF Warehouse (RIC W0H) Historic data."
TDR RequestN/ACDRL A061, Training Status ReportsThe CDRL on the current contract is the incumbent contractor's staff. Therefore, the current reports will not be released.
TDR RequestN/ACDRL A063, Quarterly Contractor Field Service Representative ReportThis reports performance and cost avoidance data for AFS CFSR (AFS contracted OEM representatives). Data provides work they do that creates Government cost avoidance.
TDR RequestN/ACDRL A068, Condition Based Maintenance Status and Trending ReportData provided in Army Technical Data Repository as "51-UH60 CBM data historic data."