J-27-architectural finishes-review.pdf

PDF 1 MB Posted

Attached to
DESIGN BUILD COURT ROOM REMODEL FORT HUACHUCA DIVISION
Solicitation number
W9124A23R0011
Issued by

About this file

This document provides details for a federal contract opportunity to remodel a courtroom at Fort Huachuca Division. The solicitation seeks design-build services to update the architectural finishes at the site, allowing substitutions to the proposed black metal exterior sheet metal as long as any alternative meets sound attenuation and aesthetic requirements. Contractors must submit proposed changes through visual plans and technical specifications for review and approval before implementation. The opportunity was issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground under solicitation number W9124A23R0011.

View the file

Other files

File Type Posted
B08 Solicitation W9124A23R0011 Amendment 3.pdf PDF
J-34 fh-az52120-01s2017.pdf PDF
B08 Solicitation W9124A23R0011 Amendment 2.pdf PDF
J-33 Sign-In Sheet 6.26.23.pdf PDF
J-15-LED light-nameplate-typical-nameplate-.pdf PDF
J-19-fire hydrant 521-2.pdf PDF
J-24-Mechanical Room and Exterior Photos.pdf PDF
J-18-ecb_2018_17_rev_2.pdf PDF
J-26-HVAC-drawings.pdf PDF
J-17-electric meter only no other utilities available-.pdf PDF
J-20-proposed fire water line.pdf PDF
J-30 Building 52120 Utility Photo Locations.pdf PDF
J-21-Fort Huachuca Fire Department Requirements 07 May 2020 Updated.pdf PDF
B08 Solicitation W9124A23R0011 Amendment 1.pdf PDF
J-28 Building 52120 Outside of Building.pdf PDF
J-01 SOO Updated 7-21-2023.pdf PDF
J-32 Questions and Answers.pdf PDF
J-31 Building 52150 Photos of Representative VAVs.pdf PDF
J-14-FFE-listing furniture-.pdf PDF
J-16-sewer-water points.pdf PDF
J-25-Photos of B52120 HVAC VAV.pdf PDF
J-23-Pavilion-1.pdf PDF
J-22-Fort Huachuca Energy Efficiency Water Conservation Design Construct Guidelines.pdf PDF
J-29 Building 52120 Photos of Rooms.pdf PDF
J-10 Questions Template.xlsx XLSX spreadsheet
J-13 Map Ft Huachuca AZ - Copy.pptx PPTX presentation
J-03 OSJA AnnexCourtroom (current layout).pdf PDF
J-02 OSJA Courtroom Plan.pdf PDF
J-12 52.204-9 Personnel Log.xlsx XLSX spreadsheet
J-08 Technical exhibit.pdf PDF
J-01 SJA-SOO.pdf PDF
J-04 Plumbing drawing soil vent domestic water Isometrics.pdf PDF
J-09 JUDICIAL CENTER (JC) Standard Design Reference Document.pdf PDF
J-05 Enlarged Restroom Plumbing Plan.pdf PDF
J-11 Past Performance Evaluation Questionnaire Form.pdf PDF
J-07 Asbestos and lead base paint reports.pdf PDF
J-06 Facility AS-BUILT DWGs.pdf PDF
B08 Solicitation W9124A23R0011.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference Question #2:

The contractor may substitute the black metal exterior sheet metal coverings with something more feasible and aesthetically pleasing that meets the planned effort in regards to sound attenuation and other project criteria.

The contractor shall submit his/her proposal via visual elevations and technical specifications for review/approval prior to any changes.

JQ-27-architectural finishes
south looking view-front
north looking view-rear
partial-west looking view
east looking view
main entrance
fuller east looking view

File details come from the government source that posted it. Updated .