J-18-ecb_2018_17_rev_2.pdf

PDF 112 KB Posted

Attached to
DESIGN BUILD COURT ROOM REMODEL FORT HUACHUCA DIVISION
Solicitation number
W9124A23R0011
Issued by

About this file

This Engineering and Construction Bulletin provides new requirements for visual notification in mass notification systems for U.S. Army and Air Force facilities. It requires the use of clear or white strobes marked with the word "ALERT" instead of amber strobes. It also mandates the installation of light-emitting diode text signs for both new mass notification systems and fire alarm systems. Numerous revisions are made to Unified Facilities Criteria 4-021-01 to remove Army- and Air Force-specific requirements and references. The point of contact is provided for any questions.

This federal contract opportunity is a solicitation from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for the design-build of a court room remodel at Fort Huachuca Division. No further details are provided regarding required products or services, response dates, or other salient information.

View the file

Other files

File Type Posted
B08 Solicitation W9124A23R0011 Amendment 3.pdf PDF
J-34 fh-az52120-01s2017.pdf PDF
B08 Solicitation W9124A23R0011 Amendment 2.pdf PDF
J-33 Sign-In Sheet 6.26.23.pdf PDF
J-27-architectural finishes-review.pdf PDF
J-15-LED light-nameplate-typical-nameplate-.pdf PDF
J-19-fire hydrant 521-2.pdf PDF
J-24-Mechanical Room and Exterior Photos.pdf PDF
J-26-HVAC-drawings.pdf PDF
J-17-electric meter only no other utilities available-.pdf PDF
J-20-proposed fire water line.pdf PDF
J-30 Building 52120 Utility Photo Locations.pdf PDF
J-21-Fort Huachuca Fire Department Requirements 07 May 2020 Updated.pdf PDF
B08 Solicitation W9124A23R0011 Amendment 1.pdf PDF
J-28 Building 52120 Outside of Building.pdf PDF
J-01 SOO Updated 7-21-2023.pdf PDF
J-32 Questions and Answers.pdf PDF
J-31 Building 52150 Photos of Representative VAVs.pdf PDF
J-14-FFE-listing furniture-.pdf PDF
J-16-sewer-water points.pdf PDF
J-25-Photos of B52120 HVAC VAV.pdf PDF
J-23-Pavilion-1.pdf PDF
J-22-Fort Huachuca Energy Efficiency Water Conservation Design Construct Guidelines.pdf PDF
J-29 Building 52120 Photos of Rooms.pdf PDF
J-10 Questions Template.xlsx XLSX spreadsheet
J-13 Map Ft Huachuca AZ - Copy.pptx PPTX presentation
J-03 OSJA AnnexCourtroom (current layout).pdf PDF
J-02 OSJA Courtroom Plan.pdf PDF
J-12 52.204-9 Personnel Log.xlsx XLSX spreadsheet
J-08 Technical exhibit.pdf PDF
J-01 SJA-SOO.pdf PDF
J-04 Plumbing drawing soil vent domestic water Isometrics.pdf PDF
J-09 JUDICIAL CENTER (JC) Standard Design Reference Document.pdf PDF
J-05 Enlarged Restroom Plumbing Plan.pdf PDF
J-11 Past Performance Evaluation Questionnaire Form.pdf PDF
J-07 Asbestos and lead base paint reports.pdf PDF
J-06 Facility AS-BUILT DWGs.pdf PDF
B08 Solicitation W9124A23R0011.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING AND

CONSTRUCTION BULLETIN

No. 2018-17 Issuing Office: CECW-EC Issued: 25 Oct 18 14 May 20, Rev 1

20 Jan 22, Rev 2

Expires: 25 Oct 20 14 May 22

20 Jan 24

SUBJECT: New Requirements for Visual Notification for Mass Notification Systems

CATEGORY: Directive and Policy

1. References:

a. Unified Facilities Criteria (UFC) 4-021-01 Change 1, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, January 2010

2. Purpose. This directive provides new requirements for mass notification systems.

3. Applicability. This applies to new mass notification systems for new construction and rehabilitation projects for U.S. Army facilities. This also applies to new mass notification systems for new construction and rehabilitation projects for U.S. Air Force facilities when the U.S. Army Corps of Engineers is the design and construction agent. This ECB has been approved for U.S. Air Force facilities by the USAF AHJ office (AFCEC/CO), and applies unless otherwise directed by

AFCEC/CO.

4. Background. UFC 4-021-01, Design and O&M: Mass Notification Systems, requires Army and Air Force facilities to use amber strobes at all locations inside the facility as the visible signal to alert occupants with hearing disabilities about non-fire related emergency situations. These amber strobes are activated in conjunction with the delivery of pre-recorded or live voice messages over the mass notification system. The amber strobes are provided at the same locations as would be required for fire alarm clear strobes.

5. Directive.

a. Amber strobes must no longer be used in new mass notification systems. In lieu of amber strobes, clear or white strobes marked with the word “ALERT” must be used for new mass notification systems. Clear or white strobes must be provided for shared use by the facility’s combination mass notification and fire alarm system. The clear or white strobes are activated in conjunction with voice messages over the mass notification or fire alarm system.

b. Light-emitting diode (LED)-type text signs must be installed for the new mass notification system, and the fire alarm system (if present). These text signs are activated in conjunction with voice messages over the mass notification or fire alarm system.

c. Comply with the following changes to UFC 4-021-01:

(1) Add the text “Army and Air Force” to the beginning of the first sentence in

ECB No. 2018-17 Subject New Requirements for Visual Notification for Mass Notification Systems

Section 4-3.4.2.1.

(2) Delete the Section 4-3.4.2.2, “Army and Air Force installations shall, ...”

(3) Add the text “Army, Air Force and” to the fourth bulleted item under Section 4-4.2.

(4) Delete the sixth bulleted item under Section 4-4.2, “Army and Air Force, …”

(5) Add the text “Army, Air Force, and” to the title of Section 4-6.2.1.

(6) Delete Section 4-6.2.3, Army- and Air Force-Specific Requirements

(7) Add the text “, Army and Air Force” to the beginning of the first sentence in Section

5-4.4.2.2.

(8) Delete Section 5-4.4.2.1, “Army and Air Force installation shall, …”

(9) Add the text “Army, and Air Force” to the fourth bulleted item under Section 5-5.2.

(10) Delete the sixth bulleted item under Section 5-5.2, “Army and Air Force ...”

(11) Add the text “Army, Air Force, and” to the title of Section 5-7.2.1.

(12) Delete section 5-7.2.3, Army- and Air Force-Specific Requirements

(13) Delete the third sentence in Section 7-3.4, “The Army and Air Force use...”

(14) Add the text “Army, Air Force, and” to the fourth and sixth sentences in Section 7-3.4.

(15) Add the text “Army, Air Force, and” to the title and display callout in Figure 4-1 and delete Figure 4-2, “Individual Building Mass... (Army and Air Force)”

(16) Add the text “Army, Air Force and” to the title of Figure 5-1 and delete Figure 5-2, “Individual Building Mass... (Army and Air Force)”

(17) Add the text “Army, Air Force and” to the title of Figure 5-4 and delete Figure 5-5, “Individual Building Mass... (Army and Air Force)”

(18) Add the text “Army, Air Force and” to the title of Figure 5-6 and delete Figure 5-7, “Use of… System: Army and Air Force”

6. Update. All new requirements will be included in the next appropriate policy document update prior the expiration of this ECB.

ECB No. 2018-17 Subject New Requirements for Visual Notification for Mass Notification Systems

7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227.

//S// LARRY D. McCALLISTER, PhD, PE, PMP, SES Chief, Engineering and Construction U.S. Army Corps of Engineers

1. References:
a. Unified Facilities Criteria (UFC) 4-021-01 Change 1, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, January 2010
2. Purpose. This directive provides new requirements for mass notification systems.
3. Applicability. This applies to new mass notification systems for new construction and rehabilitation projects for U.S. Army facilities. This also applies to new mass notification systems for new construction and rehabilitation projects for U.S. A...
4. Background. UFC 4-021-01, Design and O&M: Mass Notification Systems, requires Army and Air Force facilities to use amber strobes at all locations inside the facility as the visible signal to alert occupants with hearing disabilities about non-fir...
5. Directive.
6. Update. All new requirements will be included in the next appropriate policy document update prior the expiration of this ECB.
7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227.