A32_TechnicalExhibits-5.6.xlsx

XLSX spreadsheet 531 KB Posted

Attached to
Fort Gillem Enclave Base Operations and Maintenance Support Services (BASOPS)
Solicitation number
W91249-19-R-0019
Issued by

About this file

This document contains technical exhibits for the Fort Gillem Enclave Base Operations and Maintenance Support Services contract opportunity. It includes backflow device listings, communication manhole locations, emergency generator details, demand maintenance order reports, preventative maintenance look ahead reports, utility line demarcations, and electrical and natural gas distribution system inventories for Fort Gillem. The solicitation is identified as W91249-19-R-0019 and seeks base operations and support services for the Gillem Enclave. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis. Products and services required include facilities maintenance, utilities operation and maintenance, custodial services, integrated solid waste management, integrated pest management, and other base support functions. The response date is not specified but the incumbent contractor is also not identified.

View the file

Other files

File Type Posted
Amendment W9124919R00190006.pdf PDF
A42_Sample Pricing Worksheet_FBR.xlsx XLSX spreadsheet
A1_Performance Work Statement_27Feb2020.docx DOCX document
Conformed Copy of Solicitation W9124919R0019.pdf PDF
Amendment W9124919R00190005.pdf PDF
Conformed Copy of Solicitation W9124919R0019.pdf PDF
Technical Attachment C Grounds Maintenance.docx DOCX document
TE 2H - Gillem Enclave Energy Conservation Measures.pdf PDF
TE 2C - Task Codes.pdf PDF
TE 2D - Gillem Enclave Training and Medical Testing.pdf PDF
A3_SCA WD 2015-4471_Rev14_23Dec19.docx DOCX document
TE 5 - Gillem Enclave GFV and GFE Listing.xlsx XLSX spreadsheet
A1_Performance Work Statement_17Feb2020.docx DOCX document
Amendment W9124919R00190004.pdf PDF
Technical Attachment B Solid Waste Management.docx DOCX document
TE 2G - Gillem Enclave Financial Mgmt A76 Roles and Courses.pdf PDF
TE 1A - Gillem Enclave Real Property inventory.pdf PDF
TE 7 - Gillem Enclave Events.xlsx XLSX spreadsheet
TE 1B - Gillem Enclave Area Map.pdf PDF
Technical Attachment I - FXD Maintenance Services.docx DOCX document
A5_Specific Relevant Contracts Sheet.docx DOCX document
TE 4 - Gillem Enclave Forms.xlsx XLSX spreadsheet
TE 2B - Estimated PWO Workload Data.pdf PDF
A4_Subcontractor Teaming Partner Consent Form.docx DOCX document
TE 6 - Gillem Enclave Grounds Map.xlsx XLSX spreadsheet
Technical Attachment F Facility Maintenance Horizontal.docx DOCX document
TE 2A - Estimated DMO Workload.pdf PDF
TE 2E - Gillem Enclave Service Order Tech A76 Roles and Courses.pdf PDF
TE 3 - Gillem Enclave Est Dump and Contain Sizes and Locations.xlsx XLSX spreadsheet
Technical Attachment D Pavement Clearance.docx DOCX document
Technical Attachment H Pest Management.docx DOCX document
TE 2F - Gillem Enclave Equipment Listing.xlsx XLSX spreadsheet
A43_Questions and Answers_21Feb2020.docx DOCX document
Technical Attachment E Facility Maintenance Vertical.docx DOCX document
Technical Attachment A Facility Maintenance Instruction.docx DOCX document
Amendment_W9124919R00190003.pdf PDF
Amendment_W9124919R00190002.pdf PDF
Amendment_W9124919R00190001.pdf PDF
A42_Sample Pricing Worksheet_FBR.xlsx XLSX spreadsheet
Technical Exhibit 2g Gillem Enclave Financial Mgmt A76 Roles and Courses.pdf PDF
Technical Exhibit 1B Gillem Enclave Area Map.pdf PDF
A18_Technical Exhibit Bldg00760.xlsx XLSX spreadsheet
Solicitation W91249-19-R-0019.pdf PDF
A41_TechnicalExhibits-3 Gov Furnished Veh.xlsx XLSX spreadsheet
A17_Technical Exhibit Bldg00720.xlsx XLSX spreadsheet
A23_Technical Exhibit Bldg00900.xlsx XLSX spreadsheet
Technical Exhibit 2h Gillem Enclave Energy Conservation Measures.pdf PDF
Technical Exhibit 3 IMCOM Standards.pdf PDF
A36_Technical Exhibit Deliverables.docx DOCX document
A31_Technical Exhibit Bldg00938.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Backflow Inventory

Attachment 5.6 02 Backflow Device Listing
GILLEM ENCLAVE BACKFLOW LISTING
BuildingBuilding NameProgramQUANTITYSIZEMANUFACTURER
608 Ser LineGANG READINESS CENTERContainment13"Watts RPZ
608 Fire LineGANG READINESS CENTERContainment16"Ames DCV
700 Ser LineUSACIL Crime Lab Storage Facility
700 Ser LineUSACIL Crime Lab Storage FacilityIsolation13/4"Watts RPZ
701 Ser LineVISTOR CONTROL CENTERContainment11.5"Wilin Zurn DCV
702 Ser LineACCCESS CONTROL POINTContainment11.5"Wilkin Zurn RPZ
714 Ser LineGILLEM ENCLAVE HQSContainment12"Watts DCV
718 Ser Line723RD AND 184TH EOD HQSContainment12.5"Watts DCV
718 Make up723RD AND 184TH EOD HQSIsolation11"Watts RPZ
720MEPS FACILITYIsolation11"Wilkins Zurn DCV
760New Dial Control Center (DCO)Containment1
838CID FRAUD TEAMContainment11.5"Wilkins Zurn RPZ
839 Ser LineUSARC INTEL SUPPORT TRNG FACContainment12.5"Watts DCV
839 MakeupUSARC INTEL SUPPORT TRNG FACIsolation13/4"Watts RPZ
839 MakeupUSARC INTEL SUPPORT TRNG FACIsolation13/4"Watts RPZ
900 Ser LineUSARC ADMIN GEN PURPOSEContainment1 of 24"Watts RPZ
900 Ser LineUSARC ADMIN GEN PURPOSEContainment2 of 24"Ames RPZ
900 Fire LineUSARC ADMIN GEN PURPOSEContainment14"Ames DCV
900 MakeupUSARC ADMIN GEN PURPOSEIsolation13/4"Watts RPZ
900 MakeupUSARC ADMIN GEN PURPOSEIsolation11"Watts RPZ
905 Ser LineVEHICLE MAINT FACILITYContainment12.5"Watts DCV
905 Fire LineVEHICLE MAINT FACILITYContainment16"Ames DCV
910 Ser LineMEDICAL BATTALION LOGISTICSContainment12"Watts RPZ
910 MakeupMEDICAL BATTALION LOGISTICSContainment13/4"Watts RPZ
910 Fire LineMEDICAL BATTALION LOGISTICSContainment14"Ames DCV
913 Ser LineUSARC MEDICAL WAREHOUSEContainment12"Watts RPZ
913 Fire LineUSARC MEDICAL WAREHOUSEContainment16"Ames DCV
913 MakeupUSARC MEDICAL WAREHOUSEIsolation11"Watts RPZ
929ELEV FIRE PROTECTION WATER TANK
931 Ser lineDEFENSE FORENSIC SCIENCE CENTERContainment
931 Fire lineDEFENSE FORENSIC SCIENCE CENTERContainment14"Ames DDCV
931 MakeupDEFENSE FORENSIC SCIENCE CENTERIsolation13/4"Watts RPZ
T925DFSC LEASED TRAILER
T926DFSC LEASED TRAILER
T710DOUBLE WIDE TRAILER
Distribution SysOn Fire Line @ DFSC Mobil Lab CompContainment110"Watts DDCV

USAG FORT GORDON - GILLEM ENCLAVE

FOUO-Source Selection Sensitive - See FAR 2.101 and FAS 3.104

Comm Manholes

Attachment 5-6 - 03
COMMUNICATION MANHOLE LISTING

MANHOLE NUMBER APPROXIMATE LOCATION

MH 931Between and east of Bldgs 929/931
MH 929N 31st St, near N "R" St.
MH 1N 31st St, between Bldgs 720 & 910
MH 2N 31st St, between Bldgs 720 & 910
MH 3N 31st St, in front of Bldg 925
MH 4North of MH 3
MH 5Northeast of MH 4
MH 106-AN 31st St, between Bldgs 720 & 910
MH 925N 31st St, in front of Bldg 925
MH 900West of Bldg 900, off Hood Ave
MH 902N 31st St & Hood Ave.
MH 107-AN 31st St & Hood Ave.
MH 936East of N 37th St.
MH 941Northeast of MH 938
MH 941-ANorthwest of MH 941
MH 839East of Bldg 839
MH 839-AWest of Bldg 839
MH 720Northeast of Bldg 720
MH 720-ABehind of Bldg 720
MH 814In front of Bldg 838
MH 106-AWest of Bldg 714
MH 736In front of Bldg 760
MH 105East of Bldg 714
MH 808Hood Ave, souheas of Bldg 714
MH 104-ANear main gate
MH 760Northeast of Bldg 760 on N 26th St.
MH 757N "K" Ave, near N 22nd St.
MH 610-CN 20th St & N "K" Ave.
MH 610-BNear Bldg 607-Pole Barn

Generators

Attachment 5.6 - 04
GILLEM ENCLAVE EMERGENCY GENERATORS
DieselNat Gas
Building NumberDescription
608500kw Taylor Generator M/N TD500X
702300 KW CummingsX
760180 KW MTU On Site EnergyX
839750 KW CaterpillarX
912Generac Power System 4656705 QT080466NSN NGAS 80 GENERAC 120/208X
931500 KW KohlerX

DMO Perf Rep Template

Attachment 5.6 - 05
Open Demand Maintenance Orders
with Facility Category - as of 03 October 2012
GFEBS#FacNoPriStatusCreatedShopTaskTask DescTarget Comp DateSERVICE ORDER STATUS ON 10/04/12EDD VERIFIED BY SUPPLY ADMIN (10/04/12)
1100001341179297052WMATL9/24/2012 1:52:21 PMMRS039AE! 29705 rm 102 washer will not

power on, sn HL20655317 1352 24 sep 12 kr

10/10/2012 1:52:21 PMWMATL11/16/12
2100001341180297052WMATL9/24/2012 1:53:45 PMMRS039AE! 29705 rm 202 washer door

will not stay closed, sn HL20546529 1354 24 sep 12 kr

10/10/2012 1:53:45 PMWMATL11/16/12
3100001351910244122SHP9/24/2012 10:55:17 AMMRS0003(R)24412 Rm 322 paint peeling

on ceiling

10/10/2012 10:55:17 AMSHP
4100001352165003172SHP9/26/2012 7:33:12 AMECS036I(R) 317/ Please refer to Akima

per Micah: CCV valve stem is not connected to the CHW line on

AHU3; UMCS/79893

10/10/2012 7:33:12 AMSHP
5100001351427003172TSFM9/17/2012 2:54:18 PMMRS0017(R)E! 317 attn David W D24

ceiling fan inop 1454 17 sep 12 kr

10/10/2012 7:54:28 AMTSFM
6100001351434003172TSFM9/17/2012 2:55:28 PMMRS0017(R)E! 317 attn David W F21

ceiling fan inop 1454 17 sep 12 kr

10/10/2012 7:54:28 AMTSFM
7100001351439003172TSFM9/17/2012 2:56:01 PMMRS0017(R)E! 317 attn David W D24

ceiling fan inop 1454 17 sep 12 kr

10/10/2012 7:54:28 AMTSFM
8100001353295003152SHP10/1/2012 10:35:00 AMMRS003B315 B22 repair & paint walls

1035 01 oct 12 kr

10/15/2012 10:35:00 AMSHP
9100001353298003152SHP10/1/2012 10:36:00 AMMRS003B315 B23 repair & paint walls

1036 01 oct 12 kr

10/15/2012 10:36:00 AMSHP
10100001350171254122SHP9/30/2012 10:33:00 AMMRS003G*ESO 25412 outside door inop,

2nd flr --poc stated fire hazard 1033 30 sep 12 kr

10/15/2012 4:22:14 PMSHP
11100001353250244132SRESE10/2/2012 10:08:31 AMMRS007C24413/Rm 125 tub leaking

through wall into rm

10/16/2012 10:08:31 AMWMATL10/5/12
12100001353546003152SHP10/2/2012 12:48:59 PMMRS0003315 attn Carl B13 cut & rpr duct

work 1249 02 oct 12 kr

10/16/2012 12:48:59 PMSHP
13100001353547003152SHP10/2/2012 12:50:12 PMMRS0003315 attn Carl D23 cut & rpr duct

work 1249 02 oct 12 kr

10/16/2012 12:50:12 PMSHP
14100001353818284332SHP10/2/2012 2:05:42 PMECS039Q28433 rm 301 refrig leaking

water and starting to mildew pr poc 1406 02 oct 12 kr

10/16/2012 2:05:42 PMSHP
15100001353989257162SHP10/2/2012 3:56:40 PMMRS002F25716 chk overhangs above

windows on front side of bldg for cracks to be sure they are safe 1557 02 oct 12 kr

10/16/2012 3:56:40 PMSHP
16100001353990003152SHP10/2/2012 4:02:44 PMECS039QE! 315 E33 replace refrig pr

aprvd memo from Pat Arthur 1603 02 oct 12 kr

10/16/2012 4:02:44 PMSHP
17100001353991003152SHP10/2/2012 4:09:08 PMMRS001BE! 315 F24 rpl core & issue 2

keys - aprvd by Pat Arthur 1609 02 oct 12 kr

10/16/2012 4:09:08 PMSHP
18100001352114257032SHP10/2/2012 9:35:54 AMMRS006E25703 rm 129 exhaust fan inop
10/16/2012 9:35:54 AMSHP
19100001356077257082SHP10/3/2012 10:06:51 AMMRS007BE! 25708, Rm# 241, Sink 5 & 6

is clogged, also sink 6 water is deactivated. 10/03/12 LM

10/17/2012 10:06:51 AMSHP
20100001356434257162SHP10/3/2012 12:54:46 PMECS036D25716/ Refer to Akima per Albert,

AHU3E is leaking water into room.; UMCS WO 80084

10/17/2012 12:54:46 PMSHP
21100001357586254132SHP10/3/2012 2:10:42 PMMRS000125413 attn 224 reset locks to

default codes 1411 03 oct 12 kr

10/17/2012 2:10:42 PMSHP
22100001357588284102SHP10/3/2012 2:22:21 PMMRS007G28410, Rm# 211, Per POC "

toilet does not flush everything down, sometimes tissue comes back up. 10/03/12 LM

10/17/2012 2:22:21 PMSHP
23100001357590284252SHP10/3/2012 2:22:34 PMECS003628425, A/C unit leaking in

Lounge Area on 1st deck (Floor) per poc. 10/03/12 LM

10/17/2012 2:22:34 PMSHP
24100001354924197352SHP10/3/2012 7:41:56 AMECS036D19735/ Refer to Akima per David

P. - AHU1 VAV212 (Rm 3205) RHV not moving, good UMCS.;

UMCS WO 80058

10/17/2012 7:41:56 AMSHP
25100001354922244062SHP10/2/2012 1:37:33 PMECS0036E! 24406 Rm 234 No AC
10/17/2012 7:55:21 AMSHP
26100001354859244072SHP10/2/2012 10:04:20 AMECS003624407 No AC rm 259
10/17/2012 7:55:58 AMSHP
27100001355282003152SHP10/3/2012 9:10:33 AMMRS039Q315 C module dayrm fridge

making noise per POC

10/17/2012 9:10:33 AMSHP
28100001355285RBK092SHP10/3/2012 9:21:49 AMECS0036E! RBK09,Rm# 103,131, 132,

146, 203, 209, 212, 239, 241 & 246, Air conditioner. 10/03/12 LM

10/17/2012 9:21:49 AMSHP
29100001355289RBK092SRESE10/3/2012 9:44:15 AMMRS007DE! RBK09, Rm# 118 (Bathrm

Toilet's), Two urinals inop.

10/03/12 LM

10/17/2012 9:44:15 AMWMATL10/12/12
30100001355290RBKS12SHP10/3/2012 9:48:29 AMMRS022DE! RBKS1, Ice machine inop.

10/03/12 LM

10/17/2012 9:48:29 AMSHP
31100001356073257082SHP10/3/2012 9:55:52 AMMRS007BE! 25708, Rm# 244, Fifth sink is

clogged. 10/03/12 LM

10/17/2012 9:55:52 AMSHP
32100001356075257082SHP10/3/2012 9:57:18 AMMRS070AE! 25708, Rm# 223, ( Main

Hallway) Water fountain leaks and clogs. 10/03/12 LM

10/17/2012 9:57:18 AMSHP
33100001359989254302APPR10/4/2012 7:39:19 AMECS036D25430/ Refer to Akima per David

P. - Belt not on AHU1E ERV wheel ; UMCS WO 80095

10/18/2012 7:39:19 AMAPPR
34100001360086257152APPR10/4/2012 8:27:27 AMMRS007B25715 Rm 122 female shower

clogged

10/18/2012 8:27:27 AMAPPR
35100001359994257152APPR10/4/2012 8:29:11 AMMRS007D25715 Rm 207 Urinal overflows

when flushed

10/18/2012 8:29:11 AMAPPR
36100001351483003172TSFM9/17/2012 2:59:23 PMMRS003B(R) E! 317 attn David W D23

ceiling flaking above kitchen 1459 17 sep 12 kr

10/2/2012 11:05:29 AMTSFM
37100001351099003172TSFM9/17/2012 7:45:33 AMECS006E(R)00317, Exhaust fan on roof

not work need lift to reach exhaust fans. (PM WO#

174932). 9/17/12 LM

10/3/2012 12:55:51 PMTSFM
38100001352440284111SHP10/2/2012 11:33:47 AMPMS021DE! 28411 attn Oscar fire alarm

showing trouble 1134 02 oct 12 kr

10/4/2012 11:33:47 AM SHP

Look Ahead Rep Template

Attachment 5.6 - 6
DPW- Public Works Look Ahead Report 09 Oct - 12 Oct, 2012
PUBLIC WORKS
PREVENTATIVE MAINTENANCE DIVISION:
Fire Alarm/ Suppression Buildings:
List faclities/components to be accomplished
All fire alarm/suppression components
Equipment PM:
List faclities/components to be accomplished
HVAC Equipment (i.e., air handlers, pumps, exhaust fans, fire suppression if applicable)
List faclities/components to be accomplished
COMPONENT INSPECTORS:
The Component Inspectors will inspect mechanicalequipment, collect data and complete reports for buildings
List faclities/components to be accomplished
PROJECT DIVISION:
List projects in process and to be scheduled

Electrical Lines Demarcation

Attachment 5.6 - 7

Gas Lines Demarcation

Attachment 5.6 - 8

Wastewater Lines Demarcation

Attachment 5.6 - 9

Water Lines Demarcation

Attachment 5.6 - 10

Electrical Distro Inventory

Attachment 5.6 - 11 Electrical Distribution Inventory
ELECTRICAL DISTRIBUTION SYSTEM
COMPONENTSIZEQUANTITYUNITAPPROXIMATE YEAR OF CONSTRUCTION
Primary Overhead
3 PhaseLarge3,777Linear Feet1980
3 PhaseSmall9,325Linear Feet1980
Primary Underground
3 Phase in DuctbankLarge1,062Linear Feet2004
3 Phase in DuctbankSmall5,341Linear Feet2003
3 Phase in DuctbankSmall1,729Linear Feet2002

Secondary Underground 7,829 Linear Feet 2002

Switches
Pole mounted4Each2005
Pad mounted Sectionalizing3Each2004
Risers10Each2002
Manholes11Each2002
Handholes1Each2002
Transformers
Pole mounted 1 Phase15 kVA11Each1980
25 kVA35Each1980
50 kVA13Each1980
75 kVA3Each1980
100 kVA6Each1980
Pole mounted 3 Phase30 kVA1Each2002
150 kVA1Each2002
225 kVA1Each2002
500 kVA3Each2002
1500 kVA1Each2002

Nat Gas Distro Inventory

Attachment 5.6 - 12
NATURAL GAS DISTRIBUTION SYSTEM
COMPONENTSIZEQUANTITYUNITAPPROXIMATE YEAR OF CONSTRUCTION
Mains
Polyehylene Pipe4"3,341Linear Feet1996
6"1,015Linear Feet1996
8"8,790Linear Feet1996
10"8,082Linear Feet1996
12"5,354Linear Feet1996
Total Mains26,582Linear Feet
Service Laterals
Polyehylene Pipe<2"2,456Linear Feet1996
2"335Linear Feet1996
2.5"1,875Linear Feet1996
3"977Linear Feet1996
4"89Linear Feet1996
6"1,289Linear Feet1996
Total Service Laterals7,021Linear Feet
Building Shut-off Valves34Each1996
Regulators1.5"46Each1996
Main Valves
1"4Each1996
2"5Each1996
3"3Each1996
4"2Each1996
6"2Each1996
8"13Each1996
10"8Each1996
12"2Each1996
Total Main Valves39Each

Water Inventory

Attachment 5.6 - 13
POTABLE WATER SYSTEM
COMPONENTSIZEQUANTITYUNITAPPROXIMATE YEAR OF CONSTRUCTION
MAIN LINES
PVC - SCHEDULE 402"8,996Linear Feet1997
3"2,083Linear Feet1997
4"1,144Linear Feet1997
6"37,776Linear Feet1997
8"7,211Linear Feet1997
10"9,504Linear Feet1997
14"127Linear Feet1997
TOTAL MAIN LINES66,841Linear Feet
SERVICE LINES
PVC - SCHEDULE 402"6,843Linear Feet1997
3"89Linear Feet1997
4"428Linear Feet1997
6"495Linear Feet1997
TOTAL SERVICE LINES7,855Linear Feet
MAIN VALVES
2"31Each1997
3"4Each1997
4"3Each1997
6"75Each1997
8"14Each1997
10"19Each1997
14"1Each1997
Post Indicator Valves6"16Each1997
Gate Valves6"6Each1997
Valve Pits3Each1997
Meters4"20Each1997
Water Storage TankEach1997
No. 929 - Steel / Elevated250,000 gal1Each1942
Fire Suppression System
PVC - Schedule 802"Linear Feet2009
6"106Linear Feet2009
8"1,051Linear Feet2009
10"4,935Linear Feet2009
Total Mains3,477Linear Feet
9,569
Fire Hydrants74Each2009

Wastewater Inventory

Attachment 5.6 - 14
WASTEWATER COLLECTION SYSTEM
COMPONENTSIZEQUANTITYUNITAPPROXIMATE YEAR OF CONSTRUCTION
Gravity Lines
PVC4"601Linear Feer2000
6"2,473Linear Feer2006
8"441Linear Feer2000
8"17,693Linear Feer2006
10"471Linear Feer2000
10"7,048Linear Feer2006
12"2,032Linear Feer2006
Cast Iron10"2,000Linear Feer1959
Total Gravity Lines32,759Linear Feer
Service Laterals
PVC4"108Linear Feer2006
6"17Linear Feer2000
6"1,401Linear Feer2006
8"106Linear Feer2000
8"31Linear Feer2006
Total Service Laterals1,663Linear Feer
Manholes103Each2006
Cleanouts10Each2006
Flow Meter12"1Each2011

image1.png image2.png image3.png image4.png image5.png image6.png

File details come from the government source that posted it. Updated .