Solicitation W91249-19-R-0019.pdf
PDF 737 KB Posted
- Solicitation number
- W91249-19-R-0019
About this file
This solicitation requests proposals for base operations and maintenance support services at Fort Gillem Enclave in Georgia. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis is seeking services including building and structure sustainment, restoration and modernization, grounds maintenance, utility system sustainment, surfaced and unsurfaced area sustainment, waste water services, facility engineering, pest management, refuse collection and disposal, sand and snow removal, environmental compliance, project work orders, fixed maintenance, and contractor manpower reporting. The contract term consists of one base year and four option years. Proposals are due by 4:00 PM on January 24, 2020 with an anticipated award date of March 31, 2020. Pricing includes both firm-fixed-price and cost-reimbursable contract line items. The solicitation sets aside competition for small businesses only.
View the file
Other files
Show 40 more
Latest 50 of 98 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9124919R0019 19-Dec-2019
b. TELEPHONE NUMBER
706-791-1800
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 24 Jan 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912499. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
COREY A REZNER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011304483
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MICC - FORT GORDON
271 HERITAGE PARK LANE
BLDG. 35200
FT GORDON GA 30905
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W80PUW 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
GILLEM ENCLAVE FACILITIES MANAGER
GILLEM ENCLAVE FACILITIES MANAGER
BLDG 714, KANE HALL
FOREST PARK, GA GA 30297
TEL: FAX:
706-791-8651FAX:
TEL: 706-791-1800 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
X
SIZE STANDARD:
$38,500,000
NAICS:
561210
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF153
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9124919R0019
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Months Phase-In
FFP
The phase-in period is part of the base year of the Contract and starts immediately on the contract start date. During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this Contract. This period will be one month in duration..
FOB: Destination
PURCHASE REQUEST NUMBER: 0011304483
PSC CD: M1AZ
NET AMT
Sustainment - Bldgs & Structures
FFP
Sustainment - Bldgs & Structures (K - Maintenance & Repair).
0002AA 12 Months Sustainment - Bldgs & Structures
FFP
Sustainment - Bldgs & Structures. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services in buildings and structures. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
FOB: Destination
0002AB Job CFM & Supplies
COST
Sustainment - Bldgs.& Structures CFM and Supplies (K-Maintenance & Repair) includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $79,904.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
ESTIMATED COST
Restoration & Modernization
FFP
Restoration & Modernization - Bldgs. & Structures (L-Minor Construction).
0003AA 12 Months Restoration and Modernization
FFP
Restoration & Modernization - Bldgs. & Structures (L-Minor Construction) Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs) for restoration and/or construction of buildings, structures, and utilities. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
0003AB Job CFM and Supplies
COST
Restoration and Modernization - Bldgs. & Structures - CFM and Supplies.
Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $266.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens.
All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Grounds Maintenance Services
FFP
Grounds Maintenance Services
0004AA 12 Months Grounds Maintenance Services
FFP
Grounds Maintenance Services - Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for grounds maintenance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
0004AB Job CFM & Supplies
COST
Grounds Maintenance Services - CFM & Supplies. IIncludes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $17,638.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
Sustainment - Utilities, Dams & Other
FFP
Sustainment - Utilities, Dams & Other
0005AA 12 Months Sustainment - Utilities, Dams & Other
FFP
Sustainment - Utilities, Dams & Other - Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services on non-privatized utilities, and dams. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
0005AB Job CFM & Supplies
COST
Sustainment - Utilities, Dams & Other CFM and Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $2,656.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Sustainment- Surfaced & Unsurfaced Areas
FFP
Sustainment - Surfaced & Unsurfaced Areas
0006AA 12 Months Sustainment-Surfaced & Unsurfaced Areas
FFP
Sustainment - Surfaced and Unsurfaced Areas. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services to surfaced (paved roads, motor pools, parking lots, etc) and unsurfaced (unpaved roads, parking lots, etc) areas. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
FOB: Destination
0006AB Job CFM & Supplies
COST
Sustainment-Surfaced & Unsurfaced Areas - CFM & Supplies -- Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $3,719.00 All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
Waste Water Services
FFP
Waste Water Services
0007AA 12 Months Waste Water Services
FFP
Waste Water Services. Privatized Utility. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services for grease traps only. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
FOB: Destination
Facility Engineering Services
FFP
Facility Engineering Services
0008AA 12 Months Facility Engineering Services
FFP
Facility Engineering Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for facility engineering services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
0008AB Job CFM & Supplies
COST
Facility Engineering Services - Supplies and Materials Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $1,594.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Pest Management Services
Pest Management Services
0009AA 12 Months Pest Management Services
FFP
Pest Management Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for pest control services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
This CLIN does not support relocatable facilities.
0009AB Job CFM & Supplies
COST
Pest Management Services - CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $12,326.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
Refuse Collection & Disposal Srvs
Refuse Collection & Disposal Services
0010AA 12 Months Refuse Collection & Disposal Services
FFP
Refuse Collection & Disposal Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for refuse collection & disposal services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
Sand & Snow Removal Srvs
Sand & Snow Removal Services
0011AA 12 Months Sand & Snow Removal Services
FFP
Sand & Snow Removal Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for snow removal and ice prevention/removal services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable
Environmental Compliance Srvcs
Environmental Compliance Services
0012AA 12 Months Environmental Compliance Services
FFP
Environmental Compliance Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for environmental compliance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable
0012AB Job CFM & Supplies
COST
CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $2,656.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
Project Work Orders
COST
Project Work Orders
0013AA
Project Work Orders
COST
Project Work Orders (PWOs) - Reimbursable projects. Includes all costs for subcontracts to support Project Work Orders (PWOs). Individual PWOs are NOT known at this time. Projects may be tasked for sustainment services, restoration and modernization services, grounds maintenance services, municipal services, and other services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as fixed price plus G&A only with a Not-to-Exceed amount of $1.00.
FXD Maintenance Services
FXD Maintenance Services
0014AA
FXD Maintenance Services
FFP
FXD Maintenance Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for FXD Maintenance Services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance
0014AB Job CFM & Supplies
COST
FXD Maintenance Services - CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $12,618.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0015 Each Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
OPTION Sustainment - Bldgs & Structures
1001AA 12 Months OPTION Sustainment - Bldgs & Structures
FFP
Sustainment - Bldgs & Structures. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services in buildings and structures. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
1001AB Job OPTION CFM & Supplies
COST
Sustainment - Bldgs.& Structures CFM and Supplies (K-Maintenance & Repair) includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $81,102.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Restoration & Modernization
1002AA 12 Months OPTION Restoration & Modernization
FFP
Restoration & Modernization - Bldgs. & Structures (L-Minor Construction) Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs) for restoration and/or construction of buildings, structures, and utilities. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
1002AB Job OPTION CFM & Supplies
COST
Restoration and Modernization - Bldgs. & Structures - CFM and Supplies.
Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $270.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens.
All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Grounds Maintenance Services
1003AA 12 Months OPTION Grounds Maintenance Services
FFP
Grounds Maintenance Services - Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for grounds maintenance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
1003AB Job OPTION CFM & Supplies
COST
Grounds Maintenance Services - CFM & Supplies. IIncludes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $17,903.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Sustainment - Utilities, Dams & Other
1004AA 12 Months OPTION Sustainment - Utilities, Dams & Other
FFP
Sustainment - Utilities, Dams & Other. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services on non-privatized utilities, and dams. All work shall be performed sucessfully in accordance with the terms and conditions of the
1004AB Job OPTION CFM & Supplies
COST
Sustainment - Utilities, Dams & Other CFM and Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $2,696.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Sustainment- Surfaced & Unsurfaced Areas
1005AA 12 Months OPTION Sustainment-Surfaced & Unsurfaced Areas
FFP
Sustainment - Surfaced and Unsurfaced Areas. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services to surfaced (paved roads, motor pools, parking lots, etc) and unsurfaced (unpaved roads, parking lots, etc) areas. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
1005AB Job OPTION CFM & Supplies
COST
Sustainment-Surfaced & Unsurfaced Areas - CFM & Supplies -- Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $3,775.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Waste Water Services
1006AA 12 Months OPTION Waste Water Services
FFP
Waste Water Services. Privatized Utility. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services for grease traps only. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
OPTION Facility Engineering Services
1007AA 12 Months OPTION Facility Engineering Services
FFP
Facility Engineering Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for facility engineering services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
1007AB Job OPTION CFM & Supplies
COST
Facility Engineering Services - Supplies and Materials Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $1,618.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
OPTION Pest Management Services
1008AA 12 Months OPTION Pest Management Services
FFP
Pest Management Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for pest control services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
1008AB Job OPTION CFM & Supplies
COST
Pest Management Services - CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $12,510.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Refuse Collection & Disposal Srvs
1009AA 12 Months OPTION Refuse Collection & Disposal Services
FFP
Refuse Collection & Disposal Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for refuse collection & disposal services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance
OPTION Sand & Snow Removal Srvs
1010AA 12 Months OPTION Sand & Snow Removal Services
FFP
Sand & Snow Removal Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for snow removal and ice prevention/removal services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable
OPTION Environmental Compliance Srvcs
1011AA 12 Months OPTION Environmental Compliance Services
FFP
Environmental Compliance Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for environmental compliance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable
1011AB Job OPTION CFM & Supplies
COST
CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $2,696.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Project Work Orders
1012AA Months OPTION Project Work Orders
COST
Project Work Orders (PWOs) - Reimbursable projects. Includes all costs for subcontracts to support Project Work Orders (PWOs). Individual PWOs are NOT known at this time. Projects may be tasked for sustainment services, restoration and modernization services, grounds maintenance services, municipal services, and other services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as
OPTION FXD Maintenance Services
1013AA 12 Months OPTION FXD Maintenance Services
FFP
FXD Maintenance Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for FXD Maintenance Services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance
1013AB Job OPTION CFM & Supplies
COST
FXD Maintenance Services - CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $12,807.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
1014 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
OPTION Sustainment - Bldgs & Structures
2001AA 12 Months OPTION Sustainment - Bldgs & Structures
FFP
Sustainment - Bldgs & Structures. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services in buildings and structures. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
2001AB Job OPTION CFM & Supplies
COST
Sustainment - Bldgs.& Structures CFM and Supplies (K-Maintenance & Repair) includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $82,319.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Restoration & Modernization
2002AA 12 Months OPTION Restoration and Modernization
FFP
Restoration & Modernization - Bldgs. & Structures (L-Minor Construction) Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs) for restoration and/or construction of buildings, structures, and utilities. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
2002AB Job OPTION CFM and Supplies
COST
Restoration and Modernization - Bldgs. & Structures - CFM and Supplies.
Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $274.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens.
All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Grounds Maintenance Services
2003AA 12 Months OPTION Grounds Maintenance Services
FFP
Grounds Maintenance Services - Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for grounds maintenance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
2003AB Job OPTION CFM & Supplies
COST
Grounds Maintenance Services - CFM & Supplies. IIncludes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $18,171.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Sustainment - Utilities, Dams & Other
2004AA 12 Months OPTION Sustainment - Utilities, Dams & Other
FFP
Sustainment - Utilities, Dams & Other. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services on non-privatized utilities, and dams. All work shall be performed sucessfully in accordance with the terms and conditions of the
2004AB Job OPTION CFM & Supplies
COST
Sustainment - Utilities, Dams & Other. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $2,737.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Sustainment- Surfaced & Unsurfaced Areas
2005AA 12 Months OPTION Sustainment-Surfaced & Unsurfaced Areas
FFP
Sustainment - Surfaced and Unsurfaced Areas. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services to surfaced (paved roads, motor pools, parking lots, etc) and unsurfaced (unpaved roads, parking lots, etc) areas. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
2005AB Job OPTION CFM & Supplies
COST
Sustainment-Surfaced & Unsurfaced Areas - CFM & Supplies -- Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $3,831.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Waste Water Services
2006AA 12 Months OPTION Waste Water Services
FFP
Waste Water Services. Privatized Utility. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services for grease traps only. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
OPTION Facility Engineering Services
2007AA 12 Months OPTION Facility Engineering Services
FFP
Facility Engineering Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for facility engineering services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
2007AB Job OPTION CFM & Supplies
COST
Facility Engineering Services - Supplies and Materials Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $1,642.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Pest Management Services
2008AA 12 Months OPTION Pest Management Services
FFP
Pest Management Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for pest control services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
2008AB Job OPTION CFM & Supplies
COST
Pest Management Services - CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $12,698.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Refuse Collection & Disposal Srvs
2009AA 12 Months OPTION Refuse Collection & Disposal Services
FFP
Refuse Collection & Disposal Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for refuse collection & disposal services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance
OPTION Sand & Snow Removal Srvs
2010AA 12 Months OPTION Sand & Snow Removal Services
FFP
Sand & Snow Removal Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for snow removal and ice prevention/removal services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable
OPTION Environmental Compliance Srvcs
2011AA 12 Months OPTION Environmental Compliance Services
FFP
Environmental Compliance Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for environmental compliance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable
2011AB Job OPTION CFM & Supplies
COST
CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $2,737.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Project Work Orders
2012AA Months OPTION Project Work Orders
COST
Project Work Orders (PWOs) - Reimbursable projects. Includes all costs for subcontracts to support Project Work Orders (PWOs). Individual PWOs are NOT known at this time. Projects may be tasked for sustainment services, restoration and modernization services, grounds maintenance services, municipal services, and other services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as
OPTION FXD Maintenance Services
2013AA 12 Months OPTION FXD Maintenance Services
FFP
FXD Maintenance Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for FXD Maintenance Services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance
2013AB Job OPTION CFM & Supplies
COST
FXD Maintenance Services - CFM & Supplies. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $12,999.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
2014 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter “Not a Direct Cost”. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.
OPTION Sustainment - Bldgs & Structures
3001AA 12 Months OPTION Sustainment - Bldgs & Structures
FFP
Sustainment - Bldgs & Structures. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services in buildings and structures. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
3001AB Job OPTION CFM & Supplies
COST
Sustainment - Bldgs.& Structures CFM and Supplies (K-Maintenance & Repair) includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $83,553.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Restoration & Modernization
3002AA 12 Months OPTION Restoration and Modernization
FFP
Restoration & Modernization - Bldgs. & Structures (L-Minor Construction) Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs) for restoration and/or construction of buildings, structures, and utilities. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
3002AB Job OPTION CFM and Supplies
COST
Restoration and Modernization - Bldgs. & Structures - CFM and Supplies.
Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement. This is a Cost Reimbursable CLIN and shall be priced as cost only with a Not-to-Exceed amount of $278.00, which refers to fee (i.e. profit) not allowable indirect costs or burdens.
All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Grounds Maintenance Services
3003AA 12 Months OPTION Grounds Maintenance Services
FFP
Grounds Maintenance Services - Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for grounds maintenance services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS).
3003AB Job OPTION CFM & Supplies
COST
Grounds Maintenance Services - CFM & Supplies. IIncludes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $18,444.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Sustainment - Utilities, Dams & Other
3004AA 12 Months OPTION Sustainment - Utilities, Dams & Other
FFP
Sustainment - Utilities, Dams & Other. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services on non-privatized utilities, and dams. All work shall be performed sucessfully in accordance with the terms and conditions of the
3004AB Job OPTION CFM & Supplies
COST
Sustainment - Utilities, Dams & Other. Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $2,778.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
OPTION Sustainment- Surfaced & Unsurfaced Areas
3005AA 12 Months OPTION Sustainment-Surfaced & Unsurfaced Areas
FFP
Sustainment - Surfaced and Unsurfaced Areas. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services to surfaced (paved roads, motor pools, parking lots, etc) and unsurfaced (unpaved roads, parking lots, etc) areas. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
3005AB Job OPTION CFM & Supplies
COST
Sustainment-Surfaced & Unsurfaced Areas - CFM & Supplies -- Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to- Exceed amount of $3,889.00. All approved Other Direct Costs for supplies and materials shall be reimbursed in accordance with FAR 31.205-26.
OPTION Waste Water Services
3006AA 12 Months OPTION Waste Water Services
FFP
Waste Water Services. Privatized Utility. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Demand Maintenance Orders (DMOs), Preventive Maintenance Orders (PMOs), and Operations Work Orders (OWOs) for sustainment services for grease traps only. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
OPTION Facility Engineering Services
3007AA 12 Months OPTION Facility Engineering Services
FFP
Facility Engineering Services. Includes all costs for labor, subcontracts, travel, training and other direct costs to support Operations Work Orders (OWOs) for facility engineering services. All work shall be performed sucessfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS). This CLIN does not support relocatable facilities.
3007AB Job OPTION CFM & Supplies
COST
Facility Engineering Services - Supplies and Materials Includes all costs for materials, supplies, and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). This is a non-fee bearing Cost Reimbursable CLIN and shall be priced as cost plus G&A only with a Not-to-Exceed amount of $1,667.00.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .