This document outlines pavement clearance services required for a base operations and maintenance support services contract. The contractor will provide snow and ice removal services for paved driving areas, parking lots, sidewalks, and other locations outlined in an attached technical exhibit. Services include plowing, sweeping, de-icing, and hauling snow from accumulations of 2-3 inches or more. The contractor must submit a snow and ice removal plan within 60 days of award and update it annually by September 30th. Pavement clearance will be prioritized according to the plan, with primary roads and access points to be cleared by 6:00 AM. The contractor must also provide monthly sweeping services and maintain de-icing material stockpiles and supplies. Response time for on-call snow plowing and ice removal is within two hours of notification.

View the file

Other files

File Type Posted
Amendment W9124919R00190006.pdf PDF
A42_Sample Pricing Worksheet_FBR.xlsx XLSX spreadsheet
A1_Performance Work Statement_27Feb2020.docx DOCX document
Conformed Copy of Solicitation W9124919R0019.pdf PDF
Amendment W9124919R00190005.pdf PDF
Conformed Copy of Solicitation W9124919R0019.pdf PDF
Technical Attachment C Grounds Maintenance.docx DOCX document
TE 2H - Gillem Enclave Energy Conservation Measures.pdf PDF
TE 2C - Task Codes.pdf PDF
TE 2D - Gillem Enclave Training and Medical Testing.pdf PDF
A3_SCA WD 2015-4471_Rev14_23Dec19.docx DOCX document
TE 5 - Gillem Enclave GFV and GFE Listing.xlsx XLSX spreadsheet
A1_Performance Work Statement_17Feb2020.docx DOCX document
Amendment W9124919R00190004.pdf PDF
Technical Attachment B Solid Waste Management.docx DOCX document
TE 2G - Gillem Enclave Financial Mgmt A76 Roles and Courses.pdf PDF
TE 1A - Gillem Enclave Real Property inventory.pdf PDF
TE 7 - Gillem Enclave Events.xlsx XLSX spreadsheet
TE 1B - Gillem Enclave Area Map.pdf PDF
Technical Attachment I - FXD Maintenance Services.docx DOCX document
A5_Specific Relevant Contracts Sheet.docx DOCX document
TE 4 - Gillem Enclave Forms.xlsx XLSX spreadsheet
TE 2B - Estimated PWO Workload Data.pdf PDF
A4_Subcontractor Teaming Partner Consent Form.docx DOCX document
TE 6 - Gillem Enclave Grounds Map.xlsx XLSX spreadsheet
Technical Attachment F Facility Maintenance Horizontal.docx DOCX document
TE 2A - Estimated DMO Workload.pdf PDF
TE 2E - Gillem Enclave Service Order Tech A76 Roles and Courses.pdf PDF
TE 3 - Gillem Enclave Est Dump and Contain Sizes and Locations.xlsx XLSX spreadsheet
Technical Attachment H Pest Management.docx DOCX document
TE 2F - Gillem Enclave Equipment Listing.xlsx XLSX spreadsheet
A43_Questions and Answers_21Feb2020.docx DOCX document
Technical Attachment E Facility Maintenance Vertical.docx DOCX document
Technical Attachment A Facility Maintenance Instruction.docx DOCX document
Amendment_W9124919R00190003.pdf PDF
Amendment_W9124919R00190002.pdf PDF
Amendment_W9124919R00190001.pdf PDF
A42_Sample Pricing Worksheet_FBR.xlsx XLSX spreadsheet
Technical Exhibit 2g Gillem Enclave Financial Mgmt A76 Roles and Courses.pdf PDF
Technical Exhibit 1B Gillem Enclave Area Map.pdf PDF
A18_Technical Exhibit Bldg00760.xlsx XLSX spreadsheet
Solicitation W91249-19-R-0019.pdf PDF
A41_TechnicalExhibits-3 Gov Furnished Veh.xlsx XLSX spreadsheet
A17_Technical Exhibit Bldg00720.xlsx XLSX spreadsheet
A23_Technical Exhibit Bldg00900.xlsx XLSX spreadsheet
Technical Exhibit 2h Gillem Enclave Energy Conservation Measures.pdf PDF
Technical Exhibit 3 IMCOM Standards.pdf PDF
A36_Technical Exhibit Deliverables.docx DOCX document
A31_Technical Exhibit Bldg00938.xlsx XLSX spreadsheet
Technical Attachment E Facility Maintenance Vertical.docx DOCX document
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D

Pavement Clearance

22 January 2020 ii

Table of Contents

1.0General Information1
1.1Overview1
1.2Snow, Ice, and Sand Removal Plan1
2.0Description of Services1
2.1Scope1
2.1.1Specialized Locations1
2.1.2Sidewalks2
2.2Removal Priorities2
2.3Pre-Treatment and Clearing2
2.3.1De-icing Material/Sand/Salt3
2.3.2Ice Control Abrasives3
2.4De-icing Supplies3
2.4.1On-Call De-icing Materials3
2.4.2Snow Plowing and Ice Removal Standby3
2.5Pavement Sweeping3
2.5.1 Airfields.3
2.6Inoperable Vehicles.4
2.7Safety.4

1.0 General Information.

1.1 Overview. The Contractor shall provide pavement clearance services, to include street sweeping snow and ice removal services, on paved driving/parking areas and side streets, as annotated on Technical Exhibit (TE) 1B. Services shall commence snow height exceeds 2-3 inches, or when snow and ice, accumulation occurs in accordance with (IAW) the Snow, and Ice Removal Plan from the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR). Historically, there have been 1 ice storm events that required activation of the Snow and Ice, Removal Plan. . Follow-up service shall continue as weather conditions dictate. Storm classification will be determined by the COR/ACOR.

1.2 Snow, Ice, and Sand Removal Plan. The Contractor shall provide a recommended Snow, Ice, and Sand Removal Plan, to the KO for approval within sixty (60) days of contract award. The Contractor shall update the Snow, Ice, and Sand Removal Plan not later than (NLT) 30 September annually. The Contractor's plan shall include the following: an inventory of materials for snow and ice removal; traffic and parking control procedures, communication channels, and priorities between road users, the snow control center, and equipment operating crews; designated areas from which snow and ice shall be hauled when accumulation reaches an established level; and procedures for adding additional crews and equipment in the event of a major incapacitating storm.

2.0 Description of Services.

2.1 Scope. Pavement clearance includes, but is not limited to, the following: plowing and sweeping of sand or snow from roads, access control points (ACP), driveways and parking areas by pushing and piling the snow into adjacent areas or by collecting and removing sand. The Contractor shall begin clearing from areas when accumulations have reached 2-3 inches or within 2 hours of notification by the COR/ACOR. Snow removal shall be cleared from walkways, doorways, and gates to provide full opening and safe access for personnel and equipment. snow piles shall not be left in the plowed or swept areas.

2.1.1 Specialized Locations.

2.1.1.1 Paved Roads and Access Control Points (ACP). The Contractor shall clear roads and ACPs. The Contractor shall clear primary roads to support the safe movement of emergency vehicles. The Contractor shall ensure all ACPs are operational at all times, regardless of storm intensity. The Contractor shall deploy the assets necessary to ensure the road network is trafficable IAW the Snow, Ice, and Sand Removal Plan. Once removal operations commence, the Contractor shall continue these operations until snow is removed from the full width of streets, including intersections. The Contractor shall clear all primary roads NLT 0600 hours. The COR/ACOR will inform the Contractor of the revised clearance times, should there be a delay in opening or closure.

2.1.1.2 Parking Areas. The Contractor shall clear parking areas snow and ice shall be removed from the full width of the parking areas and pushed to designated locations. The Contractor shall clear parking areas of snow and ice.

2.1.2 Sidewalks. The Contractor shall clear sidewalks when accumulation reaches 2-3 inches. Sidewalks shall receive a complete clearing at the end of each snowstorm.

2.1.2.1 Snow Shoveling and Ice Removal. The Contractor shall snow shovel stairs and sidewalks and apply ice melt as needed for each building. Ice melts (salt) shall be placed on stairs and sidewalks for each building.

2.1.2.2 Catch Basins. The Contractor shall remove snow from all catch basins to allow free drainage. The Contractor shall clear basins at the end of each snowstorm.

2.1.2.3 Hydrants. The Contractor shall remove snow from and around the hydrants to ensure access. The cleared area shall be, at a minimum, approximately three (3) feet in radius from the hydrant. The Contractor shall clear access to hydrants at the end of each snowstorm.

2.1.2.4 Dumpsters. The Contractor shall remove snow from and around the dumpsters to allow for pedestrian access to dispose of refuse. The Contractor shall clear access to dumpsters at the end of each snowstorm.

2.1.2.5 HVAC Clearing. The Contractor shall ensure HVAC units are kept clear of snow and ice and all control panels are accessible from all sides. This shall be accomplished by means other than plowing (e.g., snow blowing or hand shoveling).

2.1.2.6 Sand or Snow Stockpile Removal. When specifically authorized by the Contracting Officer (KO), the Contractor shall remove snow stockpiles to designated on-post locations.

2.2 Removal Priorities. The priority of pavement clearance shall be IAW Snow, Ice, and Sand Removal Plan. . The COR/ACOR reserve the right to adjust clearance priorities based on mission requirements.

2.3 Pre-Treatment and Clearing. The Contractor shall ensure safe walking and driving conditions by immediately removing ice from accumulated areas. The Contractor shall coordinate with the COR/ACOR to pre-treat areas with de-icing material, salt and/or sand, prior to forecasted storms. The Contractor shall apply a salt-brine solution to roads, parking lots, and sidewalks as pre-treatment before a snow or ice event. The Contractor shall remove and dispose of excess accumulations of de-icing material, if applicable, off Government property.

2.3.1 De-icing Material/Sand/Salt. The use of sand, salt, or a mixture thereof shall be used IAW local regulations and local policy. The Contractor shall ensure all materials used are in compliance with local procedures and is acceptable to the KO. The allowable amount of material passing a No. 200 sieve as determined by the American Association of State Highway and Transportation Officials (AASHTO) -T11, Standard Method of Test for Materials Finer Than 75-μm (No.200) in Mineral Aggregates by Washing, shall not exceed 10% by weight. The maximum particle size for sand borrow shall be M1.04.0 Type A, one fourth inch (¼”). At the end of the Snow Removal Season, the Contractor shall remove excess sand from sidewalks and parking lots. No other materials shall be used without the COR/ACOR authorization.

2.3.2 Ice Control Abrasives. The Contractor shall apply abrasives for ice control as directed by the KO. Abrasives shall consist of treated salt which shall be treated with an Environmentally Preferred Product (EPP).

2.4 De-icing Supplies. The Contractor shall provide and maintain salt barrels. Salt barrels shall not be placed earlier than 2 weeks before the first forecasted freeze. The Contractor shall remove salt barrels within 2 weeks of the last forecasted freeze. Salt barrels shall have weather protective lids and shall be placed in designated locations. Salt barrels shall contain a tool or scoop for the individual application of salt. The Contractor shall be responsible for all barrels, tools, equipment, and all materials required. The Contractor shall keep the barrels three-quarters (¾) full of de-icing materials/salt through the winter season. The Contractor shall replace or repair any damaged barrels and lids within one (1) day after notification by the COR/ACOR.

2.4.1 On-Call De-icing Materials. Parking lots and sidewalks shall be de-iced as an on-call requirement. The application shall be a complete coverage of the parking area.

2.4.2 Snow Plowing and Ice Removal Standby. The Contractor shall standby on-site, to snow plow/sweep and remove ice within two (2) hours of notification from the COR/ACOR. The Government will provide the Contractor a designated staging area to park and secure equipment and a secure area to stockpile supplies.

2.5 Pavement Sweeping. The Contractor shall sweep the pavement areas specified in TE 1B using magnetic and vacuum sweepers once each month. Areas to be swept include, but are not limited to: paved streets, parking areas, sidewalks, runways, taxiways, aprons, etc. Materials collected from pavement sweeping shall be tested and disposed.

2.5.1 Airfields. N/A.

2.6 Inoperable Vehicles. The Contractor shall move all vehicles interfering with snow removal or ice control operations to a designated location. The Contractor shall remove inoperable vehicles. The Contractor shall assume liability for damages to vehicles caused by Contractor employee negligence.

2.7 Safety. The Contractor shall ensure snow removal equipment that is slow moving or otherwise creates an unsafe condition are clearly visible to oncoming traffic and bystanders (e.g., equipped with rotating or flashing amber lights).