View the file

Other files

File Type Posted
A07_Amendment_11.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_10.pdf PDF
A01_-_As-Built_-_Building_6761_Sheet_Key.xlsx XLSX spreadsheet
A04_Davis_Bacon_Wage_Determination_-_TN180098_01_05_2018__TN98.pdf PDF
A01_-_As-Built_-_Building_6761_-_PN-46740-FY98-asb.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_08.pdf PDF
A01_Revised_Install_Flooring_BPA_SOW_11-01-2017(Rev_1).docx DOCX document
A07_Amendment_07.pdf PDF
A07_Amendment_01_-_Scoping_Notes_=_21_DEC_2017_Static_Flooring.pdf PDF
A01_FE160616J_Bid_Schedule_-21_DEC_17.doc DOC document
A07_Amendment_01_-_Scoping_Notes_-_21_DEC_2017_-_Water_Heaters.pdf PDF
A01_EH950076J_Bid_Schedule_-_21_DEC_2017.doc DOC document
A07_Amendment_03.pdf PDF
BPA-General-SOW_02_Nov_2017.doc DOC document
BPA-Mechanical-SOW_7_Nov_2017.doc DOC document
A07_Amendment_02.pdf PDF
A07_Amendment_01.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FE160616J_Bid_Schedule.doc DOC document
A01_EH950076J_Bid_Schedule.doc DOC document
A04_Davis_Bacon_Wage_Determination_-_TN98_-21OCT17.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A04__Davis_Bacon_Wage_Determination_-_KY168_11AUG17.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10044.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10031.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment # 09 – 09 January 2018

General Construction / Mechanical Construction Blanket Purchase Agreements (BPAs) - W91248-18-Q- 0500 - Amendment # 09.

The following additional information is provided.

1. Proposal due date for both seed projects is Friday, January 12, 2018 at 2:00 PM CST.

2. Last day for questions for both seed projects is Tuesday, January 09, 2018 at 1:00 PM CST.

3. Wage Determination: The wage determinations for both seed projects have changed. The changes are as follows: SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No. EH950076J - KY170168 (Building), dated 01/05/2018; SEED PROJECT #2: Replace Water Heaters BLDG 6761, Project No. FE160616J - TN 170098 (Building) dated 01/05/2018. The new wage determinations are included with this amendment for your convenience.

4. Engineer for both seed projects is John Gunn, 270-798-9719, john.e.gunn17.civ@mail.mil.

5. The COR for seed project #1 - INSTALL STATIC CONTROL FLOORING BLDG 95, Project No. EH950076J is AJ Pau, (270) 412-7261, alika.j.pau.civ@mail.mil.

6. The COR for seed project #2 - REPLACE WATER HEATERS BLDG 6761, Project # FE160616J is Brad Curvin, (270) 412-7264, brad.curvin.civ@mail.mil.

7. The following questions and their responses are provided:

SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No. EH950076J

Question #1: Section 3.1.1 Field Verification, How do we verify the condition of the existing subfloor, the entire area is covered with flooring. The existing flooring would have to be removed first in order to verify condition, substrate may require extensive preparation to meet manufacturer’s requirements?

Answer #1: Contractor should inspect the sub-flooring prior to laying any flooring.

Question #2: Section 3.1.3.1 Preparation. It states that contractor shall replace any floor tile that was removed. Does it matter what type of tile is used for replacement, since the floor will be overlaid if this option is chosen? If so, what type and if it has to match existing, what is the existing esd tile information?

Answer #2: In Section 3.1.3.1, it states that "Contractor shall follow the manufacturer's instructions on providing a foundation for laying the new static dissipative carpet."

Question #3: Section 3.1.3.2 Material. Is the carpet tile to be installed as a floating installation since there is no mention of adhesive under this section?

Answer #3: In Section 3.1.3.2, it states using "Tactiles."

mailto:john.e.gunn17.civ@mail.mil mailto:alika.j.pau.civ@mail.mil mailto:brad.curvin.civ@mail.mil

SEED PROJECT #1: Replace Water Heaters BLDG 6761, Project No. FE160616J

Question #1: Can the Government provide the As-Builts for this building?

Answer #1: The requested documents are attached to this amendment.

8. In order to attempt to eliminate confusion on the Amendment names inside of FBO the previous Amendments to this requirement are outlined below:

Amendment 01 – 11 December 2017 - Changed Notice Type [Named Amendment 1 inside of FBO]

Amendment # 02 – 15 December 2017 – Identifies CORs and Answers Questions [Named Amendment 02 – Identifying CORs & Answering Questions inside of FBO]

Amendment # 03 – 15 December 2017 - Provided Master BPA Statements of Work (SOW) for Both General and Mechanical BPA and Answers General Questions [Named General & Mechanical BPA Statements of Work inside of FBO]

Amendment #04 – 18 December 2017 –Addresses New SOWs and Answers Questions - [Named Amendment 03 inside of FBO]

Amendment #05 – 21 December 2017 – Provides Question and Answers for Install Static Control Flooring BLDG 95, Project No. EH950076J. [Named Amendment 2 inside of FBO]

Amendment # 06 – 21 December 2017 – Provides Question and Answers for Replace Water Heaters BLDG 6761, Project No. FE160616J. [Named Amendment 3 inside of FBO]

Amendment # 07 – 02 January 2018 - [Named Amendment 4 inside of FBO]

Amendment # 08 – 03 January 2018 - [Named Amendment 8 inside of FBO]