About this file

Amendment 07

View the file

Other files

File Type Posted
A07_Amendment_11.pdf PDF
A07_Amendment_10.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_09.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_TN180098_01_05_2018__TN98.pdf PDF
A01_-_As-Built_-_Building_6761_Sheet_Key.xlsx XLSX spreadsheet
A01_-_As-Built_-_Building_6761_-_PN-46740-FY98-asb.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_08.pdf PDF
A01_Revised_Install_Flooring_BPA_SOW_11-01-2017(Rev_1).docx DOCX document
A01_FE160616J_Bid_Schedule_-21_DEC_17.doc DOC document
A01_EH950076J_Bid_Schedule_-_21_DEC_2017.doc DOC document
A07_Amendment_01_-_Scoping_Notes_=_21_DEC_2017_Static_Flooring.pdf PDF
A07_Amendment_01_-_Scoping_Notes_-_21_DEC_2017_-_Water_Heaters.pdf PDF
A07_Amendment_03.pdf PDF
BPA-General-SOW_02_Nov_2017.doc DOC document
BPA-Mechanical-SOW_7_Nov_2017.doc DOC document
A07_Amendment_02.pdf PDF
A07_Amendment_01.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FE160616J_Bid_Schedule.doc DOC document
A01_EH950076J_Bid_Schedule.doc DOC document
A04_Davis_Bacon_Wage_Determination_-_TN98_-21OCT17.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A04__Davis_Bacon_Wage_Determination_-_KY168_11AUG17.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10044.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10031.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment # 07 – 02 January 2018

General Construction / Mechanical Construction Blanket Purchase Agreements (BPAs) - W91248-18-Q- 0500 - Amendment # 07.

The following additional information is provided.

1. Proposal due date for both seed projects has changed from Thursday, January 04, 2018 at 2:00 PM CST to Friday, January 12, 2018 at 2:00 PM CST.

2. Last day for questions for both seed projects has changed from Tuesday, January 02, 2018 at 1:00 PM CST to Tuesday, January 09, 2018.

3. Wage Determination: SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No.

EH950076J - KY170168 (Building), dated 08/11/2017; SEED PROJECT #2: Replace Water Heaters BLDG 6761, Project No. FE160616J - TN 170098 (Building) dated 10/27/2017

4. Engineer for both seed projects is John Gunn, 270-798-9719, john.e.gunn17.civ@mail.mil.

5. The COR for seed project #1 - INSTALL STATIC CONTROL FLOORING BLDG 95, Project No. EH950076J is AJ Pau, (270) 412-7261, alika.j.pau.civ@mail.mil.

6. The COR for seed project #2 - REPLACE WATER HEATERS BLDG 6761, Project # FE160616J is Brad Curvin, (270) 412-7264, brad.curvin.civ@mail.mil.

7. The Engineer has updated the Statement of Work for the requirement INSTALL STATIC CONTROL FLOORING BLDG 95. The change is in Section 3.1.3. The Pattern/Color of the carpet has been changed to "Appalachian Trail" from "Santa Fe Sunset".

8. The following questions and their responses are provided:

Questions Applying to General Construction / Mechanical Construction Blanket Purchase Agreements (BPAs) - W91248-18-Q-0500:

Question #1: What will be the overall effective duration of the agreement be?

Answer #1: Five (5) Years.

Question #2: How will the calls be issued?

Answer #2: Requirements will be competed amongst several BPA awardees. The calls will be issued to the winner on the requirement per the evaluation process.

Question #3: Do we submit the proposal by email and to whom???

Answer #3: Yes send proposals to, Contract Specialist, CPT McCurdy at reuben.b.mccurdy.mil@mail.mil and cc Contracting Officer, Eric Boston, at eric.c.boston.civ@mail.mil mailto:john.e.gunn17.civ@mail.mil mailto:alika.j.pau.civ@mail.mil mailto:brad.curvin.civ@mail.mil mailto:reuben.b.mccurdy.mil@mail.mil mailto:eric.c.boston.civ@mail.mil

Question #4: When we send in our proposal, do we include anything else more than bid schedules, bonding letter, references for past work, and the FTCKY hazmat inventory form???? If so what???

Answer #4: Yes a detailed proposal that reflects a price breakout from the primary contractor and subcontractors.

Question #5: Do the reference past projects need to be for a past BPA’s or will non BPA Ft. Campbell projects be considered as well???

Answer #5: Any past projects from within the past five (5) years that show construction experience and examples of construction projects applicable to your specialty are acceptable.

Question #6: Will past BPA projects be considered a better reference than other non Ft. Campbell commercial projects?

Answer #6: No.

Question #7: Is there a requirement to have a full time superintendent and / or safety officer and /or quality Control officer on the project full time? If so, can one person perform the duties of all three???

Answer #7: Please read Sections 10.5, 10.6.1 and 10.6.2 in the SOW. The superintendent is required to be on-site anytime work is on-going. The site superintendent and the QC representative can be the same individual as long as that individual is qualified.

Question #8: The Contractor will submit Bid Schedule with prices, relative work project experience, and letter from Surety Bond as part of the bid submission. Please confirm if the Contractor is required to submit anything else in the bid submission.

Answer #8: All proposals shall include detailed proposal that reflects price breakout from the primary contractor and subcontractors; the most current version of bid schedule for the respective project (uploaded to FBO on 21 DEC 2017), relative work project experience (at least 3 and not more than 5 projects from within the past five (5) years that show construction experience and examples of construction projects applicable to your specialty. Experience listing shall include a description of work performed, dollar value of work completed, date work was performed, and percentage of work self-performed with in-house staff.); letter from Surety which confirms sufficient bonding capacity.

Question #9: Is the Contractor required to bid both Seed Projects (Seed Project_1 and Seed Project_2)?

Can the Contractor bid just one of the Seed Project?

Answer #9: Contractors are not required to submit proposals for both projects, only the type of project that they wish to be considered for. There will be a General Construction BPA and a Mechanical Construction BPA. The water heater project will determine the Mechanical Construction BPA holders and the Floor project will determine the General Construction BPA awardees.

Questions Applying to SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No.

EH950076J:

Question # 1: In regard to the seed project at Building 95; it was indicated at the site visit that nothing bolted down had to be moved however there were several shelf systems located in those same isles that were loaded down with parts and equipment that were not bolted down. Are we to install flooring around these shelves in place or will they be moved by the users?

Answer #1: The contractor is responsible for moving equipment that is not bolted down, installing static control flooring and then moving equipment back to its location.

Question #2: Of the items that are to be moved in the room, who is to be responsible for moving them?

If it is to be the contractor’s responsibility, where shall the items be stored?

Answer #2: The awardee will consult with the customer at BLDG 95 before moving any furniture and/or equipment. The contractor will be responsible for moving furniture, lockers, etc. so this should be factored into your proposal.

Question #3: What are the hours and days work may be performed in the building?

Answer #3: Please see SOW, Section 5.1

Question #4: Can a dumpster be placed inside the security fence close to the building?

Answer #4: No

Question #5: Has the room/ floor been checked for asbestos containing material?

Answer #5: Yes

Question #6: There is an exterior door in the “Battery Room”. Can this door be utilized for bringing in and removing material, or must all material and personnel pass through front door?

Answer #6: Yes, the side door can be used.

Question #7: Since the floor has been deemed suitable to overlay with static dissipative carpet squares, is it not then also suitable to be overlaid with static dissipative tile? Would this be an acceptable option? This would greatly reduce the cost to the government.

Answer #7: Please see SOW, Sections 3.1.2.1 and 3.1.3.1

Question #8: Is the contractor to use the bid schedule issued with the BPA agreement or the one issued with the SOW?

Answer #8: The most current version for the respective project uploaded to FBO on 21 December 2017.

Question #9: Would it be possible to access the site again either as a group or individually? A quick response is requested to schedule a visit if allowed.

Answer #9: Contract the project COR for access to the building.

Questions Applying to SEED PROJECT #2: Replace Water Heaters BLDG 6761, Project No. FE160616J:

Question #1: During the site visit for the water heater project, I noticed that all breaker spaces in the panels were full. The existing Hesco water heater has a breaker, but I do not see a spot for the new second water heater and associated pumps. Please provide electrical as built drawings as well as if you require a sub-panel set and from where this sub panel would be fed from.

Answer #1: The Engineer relooked this and each heater unit has a separate breaker, WH-2 is #34 and WH-1 is #35. Both building circulator pumps are on one breaker and each heater circulator pump can be powered by the heater unit it is serving.

Question #2: What type and thickness of insulation do you want to be used on each type of pipe? This would be Domestic Hot and Domestic Cold piping.

Answer #2: See SOW, Section 3.1.7

Question #3: How long can the hot water be off furring the work, and how long of a notification will be needed to shut off the water?

Answer #3: See SOW, Sections 5.1, 5.1.1 and 5.1.2

9. In order to attempt to eliminate confusion on the Amendment names inside of FBO the previous Amendments to this requirement are outlined below:

Amendment 01 – 11 December 2017 - Changed Notice Type [Named Amendment 1 inside of FBO]

Amendment # 02 – 15 December 2017 – Identifies CORs and Answers Questions [Named Amendment 02 – Identifying CORs & Answering Questions inside of FBO]

Amendment # 03 – 15 December 2017 - Provided Master BPA Statements of Work (SOW) for Both General and Mechanical BPA and Answers General Questions [Named General & Mechanical BPA Statements of Work inside of FBO]

Amendment #04 – 18 December 2017 –Addresses New SOWs and Answers Questions - [Named Amendment 03 inside of FBO]

Amendment #05 – 21 December 2017 – Provides Question and Answers for Install Static Control Flooring BLDG 95, Project No. EH950076J. [Named Amendment 2 inside of FBO]

Amendment # 06 – 21 December 2017 – Provides Question and Answers for Replace Water Heaters BLDG 6761, Project No. FE160616J. [Named Amendment 3 inside of FBO]