About this file

Amendment 03 - Question & Answer

View the file

Other files

File Type Posted
A07_Amendment_11.pdf PDF
A07_Amendment_10.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A01_-_As-Built_-_Building_6761_-_PN-46740-FY98-asb.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_09.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_TN180098_01_05_2018__TN98.pdf PDF
A01_-_As-Built_-_Building_6761_Sheet_Key.xlsx XLSX spreadsheet
A07_Amendment_08.pdf PDF
A01_Revised_Install_Flooring_BPA_SOW_11-01-2017(Rev_1).docx DOCX document
A07_Amendment_07.pdf PDF
A07_Amendment_01_-_Scoping_Notes_-_21_DEC_2017_-_Water_Heaters.pdf PDF
A01_FE160616J_Bid_Schedule_-21_DEC_17.doc DOC document
A01_EH950076J_Bid_Schedule_-_21_DEC_2017.doc DOC document
A07_Amendment_01_-_Scoping_Notes_=_21_DEC_2017_Static_Flooring.pdf PDF
BPA-General-SOW_02_Nov_2017.doc DOC document
BPA-Mechanical-SOW_7_Nov_2017.doc DOC document
A07_Amendment_02.pdf PDF
A07_Amendment_01.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FE160616J_Bid_Schedule.doc DOC document
A01_EH950076J_Bid_Schedule.doc DOC document
A04_Davis_Bacon_Wage_Determination_-_TN98_-21OCT17.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A04__Davis_Bacon_Wage_Determination_-_KY168_11AUG17.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10044.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10031.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment # 03 – 18 December 2017

General Construction / Mechanical Construction Blanket Purchase Agreements (BPAs) - W91248-18-Q- 0500 - Amendment # 03.

The following additional information is provided.

1. Scoping date for both seed projects remains Wednesday, December 20, 2017 at 8:30 AM CST.

Proposal due date for both seed projects remains Thursday, January 04, 2018 at 2:00 PM CST.

2. Last day for questions for both seed projects is NLT, Tuesday, January 02, 2017 at 1:00 PM CST.

3. Wage Determination: SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No.

EH950076J - KY170168 (Building), dated 08/11/2017; SEED PROJECT #2: Replace Water Heaters BLDG 6761, Project No. FE160616J - TN 170098 (Building) dated 10/27/2017

4. Engineer for both seed projects is John Gunn, 270-798-9719, john.e.gunn17.civ@mail.mil.

5. The COR for seed project #1 - INSTALL STATIC CONTROL FLOORING BLDG 95, Project No. EH950076J is AJ Pau, (270) 412-7261, alika.j.pau.civ@mail.mil.

6. The COR for seed project #2 - REPLACE WATER HEATERS BLDG 6761, Project # FE160616J is Brad Curvin, (270) 412-7264, brad.curvin.civ@mail.mil.

7. On December 15, 2017 the General Construction Statement of Work (SOW) and the Mechanical Construction Statement of Work (SOW) for the BPA was uploaded to FBO. The purpose of these SOWs are to ensure a complete understanding of the type of work to be performed under the BPA. After award, each BPA call issued will have a separate SOW similar to that found in seed projects.

8. The following questions and their responses are provided below:

Question #1: What will the acceptable document or documents need be to assure the Government that the contractor has bonding ability as required in the SOW?

Answer #1: Contractors shall include with their proposal a letter from a surety that confirms sufficient bonding capacity. Please reference Treasury Department (TD) Circular 570 at https://www.fiscal.treasury.gov/fsreports/ref/suretybnd/c570.htm for a list of approved surety’s.

mailto:john.e.gunn17.civ@mail.mil mailto:alika.j.pau.civ@mail.mil mailto:brad.curvin.civ@mail.mil https://www.fiscal.treasury.gov/fsreports/ref/suretybnd/c570.htm

File details come from the government source that posted it.