A07_Amendment_03.pdf
PDF 194 KB Posted
- Solicitation number
- W91248-18-Q-0500
About this file
Amendment 03 - Question & Answer
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment # 03 – 18 December 2017
General Construction / Mechanical Construction Blanket Purchase Agreements (BPAs) - W91248-18-Q- 0500 - Amendment # 03.
The following additional information is provided.
1. Scoping date for both seed projects remains Wednesday, December 20, 2017 at 8:30 AM CST.
Proposal due date for both seed projects remains Thursday, January 04, 2018 at 2:00 PM CST.
2. Last day for questions for both seed projects is NLT, Tuesday, January 02, 2017 at 1:00 PM CST.
3. Wage Determination: SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No.
EH950076J - KY170168 (Building), dated 08/11/2017; SEED PROJECT #2: Replace Water Heaters BLDG 6761, Project No. FE160616J - TN 170098 (Building) dated 10/27/2017
4. Engineer for both seed projects is John Gunn, 270-798-9719, john.e.gunn17.civ@mail.mil.
5. The COR for seed project #1 - INSTALL STATIC CONTROL FLOORING BLDG 95, Project No. EH950076J is AJ Pau, (270) 412-7261, alika.j.pau.civ@mail.mil.
6. The COR for seed project #2 - REPLACE WATER HEATERS BLDG 6761, Project # FE160616J is Brad Curvin, (270) 412-7264, brad.curvin.civ@mail.mil.
7. On December 15, 2017 the General Construction Statement of Work (SOW) and the Mechanical Construction Statement of Work (SOW) for the BPA was uploaded to FBO. The purpose of these SOWs are to ensure a complete understanding of the type of work to be performed under the BPA. After award, each BPA call issued will have a separate SOW similar to that found in seed projects.
8. The following questions and their responses are provided below:
Question #1: What will the acceptable document or documents need be to assure the Government that the contractor has bonding ability as required in the SOW?
Answer #1: Contractors shall include with their proposal a letter from a surety that confirms sufficient bonding capacity. Please reference Treasury Department (TD) Circular 570 at https://www.fiscal.treasury.gov/fsreports/ref/suretybnd/c570.htm for a list of approved surety’s.
mailto:john.e.gunn17.civ@mail.mil mailto:alika.j.pau.civ@mail.mil mailto:brad.curvin.civ@mail.mil https://www.fiscal.treasury.gov/fsreports/ref/suretybnd/c570.htm
File details come from the government source that posted it.