View the file

Other files

File Type Posted
A07_Amendment_11.pdf PDF
A07_Amendment_10.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_09.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_TN180098_01_05_2018__TN98.pdf PDF
A01_-_As-Built_-_Building_6761_Sheet_Key.xlsx XLSX spreadsheet
A01_-_As-Built_-_Building_6761_-_PN-46740-FY98-asb.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_08.pdf PDF
A07_Amendment_07.pdf PDF
A01_Revised_Install_Flooring_BPA_SOW_11-01-2017(Rev_1).docx DOCX document
A01_EH950076J_Bid_Schedule_-_21_DEC_2017.doc DOC document
A01_FE160616J_Bid_Schedule_-21_DEC_17.doc DOC document
A07_Amendment_01_-_Scoping_Notes_=_21_DEC_2017_Static_Flooring.pdf PDF
A07_Amendment_01_-_Scoping_Notes_-_21_DEC_2017_-_Water_Heaters.pdf PDF
A07_Amendment_03.pdf PDF
BPA-Mechanical-SOW_7_Nov_2017.doc DOC document
BPA-General-SOW_02_Nov_2017.doc DOC document
A07_Amendment_01.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10031.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FE160616J_Bid_Schedule.doc DOC document
A01_EH950076J_Bid_Schedule.doc DOC document
A04_Davis_Bacon_Wage_Determination_-_TN98_-21OCT17.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A04__Davis_Bacon_Wage_Determination_-_KY168_11AUG17.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10044.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment # 02 – 15 December 2017

General Construction / Mechanical Construction Blanket Purchase Agreements (BPAs) - W91248-18-Q- 0500 - Amendment # 02.

The following additional information is provided.

1. Scoping date for both seed projects remains Wednesday, December 20, 2017 at 8:30 AM CST.

Proposal due date for both seed projects remains Thursday, January 04, 2018 at 2:00 PM CST.

2. Last day for questions for both seed projects is NLT, Tuesday, January 02, 2017 at 1:00 PM CST.

3. Wage Determination: SEED PROJECT #1: Install Static Control Flooring BLDG 95, Project No.

EH950076J - KY170168 (Building), dated 08/11/2017; SEED PROJECT #2: Replace Water Heaters BLDG 6761, Project No. FE160616J - TN 170098 (Building) dated 10/27/2017

4. Engineer for both seed projects is John Gunn, 270-798-9719, john.e.gunn17.civ@mail.mil.

5. The COR for seed project #1 - INSTALL STATIC CONTROL FLOORING BLDG 95, Project No. EH950076J is AJ Pau, (270) 412-7261, alika.j.pau.civ@mail.mil.

6. The COR for seed project #2 - REPLACE WATER HEATERS BLDG 6761, Project # FE160616J is Brad Curvin, (270) 412-7264, brad.curvin.civ@mail.mil.

7. The following questions and their responses are provided below:

Question #1: Will projects performed in the past 5 years at Ft. Campbell as a sub-contractor (primarily to the TOC) be acceptable for performance evaluation?

Answer #1: Yes, this experience is acceptable.

Question #2: Is there a limit to the number of pages that can be submitted in this proposal?

Answer #2: There is no limit to the number of pages to be submitted. Please ensure the pages are relevant and contain all the necessary documentation outlined in the special notice posted to FBO.

Question #2: Regarding selection criteria under 1) Technical (b) Relevant Experience: What is the maximum number of projects to be submitted showing company experience?

Answer #3: Please submit at least 3 and not more than 5 projects from within the past five (5) years that show construction experience and examples of construction projects applicable to your specialty.