A01_FE160616J_Bid_Schedule.doc

DOC document 25 KB Posted

Attached to
General construction / Mechanical constructionBlanket Purchase Agreements (BPAs) -
Solicitation number
W91248-18-Q-0500
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
A07_Amendment_11.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_10.pdf PDF
A01_-_As-Built_-_Building_6761_Sheet_Key.xlsx XLSX spreadsheet
A07_Amendment_09.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_TN180098_01_05_2018__TN98.pdf PDF
A01_-_As-Built_-_Building_6761_-_PN-46740-FY98-asb.pdf PDF
A04_Davis_Bacon_Wage_Determination_-_KY180168_01_05_2018__KY168.pdf PDF
A07_Amendment_08.pdf PDF
A07_Amendment_07.pdf PDF
A01_Revised_Install_Flooring_BPA_SOW_11-01-2017(Rev_1).docx DOCX document
A01_EH950076J_Bid_Schedule_-_21_DEC_2017.doc DOC document
A07_Amendment_01_-_Scoping_Notes_=_21_DEC_2017_Static_Flooring.pdf PDF
A01_FE160616J_Bid_Schedule_-21_DEC_17.doc DOC document
A07_Amendment_01_-_Scoping_Notes_-_21_DEC_2017_-_Water_Heaters.pdf PDF
A07_Amendment_03.pdf PDF
BPA-Mechanical-SOW_7_Nov_2017.doc DOC document
BPA-General-SOW_02_Nov_2017.doc DOC document
A07_Amendment_02.pdf PDF
A07_Amendment_01.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10031.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_FTCKY_Hazmat_Inventory_Form.pdf PDF
A01_Waste_Management_Report-Jan_2017.pdf PDF
A01_EH950076J_Bid_Schedule.doc DOC document
A04_Davis_Bacon_Wage_Determination_-_TN98_-21OCT17.pdf PDF
A01_BPA_SOW_11-01-2017.docx DOCX document
A04__Davis_Bacon_Wage_Determination_-_KY168_11AUG17.pdf PDF
A07_Scoping_Sheet.pdf PDF
A01_Drawing_10044.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title: Replace Water Heaters BLDG 6761

Project Number: FE160616J

BID SCHEDULE

Remove Old Equipment

Labor

Materials

Subcontract

Equipment

Other

TOTAL

Install New Water Heater/Storage Tanks

Labor

Materials

Subcontract

Equipment

Other

TOTAL

Overhead

Profit

GRAND TOTAL

Form Version 06-08-2016