Task Order Requirement Install Static Control Flooring BLDG 95, Project No. EH950076J.
The following additional information is provided.
1. Proposal due date 04 January 2018, NLT 2:00 P.M. CT.
2. Last day for questions is NLT, 02 January 2018, 1:00 P.M.
3. Project is Funded, Bid acceptance time: 60 Calendar days.
4. Completion date is: 60 Calendar days
5. Wage Determination: KY170168 (Building), dated 08/11/2017
6. The following questions and their answers are provided:
Question #1: Is dust control an issue during the demolition phase of this requirement? If so, can you elaborate on what is acceptable for use to control dust?
Answer #1: The contractor is responsible for containing dust.
Question #2: Have grounding points been determined and if so can you provide those locations?
Answer #2: The contractor shall follow the manufacture's installation instructions.
Question #3: Who is responsible for moving furniture that isn’t bolted down?
Answer #3: The contractor will be responsible for moving furniture, lockers, etc. so this should be factored into the proposed price.
Question #4: Is the leaking water from the HVAC going to be an issue? Will this be resolved prior to construction?
Answer #4: The units are no longer leaking water.
Question #5: We would like to request access to the room again to make measurements. Please let us know if this is able to happen?
Answer: #5: For access to the building, please coordinate with the COR, Mr. AJ Pau.
Question #6: Is a cost breakdown description of materials and labor required for backup, or does the Government only want the Bid Schedule? If the breakdown is required then is subcontractor breakdowns required as well?
Answer #6: Please provide the cost breakdown description of materials and labor and for subcontractor if applicable. Also, please use the attached revised Bid Schedule when submitting your proposal.
7. COR is AJ Pau, (270) 412-7261, alika.j.pau.civ@mail.mil.
8. ENG is John Gunn, 270-798-9719, john.e.gunn17.civ@mail.mil.