1.6_Drawings-CATHODIC_PROTECTION.pdf
PDF 3 MB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion Federal contract opportunity
- Solicitation number
- W91242-18-R-0002
View the file
Other files for this federal contract opportunity
Show all 50
C-17 Refueling Hydrant System Ramp Expansion has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
PIV
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
W
W
W
W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
PIV
J F
J F
J F
J F
J F
J F
J F
J F
J F
J F
J F
J F
J F
J F
J F
J
F
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
J F
J F
J F
J F
J F
J F
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
JF
J F
J F
J F
J F
J F
J F
J
F
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
JF LINE "B" ,
SEE PROFILE
(BID OPTION)
JF ISOLATION
VALVE VAULT
HP-A3
HP-A2
HP-A1
HP-B1
HP-B2
JF ISOLATION
VALVE VAULTS
10-IN JF
(SUPPLY)
LINE "A"
10-IN JF
(RETURN)
LINE "A"
NEW TYPE III
PUMP SHELTER
JF TANK FILL LINE "E"
R
A A A A A
R
P
B
15'
(TYP)
CP
CP
CP
CP
CP
CP
CP
CP
CP
BID OPTION
CATHODIC PROTECTION
TEST STATION (TYP)
CP504
C1
SEMI-DEEP ANODE
GROUNDBED
(TYPICAL OF 5)
CP503
A1
NEW DISTRIBUTED
ANODE ICCP SYSTEM
RECTIFIER 3 (R3)
CP503
A2
ANODE JUNCTION BOX
INSTALLATION
CP503
C2 r
NEW UNDERTANK GRID ICCP
RECTIFIER (R2)
TANK 3
TANK 1
TANK 2
CP501
A2
50' 100'0
N
A1
CATHODIC PROTECTION INSTALLATION SITE PLAN
SCALE: 1" = 50'
JF JF
ISOLATION VALVE
VAULT
HYDRANT PIT (HP)
FUEL LINE
LEGEND:
NOTE: THIS DRAWING ONLY
HP-
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
CATHODIC PROTECTION INSTALLATION
SITE PLAN
CP101 0
177 280
FJRP159073-CP-101.dwg
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
M c D
O N
N E
L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
1. CATHODIC PROTECTION FOR TANK 3 SHALL
BE PROVIDED BY NEW UNDERTANK GRID
IMPRESSED CURRENT SYSTEM (RECTIFIER 2 -
ICCP SYSTEM). SEE DRAWINGS CP102 AND
CP601.
2. CATHODIC PROTECTION FOR ALL NEW AND
EXISTING UNDERGROUND FUEL PIPING SHALL
BE PROVIDED BY NEW DISTRIBUTED ANODE
IMPRESSED CURRENT SYSTEM (RECTIFIER 3 -
ICCP SYSTEM). SEE DRAWING CP602.
3. CATHODIC PROTECTION FOR EXISTING TANKS
1 AND 2 SHALL BE PROVIDED BY EXISTING
DISTRIBUTED ANODE IMPRESSED CURRENT
SYSTEM (RECTIFIER 1 - ICCP SYSTEM). SEE
DRAWING CP602. EXISTING ANODES SHALL BE
PRESERVED AND PREVENTED FROM DAMAGE
DURING CONSTRUCTION. IF DAMAGE OCCURS,
NEW ANODES SHALL BE REPLACED IN KIND AT
LOCATIONS ACCEPTABLE TO ENGINEER OF
RECORD.
4. CATHODIC PROTECTION FOR EXISTING
UNDERGROUND FUEL PIPING WAS FORMERLY
PROVIDED BY EXISTING DISTRIBUTED ANODE
IMPRESSED CURRENT SYSTEM (RECTIFIER 1 -
ICCP SYSTEM). THE EXISTING PIPING SHALL
BE DISCONNECTED AND ISOLATED FROM
RECTIFIER 1 - ICCP SYSTEM AND BONDED TO
THE NEW DISTRIBUTED ANODE IMPRESSED
CURRENT SYSTEM (RECTIFIER 3 - ICCP
SYSTEM).
5. ALL NEW AND EXISTING UNDERGROUND FUEL
PIPING SHALL BE MADE ELECTRICALLY
ISOLATED FROM ABOVEGROUND STORAGE
TANKS AND OTHER FOREIGN STRUCTURES.
NEW 4,000 BBL TANK WITH
GRID ICCP SYSTEM. SEE
NOTE 1.
NEW SUPPLY AND
RETURN LINE WITH
DISTRIBUTED ICCP
SYSTEM
NEW SUPPLY AND RETURN
LINE WITH DISTRIBUTED
ICCP SYSTEM
CP
CP TEST STATION
CP TERMINAL BOX
PB
EXPLOSION PROOF
PULL BOX
A
ANODE GROUNDBED
R
RECTIFIER
r
EXISTING RECTIFIER
EXISTING DISTRIBUTED ANODE
ICCP SYSTEM RECTIFIER 1 (R1)
EXISTING ABOVEGROUND
STORAGE TANKS
PB
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
TANK GRID ICCP SYSTEM
INSTALLATION PLAN
CP102 0
178 280
FJRP159073-CP-102.dwg
CP502
C1
NOTES: THIS DRAWING ONLY
1. ANODE RIBBON LENGTHS ARE IDENTICAL ON BOTH SIDES OF THE CENTER RIBBON.
2. ANODE AND CONDUCTOR BARS TO BE CUT BACK 6" FROM THE EDGE AT BOTH ENDS.
3. SAND BACKFILL SHALL BE CLEAN SAND MINIMUM OF 20,000 OHM-CM RESISTIVITY. IT IS CRITICAL THAT THE
PROPER SAND BE USED FOR PROPER FUNCTION OF CP SYSTEM. SAND SHALL BE TESTED AT THE EXPENSE OF
THE CONTRACTOR AND TESTING RESULTS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO
INSTALLATION.
4. SUMP BOTTOM NOT SHOWN ON DRAWING, SEE DETAIL C2/CP502 FOR CLARITY .
5. UPON COMPLETION OF THE CATHODIC PROTECTION GRID, ALL PENETRATIONS THROUGH FOUNDATION SHALL BE
SEALED WATER-TIGHT TO PREVENT MOISTURE FROM MIGRATION BENEATH THE TANK BOTTOM.
6. ELECTRICAL ISOLATION OF INLET, OUTLET PIPING, TANK ANCHORS AND GROUNDING SYSTEM IS NECESSARY IF
DIELECTRIC MEMBRANE IS NOT INSTALLED UNDER THE ANODE GRID TO PREVENT CP CURRENT DRAINAGE.
7. RGS COATED CONDUIT NOT TO BE USED UNDER TANK TO PREVENT ELECTRICAL SHORT BETWEEN ANODE GRID
AND CONDUIT.
8. CP GRID AND REFERENCE CELLS TO BE INSTALLED ON CLEAN SAND BACKFILL 2" ABOVE FML AND 10" BELOW
TANK BOTTOM.
9. NEGATIVE AND TEST LEADS TO BE ROUTED INTO CONDUIT RUNS NEAR TANK VIA STRAIN RELIEFS AND LBT
CONNECTIONS.
10. COPPER/COPPER SULFATE AND ZINC REFERENCE CELLS TO BE CENTERED BETWEEN ANODE ROWS.
11. CONTRACTOR TO ENSURE THAT CATHODIC PROTECTION COMPONENTS ARE NOT DAMAGED DURING
BACKFILLING AND TANK BOTTOM PLATE CONSTRUCTION
12. USE EXTREME CAUTION TO PREVENT ANY METALLIC CONTACT BETWEEN CP COMPONENTS IN THE SAND
BACKFILL AND TANK BOTTOM. SUCH ELECTRICAL SHORT IS DETRIMENTAL AND SHALL NOT BE ALLOWED.
13. FIELD ADJUST ANODE RIBBONS AND REFERENCE CELL TUBES TO MAINTAIN 6" SEPARATION FROM SUMP.
14. PULL BOX SHALL BE LOCATED TO MINIMIZE ROUTING OF CONDUIT TO RECTIFIER AND AVOID TANK
APPURTENANCES.
CONDUCTOR
BAR SCHEDULE
ROW
LENGTH (FT)
A 37.7
B 25
PERIMETER 124
ANODE RIBBON
SCHEDULE
ROW
LENGTH (FT)
1 39
2 38.8
3 38
4 37
5 35.6
6 33.5
7 30.7
8 27
9 22
10 15
PERIMETER 123
SCALE: 1/4" = 1'-0"
STORAGE TANK CATHODIC PROTECTION
A3
ADD 10% TO TOTAL LENGTH OF ANODE RIBBON AND
CONDUCTOR BAR AS A CONTINGENCY.
A
B
A
2' (TYP)
" MMO ANODE RIBBON
8' (TYP)
CURRENT DISTRIBUTION
CONDUCTOR BAR (TYP)
MMO ANODE RIBBON (TYP)
CP502
C1
0 2' 4' 8'
B
SEE ENLARGED VIEW
THIS SHEET
ENLARGED VIEW
1' (ANODE RIBBON LOOP)
6" (CONDUCTOR BAR LOOP)
CONCRETE
RINGWALL
LEGEND:
POWER FEED (TYPICAL 4 PLACES)
ZINC REFERENCE ELECTRODE (TYPICAL 4 PLACES)
Cu/CuSO
REFERENCE ELECTRODE (TYPICAL 4 PLACES)
2" SLOTTED PVC
REFERENCE CELL
TUBE (TYPICAL OF 2)
LOCATIONS ARE
APPROXIMATE
POWER FEED (TYP)
CP502
C4
PULL BOX
CP501
B1
Cu/CuSO
REFERENCE
ELECTRODE (TYP)
CP502
B2
ZINC REFERENCE
ELECTRODE (TYP)
CP502
A1
CP502
A2
(1) TANK RINGWALL
PENETRATION
CP502
C1 a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
TANK GRID ICCP SYSTEM
INSTALLATION DETAILS
CP501 0
179 280
FJRP159073-CP-501.dwg
12" x 12" x 8" EXPLOSION
PROOF PULL BOX
CONDUITS TO
CP TERMINAL BOX
SEE NOTE 3
REFERENCE
ELECTRODES
TANK BOTTOM
FML LINER
POWER FEED CONNECTOR
TACK WELDED TO CONDUCTOR
BAR
NOTES:
1. ALL WIRING TO BE CONTINUOUS FROM UNDERTANK TO EXPLOSION PROOF PULL BOX.
UNAPPROVED SPLICES ARE NOT ALLOWED.
2. ALL CONDUIT FITTINGS NOT SHOWN FOR CLARITY.
3. FOR CONDUIT INSTALLATION THROUGH RINGWALL, PROVIDE 4" STAINLESS STEEL
CONDUIT CAST DIRECTLY INTO CONCRETE.
" SS PIPE LONG THREAD BOTH ENDS
" x 4" MECHANICALLY
ADJUSTABLE ELASTOMERIC
SEAL
REINFORCING NOT
SHOWN FOR CLARITY
" SS PIPE LENGTH TO EXTEND 8"
EACH END FROM THE CONCRETE
RINGWALL
PVC BUSHING AT INSIDE END OF
THE 2
" SS PIPE TO PREVENT
CABLE INSULATION SHAFFING
COMPACTED
SAND
(2) SS BAND CLAMPS
TANK SHELL
4" SS PIPE SLEEVE
CP501
A1
CONDUCTOR BAR
ANODE RIBBON TACK WELDED
TO CONDUCTOR BAR
SCALE: NTS
RINGWALL PENETRATION
B1
12" x 12" x 8" EXPLOSION
PROOF PULL BOX
TANK SHELL
EXPLOSION-PROOF STRAIN
RELIEF CONNECTOR (TYP.)
TEST WIRE AND NEGATIVE
CABLE
EYS SEAL FITTING (TYP.)
TANK BOTTOM
MOUNTING CHANNEL
SS BOLT AND CONCRETE
ANCHOR
CONCRETE RING WALL
CONDUIT, LB, AND RINGWALL PENETRATION
STRUCTURE CONNECTION
CP501
C2
CP501
A4
SCALE: NTS
EXPLOSION PROOF PULL BOX INSTALLATION
A1
SCALE: NTS
JUNCTION BOX
C4
NOTES:
1. REFERENCE ELECTRODE WIRES NOT SHOWN FOR CLARITY.
2. CUSTOM CONDUITS AS PER CP SPEC. SEC. 26 42 19.00 20
PHENOLIC PANEL
16" x 16" x 8"
FIBERGLASS
ENCLOSURE
0.001 OHM SHUNT
(TYP.)
" CONDUIT
1" CONDUIT
COPPER BUS BAR
#6 AWG THHN TO
RECTIFIER POSITIVE
OUTPUT (RED)
(2) #8 AWG HMWPE
FROM TANK
CONNECTION
#6 AWG THHN TO
RECTIFIER NEGATIVE
" CONDUIT FOR
ANODES AND
REF. WIRES
(4) #8 AWG THWN
HEADER CABLE FOR
EACH ANODE LOOP
SCALE: NTS
AIR-COOLED RECTIFIER AND JUNCTION BOX INSTALLATION
A2
WALL OR POST-MOUNTED
JUNCTION BOX
CP501
C4
WALL OR POST-MOUNTED
RECTIFIER
MYERS HUB
EXISTING ASPHALT
1" CONDUIT
30V/6A
RECTIFIER
MYERS HUB
DOUBLE 1
" UNISTRUT
CHANNEL
" RIGID CONDUIT
CONDUIT CLAMPS
GRADE
NOTE:
1. ALL REFERENCE CELL WIRES NOT SHOWN FOR CLARITY.
(2) #8 AWG HMWPE (BLACK)
TO EXOTHERMICALLY
WELDED CONNECTION TO
TANK
(2) #8 AWG HMWPE (BLACK)
TO TANK CP TERMINAL BOX
(4) #8 AWG HMWPE HALAR
(RED) FROM POWER
FEED BAR
(4) #14 AWG HMWPE (YELLOW)
FROM CuSO
ELECTRODES
SEE NOTE 1
(4) #14 AWG HMWPE (BLUE)
FROM ZINC ELECTRODES
SEE NOTE 1
EXPLOSION-PROOF STRAIN
RELIEF CONNECTOR (TYP.)
2" CONDUIT (TO TANK CP TERMINAL BOX)
" CONDUIT (FROM UNDER TANK)
1" CONDUIT (TO TANK
CP TERMINAL BOX)
12" x 12" x 8" EXPLOSION
PROOF PULL BOX
(4) #8 AWG THWN STRANDED
COPPER WIRE (RED) W/ CABLE
SPLICE TO TANK CP TERMINAL BOX
(4) #14 AWG THHN (BLUE)
W/ CABLE SPLICE
(4) #14 AWG THHN (YELLOW)
W/ CABLE SPLICE
SOLDERED CABLE SPLICE (TYP)
SCALE: NTS
EXPLOSION PROOF PULL BOX
C2
SCALE: NTS
STRUCTURE CONNECTION
A4
NOTES:
1. WELD AS PER DETAIL A1/CP503.
2. USE A FILE TO REMOVE TANK OR PIPE COATING FOR
APPROXIMATELY 3 SQUARE INCHES. TANK OR PIPE SURFACE TO BE
CLEAN, BRIGHT, AND DRY.
3. REMOVE SLAG AND CLEAN WELD AREA WITH DENATURED
ALCOHOL. COAT EXPOSED COPPER AND STEEL WITH APPROVED
PAINT COATING FOR TANK/PIPELINE EXTERIOR.
ALTERNATE LOCATION
EXOTHERMIC WELD OR
WELDED STUD
COPPER SLEEVE FOR USE
WITH SMALL WIRE ONLY
CABLE
T A
K
W
A a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
TANK GRID ICCP SYSTEM
INSTALLATION DETAILS
CP502 0
180 280
FJRP159073-CP-502.dwg
PKGD. WEIGHT: 15 LBS. APPROX.
INGOT WEIGHT: 1.2 LBS.
5% SODIUM SULFATE
20% BENTONITE
75% GYPSUM
BACKFILL COMPOSITION
SECTIONAL PLAN
SCALE: NTS
ZINC REFERENCE CELL
A1
ZINC REFERENCE LEAD WIRE
#14 STR COPPER WIRE W/
HMWPE INSULATION (BLUE)
SECURE WITH TIE WIRE
HEAT SHRINKABLE SLEEVE
GALV. STEEL CORE
"Ø
ZINC ALLOY INGOT
" x
" x 12")
CLOTH BAG
PREPACKAGED BACKFILL
ZINC ALLOY INGOT
" x
" x 12")
GALV. STEEL
CORE
"Ø
SILVER SOLDER CONNECTION
COAT CONNECTION WITH
BITUMINOUS COMPOUND
SCALE: NTS
COPPER/COPPER SULFATE REF. CELL
B2
12"
6"
#14 AWG HMWPE .062 INSULATION
(YELLOW WIRE)
WIRE TIE
BENTONITE/COPPER SULFATE
THIXOTROPIC GELL
50% BENTONITE
50% PLATING GRAGE
COPPER SULFATE CYRSTALS
GELLED WITH COPPER SULFATE
SATURATED DEIONIZED WATER
MICRO PORE GEOTEXTILE
FILTRATION BAG
SCALE: NTS
SLOTTED/SOCKER PIPE
A2
4 COLUMNS OF 1" SLOTS
AT 90° INCREMENTS
SECTIONAL PLAN
2"Ø SCH 80 SLOTTED
PVC PIPE
0.06" WIDE SLOT X 1" LONG
(MEASURED ON THE PIPE'S ID)
NOTE:
1. SLOTTED PIPE TO BE FITTED WITH FILTER SOCK.
SCALE: NTS
ANODE GRID NEAR SUMP
C2
6" MIN.
CENTERLINE OF TANK
CP RIBBON ANODE
2"
ANODE
GRID
4"
GEOTEXTILE MEMBRANE
SOCK (TYP)
CONTINUOUS 2" SLOTTED PVC
REFERENCE CELL TUBE
TO AVOID SUMP
SAND
FML
LINER
POWER FEED CONNECTION
SEE DETAIL
.025" X 0.5" RIBBON (TYP)
#8 AWG HMWPE/HALAR
POWER FEED (RED)
.035" X
" WIDE CONDUCTOR BAR
SPOT WELD (TYP)
ENCAPSULATE POWER FEED
CONNECTION WITH HEAT
SHRINK 1" OVERLAP AT
EACH END
SCALE: NTS
MMO ANODE RIBBON AND CURRENT
DISTRIBUTION BAR INSTALLATION
C1
SCALE: NTS
POWERFEED
C4
3"
POWER FEED #8 AWG HMWPE/HALAR
CONDUCTOR
COMPRESSION SPLICING
SLEEVE
HEAT SHRINK SLEEVE
"Ø x 4" CONDUCTOR ROD
WELDED TO SHORT CONDUCTOR
BAR
CONDUCTOR BAR TO BE SPOT
WELDED TO MAIN CONDUCTOR
BAR AT LOCATION INDICATED
CP501
C4
SUBGRADE SOIL
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
CATHODIC PROTECTION SYSTEM
DETAILS
CP503 0
181 280
FJRP159073-CP-503.dwg
SCALE: NTS
SEMI-DEEP ANODE GROUNDBED
A1
ANODE LEAD WIRES TO JUNCTION
BOX ROUTED IN 2" PVC CONDUIT
1.5" CONDUIT NIPPLE AND BUSHING
NATIVE SOIL BACKFILL
TOP OF COKE BREEZE COLUMN
1" PERFORATED PVC VENT PIPE
1" NON-PERFORATED PVC VENT PIPE
20'
4'
"Ø X 48" LONG MMO ANODES
(TYPICAL OF 2)
ANODE VENTRALIZER
(TYPICAL EACH ANODE)
6'
4'
CALCINED PETROLEUM COKE
BREEZE BACKFILL FOR ANODE
COLUMN
42'
CONCRETE PAD
#8 AWG/HALAR ANODE LEAD WIRE
CONTINUOUS WITHOUT SPLICE FROM
ANODE JUNCTION BOX (TYPICAL EACH
ANODE)
SCALE: NTS
ANODE JUNCTION BOX INSTALLATION
C2
ANODE JUNCTION BOX
CP503
C4
SCALE: NTS
ANODE JUNCTION BOX
C4
UNISTRUT
UNISTRUT
2" PVC SCH 40
PVC CONDUIT
24" X 36" X 8"
CONCRETE PAD
1" PVC 90° ELBOW
1" PVC CONDUIT
1" PVC 90° ELBOW
1" PVC VENT PIPE
W/ INSECT SCREEN
G
G
SCALE: NTS
AIR-COOLED RECTIFIER AND
CP TERMINAL BOX INSTALLATION
A2
GRADE
SCALE: NTS
CP TERMINAL BOX
A4
CP504
A4
CONCRETE TEST BOX W/
12"Ø CAST IRON LID
MARKED "ANODE"
CP504
A3
6"
WARNING TAPE
16" MIN.
VENTS FROM (3)
ANODE WELLS
VENTS FROM (2)
ANODE WELLS
" PVC SCH 40
PVC CONDUIT
G
G
G
G
G
G
G
G
MECHANICAL LUG (TYP)
PHENOLIC PANEL
#8 AWG HMWPE/HALAR (RED)
2" CONDUIT
" CONDUIT
0.001Ω HOLLOWAY SHUNT
TYPE "SS" (TYP)
COPPER BUSSBAR
#2 AWG THHN POSITIVE
CABLE TO RECTIFIER (RED)
1" PVC END CAP
16" x 12" x 8" FIBERGLASS
JUNCTION BOX
STRUCTURE
#6 AWG THWN STRANDED
STRUCTURE (BLACK) TO
RECTIFIER NEGATIVE
#8 AWG HMWPE STRANDED
(BLACK) LEAD STRUCTURE
WIRES (1 PER PIPE)
MYERS HUB (TYP)
" CONDUIT
" THICK COPPER
BUSSBAR
(2) #2 AWG THHN STRANDED (RED)
ANODE WIRES TO RECTIFIER
POSITIVE
COPPER SOLDERLESS LUG
CONNECTORS (TYP)
12" x 12" x 6" FIBERGLASS
NEMA 4X CP TERMINAL BOX
" CONDUIT
" THICK PHENOLIC OR
MICARTA BOARD
0.001Ω, 25 AMP
SHUNT (TYP)
RECTIFIER:
STANDARD AIR-COOLED
40V-20A DC OUTPUT
120/240 VAC INPUT
60Hz, SINGLE PHASE
CP TERMINAL BOX
CP503
A4
" CONDUIT W/ ANODE CABLES
GRADE
NATIVE BACKFILL
24" MIN.
AC SERVICE DISCONNECT
SWITCH
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
CATHODIC PROTECTION SYSTEM
DETAILS
CP504 0
182 280
FJRP159073-CP-504.dwg
SCALE: NTS
AIRCRAFT-RATED CP TEST STATION
A1
C
P
T
E
S
T
EXISTING PAVEMENT
14"Ø CORE DRILL
CONCRETE FILL
8"Ø CAST IRON BOX
6"Ø CAST IRON SCREW
DOWN LID
CAST IRON SCREW DOWN LID
CAST IRON BOX RECESSED
BELOW EXISTING PAVEMENT
EXISTING PAVEMENT
CONCRETE FILL
NON-METALLIC DOWN TUBE
6"Ø x 15" LENGTH
(LEAVE EMPTY)
14"Ø CORE DRILL 8" TO 16"
THROUGH AIRFIELD PAVEMENT
(2) ANODE LEAD WIRES IN
2" PVC TO EXISTING HEADER
CABLE
1" PVC VENT PIPE
CAST IRON LID MARKED "ANODE"
1" THREADED COUPLER
AND 1" THREADED PLUG
SCALE: NTS
CONCRETE TEST BOX W/ CAST IRON LID
A3
SCALE: NTS
MMO ANODE
A4
48"
"Ø
#8 AWG STRANDED COPPER WIRE WITH SPECIAL PURPOSE DUAL
INSULATION INNER: (20 MIL) ETHYLENE
CHLOROTRIFLUOROETHYLENE
INSUL OUTER: (65 MIL) HMWPE INSUL.
NOTES:
1. ANODES MUST BE PROVIDED WITH LEAD WIRES LONG ENOUGH
TO REACH THE ANODE JUNCTION BOXES WITHOUT SPLICES.
2. THICKNESS OF OXIDE LAYER IS GREATLY EXAGGERATED HERE
FOR GRAPHICAL CLARITY.
FILL ENTIRE ANODE TUBE WITH TWO COMPONENT, ROOM
TEMPERATURE CURE, MEDIUM VOLTAGE ELECTRICAL POTTING
COMPOUND
INTERNAL ANODE LEAD WIRE CONNECTION MADE AT THE MIDPOINT
WITH A TWO PIECE BRASS WEDGE CONNECTOR
ASTM B-338, GRADE 1 TITANIUM ANODE SUBSTRATE TUBE WITH
LENGTH AND DIAMETER AS INDICATED
ELECTROCATALYTIC COATING OF MIXED METAL OXIDES OF THE
PLATINUM GROUP OF METALS APPLIED BY THERMAL
DECOMPOSITION TO PRODUCE A CRYSTALLINE, ANHYDROUS, ACID
RESISTANT COATING THAT IS HIGHLY CONDUCTIVE (10 X E-5
OHM-CM) TO ANODIC CURRENT
SCALE: NTS
AIRCRAFT-RATED CPTS WITH REF CELL
C1
EXOTHERMIC WELD (TYP)
(2) #10 AWG THHN FROM
EACH PIPE (BLACK)
AIRCRAFT RATED
FLUSH MOUNTED
TEST STATION
STATIONARY COPPER/COPPER SULFATE
REFRENCE ELECTRODE AT SPRINGLINE
(1) #14 AWG THHN FROM REFERENCE
ELECTRODE (YELLOW)
TERMINAL BOARD
SPRINGLINE
CP504
A1
CP505
C1
CP502
B2 a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
CATHODIC PROTECTION SYSTEM
DETAILS
CP505 0
183 280
FJRP159073-CP-505.dwg
SCALE: NTS
EXOTHERMIC WELD
C1
8.
PIPE SURFACE
COPPER WIRE
METAL DISK
9.
3.
WELD METAL
STARTING POWDER
GRAPHITE MOLD
HANDLE
7.
6.
5.
4.
1.
2.
HOLD WELDER FIRMLY
IN PLACE WHILE
MAKING CONNECTION
APPLY SPARK GUN
AWAY FROM OPERATOR
REMOVE SLAG
WITH HAMMER
WHEN USING No. 10 TO No. 14 AWG SOLID WIRE, IT WILL BE
NECESSARY TO INSTALL A COPPER SLEEVE OF ADEQUATE
SIZE OVER THE BARE END OF THE WIRE AND CRIMP IN PLACE
BEFORE ATTEMPTING TO MAKE THE CONNECTION. THE WIRE
SHOULD PROTRUDE AT LEAST 0.1 INCHES FROM THE END OF
THE SLEEVE.
INSERT THE CONDUCTOR INTO MOLD NOTING ANY SPECIAL
INFORMATION UNDER "POSITIONING" FOR APPLICATION TYPE
IN THE MANUFACTURER'S INSTRUCTIONS PACKAGED WITH
THE WELDER.
INSERT STEEL DISK IN BOTTOM OF CAVITY INSIDE MOLD.
DUMP THE WELD METAL INTO MOLD BEING CAREFUL NOT TO
UPSET THE STEEL DISK. TAP THE BOTTOM OF THE TUBE TO
LOOSEN ALL THE STARTING POWDER AND SPREAD IT
EVENLY OVER THE WELD METAL. PLACE A SMALL AMOUNT
OF STARTING POWDER ON THE TOP EDGE OF MOLD UNDER
COVER OPENING FOR EASY IGNITION.
CLOSE COVER AND IGNITE WITH THE FLINT GUN. MOVE FLINT
GUN AWAY QUICKLY TO PREVENT FOULING. IF FLINT GUN
SHOULD BECOME FOULED, SOAK IT IN HOUSEHOLD
AMMONIA.
AFTER IGNITION, HOLD THE WELDER IN PLACE FOR A
MOMENT TO ALLOW THE WELD TO SOLIDIFY. AFTER THE
WELD HAS COOLED, REMOVE THE SLAG WITH A CHIPPING
HAMMER OR WIRE BRUSH.
COAT THE CONNECTION AND THE ENTIRE PREPARED
SURFACE WITH THE SPECIFIED WELD COATING.
REMOVE ALL SLAG FROM THE WELDER BEFORE MAKING
WELD. CLEAN THE COVER EVERY 6 TO 10 WELDS.
WET OR DAMP MOLDS WILL PRODUCE POROUS WELDS.
MOLDS MUST BE DRIED OUT BEFORE ATTEMPTING TO WELD.
CONNECTIONS ARE TO BE PLACED A MINIMUM OF 3 INCHES
APART. UNSUCCESSFUL WELDS ARE TO BE ABANDONED AND
MOVED TO ANOTHER PREPARED SURFACE NOT LESS THAN 3
INCHES AWAY.
COAT CONNECTION WITH
BITUMINOUS COMPOUND
STRIP INSULATION
FROM WIRE (SEE
NOTE NO. 1)
REMOVE PIPELINE
COATING FILE PIPE TO
BRIGHT METAL AND DRY
ANY MOISTURE WITH A
TOWEL
NOTES:
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JUNE 2017 R. MAR
B. BUCHER N. NEGRETE
CATHODIC PROTECTION SYSTEM
TANK ICCP WIRING SCHEMATIC
CP601 0
184 280
FJRP159073-CP-601.dwg
SCALE: NTS
TANK 3 ICCP SYSTEM WIRING SCHEMATIC
A1
AC POWER
DISCONNECT
AC INPUT
AIR-COOLED RECTIFIER
MAX OUPUT RATING
30V-6A
DC (-) DC (+)
C1
C2
C3
C4
Z1
Z2
Z3
Z4
A1
A2
A3
EXPLOSION PROOF PULL BOX
SOLDERED CABLE SPLICE
TANK CABLE
#8 AWG HMWPE (BLACK)
DC NEGATIVE
#6 AWG HMPWE (BLACK)
DC POSITIVE
#6 AWG THHN
(RED)
0.001Ω SHUNTS
BUS
BAR
TANK CP TERMINAL
JUNCTION BOX
(4) #14 AWG THHN (YELLOW)
(4) #14 AWG THHN
(BLUE)
TANK TEST WIRE
#8 AWG HMWPE
(BLACK)
TANK 3
(4) #14 AWG HMWPE (YELLOW)
(4) #14 AWG HMWPE
(BLUE)
(4) #8 AWG THWN
(RED)
(4) #8 AWG HMWPE
HALAR (RED)
TEST
EXOTHERMICALLY WELDED
CONNECTION ON TANK
TO STATIONARY Cu/CuS0
REFERENCE ELECTRODES
TO STATIONARY ZINC
REFERENCE ELECTRODES
POWER FEED CONNECTORS
ON POWER FEED BAR
EXOTHERMICALLY WELDED
CONNECTION ON TANK
A4
RECTIFIER 2 (R2)
a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
W9133L-15-D-0003
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O P Y R I G H T
B U
R N
D
O N
N E
G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
R
An Aegion Company
TM
JULY 2017 R. MAR
B. BUCHER N. NEGRETE
CATHODIC PROTECTION SYSTEM
ICCP WIRING SCHEMATICS
CP602 0
185 280
FJRP159073-CP-602.dwg
SCALE: NTS
NEW DISTRIBUTED ICCP SYSTEM WIRING SCHEMATIC
B1
AC POWER
DISCONNECT
RECTIFIER 3 (R3)
NEW
AIR-COOLED RECTIFIER
MAX OUTPUT RATING
40V-20A
DC (-)DC (+)
A7
A8
A9
0.001Ω SHUNTS
BUS
BAR
ANODE JUNCTION BOX
A10
A1
A2
A3
0.001Ω SHUNTS
BUS
BAR
A4
A5
A6
0.001Ω SHUNTS
BUS
BAR
CP TERMINAL BOX
ANODE GROUNDBED
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
SCALE: NTS
EXISTING ICCP SYSTEM WIRING SCHEMATIC
B3
TANK 1
AC POWER
DISCONNECT
EXISTING
AIR-COOLED RECTIFIER
MAX OUPUT RATING
100V-22A
DC (+)DC (-)
TANK 2
EXISTING
ANODE GROUNDBED
NEW HYDRANT LOOP
EXISTING TRUCK STAND PIPING
(10) #8 AWG HMWPE/HALAR (RED)
DC POSITIVE
(2) #2 AWG THHN
(RED)
DC NEGATIVE
#6 AWG THWN
(BLACK)
#8 AWG HMWPE ANODE
COLLECTOR CABLE
LOOP
EXISTING HSCI ANODE
(TYPICAL OF 11)
NEW SUPPLY & RETURN
AC INPUT
RECTIFIER 1 (R1)
AC INPUT
| FJRP159073-CP-101 |
| FJRP159073-CP-102 |
| FJRP159073-CP-501 |
| FJRP159073-CP-502 |
| FJRP159073-CP-503 |
| FJRP159073-CP-504 |
| FJRP159073-CP-505 |
| FJRP159073-CP-601 |
| FJRP159073-CP-602 |
File details come from the government source that posted it.