This pre-solicitation notice is for the construction of missile motor receipt and storage facilities at the Utah Test and Training Range. The project scope includes building eighteen earth-covered modular storage magazines, a 7,000 square foot motor transfer facility, and approximately fifteen miles of railroad track. The estimated cost range is between $25-100 million. The period of performance for construction is 730 days. The solicitation will be issued on or around September 23, 2019 via the Federal Business Opportunities website. The response date for proposals is on or about November 7, 2019. The procurement will be conducted under NAICS code 236220 for heavy and civil engineering construction with a size standard of $36.5 million. All questions should be directed to the identified contracting officer.

View the file

Other files

File Type Posted
W91238-19-R-0006 Amendment 0005 - SF30.pdf PDF
W91238-19-R-0006 Amendment 0005 Pricing Schedule.pdf PDF
W91238-19-R-0006 Amendment 004_Division 01.pdf PDF
W91238-19-R-0006 Amendment 004_Package 2 Rail-MTF.pdf PDF
W91328-19-R-0006-Amendment 0004_UTTR RTA_Package 1 MSM Submittal Register.xlsx XLSX spreadsheet
W91238-19-R-0006 Amendment 0004 - SF30.pdf PDF
W91328-19-R-0006-Amendment 0004_UTTR RTA_Package 2 Rail-MTF Submittal Register.xlsx XLSX spreadsheet
W91238-19-R-0006 Amendment 0004 Summary.pdf PDF
W91238-19-R-0006 Amendment 004_Package 1 MSM.pdf PDF
W9123819R0006 Amendment 0003.pdf PDF
Sample Breakout Format_19-R-0006 Amendment 0003.xlsx XLSX spreadsheet
Atch_7_DB_WD_Building-_Tooele_10-04-2019.pdf PDF
UTTR_MMRSF_19R0006_Site_Walk_Attendees_10_OCT_19.pdf PDF
UTTR_MMRSF_Briefing_-_Site_Walk_Briefing_10_OCT_19.pdf PDF
SF30_Amend_0002_Extend_&_Add_DB_WDs.pdf PDF
Atch_6_DB_WD_Building-_Box_Elder_10-04-2019.pdf PDF
Atch_9_DB_WD_Heavy_-_Box_Elder_01-04-2019.pdf PDF
Atch_10_DB_WD_Heavy_-_Tooele_04-26-2019.pdf PDF
P822_UTTR_Site_Walk_10_Oct_2019_(rev).pdf PDF
SF_30_Amend_0001_-_Site_Visit_and_DB_Wage_Determination.pdf PDF
DB_WD_Box_Elder_Cty_UTTR_MMR_&_Storage_Facility_v22Aug19.pdf PDF
J&A_UTTR_MMR_&_Storage_Facility.pdf PDF
Atch_4_Package_2_MTF_Plan_Set.pdf PDF
Atch_7_Site_Visit_Instructions.pdf PDF
Atch_6_DB_WD_Davis_County_Utah_7-26-2019.pdf PDF
Atch_8_Pricing_Schedule_P822_MMRSF_UTTR_28_Sep_19.pdf PDF
Atch_1_Division_01_Specifications.pdf PDF
Atch_3_Package_1_MSM_Specifications.pdf PDF
Atch_5_Package_2_MTF_Specifications.pdf PDF
Atch_2_Package_1_MSM_Plan_Set.pdf PDF
SF1442_W9123819R0006_MMR_&_Storage_Facility_28_SEP_19.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 4

TITLE:D5 Missile Motor Receipt/Storage FacilitiesSUBMITTAL REGISTER
JOB NAME:10121996DIV01
LOCATION:Utah Test and Training Range
CONTRACT NO:W91238-17-D-0027
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Transmittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E ReviewerSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other ReviewerAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 00 001Preconstruction SubmittalsPreconstruction Quantity Survey PlanG
201 00 001Preconstruction SubmittalsPreconstruction Access Road Survey
301 00 001Preconstruction SubmittalsPost-construction Access Road Survey
401 00 001Preconstruction SubmittalsActivity Hazard Analysis
501 00 001Preconstruction SubmittalsQualifications for Safety and Health Person(s)G
601 00 001Preconstruction SubmittalsContractor's Right Of Entry Agreement1.23
701 00 002Shop DrawingsProvisions of Positive Protection SystemG
801 00 0011Closeout SubmittalsWorker's Compensation Claims
901 11 001Preconstruction SubmittalsSalvage Plan1.6G
1001 30 001Preconstruction SubmittalsView Location Map1.4G
1101 30 001Preconstruction SubmittalsProgress and Completion Pictures1.5G
1201 30 004SamplesColor Boards1.3G
1301 32 011Preconstruction SubmittalsProject Scheduler Qualifications1.3G
1401 32 011Preconstruction SubmittalsPreliminary Project Schedule3.4.1G
1501 32 011Preconstruction SubmittalsInitial Project Schedule3.4.2G
1601 32 011Preconstruction SubmittalsPeriodic Schedule Update3.6.2G
1701 33 001Preconstruction SubmittalsSubmittal Register1.8G
1801 33 291Preconstruction SubmittalsPreliminary High Performance and Sustainable Building Checklist1.5.3.1G
1901 33 291Preconstruction SubmittalsSustainability Action Plan1.4.1G
2001 33 291Preconstruction SubmittalsPreliminary Sustainability eNotebook1.5.3.1G
2101 33 2911Closeout SubmittalsFinal High Performance and Sustainable Building Checklist1.5.3.1G
2201 33 2911Closeout SubmittalsFinal Sustainability eNotebook1.5.3.1G
2301 33 2911Closeout SubmittalsAmended Final Sustainability eNotebook1.5.3.1G
2401 33 2911Closeout SubmittalsAmended Final High Performance and Sustainable Building Checklist1.5.3.1G
2501 35 261Preconstruction SubmittalsAccident Prevention Plan (APP)1.7G
2601 35 266Test ReportsMonthly Exposure Reports1.4
2701 35 266Test ReportsNotifications and Reports1.12
2801 35 266Test ReportsAccident Reports1.12.2G
2901 35 266Test ReportsLHE Inspection Reports1.12.3
3001 35 267CertificatesCrane Operators/Riggers1.6.1.4
3101 35 267CertificatesStandard Lift Plan1.7.2.2G
3201 35 267CertificatesCritical Lift Plan1.7.2.3G
3301 35 267CertificatesActivity Hazard Analysis (AHA)1.8
3401 35 267CertificatesConfined Space Entry Permit1.9.1
3501 35 267CertificatesHot Work Permit1.9.1
3601 35 267CertificatesCertificate of Compliance1.12.4
3701 35 267CertificatesLicense Certificates
3801 35 267CertificatesRadiography Operation Planning Work SheetG
3901 35 267CertificatesPortable Gauge Operations Planning WorksheetG
4001 45 001Preconstruction SubmittalsContractor Quality Control (CQC) Plan3.2G
4101 45 001Preconstruction SubmittalsAdditional Requirements for Design Quality Control (DQC) PlanG DO
4201 45 005Design DataDiscipline-Specific Checklists
4301 45 005Design DataDesign Quality Control
4401 45 006Test ReportsVerification Statement3.10.2
4501 45 351Preconstruction SubmittalsSIOR Letter of Acceptance3.1.1G
4601 45 351Preconstruction SubmittalsProject Manual3.1.1G
4701 45 351Preconstruction SubmittalsProject Manual3.1.1G
4801 45 351Preconstruction SubmittalsWritten Practices3.1.1
4901 45 351Preconstruction SubmittalsNDT Procedures and Equipment Calibration Records3.1.1
5001 45 356Test ReportsDaily Reports3.1.1
5101 45 356Test ReportsDaily Reports3.1.3
5201 45 356Test ReportsDaily Reports3.1.3
5301 45 356Test ReportsBiweekly Reports3.1.1
5401 45 357CertificatesFabrication Plant2.1
5501 45 357CertificatesCertificate of Compliance2.1
5601 45 357CertificatesSpecial Inspector of Record1.5.6G
5701 45 357CertificatesSpecial Inspector1.5G
5801 45 357CertificatesQualification Records3.1.1
5901 45 3511Closeout SubmittalsInterim Final Report3.1.1
6001 45 3511Closeout SubmittalsComprehensive Final Report3.1.1G
6101 45 3511Closeout SubmittalsComprehensive Final Report3.1.3G
6201 50 001Preconstruction SubmittalsConstruction Site Plan1.3G
6301 50 001Preconstruction SubmittalsTraffic Control Plan3.4.1G
6401 50 001Preconstruction SubmittalsHaul Road Plan2.2.1G
6501 50 001Preconstruction SubmittalsTemporary Power DesignG
6601 50 001Preconstruction SubmittalsBatch Plant3.11G
6701 50 003Product DataBackflow Preventers1.4G
6801 50 006Test ReportsBackflow Preventer Tests
6901 50 007CertificatesBackflow Tester1.4.1
7001 50 007CertificatesBackflow Preventers1.4
7101 50 013Product DataGPO Digital PhotographsG RO
7201 50 013Product DataGPO Furniture, Fixtures and Equipment (FFE)G RO
7301 50 013Product Datainsulation for floors, walls, and atticG RO
7401 50 014SamplesColorG RO
7501 50 014SamplesSkirting MaterialG RO
7601 50 015Design DataData GPO Site PlanG
7701 50 015Design DataGPO Specifications InformationG RO
7801 50 015Design Dataannotated drawings and product informationG RO
7901 57 201Preconstruction SubmittalsEnvironmental Protection Plan1.7G
8001 57 201Preconstruction SubmittalsStorm Water Pollution Prevention Plan3.2.3G
8101 57 201Preconstruction SubmittalsErosion Control3.2.3G
8201 57 2011Closeout SubmittalsFugitive Dust Control3.4.1
8301 74 191Preconstruction SubmittalsConstruction Waste Management Plan1.7G
8401 74 196Test ReportsQuarterly Reports1.9.2
8501 74 196Test ReportsAnnual Report1.9.3
8601 74 1911Closeout SubmittalsFinal Construction Waste Diversion Report1.1S
8701 78 003Product DataWarranty Management Plan1.7.1
8801 78 003Product DataWarranty Tags1.7.5
8901 78 003Product DataFinal Cleaning3.8
9001 78 003Product DataSpare Parts Data1.5
9101 78 008Manufacturer’s InstructionsInstructions1.7.1
9201 78 0010Operation and Maintenance DataOperation and Maintenance Manuals3.7G
9301 78 0011Closeout SubmittalsAs-Built Drawings3.1G
9401 78 0011Closeout SubmittalsRecord Drawings3.3G
9501 78 0011Closeout SubmittalsAs-Built Record of Equipment and Materials1.7.1
9601 78 0011Closeout SubmittalsAs-Built Record of Equipment and Materials3.6
9701 78 0011Closeout SubmittalsFinal Approved Shop Drawings3.4
9801 78 0011Closeout SubmittalsConstruction Contract Specifications3.5
9901 78 0011Closeout SubmittalsCertification of EPA Designated Items2.3G
10001 78 0011Closeout SubmittalsCertification Of USDA Designated Items2.4G
10101 78 0011Closeout SubmittalsInterim DD FORM 13543.9G
10201 78 0011Closeout SubmittalsChecklist for DD FORM 13543.9G
10301 78 0011Closeout SubmittalsHigh Performance and Sustainable Building (HPSB) Checklist3.9G
10401 78 2310Operation and Maintenance DataO&M Database1.4G
10501 78 2310Operation and Maintenance DataTraining Plan3.1.1G
10601 78 2310Operation and Maintenance DataTraining Outline3.1.3G
10701 78 2310Operation and Maintenance DataTraining Content3.1.2G
10801 78 2311Closeout SubmittalsTraining Video Recording3.1.4G
10901 78 2311Closeout SubmittalsValidation of Training Completion3.1.6G
11001 91 00.151Preconstruction SubmittalsCommissioning Firm1.7G DO
11101 91 00.151Preconstruction SubmittalsLead Commissioning Specialist1.7.1G DO
11201 91 00.151Preconstruction SubmittalsTechnical Commissioning Specialists1.7.2G DO
11301 91 00.151Preconstruction SubmittalsCommissioning Firm's Contract1.7G DO
11401 91 00.156Test ReportsInterim Construction Phase Commissioning Plan3.1.2.1G DO
11501 91 00.156Test ReportsFinal Construction Phase Commissioning Plan3.1.2.2G DO
11601 91 00.156Test ReportsPre-Functional Checklists3.1.4.2G DO
11701 91 00.156Test ReportsIssues Log1.9
11801 91 00.156Test ReportsCommissioning Report3.2G DO
11901 91 00.156Test ReportsPost-Construction Trend Log Report3.3.1G DO
12001 91 00.157CertificatesCertificate of Readiness1.1G DO
12101 91 00.1510Operation and Maintenance DataTraining Plan3.1.5G RO
12201 91 00.1510Operation and Maintenance DataTraining Attendance Rosters3.1.5G RO
12301 91 00.1510Operation and Maintenance DataSystems Manual/Computerized Maintenance Management System Manual3.1.6G DO
12401 91 00.1510Operation and Maintenance DataMaintenance and Service Life Plans3.1.7G DO
12501 91 00.1511Closeout SubmittalsFinal Commissioning Report3.2S DO