W91238-19-R-0006 Amendment 0004 Summary.pdf
PDF 71 KB Posted
- Attached to
- UTTR Missile Motor Receipt & Storage Facility Federal contract opportunity
- Solicitation number
- W9123819R0006
About this file
This amendment provides updated specifications and drawings for a federal design-bid-build construction project. The project involves building a Missile Motor Receipt and Storage Facility at the Utah Test and Training Range, including eighteen earth-covered modular storage magazines for missile motors, a 7,000 square foot Motor Transfer Facility, and approximately fifteen miles of railroad track. The acquisition will proceed as an unrestricted competitive solicitation with an estimated cost range of $25-100 million. The response date for questions is September 23, 2019, with the solicitation to be issued on or around that date. The period of performance for construction is 730 days.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number W91238-19-R-0006 Project: Missile Motor Receipt/Storage Facility, Utah Test and Training Range
AMENDMENT 0004 – SUMMARY
A. DIVISION 01 SPECIFICATIONS (2 sections)
1) Replaced entire Section 01 00 00.
2) Replaced entire Section 01 11 00.
3) Replaced entire Section 01 45 00.
4) Replaced entire Section 01 50 00.
5) Replaced entire Section 01 57 20.
6) Added entire Submittal Register (all packages).
B. PACKAGE 1 MSM SPECIFICATIONS (6 sections)
1) Replaced entire Section 08 39 53 in Package 1 MSM.
2) Replaced entire Section 28 31 64 in Package 1 MSM.
3) Replaced entire Section 31 00 00 in Package 1 MSM.
4) Replaced entire Section 31 11 00 in Package 1 MSM.
5) Replaced entire Section 32 12 16 in Package 1 MSM.
6) Replaced entire Section 32 15 00 in Package 1 MSM.
7) Replaced entire Section 32 92 19 in Package 1 MSM.
8) Replaced entire Section 33 71 02 in Package 1 MSM.
C. PACKAGE 1 MSM DRAWINGS (13 sheets)
1) Replaced sheet C-001 in Package 1 MSM.
2) Replaced sheet GC-101 in Package 1 MSM.
3) Replaced sheet GC-102 in Package 1 MSM.
4) Replaced sheet CS-101 in Package 1 MSM.
5) Replaced sheet CS-102 in Package 1 MSM.
6) Replaced sheet CS-103 in Package 1 MSM.
7) Replaced sheet CS-104 in Package 1 MSM.
8) Replaced sheet CS-105 in Package 1 MSM.
9) Replaced sheet C-501 in Package 1 MSM.
10) Replaced sheet S-203 in Package 1 MSM.
11) Replaced sheet E-103 in Package 1 MSM.
12) Replaced sheet E-503 in Package 1 MSM.
13) Replaced sheet ET-502 in Package 1 MSM.
D. PACKAGE 2 RAIL/MTF SPECIFICATIONS (9 sections)
1) Replaced entire Section 13 34 19 in Package 2 MTF.
9) Replaced entire Section 28 31 64 in Package 2 MTF.
2) Replaced entire Section 31 00 00 in Package 2 MTF.
3) Replaced entire Section 31 11 00 in Package 2 MTF.
4) Replaced entire Section 32 12 16 in Package 2 MTF.
5) Replaced entire Section 32 15 00 in Package 2 MTF.
10) Replaced entire Section 32 92 19 in Package 2 MTF.
11) Replaced entire Section 33 51 15 in Package 2 MTF.
6) Replaced entire Section 33 71 01.00 in Package 2 MTF.
7) Replaced entire Section 33 71 02 in Package 2 MTF.
8) Replaced entire Section 34 11 00 in Package 2 MTF.
9) Replaced entire Section 41 22 13.13 in Package 2 MTF.
E. PACKAGE 2 RAIL/MTF DRAWINGS (52 sheets)
1) Replaced sheet G-001 in Package 2 Rail/MTF.
2) Replaced sheet C-001 in Package 2 Rail/MTF.
3) Replaced sheet CS-101 in Package 2 Rail/MTF.
4) Replaced sheet CS-102 in Package 2 Rail/MTF.
5) Replaced sheet CP-101 in Package 2 Rail/MTF.
6) Replaced sheet CP-102 in Package 2 Rail/MTF.
7) Replaced sheet CU-109 in Package 2 Rail/MTF.
8) Replaced sheet C-501 in Package 2 Rail/MTF.
9) Replaced sheet CT-002 in Package 2 Rail/MTF.
10) Replaced sheet CT-101 in Package 2 Rail/MTF.
11) Replaced sheet CT-102 in Package 2 Rail/MTF.
12) Replaced sheet CT-103 in Package 2 Rail/MTF.
13) Replaced sheet CT-104 in Package 2 Rail/MTF.
14) Replaced sheet CT-105 in Package 2 Rail/MTF.
15) Replaced sheet CT-111 in Package 2 Rail/MTF.
16) Replaced sheet CT-121 in Package 2 Rail/MTF.
17) Replaced sheet CT-135 in Package 2 Rail/MTF.
18) Replaced sheet CT-136 in Package 2 Rail/MTF.
19) Replaced sheet CT-314 in Package 2 Rail/MTF.
20) Added sheet CT-397 in Package 2 Rail/MTF.
21) Added sheet CT-398 in Package 2 Rail/MTF.
22) Added sheet CT-399 in Package 2 Rail/MTF.
23) Replaced sheet CT-501 in Package 2 Rail/MTF.
24) Replaced sheet CT-502 in Package 2 Rail/MTF.
25) Replaced sheet CT-503 in Package 2 Rail/MTF.
26) Replaced sheet CT-504 in Package 2 Rail/MTF.
27) Replaced sheet CT-505 in Package 2 Rail/MTF.
28) Replaced sheet CT-506 in Package 2 Rail/MTF.
29) Replaced sheet CT-507 in Package 2 Rail/MTF.
30) Replaced sheet CT-508 in Package 2 Rail/MTF.
31) Replaced sheet CT-509 in Package 2 Rail/MTF.
32) Replaced sheet CT-510 in Package 2 Rail/MTF.
33) Replaced sheet CT-511 in Package 2 Rail/MTF.
34) Replaced sheet CT-512 in Package 2 Rail/MTF.
35) Replaced sheet CT-513 in Package 2 Rail/MTF.
36) Replaced sheet CT-514 in Package 2 Rail/MTF.
37) Replaced sheet CT-515 in Package 2 Rail/MTF.
38) Replaced sheet CT-516 in Package 2 Rail/MTF.
39) Replaced sheet CT-517 in Package 2 Rail/MTF.
40) Replaced sheet CT-518 in Package 2 Rail/MTF.
41) Replaced sheet S-107 in Package 2 Rail/MTF.
42) Replaced sheet S-301 in Package 2 Rail/MTF.
43) Replaced sheet A-601 in Package 2 Rail/MTF.
44) Replaced sheet ES-105 in Package 2 Rail/MTF.
45) Replaced sheet EG-101 in Package 2 Rail/MTF.
46) Replaced sheet E-103 in Package 2 Rail/MTF.
47) Replaced sheet E-504 in Package 2 Rail/MTF.
48) Replaced sheet E-508 in Package 2 Rail/MTF.
49) Replaced sheet E-515 in Package 2 Rail/MTF.
50) Replaced sheet E-516 in Package 2 Rail/MTF.
51) Replaced sheet E-517 in Package 2 Rail/MTF.
52) Replaced sheet E-600 in Package 2 Rail/MTF.
53) Replaced sheet ET-603 in Package 2 Rail/MTF.
File details come from the government source that posted it. Updated .