W91238-19-R-0006 Amendment 0005 - SF30.pdf

PDF 191 KB Posted

Attached to
UTTR Missile Motor Receipt & Storage Facility
Solicitation number
W9123819R0006
Issued by

About this file

This federal contract opportunity is for the design and construction of a Missile Motor Receipt and Storage Facility at the Utah Test and Training Range in Utah. Key requirements include constructing 18 earth-covered modular storage magazines configured for air bearing operations for D5 missile motors. Supporting facilities such as a 7,000 square foot motor transfer facility and approximately 15 miles of railroad track must also be built. The estimated cost range is $25-100 million. Interested parties must register in the System for Award Management and FedBizOpps to access the solicitation documents. The response date is on or about November 7, 2019. The period of performance for construction is 730 days. The procuring agency is the Department of the Army Corps of Engineers Engineering District Sacramento. The NAICS code is 236220 for commercial and institutional building construction.

View the file

Other files

File Type Posted
W91238-19-R-0006 Amendment 0005 Pricing Schedule.pdf PDF
W91238-19-R-0006 Amendment 004_Division 01.pdf PDF
W91238-19-R-0006 Amendment 004_Package 2 Rail-MTF.pdf PDF
W91328-19-R-0006-Amendment 0004_UTTR RTA_Package 1 MSM Submittal Register.xlsx XLSX spreadsheet
W91238-19-R-0006 Amendment 0004 - SF30.pdf PDF
W91328-19-R-0006-Amendment 0004_UTTR RTA_Package 2 Rail-MTF Submittal Register.xlsx XLSX spreadsheet
W91328-19-R-0006-Amendment 0004_UTTR AMD 4_Division 01 Submittal Register.xlsx XLSX spreadsheet
W91238-19-R-0006 Amendment 0004 Summary.pdf PDF
W91238-19-R-0006 Amendment 004_Package 1 MSM.pdf PDF
W9123819R0006 Amendment 0003.pdf PDF
Sample Breakout Format_19-R-0006 Amendment 0003.xlsx XLSX spreadsheet
Atch_7_DB_WD_Building-_Tooele_10-04-2019.pdf PDF
UTTR_MMRSF_19R0006_Site_Walk_Attendees_10_OCT_19.pdf PDF
UTTR_MMRSF_Briefing_-_Site_Walk_Briefing_10_OCT_19.pdf PDF
SF30_Amend_0002_Extend_&_Add_DB_WDs.pdf PDF
Atch_6_DB_WD_Building-_Box_Elder_10-04-2019.pdf PDF
Atch_9_DB_WD_Heavy_-_Box_Elder_01-04-2019.pdf PDF
Atch_10_DB_WD_Heavy_-_Tooele_04-26-2019.pdf PDF
P822_UTTR_Site_Walk_10_Oct_2019_(rev).pdf PDF
SF_30_Amend_0001_-_Site_Visit_and_DB_Wage_Determination.pdf PDF
DB_WD_Box_Elder_Cty_UTTR_MMR_&_Storage_Facility_v22Aug19.pdf PDF
J&A_UTTR_MMR_&_Storage_Facility.pdf PDF
Atch_4_Package_2_MTF_Plan_Set.pdf PDF
Atch_7_Site_Visit_Instructions.pdf PDF
Atch_6_DB_WD_Davis_County_Utah_7-26-2019.pdf PDF
Atch_8_Pricing_Schedule_P822_MMRSF_UTTR_28_Sep_19.pdf PDF
Atch_1_Division_01_Specifications.pdf PDF
Atch_3_Package_1_MSM_Specifications.pdf PDF
Atch_5_Package_2_MTF_Specifications.pdf PDF
Atch_2_Package_1_MSM_Plan_Set.pdf PDF
SF1442_W9123819R0006_MMR_&_Storage_Facility_28_SEP_19.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of Amendment 0005 is to revise the Contract Line Item Number (CLIN) descriptions on this document, revise the description from block 10 of the original soclitation and provide an updated Price Schedule.

B. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Nov-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123819R0006

X 9B. DATED (SEE ITEM 11)

28-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Nov-2019

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123819R0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required performance has changed from Title: Utah Test and Training Range (UTTR) Missile Motor Receipt & Storage FacilityProject is to construct (18) earth-covered Modular Storage Magazines (MSM) configured for air bearing operations for the staging of D5 missile motors. Each MSM will include a mechanical room and an elevated concrete dock and floor with air-pallet-bearing floor finish. MSMs will be located within the existing munitions storage area (MSA) security perimeter. The size of MSMs are based on the Navy Modular Storage Magazine, with modifications to the standard design to be approved by the Department of Defense Explosive Safety Board (DDESB) during the current design phase. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. Also, a 7,000 SF, single story, pre-engineered steel-framed, thermal-controlled Motor Transfer Facility (MTF) will be constructed with enclosed vehicle bays, an elevated concrete dock for air pallet operations and concrete pedestals for jacking boxcar. Built-in equipment at the MTF includes a bridge crane (60-tons) with dual trolleys. The DFARS 236.204(ii) magnitude is between $25M-$100M. Full & Open RFP.

to Title: Utah Test and Training Range (UTTR) Missile Motor Receipt & Storage FacilityProject is to construct approximately 15 miles of rail, (18) earth-covered Modular Storage Magazines (MSM), a 7,000 SF, single story, pre-engineered steel-framed, thermal-controlled Motor Transfer Facility (MTF) configured for the air bearing operations for the staging of D5 missile motors. Each MSM will include a mechanical room and an elevated concrete dock and floor with air-pallet-bearing floor finish. MSMs will be located within the existing munitions storage area (MSA) security perimeter. The size of MSMs are based on the Navy Modular Storage Magazine, with modifications to the standard design to be approved by the Department of Defense Explosive Safety Board (DDESB) during the current design phase. MTF will be constructed with enclosed vehicle bays, an elevated concrete dock for air pallet operations and concrete pedestals for jacking boxcar. Built-in equipment at the MTF includes a bridge crane (60-tons) with dual trolleys. The DFARS 236.204(ii) magnitude is between $25M-$100M.

Full & Open RFP..

CLIN 0001

The CLIN extended description has changed from:

Missile Motor Receipt & Storage Facility: Provide all labor, management, supervision, tools, materials, equipment, and transportation for Mobilization & Demobilization of the Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

To:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for Mobilization & Demobilization of the Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

CLIN 0002

10 Modular Storage Magazines: Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of Motor Storage Magazines (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of ten

(10) Motor Storage Magazines (MSM) per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes site civil work and work within the “5-foot building line”.

SUBCLIN 0003AA

Provide all labor, management, supervision, tools, materials, equipment, and transportation for placement of Asphalt for the Roads and Walkways in Package 1 and Package 2, and for ten (10) base bid MSM Access Aprons in Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

The pricing detail quantity has increased by 367.00 from 16,584.00 to 16,951.00.

SUBCLIN 0003AB

Base, sub-base and adjacent drainage/culverts

Provide all labor, management, supervision, tools, materials, equipment, and transportation for placement of all Earthwork, Base, Sub-base, underlying Utilities, Drainage/Culverts under and adjacent to the Roads and Walkways in Package 1 and Package 2, and the ten (10) MSM Access Aprons in Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

This item includes work outside the “5-foot building line”, site civil work, transporter concrete pavement, concrete utility pads and sidewalks, retention basins/low impact design swales, monuments, bollards and fire break adjacent to the roads and walkways. Utilities to stub out beyond the edge of road to facilitate future utility connection with additional MSMs.

CLIN 0004

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of Motor Transfer Facility (MTF) and Boxcar Holding Area (BHA) (Package 2), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of Motor Transfer Facility (MTF) and Boxcar Holding Area (BHA) per Package 2, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

The item includes site civil work and work within the “5-foot building line”.

CLIN 0005

Provide all labor, management, supervision, tools, materials, equipment, and transportation for Extended Warranty and O&M associated with the early Use & Possession of minimum 4 MSMs, MTF, BHA, and Rail System, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

Provide all labor, management, supervision, tools, materials, equipment, and transportation for Extended Warranty and O&M associated with the early Use & Possession of minimum 4 MSMs and associated Access Aprons, MTF, BHA, all Roads and Walkways, and entire Rail System, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

CLIN 0006

Spur: 212+00 to 687+92.06D: 0+00 to 35+21.42E: 0+00 to 12+06.65F: 0+00 to 13+37.07G: 0+00 to 6+69.78H:

0+00 to 6+08.47

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of the Rail System on Government property, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all work within the rail system footprint, including earthwork, base, subbase, subballast, ballast, underlying and adjacent drainage/culverts, and all track materials along the following alignments per Package 2.- UTTR Rail Spur: 212+00 to 687+92.06.- D: 0+00 to 35+21.42.- E: 0+00 to 12+06.65.- F: 0+00 to 13+37.07.- G: 0+00 to 6+69.78.- H: 0+00 to 6+08.47.

CLIN 0007

Spur: 4+75 to 212+00B: 0+00 to 8+08.80C: 0+00 to 13+51.84

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of the Rail System, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The work included on this item is located within an easement acquired from SITLA and UPRR. The item includes all work within the rail system footprint, including earthwork, base, subbase, subballast, ballast, underlying and adjacent drainage/culverts, and all track materials along the following alignments per Package 2.- UTTR Rail Spur: 4+75 to 212+00- B: 0+00 to 8+08.80- C: 0+00 to 13+51.84

CLIN 1001

The CLIN description has changed from MSM to MSM - 30310.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised within 180 days of base award.

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option to be exercised within 180 days of base award.

CLIN 1002

The CLIN description has changed from MSM to MSM - 30311.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option

CLIN 1003

The CLIN description has changed from MSM to MSM -30312.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option

CLIN 1004

The CLIN description has changed from MSM to MSM - 30313.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option

CLIN 1005

The CLIN description has changed from MSM to MSM - 30314.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option

CLIN 1006

The CLIN description has changed from MSM to MSM - 30315.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option

CLIN 1007

The CLIN description has changed from MSM to MSM - 30316.

The CLIN extended description has changed from:

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications.

The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron.

This option to be exercised within 180 days of base award.

CLIN 1008

The CLIN description has changed from MSM to MSM - 30317.

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of a Motor Storage Magazine (MSM) (Package 1), at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. This option to be exercised

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of one

(1) Motor Storage Magazine (MSM) and Access Apron per Package 1, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The item includes all grading, site civil work and utility connections associated with the MSM and Access Apron. This option to be exercised within 180 days of base award.

CLIN 0008 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Rail System

FFP

Provide all labor, management, supervision, tools, materials, equipment, and transportation for construction of the Rail System, at Missile Motor Receipt/Storage Facility, at UTTR, UT, in accordance with this contract and all associated documents, drawings, and specifications. The work included on this item is located in the UP quarry spur area within an easement acquired from UPRR. The item includes all work within the rail system footprint, including subgrade and subballast grading, drainage, site civil work, and subballast placement along the following alignments per Package 2. Track work including ballast and surfacing will be conducted by UPRR.

- UTTR Rail Spur: 0+00 to 4+75.

- Track 701: 3+03.98 to 11+51.46

- Track 704: 0+00 to 3+53.16

- Track 705: 0+00 to 3+35.97 FOB: Destination

NET AMT

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0008:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)