This briefing document and solicitation provide details for a design-build construction project at the Utah Test and Training Range to build modular storage magazines, a motor transfer facility, and railroad infrastructure. Key requirements include constructing 18 earth-covered modular storage magazines configured for air bearing operations to stage D5 missile motors. Supporting facilities such as site preparation, paving, utilities, and a 7,000 square foot single story pre-engineered steel motor transfer facility are also included. Approximately 15 miles of new railroad track will be built to transport specialized boxcars carrying D5 motors. The solicitation is designated as unrestricted with responses due by November 7, 2019. The project is estimated to cost between $25-100 million and have a period of performance of 730 days. The Army Corps of Engineers is conducting this procurement and the pre-proposal site walk briefing outlines additional administrative and technical details for offerors.
Site Walk Briefing
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P822 MISSILE MOTOR RECEIPT /
STORAGE FACILITY
UTAH TEST AND TRAINING RANGE (UTTR)
PRE-PROPOSAL SITE WALK
10 OCT 2019
AGENDA
1000 – 1015
1015 – 1050
1050 – 1100
1100 – 1300
• Welcome / Sign In
• Introductions
• Administrative Announcements
• Safety Briefing
• Contracting Officer Briefing
• Procurement Process
• Project Overview
• Questions
• Break
• Site Walk
• Closing Remarks
INTRODUCTIONS
UTTR/Hill AFB 75th Civil Engineer Group (CEG) Hal Sagers UTTR Director Chance Fackrell UTTR Superintendent Corey Mellor 75 CEG Project Manager
USACE Sacramento District (SPK) Melissa DeNigris Contracting Officer Arianna Raymundo Project Manager Daniel Ross Program Manager Doug Wesemann Resident Engineer Steve Pittman Electrical Tech Arved Taylor Project Engineer
• Pre-Proposal Site Walk o Intended to provide interested parties with an opportunity to become familiar with the project site
& requirements o Intended to provide opportunity for interaction between prime contractors and sub-contractors o All questions and correspondence will be through the Contracting Officer
• This presentation is for informational purposes only and is not and will not be contractually binding.
ADMINISTRATIVE ANNOUNCEMENTS
• No audio/video recordings
• No photography permitted
• Please remain with Government escorts
• PPE required
ADMINISTRATIVE ANNOUNCEMENTS
SAFETY BRIEFING
• Project is Design-Bid-Build (DBB) o Includes one (1) DIV 01 set & two (2) design packages: 1) MSM, 2) Rail & MTF
• Requirements to download:
o Need to be registered in System for Award Management (SAM) – www.sam.gov o Need to be registered in FBO
• Register to receive notifications and updates/amendments
• All information will be posted on the FBO website
• Submit all Questions via the Bidder Inquiry in ProjNet at https://www.projnet.org/projnet
SOLICITATION – W91238-19-R-0006
• Solicitation: Request for Proposal (RFP)
• Unrestricted (full and open)
• Firm-Fixed Price (FFP)
• Optional Items are utilized
• Source selection methodology: Best-Value Tradeoff
• The Source Selection Evaluation Board (SSEB) will evaluate Offerors’ proposals based on the specific factors as defined in the solicitation
PROCUREMENT PROCESS
• BINDER 1 – TECHNICAL REQUIREMENTS
o TAB A – Teaming Agreements o TAB B – Factor 1: Experience & Capability o TAB C – Factor 3: Technical Approach o TAB D – Factor 4: Management Approach
• BINDER 2 – PAST PERFORMANCE (TAB E)
• BINDER 3 – SMALL BUSINESS PARTICIPATION (TAB F – G)
• BINDER 4 – PRICE & SOLICITATION INFORMATION (TAB H – M)
PROPOSAL REQUIREMENTS – SECTION 00 22 16
REFER TO THE SOLICITATION – NOT FOR PROPOSAL PREPARATION PURPOSES
• All evaluation factors other than price, when combined, are significantly more important than price.
• The non-price factors are listed in descending order of importance.
o Factor 1 – Experience and Capability o Factor 2 – Past Performance o Factor 3 – Technical Approach o Factor 4 – Management Approach o Factor 5 – Small Business Participation Commitment Document
• Trade-Off Analysis: After all of the evaluations have been completed, the SSA will consider all factors to determine which Offeror submitted the proposal that represents the "best value" to the Government for this project.
BASIS OF AWARD
• Bidder Inquiry System will be unavailable for new inquiries after 22 October 2019
• Proposals due by 1000 local time on 5 NOV 2019
KEY DATES
Points of Contact
Melissa DeNigris, Contracting Officer Deanna Zemovich, Contracting Specialist Melissa.A.DeNigris@usace.army.mil Deanna.Zemovich@usace.army.mil 916-557-5137 916-557-7027 mailto:tracy.tenholder@usace.army.mil mailto:deanna.zemovich@usace.army.mil
• Safety first – USACE Safety Manual Engineering Manual (EM) 385-1-1 o Note – augmented qualifications for personnel working within UP easements are specified
• Dedicated USACE Resident Office in Utah o Key staff co-located at the Utah Test and Training Range
• USACE Resident Management System (RMS)
• Regular schedule (Primavera) updates required
• Monthly progress payments
• Formal Partnering will be utilized
CONSTRUCTION CONTRACT ADMINISTRATION
PROJECT OVERVIEW
• Project provides facilities to meet the Strategic System Program (SSP) requirement to receive and transship D5 motors at the UTTR for demilitarization
• Primary Facilities:
• 18 Modular Storage Magazines (MSM)
• Motor Transfer Facility (MTF) & Boxcar Holding Area (BHA)
• ~15 miles of Rail Spur
• DDESB approved the Explosive Site Plan and MSM Modified Standard design
• POP: 730 CD
• Interim Use & Possession requirement specified
PROJECT OVERVIEW
PLAN REVIEW
FACILITY EVALUATION TEST (FET)
• Requirement for ‘augmented’ Quality Assurance
• Refer to attachment to the Quality Control Specifications o Field inspection o Field demonstration o Field test
• Utah School and Institutional Trust Land Administration (SITLA)
• Dominion Energy o 50-foot wide right of way on SITLA property crosses the track alignment near the Federal/State
Lands property line (approximately MP4)
• Union Pacific Railroad (UPPR)
REAL ESTATE
PRICING SCHEDULE
BASE ITEMS
0001 – Mob/Demob 0002 – 10 Modular Storage Magazines (MSMs) (Package 1) 0003 – Roads and MSM Access Aprons
0003AA – Asphalt 0003AB – Earthwork
0004 – Motor Transfer Facility (MTF) and Boxcar Holding Area (Package 2) 0005 – Extended Warranty and O&M (for early Use & Possession FOW) 0006 – Rail System (Package 2) (stationing specified) 0007 – Rail System (Package 2) (stationing specified)
OPTION ITEMS
1001-1008 – MSMs (EA)
LINE ITEMS – SECTION 00 10 00
SITE WALK
QUESTIONS?
| P822 Missile Motor receipt / storage facility�Utah test and training range (UTTR)��Pre-proposal site walk�10 OCT 2019 |
| AGENDA |
| introductions |
| Administrative announcements |
| Administrative announcements |
| Safety briefing |
| Solicitation – W91238-19-R-0006 |
| Procurement process |
| Proposal requirements – section 00 22 16 |
| Basis of award |
| KEY dates |
| Construction contract administration |
| Project overview |
| Project overview |
| Slide Number 15 |
| Plan review |
| FACILITY EVALUATION TEST (FET) |
| Real estate |
| Pricing schedule |
| Line items – section 00 10 00 |
| Site WaLK |
| Questions? |
File details come from the government source that posted it. Updated .