NAPA RIVER DRY BYPASS, NAPA, CA Federal contract opportunity
Solicitation number
W91238-13-R-0032
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Amendment 0008

View the file

Other files for this federal contract opportunity

Other files attached to NAPA RIVER DRY BYPASS, NAPA, CA, newest first.
File Type Posted
W91238-13-R-0032_Conformed_Copy_of_Solicitation.pdf PDF
AMD_0008_Pricing_Breakout.docx DOCX document
AMD_0008_Specifications.pdf PDF
AMD_0008_Summary_of_Changes.pdf PDF
AMD_0006_FCD_Encroachment_Permit.pdf PDF
13-R-0032-0006_Attachment_15.pdf PDF
AMD_0006_Pricing_Breakout_(20131112).pdf PDF
13-R-0032-0005.pdf PDF
Attch_14 _AMENDMENT_5_SUMMARY.pdf PDF
Attch_13 _FCD_Encroachment_Permit.pdf PDF
Attachment_3 _Pricing_Breakout.pdf PDF
A02.1__AMD__0004_Specifications.pdf PDF
A02.1__AMD__0004_Summary.pdf PDF
A02.1__AMD_0004_Pricing.pdf PDF
A02.1__AMD_0004__Drawings.pdf PDF
A02.1__AMD_0004_Encroachment_Pmt.pdf PDF
W91238-13-R-0032_AMD_0004.pdf PDF
Amendment_0003.pdf PDF
Site_Visit_2_Sign_In_Sheet.pdf PDF
A02.1_AMD_0002__Summary_of_Spec_Changes_.pdf PDF
A02.1_W91238-13-R-0032_AMD_0002.pdf PDF
A02.1__AMD_0002_Pricing_Breakout_AMD_0002.pdf PDF
A02.1_AMD_0002_Drawing_Sheet_List_(100113).pdf PDF
A02.1_AMD_0002__Specification_1839_(100113).pdf PDF
A02.1__AMD_0002_Drawings_(2)_09-27-13.pdf PDF
Exhibit_A_Floodwall_Sheets.docx DOCX document
Attachment_4 _WD_6_Sep.pdf PDF
Attachment_3 _Pricing_Breakout.pdf PDF
A01.2_Specifications_AMD_0001.pdf PDF
Pages_76-150__from_A01.2_Drawings_AMD_0001.pdf PDF
Pages_from_Pages_1-75__from_A01.2_Drawings_AMD_0001.pdf PDF
13-R-0032-0001.pdf PDF
Site_Visit_Notes.pdf PDF
Site_Visit_Sign-In_Sheets.pdf PDF
Drawings_22x34_C-123.pdf PDF
Drawings_22x34_L_Seeding_Sheets.pdf PDF
Drawings_22x34_CD_CS_CU_Sheets.pdf PDF
Drawings_22x34_L_Plug_Planting_Sheets.pdf PDF
Drawings_22x34_G_Sheets.pdf PDF
Drawings_22x34_C_Sheets_4_of_4.pdf PDF
Drawings_22x34_C_Sheets_3_of_4.pdf PDF
Drawings_22x34_C_Sheets_2_of_4.pdf PDF
Drawings_22x34_C_Sheets_1_of_4.pdf PDF
NapaBypass-USACE_22x34_LI_Sheets_.pdf PDF
NapaBypass-USACE_22x34_E_Sheets.pdf PDF
NapaBypass-USACE_22x34_B_Sheets.pdf PDF
NapaBypass-USACE_22x34_L_Planting_Plan_Sheets.pdf PDF
NapaBypass-USACE_22x34_GC_Sheets.pdf PDF
A02.1(b)__Attach_2__1839_SPECIFICATION(082113).pdf PDF
A02.1__W91238-13-R-0032.pdf PDF
Show all 50

NAPA RIVER DRY BYPASS, NAPA, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Napa River Dry Bypass, Napa, CA

The purpose of this amendment is to address bidder inquiry questions by revising:

1) The Detailed Pricing Breakout. (See attachment 03)

2) A Summary of Changes (See attachment 16)

3) The Specifications (See attachment 17)

4) The Plans (See attachment 18)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Nov-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-13-R-0032

X 9B. DATED (SEE ITEM 11)

23-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Nov-2013

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-13-R-0032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION - CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 1002 Exhibit(s) 1 Attachment 01 Specifications 1088 12-SEP-2013 Attachment 02 Drawings 249 01-JUL-2013 Attachment 03 AMD 0006 Rev Pricing

Breakout

8 12-NOV-2013

Attachment 04 Wage Determination

CA130009

43 06-SEP-2013

Attachment 05 Summary of Specification Changes

2 01-OCT-2013

Attachment 06 Specifications AMD

114 01-OCT-2013

Attachment 07 Drawings Sheet List 4 01-OCT-2013 Attachment 08 Drawings (1) AMD 0002 14 27-SEP-2013 Attachment 09 Drawings (2) AMD 0002 17 27-SEP-2013 Attachment 10 AMD 0004 Summary of

Changes

2 29-NOV-2013

Attachment 11 AMD 0004 Specifications 161 29-NOV-2013 Attachment 12 AMD 0004 Drawings 12 29-NOV-2013 Attachment 13 AMD 0006 REV

Encroachment Permit

6 12-NOV-2013

Attachment 14 Amendment 0005 Revisions to Plans and Specifications

134 08-NOV-2013

Attachment 15 AMD 0006 Summary of Changes Revised Plans and Specs

93 12-NOV-2013

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 1002 Exhibit(s) 1 Attachment 01 Specifications 1088 12-SEP-2013 Attachment 02 Drawings 249 01-JUL-2013 Attachment 03 AMD 0008 Pricing

Breakout

8 14-NOV-2013

Attachment 04 Wage Determination

CA130009

43 06-SEP-2013

W91238-13-R-0032

Attachment 05 Summary of Specification Changes

2 01-OCT-2013

Attachment 06 Specifications AMD

114 01-OCT-2013

Attachment 07 Drawings Sheet List 4 01-OCT-2013 Attachment 08 Drawings (1) AMD 0002 14 27-SEP-2013 Attachment 09 Drawings (2) AMD 0002 17 27-SEP-2013 Attachment 10 AMD 0004 Summary of

Changes

2 29-NOV-2013

Attachment 11 AMD 0004 Specifications 161 29-NOV-2013 Attachment 12 AMD 0004 Drawings 12 29-NOV-2013 Attachment 13 AMD 0006 REV

Encroachment Permit

6 12-NOV-2013

Attachment 14 Amendment 0005 Revisions to Plans and Specifications

134 08-NOV-2013

Attachment 15 AMD 0006 Summary of Changes Revised Plans and Specs

93 12-NOV-2013

Attachment 16 AMD 0008 Summary of Changes

1 14-NOV-2013

Attachment 17 AMD 0008 Revised Specifications

49 14-NOV-2013

Attachment 18 AMD 0008 Revised Drawings

1 14-NOV-2013

(End of Summary of Changes)