Amendment 0004
NAPA COUNTY FLOOD CONTROL AND
WATER CONSERVATION DISTRICT
ENCROACHMENT PERMIT
Applicant to provide the following information:
NAME OF APPLICANT:
MAILING ADDRESS OF APPLICANT:
TELEPHONE NUMBER: ( ) - RECEIPT NUMBER:
I hereby apply for an encroachment permit to perform the following work on, over or under District property, right of way or easement:
LOCATION OF PROPOSED ENCROACHMENT:
NOTE: Give street address, approximate distance to nearest public road intersection and the approximate location in the field to readily identifiable fixed object.
DESCRIPTION OF WORK TO BE PERFORMED OR
IMPROVEMENTS TO BE INSTALLED:
Attach detailed plans or sketch. (If available)
ASSESSOR’S PARCEL NO:
EXPECTED DATE OF COMPLETION
(or N/A if permanent):
In making this application, I agree to comply with all the terms hereof:
SIGNATURE OF APPLICANT: DATE:
APPLICANT TO SEND COMPLETED APPLICATION TO:
NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
804 FIRST STREET
NAPA, CALIFORNIA 94559-2623
(707) 259-8624
(FOR OFFICE USE ONLY)
Issued on , subject to the conditions and restrictions attached and to the special regulations enumerated on the reverse side hereof. The terms of this permit shall be strictly complied with and only the work specifically authorized hereby shall be accomplished. The permit shall expire on ____________________________.
Project Engineer ______________________ O&M Manager ___________________________
(OVER)
FOR OFFICE USE ONLY
Channel or Facility
Permit No.
Date Received
Attachment # ______
L2CTBMRS
Typewritten Text
FOR INFORMATION ONLY
L2CTBMRS
Typewritten Text
L2CTBMRS
Typewritten Text
L2CTBMRS
Typewritten Text
L2CTBMRS
Typewritten Text
L2CTBMRS
Typewritten Text
PERMITTEE NOTES:
All Encroachments over, upon or under District Facilities or other rights of way are regulated by County of NAPA CODE TITLE 12 ROADS AND VEHICLES – ENCROACHMENTS and the EXCAVATION AND BACKFILL SPECIFICATIONS adopted pursuant thereto. Copies of these are available for review at the Department of Public Works, 1195 Third Street, Room 201, Napa, California 94559. The failure of Permittee to fully accomplish or satisfy the terms hereof shall render this permit null and void.
GENERAL PERMIT REGULATIONS
1. Work done under this permit shall be in accordance with the latest edition of the Standard Specifications of the Department of Public Works, State of California, Department of Transportation, the above-mentioned code and the specifications and provisions enumerated herein: Title IV of the Napa County Code and attached specifications shall govern in case of conflict.
2. Permittee is responsible to obtain all other permits required by other public or private agencies or individuals for the performance of the intended work.
3. Authorization for any installation granted by virtue of this permit is revocable by District at any time.
4. Maintenance of the encroachment is strictly the responsibility of the Permittee.
5. Whenever District sponsored construction, reconstruction or maintenance work on the easement or facility requires any installation authorized by this permit shall, upon order of the District Engineer, be promptly removed or relocated by and at the expense of the Permittee.
6. Existing drainage facilities must be operable at all times.
7. Upon the completion of the work, the Permittee shall clean the right of way of all rubbish, debris, trees, brush, excess material, temporary structures and the right of way shall be left in at least as presentable a condition as before the work began.
8. The Permittee shall notify the Napa County Flood Control District three (3) days prior to the commencement of any work authorized by this permit and shall advise when the work is complete and ready for final inspection. This permit shall be kept at the jobsite at all times.
9. The Permittee shall be responsible for all repairs of public facilities that are necessitated by any failure in the work accomplished under this permit; such responsibility shall extend for a period of one (1) year from date of acceptance by the District.
10. Erosion control measures shall be provided for work as required by applicable regulations and standards and shall be at
Permittee’s expense.
SPECIAL REQUIREMENTS FOR THIS PERMIT ARE ATTACHED
FOR INSPECTION, CALL (707) 259-8600 AT LEAST 72 HOURS PRIOR.
City of Napa Encroachment Permit Conditions
This is not an Encroachment Permit and has been included for the Contractors information. The Contractor will be required to obtain an encroachment permit from the City of Napa before the start of work. The following conditions will be included in the permit. Other conditions may be included at the time of permit issuance.
Contractor will be solely responsible for meeting the requirements of the permit and associated conditions.
1. Contractor shall maintain safe vehicle, pedestrian, ADA, and bicycle traffic access throughout the duration of the Project and provide detours only as needed to facilitate construction activities. All such detours shall be in accordance with the Project’s Detour Plans which shall be submitted to the City of Napa for review.
2. Contractor shall submit formal written requests to the City for all street, traffic lane, bike lane, and pedestrian access closures and/or detour at least five (5) business days in advance of planned closure/detour. Road closures or lane restrictions will require review and approval by the City of Napa along with outreach to businesses, owners, residents, and the public at large. Outreach efforts must include informing all businesses and residents on McKinstry Street, First Street between Silverado and Soscol Avenue at least two weeks before planned closure/detour. Road closures and /or detours will not be approved without an outreach plan and documentation of outreach efforts. (Spec 01 45 00 Sec 3.4.5)
3. Contractor is responsible for the safety of the construction site. Contractor shall erect barricades on all trenches, excavations, and obstructions. Lights must be maintained at night. All signs, flags, lights and other warning and safety devices shall conform to the requirements set forth in the latest California Manual Uniform Traffic Control Devices (MUTCD). Contractor shall maintain existing City lighting at all times and provide temporary lighting of pedestrian walkways for detours or when City lighting cannot be maintained. Failure to install said public safety devices to the satisfaction of the City may result in the City taking all necessary actions to protect the public and the District at the expense of the contractor.
4. Contractor shall provide sufficient access to all fire hydrants at all times. The determination of sufficient access is at the sole discretion of the City and the District shall ensure that Grantee take immediate actions to restore sufficient access to all fire hydrant as solely determined by the City. (EM-385 Section 9, 09.A.21)
5. The contractor shall not store dumpsters, materials, equipment or any other items within the public right-of-way without prior written approval from the City.
Failure to remove all refuse to the satisfaction of the City or unapproved storage of any items within the public right-of-way may result in the City taking actions to remove the refuse or stored items.
6. Trees, shrubs, and other plants that are not to be removed, fences, signs, marker and monuments, buildings and structures, conduits, pipelines under or above ground, sewer and water lines, all City facilities and any other improvements or facilities not included in the work shall be protected from injury or damage. The Contractor shall provide and install suitable safeguards, approved by the City, to protect the objects from injury or damage. If the objects are injured or damaged by reason of the Contractor’s operations, the objects shall be replaced or restored at the Contractor’s expense as approved by the City. (Spec 02 41 00 Sec 1.5)
7. Contractor shall screen active staging areas from public view. The fencing and screen shall be maintained in good condition. A sign shall be placed on the construction fencing at visible public vantage points informing the public of the construction activity, duration of work and contact information for the contractor.
The sign shall be of professional quality and mounted in a safe and effective manner. Prior to erecting the screening fence and sign, the fence plans and sign proof shall be reviewed and approved by the City. Vandalism of signage or fencing screen shall be cleaned/replaced within 72 hours. (Spec 32 31 13 and Spec 01 50 00)
8. Contractor shall complete all construction in accordance with the latest edition of the City of Napa Public Works Standard Plans and Specifications and all work not completed in accordance with said standards shall be removed at the contractor’s sole expense.
9. Contractor shall protect existing drainage conditions at all times in all locations.
Drainage water shall not be permitted to flow over the public property or sidewalk.
10. Contractor shall obtain all other permits required by other public or private agencies or individuals necessary in order to perform the intended work. If this provision is not complied with, this Agreement shall be null and void. It shall be the responsibility of the contractor to notify the utility companies before starting any construction which may involve their underground or overhead facilities and pay for any removal or relocation work necessary. Following is a partial list of telephone numbers:
Underground Service Alert, USA, 811 / 800-227-2600 Napa Sanitation District, 258-6000 City of Napa - Water Division, 257-9520
(Spec 32 91 00)
11. The Contractor shall notify Underground Service Alert at least two (2) working days, but not more than fourteen (14) calendar days, prior to performing any excavation. The Contractor shall not perform any excavation unless Underground Service Alert has been notified in the required time frame.
(Spec 32 91 00)
12. Contractor shall maintain all excavations in existing streets in a safe condition until the permanent paving is installed. Public streets shall be restored to usable conditions at the end of each closure. In areas where temporary restoration methods are used, they shall be replaced with permanent paving within 14 calendar days unless otherwise approved by the Contracting Officer’s Representative.
13. Contractor is responsible for preservation and/or perpetuation of all existing monuments which control subdivisions, tracts, boundaries, streets, highways, or other rights-of-way, easements, or provide survey control which will be disturbed or removed due to contractor’s work. Contractor shall provide a minimum of 10 working days’ notice to City of Napa and project engineer/surveyor prior to disturbance or removal of existing monuments. Contractor shall reset monuments or provide permanent witness monuments and file the required documentation with the County Surveyor pursuant to the Business and Professions Code, Section 8771. (Spec 01 57 20 and Plan Sheet G-111 Note 25)
14. Contractor shall conduct outreach activities to residents, property owners, and businesses informing them of construction activities that may impact them including, noise, night or weekend work, traffic, parking, delivery, garbage service, and pedestrian access. Email notification, mail notification, signage and other outreach media including the newspaper will be required for this project at the sole expense of the contractor. All outreach efforts shall be documented and approved by the City. Contractor shall be required to develop an outreach plan approved by the City. The outreach plan will designate a contact person that will be responsible for the outreach to the community and available to answer questions. (Spec 01 45 00)
15. Contractor shall provide a minimum 48 hours’ notice to property owners, tenants or businesses if vehicle, pedestrian, or delivery access is to be limited for construction activities. At least one access point to adjacent properties within the work area shall be provided at all times unless arrangements have been made prior to the limitation of access. (Spec 01 50 00)
16. Contractor shall identify parking locations for employee and subcontractor and submit a plan to the City prior to the use of City/Agency property. The parking area(s) shall be large enough to accommodate the construction activity per phase. Parking is limited in the construction work zone(s), so contractor and subcontractors will be required to park within designated area(s) and not impact City on-street hourly parking or public parking lots that are not part of active construction. Contractor may be required to park offsite and shuttle workers to the site if adequate space is not available within the designated staging areas.
City may charge a day fee for parking for onsite parking owned by the City due to the limited parking. Contractor shall be responsible for informing their subcontractors about where to park and where not to park and will be responsible for enforcing no parking along the City streets and businesses’ parking lots for employees, vendors, and sub-contractors.
17. Contractor shall provide a Storm Water Pollution Prevention Plan (SWPPP) that includes an Erosion Control Plan and Best Management Practices (BMP’s) to prevent illicit discharges during construction along with a schedule for implementation. Contractor shall ensure all activities are conducted in accordance with the most recent edition of the State Water Resources Control Board “General Permit for Storm water Discharges Associated with Construction Activity” and the Napa Municipal Code Section 8.36 “Storm water Runoff Pollution Control” to the Maximum Extent Practicable. The contractor shall ensure all activities are conducted in accordance with the approved SWPPP that incorporates BMP’s during construction in order to prevent illicit discharges.
Street sweeping that effectively removes and controls sediment from the roadways in the project area and along haul routes is required. The SWPPP shall include, but is not limited to, the following, Erosion Control Plan, dust control, handling, storage and disposal of all hazardous and non-hazardous waste, spill prevention, cleanup and disposal procedures, designated equipment cleanup and fueling areas and a copy of the Notice of Intent (NOI) submitted for coverage under NPDES. Any construction area within the City may be subject to storm water compliance inspections and enforcement by the City. (Spec 01 57 20)
18. Construction activities throughout the entire duration of the project shall be limited to the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday. There will be no start up of machines nor equipment prior to 8:00 a.m., Monday through Friday; no delivery of materials nor equipment prior to 7:30 a.m. nor past 5:00 p.m., Monday through Friday; no cleaning of machines nor equipment past 6:00 p.m., Monday through Friday; no servicing of equipment past 6:45 p.m., Monday through Friday;
and construction on weekends or legal holidays shall be limited to the hours of 8:00 a.m. to 4:00 p.m., unless a permit shall first have been secured from the City Manager, or designee, pursuant to Section 8.08.050 of the municipal code. If the Contractor desires to work on Saturdays, Sundays, City holidays, or hours beyond those stated above, the Contractor shall submit a written request to the City designated Engineer for approval. The request shall state the reason for the change in the working day schedule, approval in writing from the Army Corps of Engineers, and received by the City a minimum of (5) working days prior to the requested change.
19. Contractor shall schedule and hold a preparatory meeting with the City prior to any and all phases of work within the City right of way or that may affect the City right of way, including hauling. (Spec 01 45 00 Sec 3.6.1)
| 01 14 00 1 Attachment: AM0004 FCD Encroachment Permit Application |
| 01 14 00 2 Attachment: AM0004: City of Napa Encroachment Permit Conditions |
| 01 22 00 AM0004 |
| 01 22 00 - MEASUREMENT AND PAYMENT |
| 01 22 00 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 LUMP SUM PAYMENTS ITEMS |
| 1.1.1 Mobilization and Demobilization 0001AA |
| 1.1.1.1 Payment |
| 1.1.2 Traffic Control 0001AC |
| 1.1.2.1 Payment |
| 1.1.3 Traffic Control 0001AD |
| 1.1.3.1 Payment |
| 1.1.4 Sanitary Sewer Modifications 0001AO |
| 1.1.4.1 Payment |
| 1.1.5 Cathodic Protection 0001AV |
| 1.1.5.1 Payment |
| 1.1.6 Monitoring 0001BG |
| 1.1.6.1 Payment |
| 1.1.7 Pavement Markings 0001BH |
| 1.1.7.1 Payment |
| 1.1.8 Mobilization and Demobilization 0002AA |
| 1.1.8.1 Payment |
| 1.1.9 Traffic Control 0002AB |
| 1.1.9.1 Payment |
| 1.1.10 Demolish Energy Dissipater 0002AI |
| 1.1.10.1 Payment |
| 1.1.11 Cofferdams And Dewatering 0002AR |
| 1.1.11.1 Payment |
| 1.1.12 Monitoring 0002BMO |
| 1.1.12.1 Payment |
| 1.1.13 Box Culvert Structure 0002BV |
| 1.1.13.1 Payment |
| 1.1.14 Irrigation System 0005AF |
| 1.1.14.1 Payment |
| 1.1.15 Irrigation Water Line Fee 0007AA |
| 1.1.15.1 Payment |
| 1.1.16 Floodwall 352 Closure Structure 12002AE |
| 1.1.16.1 Payment |
| 1.1.17 Floodwall 352 Flood Gate 12002AF |
| 1.1.17.1 Payment |
| 1.1.18 Patch Asphalt 2002AH |
| 1.1.18.1 Payment |
| 1.1.19 Floodwall 362 Closure Structure 12002AN |
| 1.1.19.1 Payment |
| 1.1.20 Floodwall 362 Flood Gate 12002AO |
| 1.1.20.1 Payment |
| 1.1.21 Patch Asphalt 2002AQ |
| 1.1.21.1 Payment |
| 1.1.22 Conduits 12002AS |
| 1.1.22.1 Payment |
| 1.1.23 Conductors 12002AT |
| 1.1.23.1 Payment |
| 1.1.24 Floodwall Lighting 12002AU |
| 1.1.24.1 Payment |
| 1.1.25 Closure Structure Lighting 12002AV |
| 1.1.25.1 Payment |
| 1.1.26 Power Service 12002AW |
| 1.1.26.1 Payment |
| 1.2 UNIT PRICE PAYMENT ITEMS |
| 1.2.1 Demolition Water Line and Valves 0001ADE |
| 1.2.1.1 Payment |
| 1.2.2 Demolition Sanitary Sewer Lines 0001AEF |
| 1.2.2.1 Payment |
| 1.2.3 Demolition Asphalt Paving 0001AFG |
| 1.2.3.1 Payment |
| 1.2.4 Demolition Concrete Curb 0001AGH |
| 1.2.4.1 Payment |
| 1.2.5 Demolition Landscape Wall 0001AHI |
| 1.2.5.1 Payment |
| 1.2.6 Remove and Return Light Poles 0001AIJ |
| 1.2.6.1 Payment |
| 1.2.7 Relocate Light Poles 0001AJK |
| 1.2.7.1 Payment |
| 1.2.8 Salvage Amtrak Signs and Posts 0001AKL |
| 1.2.8.1 Payment |
| 1.2.9 Rough Grading 0001ALM |
| 1.2.9.1 Payment |
| 1.2.10 Sanitary Sewer Pipe CLSM Encasement 0001AMN |
| 1.2.10.1 Payment |
| 1.2.11 Water Line Relocation 0001AOP |
| 1.2.11.1 Payment |
| 1.2.12 Water Line Connection To Kayak Building 0001APQ |
| 1.2.12.1 Payment |
| 1.2.13 Water Line Connection To 1031 Building 0001AQR |
| 1.2.13.1 Payment |
| 1.2.14 New Fire Hydrant And Service 0001ARS |
| 1.2.14.1 Payment |
| 1.2.15 New Irrigation Service Line 0001AST |
| 1.2.15.1 Payment |
| 1.2.16 Steel Casing Sleeves 0001ATU |
| 1.2.16.1 Payment |
| 1.2.17 15 Inch RCP Storm Drain 0001AVW |
| 1.2.17.1 Payment |
| 1.2.18 18 Inch RCP Storm Drain 0001 AW |
| 1.2.18.1 Payment |
| 1.2.19 Catch Basins 0001AXY |
| 1.2.19.1 Payment |
| 1.2.20 Subgrade Prep RoadsPaved Areas 0001AYZ |
| 1.2.20.1 Payment |
| 1.2.21 Subgrade Prep SidewalksCurbs 0001BA |
| 1.2.21.1 Payment |
| 1.2.22 Base Course 0001BB |
| 1.2.22.1 Payment |
| 1.2.23 Place Curb and Gutter 0001BC |
| 1.2.23.1 Payment |
| 1.2.24 Place New Roadway 0001BD |
| 1.2.24.1 Payment |
| 1.2.25 Place Sidewalk 0001BE |
| 1.2.25.1 Payment |
| 1.2.26 Bollards 0001BF |
| 1.2.26.1 Payment |
| 1.2.27 Demolish Parking Lots and Pathways 0002AC |
| 1.2.27.1 Payment |
| 1.2.28 Demolish Curb and Sidewalk 0002AD |
| 1.2.28.1 Payment |
| 1.2.29 Demolish Fencing 0002AE |
| 1.2.29.1 Payment |
| 1.2.30 Demolish Guard Rails and Barriers 0002AF |
| 1.2.30.1 Payment |
| 1.2.31 Remove Light Poles 0002AG |
| 1.2.31.1 Payment |
| 1.2.32 Remove Street Signs 0002AH |
| 1.2.32.1 Payment |
| 1.2.33 Remove RCP Pipe 0002AJ |
| 1.2.33.1 Payment |
| 1.2.34 Remove Sewer Lines 0002AK |
| 1.2.34.1 Payment |
| 1.2.35 Salvage Tree 0002AL |
| 1.2.35.1 Payment |
| 1.2.36 Clearing and Grubbing 0002AM |
| 1.2.36.1 Payment |
| 1.2.37 Channel Excavation 0002AN |
| 1.2.37.1 Payment |
| 1.2.38 Cut To Fill Excavation 0002AO |
| 1.2.38.1 Payment |
| 1.2.39 Disposal Yard Grading 0002AP |
| 1.2.39.1 Payment |
| 1.2.40 Subgrade Preparation 0002AQ |
| 1.2.40.1 Payment |
| 1.2.41 30 Inch RCP With Outfall 0002AS48 Inch Manhole 0002AS & 0002AU |
| 1.2.41.1 Payment |
| 1.2.42 48 Inch Manhole 0002AT30 Inch RCP Storm Drain & 18" RCP Storm Drain |
| 1.2.42.1 Payment |
| 1.2.43 Fine Grading For Landscaped Areas 0002AWU |
| 1.2.43.1 Payment |
| 1.2.44 Bypass Inlet Sheetpile 0002AXV |
| 1.2.44.1 Payment |
| 1.2.45 Bypass Inlet Bank Rock Slope Bedding 0002AYW |
| 1.2.45.1 Payment |
| 1.2.46 Bypass Inlet Bank Rock Slope Protection D50 0002AZX |
| 1.2.46.1 Payment |
| 1.2.47 Bypass Inlet VRSS Soil Lifts 0002AYBA |
| 1.2.47.1 Payment |
| 1.2.48 Bypass Outlet Sheetpile 0002AZBB |
| 1.2.48.1 Payment |
| 1.2.49 Bypass Outlet Bank Rock Slope Bedding 0002BCA |
| 1.2.49.1 Payment |
| 1.2.50 Bypass Outlet Bank Rock Slope Protection D50 0002BDB |
| 1.2.50.1 Payment |
| 1.2.51 Bypass Outlet Launchable Toe Bedding0002BEC |
| 1.2.51.1 Payment |
| 1.2.52 Bypass Outlet Launchable Toe Protection 0002BFD |
| 1.2.52.1 Payment |
| 1.2.53 Bypass Outlet Launchable Toe Fill 0002BGE |
| 1.2.53.1 Payment |
| 1.2.54 Napa Creek Bank Protection STA 17+70 to STA 16+00 0002BHF |
| 1.2.54.1 Payment |
| 1.2.55 Napa Creek Bank Protection STA16+00 to STA 14+55 0002BIG |
| 1.2.55.1 Payment |
| 1.2.56 Rootwads 0002BJH |
| 1.2.56.1 Payment |
| 1.2.57 Stepped Energy Dissipater 0002BKI |
| 1.2.57.1 Payment |
| 1.2.58 Slab On Grade Under Wine Train Bridge 0002BLJ |
| 1.2.58.1 Payment |
| 1.2.59 Energy Dissipater Blocks 0002BMK |
| 1.2.59.1 Payment |
| 1.2.60 Concrete Curb at Energy Dissipater 0002BNL |
| 1.2.60.1 Payment |
| 1.2.61 Low Flow Channel Excavation 0002BPN |
| 1.2.61.1 Unit of Measure |
| 1.2.62 Low Flow Channel Rock Lining 0002BQO |
| 1.2.62.1 Payment |
| 1.2.63 Concrete Elliptical Stage 0002BRP |
| 1.2.63.1 Payment |
| 1.2.64 China Point Pathway 0002BSR |
| 1.2.64.1 Payment |
| 1.2.65 Slab on Grade Under Soscol Street Bridge 0002BT |
| 1.2.65.1 Payment |
| 1.2.66 Slab on Grade Under First Street Bridge 0002BU |
| 1.2.66.1 Payment |
| 1.2.67 10' Concrete Pathway BETTERMENT 0003AB |
| 1.2.67.1 Payment |
| 1.2.68 10' Concrete Pathway RECREATION 0003AC |
| 1.2.68.1 Payment |
| 1.2.69 12' Concrete Pathway BETTERMENT 0004AA |
| 1.2.69.1 Payment |
| 1.2.70 12' Concrete Pathway RECREATION 0004AB |
| 1.2.70.1 Payment |
| 1.2.71 Soil Preparation 0005AA |
| 1.2.71.1 Payment |
| 1.2.72 Turf Reinforcement Mat 0005AB |
| 1.2.72.1 Payment |
| 1.2.73 Plantings - Shrubs 0005AC |
| 1.2.73.1 Payment |
| 1.2.74 Plantings - Trees 0005AD |
| 1.2.74.1 Payment |
| 1.2.75 Plug Plantings 0005AE |
| 1.2.75.1 Payment |
| 1.2.76 Irrigation System 0005AF |
| 1.2.76.1 Payment |
| 1.2.77 Seeding 0005AG |
| 1.2.77.1 Payment |
| 1.2.78 Excavate BETTERMENT 1001AA |
| 1.2.78.1 Payment |
| 1.2.79 Concrete BETTERMENT 1001AB |
| 1.2.79.1 Payment |
| 1.2.80 Backfill BETTERMENT 1001AC |
| 1.2.80.1 Payment |
| 1.2.81 Excavation 12002AA |
| 1.2.81.1 Payment |
| 1.2.82 Cast-In-Place Wall With Pedestals 12002AB |
| 1.2.82.1 Payment |
| 1.2.83 Gabion Wall 12002AC |
| 1.2.83.1 Payment |
| 1.2.84 Architectural Railing Low 12002AD |
| 1.2.84.1 Payment |
| 1.2.85 Backfill 12002AG |
| 1.2.85.1 Payment |
| 1.2.86 Floodwall 352 Maintenance Road 12002AI |
| 1.2.86.1 Payment |
| 1.2.87 Excavation 12002AJ |
| 1.2.87.1 Payment |
| 1.2.88 Cast-In-Place Wall With Pedestals 12002AK |
| 1.2.88.1 Payment |
| 1.2.89 Architectural Railing Low 12002AL |
| 1.2.89.1 Payment |
| 1.2.90 Architectural Railing Tall 12002AM |
| 1.2.90.1 Payment |
| 1.2.91 Backfill 12002AP |
| 1.2.91.1 Payment |
| 1.2.92 Payment |
| 1.2.93 Solid Waste Removal 13003AA |
| 1.2.93.1 Payment |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 33 00 AM0004 |
| 01 33 00 - SUBMITTAL PROCEDURES |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 DEFINITIONS |
| 1.2.1 Submittal Descriptions SD |
| 1.2.2 Approving Authority |
| 1.2.3 Work |
| 1.3 SUBMITTALS |
| 1.4 SUBMITTAL CLASSIFICATION |
| 1.4.1 Government Approved G |
| 1.4.2 Information Only |
| 1.5 PREPARATION |
| 1.5.1 Transmittal Form |
| 1.6 INFORMATION ONLY SUBMITTALS |
| 1.7 VARIATIONS |
| 1.7.1 Considering Variations |
| 1.7.2 Proposing Variations |
| 1.7.3 Warranting That Variations Are Compatible |
| 1.7.4 Review Schedule Is Modified |
| 1.8 SUBMITTAL REGISTER |
| 1.8.1 Use of Submittal Register |
| 1.8.2 Contractor Use of Submittal Register |
| 1.8.3 Approving Authority Use of Submittal Register |
| 1.8.4 Copies Delivered to the Government |
| 1.9 SCHEDULING |
| 1.10 GOVERNMENT APPROVING AUTHORITY |
| 1.11 DISAPPROVED OR REJECTED SUBMITTALS |
| 1.12 APPROVED/ACCEPTED SUBMITTALS |
| 1.13 APPROVED SAMPLES |
| 1.14 WITHHOLDING OF PAYMENT |
| 1.15 STAMPS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 AFTER AWARD DOCUMENTS Contractor Prepared |
| 01 45 00 AM0004 |
| 01 45 00 - QUALITY CONTROL |
| 01 45 00 - QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PAYMENT |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 QUALITY CONTROL PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager |
| 3.4.3 CQC Personnel |
| 3.4.4 Information Officer |
| 3.4.5 Disturbance Coordinator |
| 3.4.6 Additional Requirement |
| 3.4.7 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.2.1 Capability Check |
| 3.7.2.2 Quality Assurance Check |
| 3.7.3 Onsite Laboratory |
| 3.7.4 Furnishing or Transportation of Samples for Testing |
| 3.8 COMPLETION INSPECTION |
| 3.8.1 Punch-Out Inspection |
| 3.8.2 Pre-Final Inspection |
| 3.8.3 Final Acceptance Inspection |
| 3.9 DOCUMENTATION |
| 3.10 IMPLEMENTATION OF GOVERNMENT RESIDENT MANAGEMENT SYSTEM |
| 3.11 SAMPLE OF REQUIRED FORMS |
| 3.12 NOTIFICATION OF NONCOMPLIANCE |
| 3.13 CONSTRUCTION CONTROL MANUAL |
| TEST REPORT |
| DAILY CONSTRUCTION QUALITY CONTROL REPORT |
| PREPARATORY INSPECTION OUTLINE |
| INITIAL PHASE CHECK LIST |
| CESPK FORM 437 |
| 31 00 00 AM0004 |
| 31 00 00 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 MEASUREMENT |
| 1.2 PAYMENT |
| 1.3 MEASUREMENT PROCEDURES |
| 1.3.1 Excavation |
| 1.3.2 Piping Trench Excavation |
| 1.3.3 Topsoil Requirements |
| 1.4 PAYMENT PROCEDURES |
| 1.4.1 Piping Trench Excavation |
| 1.4.2 Unclassified Excavation |
| 1.4.3 Sheeting and Bracing |
| 1.4.3.1 Timber Sheeting |
| 1.4.3.2 Steel Sheeting and Soldier Piles |
| 1.5 CRITERIA FOR BIDDING |
| 1.6 REFERENCES |
| 1.7 DEFINITIONS |
| 1.7.1 Relative Compaction |
| 1.7.2 Satisfactory Materials |
| 1.7.3 Unsatisfactory Materials |
| 1.8 SYSTEM DESCRIPTION |
| 1.9 DEWATERING WORK PLAN |
| 1.10 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 BURIED WARNING AND IDENTIFICATION TAPE |
| 2.1.1 Warning Tape for Metallic Piping |
| 2.1.2 Detectable Warning Tape for Non-Metallic Piping |
| 2.2 DETECTION WIRE FOR NON-METALLIC PIPING |
| 2.3 CONTROLLED LOW-STRENGTH MATERIAL CLSM |
| 2.4 EMBANKMENT FILL |
| 2.5 GRANULAR FILL |
| 2.6 COHESIVE BACKFILL |
| 2.7 TOPSOIL |
| 2.8 UTILITY BEDDING MATERIAL |
| 2.9 INITIAL BACKFILL FOR TRENCHES |
| PART 3 EXECUTION |
| 3.1 SHORING AND SHEETING PLAN |
| 3.1.1 General Requirements |
| 3.2 SURFACE PREPARATION |
| 3.2.1 Clearing and Grubbing |
| 3.2.2 Stripping |
| 3.3 PROTECTION |
| 3.3.1 Shoring and Sheeting |
| 3.3.2 Drainage |
| 3.3.3 Dewatering |
| 3.3.3.1 Dewatering Plan Requirements |
| 3.3.3.1.1 Description of Dewatering Plan Elements |
| 3.3.3.2 DEWATERING THE SITE |
| 3.3.3.2.1 General |
| 3.3.3.2.2 Dewatering Plan |
| 3.3.3.3 Control of Water |
| 3.3.3.3.1 General |
| 3.3.3.3.2 Dewatering Requirements |
| 3.3.3.3.3 Dewatering Contaminated Groundwater |
| 3.3.4 Underground Utilities |
| 3.3.5 Machinery and Equipment |
| 3.4 EXCAVATION |
| 3.4.1 Ditches, Gutters, and Channel Changes |
| 3.4.2 Drainage Structures |
| 3.4.3 Trench Excavation |
| 3.4.3.1 Removal of Unstable Material |
| 3.4.3.2 Excavation for Appurtenances |
| 3.5 UTILIZATION OF EXCAVATED MATERIALS |
| 3.6 SUBGRADE PREPARATION |
| 3.6.1 Trench Subgrade |
| 3.6.2 Embankment Subgrade |
| 3.6.3 Foundation Subgrade |
| 3.6.4 Subgrade for Pavements |
| 3.7 FILL AND BACKFILL |
| 3.7.1 Fill and Backfill |
| 3.7.2 Earth Embankments |
| 3.7.3 Backfill Adjacent to Floodwalls |
| 3.7.4 Backfill and Fill Material Placement over Pipes and at Walls |
| 3.7.5 Trench Backfilling |
| 3.7.5.1 Replacement of Unyielding Material |
| 3.7.5.2 Replacement of Unstable Material |
| 3.7.5.3 Bedding and Initial Backfill |
| 3.7.5.4 Sub Title |
| 3.7.5.5 Final Backfill |
| 3.7.5.6 Backfill for Appurtenances |
| 3.8 BURIED TAPE AND DETECTION WIRE |
| 3.8.1 Buried Warning and Identification Tape |
| 3.8.2 Buried Detection Wire |
| 3.9 SPECIAL REQUIREMENTS |
| 3.9.1 Gas Distribution |
| 3.9.2 Water Lines |
| 3.9.3 Heat Distribution System |
| 3.9.4 Electrical Distribution System |
| 3.9.5 Sewage Absorption Trenches or Pits |
| 3.9.6 Cleaning |
| 3.9.6.1 End Seals |
| 3.10 SPECIAL EARTHWORK REQUIREMENTS FOR SUBSURFACE DRAINS |
| 3.10.1 Slotted Wall Pipe |
| 3.11 RIP-RAP CONSTRUCTION |
| 3.12 FINISH OPERATIONS |
| 3.12.1 Grading |
| 3.12.2 Shoulder Construction |
| 3.12.3 Topsoil and Seed |
| 3.12.4 Protection of Surfaces |
| 3.13 DISPOSITION OF SURPLUS MATERIAL |
| 3.14 TESTING |
| 3.14.1 Fill and Backfill Material Gradation |
| 3.14.2 Density Test |
| 3.14.3 Moisture Content |
| 3.14.4 Optimum Moisture and Laboratory Maximum Density |
| 3.14.5 Sub-grade Observation and Testing |
| 3.14.6 Displacement of Sewers |
3.15 PLACING TOPSOIL
| 32 91 00 Attachment: AM0004: |
| 32 92 19 AM0004 |
| 32 92 19 - SEEDING |
| 32 92 19 - SEEDING |
| PART 1 GENERAL |
| 1.1 MEASUREMENT |
| 1.2 PAYMENT |
| 1.3 DESCRIPTION |
| 1.4 REFERENCES |
| 1.4.1 Related Work |
| 1.5 DEFINITIONS |
| 1.5.1 Stand of Turf |
| 1.6 SUBMITTALS |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| 1.7.1 Delivery |
| 1.7.1.1 Seed Protection |
| 1.7.1.2 Soil Conditioners |
| 1.7.2 Storage |
| 1.7.2.1 Seed and Soil Conditioners Storage |
| 1.7.2.2 Topsoil |
| 1.7.2.3 Handling |
| 1.8 TIME RESTRICTIONS AND PLANTING CONDITIONS |
| 1.8.1 Restrictions |
| 1.9 TIME LIMITATIONS |
| 1.9.1 Seed |
| 1.10 INSPECTIONS |
| 1.10.1 Inspection of Seed, Equipment, and Quantities |
| 1.10.2 Inspection of Seeding Operation |
| 1.10.3 Seeding Acceptance |
| PART 2 PRODUCTS |
| 2.1 SEED |
| 2.1.1 Classification |
| 2.1.2 Planting Dates |
| 2.1.3 Seed Species and Seeding Rates |
| 2.1.3.1 Seeding Timing in Tidal Zones |
2.1.4 Substitutions
| 2.2 TOPSOIL |
| 2.2.1 On-Site Topsoil for Non-Mow and Mow Turf Areas |
| 2.2.2 Off-Site Topsoil |
| 2.3 SOIL CONDITIONERS |
| 2.4 MULCH |
| 2.4.1 Wood Cellulose Fiber Mulch |
| 2.5 WATER |
| 2.6 ENDOMYCHORRHIZAL INOCULUM |
| 2.7 EROSION CONTROL MATERIALS |
| PART 3 EXECUTION |
| 3.1 SEEDING PREPARATION |
| 3.1.1 EXTENT OF WORK |
| 3.1.2 Soil Preparation |
| 3.2 HYDROSEEDING METHOD |
| 3.2.1 Applying Endomycorrhizal Inoculum |
| 3.2.2 Overspray |
| 3.3 MAINTENANCE DURING SEEDNG PERIODS |
| 3.3.1 Watering |
| 3.3.2 Spraying for Weed Control After Seeding |
| 3.3.3 Repair |
| 3.4 CLEAN UP |
| 3.5 GRASS SEEDING ESTABLISHMENT |
| 3.5.1 Establishment Duration |
| 32 93 00 AM0004 |
| 32 93 00 - PLANTING |
| 32 93 00 - PLANTING |
| PART 1 GENERAL |
| 1.1 MEASUREMENT |
| 1.2 PAYMENT |
| 1.3 DESCRIPTION |
| 1.4 REFERENCES |
| 1.4.1 Required Work |
| 1.4.2 Related Requirements |
| 1.5 DEFINITIONS |
| 1.5.1 Installation Period |
| 1.5.2 Planting Materials |
| 1.5.3 Cuttings |
| 1.5.4 B&B Container TreesDead and Diseased Plants |
| 1.5.5 Vegetated Mats |
| 1.5.6 Seeding Materials |
| 1.5.7 Collection |
| 1.5.8 Friable |
| 1.5.9 Pesticides |
| 1.6 SUBMITTALS |
| 1.7 QUALITY ASSURANCE |
| 1.7.1 Topsoil Composition Tests |
| 1.7.2 Nursery Certifications |
| 1.7.3 State Landscape Contractor's License |
| 1.7.4 Plant Material Photographs |
| 1.7.5 Percolation Test |
| 1.7.6 Erosion Assessment |
| 1.7.7 Pre-Installation Meeting |
| 1.7.8 LANDSCAPE/REVEGETATION MINIMUM QUALIFICATIONS |
| 1.7.8.1 Contractor™s Project Manager |
| 1.7.8.2 Contractor Licensing |
| 1.7.8.3 Contractor Experience |
| 1.7.8.3.1 Restoration Experience |
| 1.7.8.3.2 Project Management, Site Supervision & Pesticide Application |
| 1.7.8.3.3 Contractor's Organizational Information |
| 1.7.8.3.4 General References |
| 1.7.8.3.5 Subcontractor Experience |
| 1.8 DELIVERY, STORAGE, AND HANDLING |
| 1.8.1 Shipment |
| 1.8.2 Delivery |
| 1.8.2.1 Branched Plant Delivery |
| 1.8.2.2 Soil Amendment Delivery |
| 1.8.2.3 Plant Labels |
| 1.8.3 Storage |
| 1.8.3.1 Plant Storage and Protection |
| 1.8.3.2 Fertilizer, Gypsum, pH Adjusters and Mulch Storage |
| 1.8.3.3 Topsoil |
| 1.8.4 HANDLING |
| 1.8.5 TIME LIMITATION |
| 1.9 TIME RESTRICTIONS AND PLANTING CONDITIONS |
| 1.9.1 Installation Periods |
| 1.9.2 Container Plant Installation Periods |
| 1.9.3 Coordination |
| 1.10 PLANT REPLACEMENT |
| 1.11 SUSTAINABLE DESIGN REQUIREMENTS |
| 1.11.1 Local/Regional Materials |
| 1.11.2 Plastic Identification |
| 1.11.3 Forest Stewardship Council FSC Certification |
| 1.12 INSPECTIONS |
| 1.12.1 Plant Inspection at Nursery |
| 1.12.2 Plug Inspection at Growing Facility |
| 1.12.3 Plant Inspection at Job Site |
| 1.12.4 Inspection of Seed, Equipment & Quantities |
| 1.12.5 Rejection of Contractor Furnished Materials |
| 1.12.6 Plant and Seed Installation |
| 1.12.7 Installation Acceptance Inspection |
| 1.13 SUBSTITUTIONS |
| 1.13.1 Prohibition of Substitutions |
| 1.13.2 Equality |
| PART 2 PRODUCTS |
| 2.1 PLANTS |
| 2.1.1 Regulations and Varieties |
| 2.1.1.1 Plant Collection |
| 2.1.1.2 Cuttings |
| 2.1.1.3 Government Supplied Seed |
| 2.1.2 Shape and Condition |
| 2.1.2.1 Deciduous Trees and Shrubs |
| 2.1.2.2 Plugs |
| 2.1.2.3 Ground Covers |
| 2.1.3 Plant Size |
| 2.1.4 Root Ball Size |
| 2.1.4.1 Mycorrhizal fungi inoculum |
| 2.1.5 Growth of Trunk and Crown |
| 2.1.5.1 Deciduous Trees |
| 2.1.5.2 Deciduous Shrubs |
| 2.1.5.3 Plugs |
| 2.1.5.4 Waterfowl Exclusion |
| 2.1.5.5 Broadleaf Evergreen Plant Material |
| 2.1.5.6 Ground Cover |
| 2.1.5.7 Substitutions |
| 2.1.5.8 Pin Flags |
| 2.1.5.9 Plant ID Tags |
| 2.2 TOPSOIL |
| 2.2.1 Existing Soil |
| 2.2.2 On-Site Topsoil |
| 2.2.3 Off-Site Topsoil |
| 2.2.4 Composition |
| 2.3 SOIL CONDITIONERS |
| 2.3.1 Lime |
| 2.3.2 Aluminum Sulfate |
| 2.3.3 Sulfur |
| 2.3.4 Iron |
| 2.3.5 Sand |
| 2.3.6 Gypsum |
| 2.3.7 Compost |
| 2.4 FERTILIZER |
| 2.5 MULCH |
| 2.6 STAKING AND GUYING MATERIAL |
| 2.6.1 Staking Material |
| 2.6.1.1 Tree Support Stakes |
| 2.6.1.2 Tree Anchors |
| 2.7 ANTIDESICCANTS |
| 2.8 EROSION CONTROL MATERIALS |
| 2.9 WATER |
| 2.9.1 Hose |
| 2.10 MYCORRHIZAL FUNGI INOCULUM |
| 2.11 SOURCE QUALITY CONTROL |
| PART 3 EXECUTION |
| 3.1 EXTENT OF WORK |
| 3.1.1 Coordination |
| 3.1.2 Periodic Inundation |
| 3.1.3 Vandalism |
| 3.2 PREPARATION |
| 3.2.1 Coordination |
| 3.2.2 Timing |
| 3.2.3 Protection |
| 3.2.4 Layout |
| 3.2.5 Erosion Control |
| 3.2.6 Soil Preparation |
| 3.2.6.1 pH Adjuster Application Rates |
| 3.2.6.2 Fertilizer Application Rates |
| 3.3 PLANT BED PREPARATION |
| 3.4 PLANT INSTALLATION |
| 3.4.1 Individual Plant Pit Excavation |
| 3.4.2 Plant Locations |
| 3.4.3 Handling and Setting |
| 3.4.3.1 Balled and Burlapped Stock |
| 3.4.3.2 Bare-Root Stock |
| 3.4.3.3 Container Grown Stock |
| 3.4.3.4 Ground Covers |
| 3.4.4 Earth Mounded Watering Basin for Individual Plant Pits |
| 3.4.5 Erosion Control Material |
| 3.4.6 Mulch Topdressing |
| 3.4.7 Watering |
| 3.4.8 Staking and Guying |
| 3.4.8.1 Staking |
| 3.4.8.2 Wood Ground Stakes |
| 3.4.9 Pruning |
| 3.4.9.1 Trees and Shrubs |
| 3.4.9.2 Wound Dressing |
| 3.4.9.3 Plant ID Tag Installation |
| 3.5 PLUG INSTALLATION |
| 3.6 MAINTENANCE DURING THE INSTALLATION PERIOD |
| 3.6.1 General Maintenance |
| 3.6.2 Watering-In |
| 3.6.3 Application Frequency, Rate and Duration |
| 3.7 RESTORATION AND CLEAN UP |
| 3.7.1 Restoration |
| 3.7.2 Clean Up |
| 3.7.3 Regular Maintenance |
| 3.7.4 Weekly Cleanup |
| 3.7.5 Garbage Removal |
| 3.7.6 Maintenance of Site and Surrounding Area |