A02.1_W91238-13-R-0032_AMD_0002.pdf

PDF 34 KB Posted

Attached to
NAPA RIVER DRY BYPASS, NAPA, CA
Solicitation number
W91238-13-R-0032
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
W91238-13-R-0032_Conformed_Copy_of_Solicitation.pdf PDF
AMD_0008_Pricing_Breakout.docx DOCX document
W91238-13-R-0032-0008.pdf PDF
AMD_0008_Specifications.pdf PDF
AMD_0008_Summary_of_Changes.pdf PDF
AMD_0006_FCD_Encroachment_Permit.pdf PDF
13-R-0032-0006_Attachment_15.pdf PDF
AMD_0006_Pricing_Breakout_(20131112).pdf PDF
13-R-0032-0005.pdf PDF
Attachment_3 _Pricing_Breakout.pdf PDF
Attch_14 _AMENDMENT_5_SUMMARY.pdf PDF
Attch_13 _FCD_Encroachment_Permit.pdf PDF
A02.1__AMD_0004_Encroachment_Pmt.pdf PDF
A02.1__AMD__0004_Specifications.pdf PDF
A02.1__AMD__0004_Summary.pdf PDF
A02.1__AMD_0004_Pricing.pdf PDF
A02.1__AMD_0004__Drawings.pdf PDF
W91238-13-R-0032_AMD_0004.pdf PDF
Amendment_0003.pdf PDF
Site_Visit_2_Sign_In_Sheet.pdf PDF
A02.1_AMD_0002__Summary_of_Spec_Changes_.pdf PDF
A02.1__AMD_0002_Pricing_Breakout_AMD_0002.pdf PDF
A02.1_AMD_0002_Drawing_Sheet_List_(100113).pdf PDF
A02.1_AMD_0002__Specification_1839_(100113).pdf PDF
A02.1__AMD_0002_Drawings_(2)_09-27-13.pdf PDF
Exhibit_A_Floodwall_Sheets.docx DOCX document
Attachment_3 _Pricing_Breakout.pdf PDF
A01.2_Specifications_AMD_0001.pdf PDF
Pages_76-150__from_A01.2_Drawings_AMD_0001.pdf PDF
Attachment_4 _WD_6_Sep.pdf PDF
Pages_from_Pages_1-75__from_A01.2_Drawings_AMD_0001.pdf PDF
13-R-0032-0001.pdf PDF
Site_Visit_Notes.pdf PDF
Site_Visit_Sign-In_Sheets.pdf PDF
Drawings_22x34_C-123.pdf PDF
Drawings_22x34_L_Seeding_Sheets.pdf PDF
Drawings_22x34_CD_CS_CU_Sheets.pdf PDF
Drawings_22x34_L_Plug_Planting_Sheets.pdf PDF
Drawings_22x34_G_Sheets.pdf PDF
Drawings_22x34_C_Sheets_4_of_4.pdf PDF
Drawings_22x34_C_Sheets_3_of_4.pdf PDF
Drawings_22x34_C_Sheets_2_of_4.pdf PDF
Drawings_22x34_C_Sheets_1_of_4.pdf PDF
NapaBypass-USACE_22x34_LI_Sheets_.pdf PDF
NapaBypass-USACE_22x34_E_Sheets.pdf PDF
NapaBypass-USACE_22x34_B_Sheets.pdf PDF
NapaBypass-USACE_22x34_L_Planting_Plan_Sheets.pdf PDF
NapaBypass-USACE_22x34_GC_Sheets.pdf PDF
A02.1(b)__Attach_2__1839_SPECIFICATION(082113).pdf PDF
A02.1__W91238-13-R-0032.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project: Napa River Dry Bypass, Napa, California

The purpose of this Amendment is to:

1. Add Option Item Floodw all. This includes revised Specs & Draw ings;

2. Add Option Item Retaining Wall. This includes revised Specs & Draw ings;

3. Proposal Due Date: This modification extends the proposal due date to 28 Oct 2013;

4. Revise Soil CLIN 1003 In-Situ Solid Waste Removal. This includes revised Specs;

5. Revised Pricing Schedule; and

6. Adds Draw ing Sheet List.

7. Schedule 2nd Site Visit Section 002100, FAR Clause 52.236-27 SITE VISIT

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Oct-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-13-R-0032

X 9B. DATED (SEE ITEM 11)

23-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 6 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Oct-2013

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-13-R-0032

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION - CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 1002 Exhibit(s) 1 Attachment 1 Specifications 1088 12-SEP-2013 Attachment 2 Drawings 249 01-JUL-2013 Attachment 3 Detailed Pricing Breakout 6 13-SEP-2013 Attachment 4 Wage Determination

CA130009

43 06-SEP-2013

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CLIN 1002 Exhibit(s) 1 Attachment 1 Specifications 1088 12-SEP-2013 Attachment 10 Pricing Breakout AMD

6 03-OCT-2013

Attachment 2 Drawings 249 01-JUL-2013 Attachment 3 Detailed Pricing Breakout 6 13-SEP-2013 Attachment 4 Wage Determination

CA130009

43 06-SEP-2013

Attachment 5 Summary of Specification Changes

2 01-OCT-2013

Attachment 6 Specifications AMD

114 01-OCT-2013

Attachment 7 Drawings Sheet List 4 01-OCT-2013 Attachment 8 Drawings (1) AMD 0002 14 27-SEP-2013 Attachment 9 Drawings (2) AMD 0002 17 27-SEP-2013

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 15-Oct-2013 01:00 PM to 28-Oct-2013 01:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

W91238-13-R-0032

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

October 9, 2013 at 9:00 am local time

(c) Participants will meet at--

804 First Street, Napa, CA 94559-2623

(End of provision)

SECTION 00 72 00 - GENERAL CONDITIONS

CLIN 1004 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1004 1 Job OPTION Construct Retaining Walls

FFP

Construct Retaining Walls in Lieu of Floodwalls.

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT,

ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE

WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO

INCLUDE ALL ATTACHMENTS THERETO.

FOB: Destination

NET AMT

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following Acceptance/Inspection Schedule was added for CLIN 1004:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)