Attachment 14 Amendment 0005 Plans and Specifications
View the file
Other files for this federal contract opportunity
Show all 50
NAPA RIVER DRY BYPASS, NAPA, CA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 14 W91238-13-R-0032-0005
8 November 2013
AMENDMENT 5 SUMMARY OF CHANGES TO PLANS/SPECS
Bidder Inquiry # Section Subpart Paragraph Change Internal
M&P Includes the In-Situ Solid Waste Disposal of 10 lots of 20 tons each 5416646 Attachment 3 1002AJ (C101 Note 35) and 0005AH (C101 Note 36)
Drainage closure gate for West Street, and rock buttress section between pathway A and A-1 at the intersection of pathway B included in Bid Schedule
5409381, 5418872
01 45 00
3.2.1. a.
CQC Systems Manager shall report to the Contractor’s Project Manager
5416365
02 61 13 and 02 81 00
Designates the sections as “For Information Only” and provides a sentence that contaminated material is encountered it will be handled in accordance with 52.236-2, Differing Site Condition
5414136
32 92 19
2.1.3, 3.3, 3.3.2
Removes multi-year plant maintenance responsibility, adds responsibility for plant maintenance during construction
5414160 32 93 00 1.4.1. f. Reference to restoration signage deleted 5414165 32 93 00 3.5. a. Reference to vegetated mats removed 5409447 32 93 00 2.1.1.1, 2.1.1.3, 2.1.5.3 Language added for seed collection none C325 Details A and B Details A and B modified to require native materials
5417787
Sheet C327
Notes for Detail 4 Revised to delete requirement for welding of the Top Cap