A02.1__AMD_0002_Pricing_Breakout_AMD_0002.pdf
PDF 61 KB Posted
- Attached to
- NAPA RIVER DRY BYPASS, NAPA, CA Federal contract opportunity
- Solicitation number
- W91238-13-R-0032
About this file
Amendment 0002 Pricing Breakout
View the file
Other files for this federal contract opportunity
Show all 50
NAPA RIVER DRY BYPASS, NAPA, CA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0002 Attachment 10
Detailed Pricing Breakout Item Unit No. Description Quantity Unit Price Amount
0001 MCKINSTRY ST. RELOCATION (LERRDs(LR) & PROJECT COSTS(PC))
0001AA Mobilization & Demobilization (LR) 1 JB $
0001AB Traffic Control (LR) 50% 0.5 JB $
0001AC Traffic Control (PC) 50% 0.5 JB $
0001AD Demolition Water Line and Valves (LR) 620* LF $
0001AE Demolition Sanitary Sewer Lines (LR) 417* LF $
0001AF Demolition Asphalt Paving (LR) 3,650* SY $
0001AG Demolition Concrete Curb (LR) 1,365* LF $
0001AH Demolition Landscape Wall (LR) 495* SF $
0001AI Remove and Return Light Poles (LR) 2 EA $
0001AJ Relocate Light Poles (LR) 3 EA $
0001AK Salvage Amtrak Signs and Posts (LR) 2 EA $
0001AL Rough Grading (PC) 6,300* CY $
0001AM Sanitary Sewer Pipe CLSM Encasement(LR) 254* CY $
0001AN Sanitary Sewer Modifications (LR) 1 JB $
0001AO Water Line Relocation (LR) 515* LF $
0001AP Water Line Conn to Kayak Bldg (LR) 44* LF $
0001AQ Water Line Conn to 1031 Bldg (LR) 52* LF $
0001AR New Fire Hydrant and Service (LR) 1 EA $
0001AS New Irrigation Service Line (LR) 25* LF $
0001AT Steel Casing Sleeves (LR) 2 EA $
0001AU Cathodic Protection (LR) 1 JB $
0001AV 15” RCP Storm Drain (PC) 41* LF $
0001AW 18” RCP Storm Drain (PC) 200* LF $
0001AX Catch Basins (PC) 2 EA $
0001AY Subgrade Prep Roads/Paved Areas (LR) 15,900* SF $
0001BA Subgrade Prep Sidewalks/Curbs (LR) 12,560* SF $
0001BB Base Course (LR) 2,000* Tons $
0001BC Place Curb (LR) 1,114* LF $
0001BD Place New Roadway (LR) 1,767* SY $
Detailed Pricing Breakout 0001BE Place Sidewalk (LR) 1,332* SY $
0001BF Bollards (LR) 24 EA $
0001BG Monitoring (LR) 1 JB $
0001BH Pavement Markings (LR) 1 JB $
SUB TOTAL MCKINSTRY ST. RELOCATION PRICE $
0002 BYPASS CHANNEL (PROJECT COSTS)
0002AA Mobilization & Demobilization 1 JB $
0002AB Traffic Control 1 JB $
0002AC Demolish Parking Lots and Pathways 7,271* SY $
0002AD Demolish Curb and Sidewalk 2,146* SY $
0002AE Demolish Fencing 1,765* LF $
0002AF Demolish Guard Rails and Barriers 200* LF $
0002AG Remove Light Poles 7 EA $
0002AH Remove Street Signs 4 EA $
0002AI Demolish Energy Dissipater 1 JB $
0002AJ Remove RCP Pipe 200* LF $
0002AK Remove Sewer Lines 642* LF $
0002AL Salvage Trees 55 EA $
0002AM Clearing and Grubbing 9.5* ACRE $
0002AN Channel Excavation 123,000* CY $
0002AO Cut to Fill Excavation 28,000* CY $
0002AP Disposal Yard Grading 118,750* CY $
0002AQ Subgrade Preparation 52,900* SY $
0002AR Cofferdams and Dewatering 1 JB $
0002AS Storm Drain – 30” RCP with Outfall 72* LF $
0002AT Storm Drain – 48” Manhole 1 EA $
Detailed Pricing Breakout
0002AU Fine Grading for Landscaped Areas 30,852* SY $
0002AV Bypass Inlet Sheetpile 11,760* SF $
0002AW Bypass Inlet Bank Rock Slope Bedding 169* CY $
0002AX Bypass Inlet Bank Rock Slope Protect 353* TONS $
0002AY Bypass Inlet VRSS Soil Lifts 331* LF $
0002AZ Bypass Outlet Sheetpile 6,000* SF $
0002BA Bypass Outlet Bank Rock Slope Bedding 80* CY $
0002BB Bypass Outlet Bank Rock Slope Protect 175* TONS $
0002BC Bypass Outlet Launchable Toe Bedding 327* CY $
0002BD Bypass Outlet Launchable Toe Protect 2,300* TONS $
0002BE Bypass Outlet Launchable Toe Fill 2,083* CY $
0002BF Napa Creek BP STA 17+70 to STA 16+00 170* LF $
0002BG Napa Creek BP STA 16+00 to STA 14+55 145* LF $
0002BH Rootwads 10 EA $
0002BI Stepped Energy Dissipater 191* CY $
0002BJ Slab on Grade under Wine Train Bridge 1,365* CY $
0002BK Energy Dissipater Blocks 17 EA $
0002BL Concrete Curb at Energy Dissipater 200* LF $
0002BM Monitoring 1 JB $
0002BN Low Flow Channel Excavation 3,935* CY $
0002BO Low Flow Channel Rock Lining 2163* Tons $
0002BP Concrete Elliptical Stage 26* CY $
0002BQ Paved Maintenance Road 940* LF $
0002BR China Point Pathway 436* LF $
0002BS 12’ Concrete Pathway 1,041* LF $
0002BT Slab on Grade under Soscol St Bridge 972* CY $
0002BU Slab on Grade under First St Bridge 188* CY $
0002BV Box Culvert Structure 1 JB $
SUB TOTAL BYPASS CHANNEL BASE PRICE $
0003 10’ CONCRETE PATHWAYS (BETTERMENTS & RECREATION)
0003AB 10’ Concrete Pathways (BETTERMENT) 776* LF $
0003AC 10’ Concrete Pathways (RECREATION) 521* LF $
SUB TOTAL 10’ CONCRETE PATHWAYS (BETTERMENTS & REC) BASE PRICE $ _________
0004 12’ CONCRETE PATHWAYS (BETTERMENTS & RECRECREATION)
0004AA 12’ Concrete Pathways (BETTERMENT) 585* LF $
0004AB 12’ Concrete Pathways (RECREATION) 486* LF $
SUB TOTAL 12’ CONCRETE PATHWAYS (BETTERMENTS & REC) BASE PRICE $
0005 LANDSCAPING (PROJECT COSTS)
0005AA Soil Preparation 28,616* SY $
0005AB Turf Reinforcement Mat 30,242* SY $
0005AC Plantings – Shrubs 2,652* EA $
0005AD Plantings – Trees 73 EA $
0005AE Plug Plantings 14,841 EA $
0005AF Irrigation System 1 JB $
0005AG Seeding 5.9* ACRE $
SUB TOTAL LANDSCAPING BASE PRICE $
0006 UTILITY FEES (PROJECT COSTS)
0006AA Irrigation Water Line Fee 1 JB $
SUB TOTAL Irrigation Water Line BASE PRICE $
BASE ITEMS TOTAL PRICE $
Option Schedule
1001 CONSTRUCT DOWNSTREAM RIVER ACCESS (BETTERMENTS)
1001AA Excavate 142* CY $
1001AB Concrete 85* CY $
1001AC Backfill 80* CY $
SUB TOTAL DOWNSTREAM RIVER ACCESS OPTION PRICE $
1002 CONSTRUCT FLOODWALLS 352, 362, & FLOODWALL ELECTRICAL AND LIGHTING
FLOODWALL 352
1002AA Excavation 2,700* CY $
1002AB Cast-in-Place Wall w/Pedestals 1,218* LF $
1002AC Gabion Wall 84* LF $
1002AD Architectural Railing (low) 390* LF $
1002AE Floodwall 352 Closure Structure 1 JB $
1002AF Floodwall 352 Flood Gates 1 JB $
1002AG Backfill 3,030* CY $
1002AH Patch Asphalt 1 JB $
1002AI Floodwall 352 Maintenance Road 559* LF $
FLOODWALL 362
1002AJ Excavation 2,100* CY $
1002AK Cast-in-Place Wall w/Pedestals 983* LF $
1002AL Architectural Railing (low) 432* LF $
1002AM Architectural Railing (tall) 163* LF $
1002AN Floodwall 362 Closure Structure 1 JB $
1002AO Floodwall 362 Flood Gates 1 JB $
1002AP Backfill 2,233* CY $
1002AQ Patch Asphalt 1 JB $
1002AR Floodwall 362 Maintenance Road 381* LF $
FLOODWALL ELECTRICAL AND LIGHTING (BETTERMENTS)
1002AS Conduits 1 JB $
1002AT Conductors 1 JB $
1002AU Floodwall Lighting 1 JB $
1002AV Closure Structure Lighting 1 JB $
1002AW Power Service 1 JB $
SUB TOTAL FLOODWALLS, ELECTRICAL, AND LIGHTING OPTION PRICE $
1003 IN-SITU SOLID WASTE REMOVAL (MAY BE EXERCISED UP TO 10 TIMES)
1003AA 20 Ton Batches of Solid Waste Removal 10 Lots $
SUB TOTAL Solid Waste Removal OPTION PRICE $
1004 Construct Retaining Walls in Lieu of Floodwalls
1004AA Excavation 1 JB $ 1004AB Cast-in-Place Wall 1 JB $
SUB TOTAL Retaining Wall OPTION PRICE $
Notes:
1. Prices must be submitted on all individual items of this pricing breakout. Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item.
3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items. The Government will review all submitted prices for any unbalancing of the items. Any submitted price determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
5. Exercise of any option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item.
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION
IN ESTIMATED QUANTITY CONTRACT CLAUSE.
File details come from the government source that posted it. Updated .