W9123621R2012 Attachment 6.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- ANC Multi-Road Repair Projects MATOC
- Solicitation number
- W91236-21-R-2012
About this file
This document includes a bid schedule template and details of a federal contract opportunity for road repair projects at Arlington National Cemetery and Soldier's and Airmen's Home National Cemetery. The contract is a single-phase design-bid-build multiple award task order contract with a total capacity of $49 million to be awarded to approximately three small businesses. Task orders will be for work such as construction, issued on a firm-fixed price basis, and range from $150,000 to $15 million. The base period of the basic contract is one year with four one-year options. Offerors must fill in labor rates that will be used for evaluation and inflated by 2.4% annually, as well as unit prices for work items like milling, paving and material hauling also inflated at 2.4% per option year. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Norfolk.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE (Blank-Offerors)
FOR OFFICIAL USE ONLY
BID SCHEDULE 10/20/20
| TABLE 1 | TABLE 2 | |||||
| LINE | ITEM | UNIT ITEM PRICE | TOTAL PRICE | FULLY BURDENED WAGE RATES TO BE INCLUDED IN THE BASE CONTRACT | ||
| 0001A | SEED PROJECT, Firm Fixed Price- Construction of Humphreys Drive- complete (BASE), including | |||||
| All work incidental, thereto as shown on the drawings and specifications, excluding items 0002 | $ - 0 | |||||
| 0001B | SEED PROJECT, Firm Fixed Price- Construction of Humphreys Drive- (OPTION), additional undercut of subgrade (0.5ft depth) and replacement with geogrid and suitable backfill material for all of new road complete, including |
All work incidental, thereto as shown on the drawings and specifications, excluding items 0001
| Est. Qty 500 CUBIC YARDS (Unit - CY)- [Unit Item Price Rate= Total Price / 500 CY] | $0.00 | $ - 0 | ||||||||
| 0001 | SEED PROJECT SUBTOTAL | $ - 0 | ||||||||
| POSITION | AVERAGE OF RATES | ESTIMATED HOURS | RATE TOTAL | BASE YEAR RATES ($/HR) | OPTION YEAR 1 RATES ($/HR) | OPTION YEAR 2 RATES ($/HR) | OPTION YEAR 3 RATES ($/HR) | OPTION YEAR 4 RATES ($/HR) | ||
| 0002A | PROJECT MANAGER | $0.00 | 2000 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0002B | SUPERINTENDENT | $0.00 | 4000 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0002C | QUALITY CONTROL MANAGER | $0.00 | 3000 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0002 | WAGE RATE SUBTOTAL | $ - 0 | ||||||||
| DESCRIPTION | AVERAGE OF UNIT PRICE | UNIT ITEM ESTIMATE | TOTAL PRICE | BASE YEAR | ||||||
| UNIT PRICE | OPTION YEAR 1 UNIT PRICE | OPTION YEAR 2 UNIT PRICE | OPTION YEAR 3 UNIT PRICE | OPTION YEAR 4 UNIT PRICE | ||||||
| 0003A | MILLING 2-3" of SURFACE COURSE - Est. Qty 18,000 SQUARE FEET (Unit-SF) | |||||||||
| - Milling, Demolition, and Hauling of Material included with Unit Price | $0.00 | 18000 | $ - 0 | $0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 0003B | PAVING 2-3" of SURFACE COURSE (VDOT SM-9.5A) |
& REQUIRED LEVELING COURSE AS NEEDED -
| Est. Qty 300 TONS (Unit-TN) | $0.00 | 300 | $ - 0 | $0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003C | SPOILS YARD HAULING EXCESS PRESCREENED MATERIAL - | |||||||
| Est. Qty 5,000 CUBIC YARDS (Unit-CY) | $0.00 | 5000 | $ - 0 | $0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | UNIT PRICE (MILLING-PAVING-SY HAULING) SUBTOTAL | $ - 0 |
| 0004 | GRAND TOTAL FOR PRICE COMPARISON (0001+0002-0003) | $ - 0 |
| NOTES: | ||
| 1) CELLS IN BLUE ARE COSTS/RATES TO BE FILLED IN BY OFFERORS AND WILL BE INCORPORATED INTO THE BASE/SEED CONTRACTS. | ||
| 2) 0002 WAGE RATE - ESTIMATED HOURS & RATE TOTALS, WILL BE USED ONLY FOR PURPOSES OF THE PRICE COMPARISON. | ||
| 3) 0002 THE BASE WAGE RATES SHALL BE INFLATED BY 2.4% FOR EACH SUBSEQUENT OPTION YEAR. | ||
| 4) 0003 THE BASE UNIT PRICE RATES SHALL BE INFLATED BY 2.4% FOR EACH SUBSEQUENT OPTION YEAR. | ||
| 5) 0004 IS USED FOR PRICE COMPARISON, WHICH IS SEED W/OPTION (0001) PLUS WAGE RATE TOTAL (0002) PLUS UNIT PRICE MILLING- PAVING-SPOILS YARD HAULING TOTAL (0003). |
File details come from the government source that posted it. Updated .