This solicitation is for a single-phase design-build multiple award task order contract for future road and construction projects. The contract will have a one-year base period and four one-year options, with a total shared capacity of $49 million. The Army Corps of Engineers will issue task orders predominantly for work at Arlington National and Soldiers' and Airmen's Home National Cemeteries. Task orders will range from $150,000 to $15 million each and be on a firm-fixed-price basis, potentially including options. This is a total small business set-aside solicitation, with only small businesses eligible to submit offers. The selection process will use best value design-build procedures in accordance with FAR Part 15.
The milling specification outlines requirements for cold milling asphalt pavement for road repair projects. It specifies tolerances for grade, surface smoothness and traffic control. It also provides equipment requirements and procedures for milling, grade and smoothness testing, and removal of milled material.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9123621R2012 Amendment 0003.pdf | ||
| 31_00_00.00_51_para_2.5_rev.pdf | ||
| 01_30_00.10_51_para_1.10.1_rev.pdf | ||
| ANC_Tree_Preservation_Specifications_-_UPDATE_Nov-2020.pdf | ||
| W9123621R2012 Amendment 02.pdf | ||
| W9123621R2012 Amendment 0001.pdf | ||
| 17121D - RTA Specs 2020.10.19.pdf | ||
| W9123621R2012 Attachment 5.pdf | ||
| W9123621R2012 Attachment 2.pdf | ||
| 17121D - SP RTA 2020.09.25.pdf | ||
| W9123621R2012 Attachment 1.pdf | ||
| W9123621R2012 Attachment 6.xlsx | XLSX spreadsheet | |
| W9123621R2012 Attachment 3.pdf | ||
| W9123621R2012 Solicitation .pdf | ||
| 2020-0127_2020-08-18_ANCHumphreys_ApprLttr.pdf | ||
| W9123621R2012 Attachment 4.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps Of Engineers
ANC Roads MATOC Road Repair
Milling Specification
ROAD REPAIR - VARIOUS ROADS
Arlington National Cemetery Project Number: ANC- ENG-0912
To be used in consideration with Humphreys Drive Specifications.
U.S. Army Engineer District, Norfolk Engineering & Construction Division Engineering Branch- Civil Engineering Section 803 Front Street Norfolk, VA 23510
Milling Specification MILLING
PROJECT TABLE OF CONTENTS
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 16.71 COLD MILLING ASPHALT PAVING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 32 01 16.71
COLD MILLING ASPHALT PAVING
02/17
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Measurement
The quantity of milled pavement will be the number of square yards completed and accepted as determined by the Contracting Officer. Determine the number of square yards of milled pavement by measuring the length and width of the milled surface within the specified work area. Measure the width of the area to the closest inch and measure the length of the area to the closest foot .
1.1.2 Payment
Payment will be to the nearest square yard . No payment will be made for milling outside the specified area of work.
1.2 QUALITY ASSURANCE
1.2.1 Grade
Mill pavement such that the finished surface conforms to the lines, grades, and cross sections indicated. The maximum allowable deviation of the finished milled pavement surfaces from the established plan grade line and elevation will be 1/4 inch . The deviations from the plan grade line and elevation will not be permitted in areas of pavements where closer conformance with planned grade and elevation is required for the proper functioning of appurtenant structures involved.
1.2.2 Surface Smoothness
The maximum allowable deviation of the finished surfaces from the testing edge in the transverse or longitudinal direction will be 1/4 inch .
1.2.3 Traffic Control
Provide all necessary traffic controls during milling operations.
1.3 EQUIPMENT, TOOLS, AND MACHINES
Maintain in a satisfactory working condition equipment, tools, and machines used in the performance of the work.
1.3.1 Cold-Milling Machine
Provide a cold-milling machine which is self-propelled, capable of milling the pavement to a specified depth and smoothness and of establishing grade control; with means of controlling transverse slope and dust produced during the pavement milling operation. Machine will have capability of adding water in front of equipment to minimize dust during milling operation. The machine will have the ability to remove the millings or cuttings from the pavement and load them into a truck. The milling machine will not damage any part of the pavement structure that is not to
SECTION 32 01 16.71 Page 1 be removed.
1.3.2 Cleaning Equiment
Provide cleaning equipment suitable for removing and cleaning loose material from the pavement surface.
1.3.3 Straightedge
Furnish and maintain at the site, in good condition, one 12 foot straightedge or other suitable device for each milling machine, for testing the finished surface. Make straightedge available for Government use. Use straightedges constructed of aluminum or other lightweight metal, with blades of box or box-girder cross section with flat bottom reinforced to insure rigidity and accuracy. Use straightedges with handles to facilitate movement on the pavement.
1.4 ENVIRONMENTAL REQUIREMENTS
Do not perform milling when there is accumulation of snow or ice on the pavement surface.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 MILLING OPERATION
A minimum of seven days notice is required, prior to start work, for the Contracting Officer to coordinate the milling operation with other activities at the site. Make sufficient passes so that the designated area is milled to the grades and cross sections indicated. Mill the pavement in depth increments that will not damage the pavement below the designated finished grade. If scabbing occurs, the surface will not meet smoothness requirements. Take steps to modify the process as needed to prevent scabbing from occuring. Repair or replace, as directed, items damaged during milling such as manholes, valve boxes, utility lines, pavement that is torn, cracked, gouged, broken, or undercut. Remove the milled material from the pavement and load into trucks.
3.2 GRADE AND SURFACE-SMOOTHNESS TESTING
3.2.1 Grade-Conformance Tests
Test the finished milled surface of the pavement for conformance with the plan-grade requirements and for acceptance by the Contracting Officer by running lines of levels at intervals of 25 feet longitudinally and 25 feet transversely to determine the elevation of the completed pavement. Correct variations from the designated grade line and elevation in excess of the plan-grade requirements as directed. Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area.
Remove sufficient material to allow at least 1 inch of asphalt concrete to be placed.
3.2.2 Surface-Smoothness Tests
After completion of the final milling, the finished milled surface will be
SECTION 32 01 16.71 Page 2 tested by the Government with a straightedge. Other approved devices may be used, provided that when satisfactorily and properly operated, such devices reveal all surface irregularities exceeding the tolerances specified. Correct surface irregularities that depart from the testing edge by more than 1/4 inch . Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area. Remove sufficient material to allow at least 1 inch of asphalt concrete to be placed.
3.3 REMOVAL OF MILLED MATERIAL
Material that is removed will be disposed in accordance with the Construction and Demolition Waste Management Specification 01 74 19.00 50.
-- End of Section --
SECTION 32 01 16.71 Page 3
| PUBLISH.pdf |
| PROJECT TABLE OF CONTENTS |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 01 16.71 - COLD MILLING ASPHALT PAVING |
| PART 1 GENERAL |
| 1.1 UNIT PRICES |
| 1.1.1 Measurement |
| 1.1.2 Payment |
| 1.2 QUALITY ASSURANCE |
| 1.2.1 Grade |
| 1.2.2 Surface Smoothness |
| 1.2.3 Traffic Control |
| 1.3 EQUIPMENT, TOOLS, AND MACHINES |
| 1.3.1 Cold-Milling Machine |
| 1.3.2 Cleaning Equiment |
| 1.3.3 Straightedge |
1.4 ENVIRONMENTAL REQUIREMENTS
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 MILLING OPERATION |
| 3.2 GRADE AND SURFACE-SMOOTHNESS TESTING |
| 3.2.1 Grade-Conformance Tests |
| 3.2.2 Surface-Smoothness Tests |
3.3 REMOVAL OF MILLED MATERIAL