2020-0127_2020-08-18_ANCHumphreys_ApprLttr.pdf

PDF 144 KB Posted

Attached to
ANC Multi-Road Repair Projects MATOC Federal contract opportunity
Solicitation number
W91236-21-R-2012
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document provides details for a single phase design-bid-build multiple award task order contract notice. The contract is for future road and construction task orders predominantly at Arlington National Cemetery and Soldier's and Airmen's Home National Cemetery. The Army Corps of Engineers will award approximately three indefinite delivery indefinite quantity contracts as a total small business set aside. The base period of the basic contract is one year with four one-year options and a total shared capacity of $49 million among contractors. Task orders will range from $150,000 to $15 million and be on a firm-fixed price basis. The best value selection procedure will follow FAR Part 15 guidelines.

View the file

Other files for this federal contract opportunity

Other files attached to ANC Multi-Road Repair Projects MATOC, newest first.
File Type Posted
W9123621R2012 Amendment 0003.pdf PDF
31_00_00.00_51_para_2.5_rev.pdf PDF
01_30_00.10_51_para_1.10.1_rev.pdf PDF
ANC_Tree_Preservation_Specifications_-_UPDATE_Nov-2020.pdf PDF
W9123621R2012 Amendment 02.pdf PDF
W9123621R2012 Amendment 0001.pdf PDF
17121D - RTA Specs 2020.10.19.pdf PDF
W9123621R2012 Attachment 5.pdf PDF
W9123621R2012 Attachment 2.pdf PDF
17121D - SP RTA 2020.09.25.pdf PDF
912_MATOC_MillingSpecification_30SEP2020.pdf PDF
W9123621R2012 Attachment 1.pdf PDF
W9123621R2012 Attachment 6.xlsx XLSX spreadsheet
W9123621R2012 Attachment 3.pdf PDF
W9123621R2012 Solicitation .pdf PDF
W9123621R2012 Attachment 4.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

NORTHERN REGIONAL OFFICE

13901 Crown Court, Woodbridge, Virginia 22193

(703)583-3800 www.deq.virginia.gov Matthew J. Strickler David K. Paylor

Secretary of Natural Resources Director

(804) 698-4000

Thomas A. Faha Regional Director

August 18, 2020

Evan Waagen

MSA, P.C.

5032 Rouse Drive Suite 100

Virginia Beach, Virginia

Transmitted Via Email: (Evan.Waagen@msaonline.com)

Re: Road Survey and Design for ANC – Humphreys Drive

Arlington National Cemetery, Virginia

DEQ SWM #: 2020-0127

Stormwater Management and Erosion and Sediment Control Plan Approval

Dear Mr. Waagen:

The Department of Environmental Quality (DEQ) has reviewed the revised combined Stormwater

Management Plan and Erosion & Sediment Control Plan (Plan) and Stormwater Management and Erosion and Sediment Control Report (Narrative) received electronically on August 17, 2020 in accordance with the Virginia Stormwater Management Act and the Virginia Stormwater Management Program (VSMP)

Regulations and the Virginia Erosion and Sediment Control Law and attendant Regulations. The Plan and Narrative received electronically August 17, 2020 with a signed seal date of August 12, 2020 are hereby approved and a copy is enclosed. No changes may be made to the approved Plan without obtaining prior approval from DEQ. Additionally, approval of the ESC and SWM Plan does not relieve the operator of complying with all other federal, state, or local laws and regulations.

As provided by Rule 2A:2 of the Supreme Court of Virginia, you have thirty (30) days from the date yo u received this decision within which to appeal this decision by filing a notice of appeal in accordance with the Rules of the Supreme Court of Virginia with the Director, Virginia Department of Environmenta l Quality.

http://www.deq.virginia.gov/

August 18, 2020

DEQ Plan #: 2020-0127

If not already provided, at your earliest convenience, please submit one digital copy (PDF preferred) of the approved Plan and accompanying specifications to DEQ at the following address:

Department of Environmental Quality

Northern Regional Office Attn: Stormwater Plan Review

13901 Crown Court Woodbridge, Virginia 22193

It is the responsibility of the owner and/or operator to ensure that the project is constructed in accordance with the approved Plan and accompanying specifications. Upon completion of the project, the owner and/or operator will be required to submit a construction record drawing for all permanent stormwater management facilities (i.e., post-development best management practices) constructed in accordance with the approved Plan.

Prior to the commencement of construction, all land-disturbing activities equal to or greater than one acre, or less than one acre and part of a larger common plan of development or sale, must register for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10).

If not already submitted, a copy of the General Permit registration statement can be obtained from DEQ’s website at the following location:

https://www.deq.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGen eralPermit.aspx

Please contact April Rhodes at (703) 583-3866 or April.Rhodes@deq.virginia.gov if you have any questions about this letter.

Respectfully, Trisha Beasley, Manager Regional VWPP/Stormwater Program

Cc: Larry Gavan, DEQ-CO

Kelly Vanover, DEQ-NRO Manager Mark Remsberg, DEQ-NRO SW Inspector Stacey Rosenquist, ANC

DEQ CGP Permitting Staff Enclosure https://www.deq.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGeneralPermit.aspx https://www.deq.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGeneralPermit.aspx

File details come from the government source that posted it. Updated .