17121D - SP RTA 2020.09.25.pdf
PDF 25 MB Posted
- Attached to
- ANC Multi-Road Repair Projects MATOC Federal contract opportunity
- Solicitation number
- W91236-21-R-2012
About this file
This document outlines a federal contract opportunity for a Multiple Award Task Order Contract (MATOC) for road repair projects. The Army Corps of Engineers Engineering District Norfolk is seeking to award approximately three indefinite delivery indefinite quantity contracts to small businesses for a base period of one year plus four one-year options, with a total shared contract capacity of $49 million. Task orders issued under this MATOC will be for work predominantly at Arlington National Cemetery and Soldier's and Airmen's Home National Cemetery, and will range in value from $150,000 to $15 million utilizing a firm-fixed price contract type. The selection procedure will utilize best value Design-Bid-Build in accordance with FAR Part 15 for this total small business set-aside competitive acquisition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 01_30_00.10_51_para_1.10.1_rev.pdf | ||
| ANC_Tree_Preservation_Specifications_-_UPDATE_Nov-2020.pdf | ||
| W9123621R2012 Amendment 0003.pdf | ||
| 31_00_00.00_51_para_2.5_rev.pdf | ||
| W9123621R2012 Amendment 02.pdf | ||
| W9123621R2012 Amendment 0001.pdf | ||
| W9123621R2012 Attachment 3.pdf | ||
| 912_MATOC_MillingSpecification_30SEP2020.pdf | ||
| W9123621R2012 Attachment 1.pdf | ||
| W9123621R2012 Attachment 6.xlsx | XLSX spreadsheet | |
| W9123621R2012 Solicitation .pdf | ||
| 2020-0127_2020-08-18_ANCHumphreys_ApprLttr.pdf | ||
| W9123621R2012 Attachment 4.pdf | ||
| 17121D - RTA Specs 2020.10.19.pdf | ||
| W9123621R2012 Attachment 5.pdf | ||
| W9123621R2012 Attachment 2.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001 COVER SHEET
G-002 STORMWATER POLLUTION PREVENTION PLAN
G-003 EROSION & SEDIMENT CONTROL NOTES
G-004 EROSION & SEDIMENT CONTROL NOTES
G-005 GENERAL NOTES & SEQUENCE OF CONSTRUCTION
BB001 BORING LOGS
C-100 KEY PLAN
CT101 MAINTENANCE OF TRAFFIC PLAN
V-100 CIVIL LEGEND, ABBREVIATIONS, AND SURVEY NOTES
V-101 TOPOGRAPHIC SURVEY
V-102 TOPOGRAPHIC SURVEY
V-103 TOPOGRAPHIC SURVEY
V-104 TOPOGRAPHIC SURVEY
V-105 EXISTING STORM STRUCTURE SCHEDULE
CD101 E&S AND DEMOLITION PLAN
CD102 E&S AND DEMOLITION PLAN
CD103 E&S AND DEMOLITION PLAN
CD104 E&S AND DEMOLITION PLAN
CS101 SITE LAYOUT
CS102 SITE LAYOUT
CS103 SITE LAYOUT
CS104 SITE LAYOUT
CG101 ROADWAY PLAN & PROFILE STA: 20+00 TO STA: 24+00
CG102 ROADWAY PLAN & PROFILE STA: 24+00 TO STA: 26+75
CG103 ROADWAY PLAN & PROFILE STA: 26+75 TO STA: 30+50
CG104 ROADWAY PLAN & PROFILE STA: 30+50 TO STA: 34+33.92
CG105 WIFI CONDUIT AND EDGE SUBDRAIN LOCATION
CG201 STORM SEWER PROFILE
CG301 ROADWAY CROSS SECTIONS STA: 20+06.44 TO STA: 21+25.00
CG302 ROADWAY CROSS SECTIONS STA: 21+50.00 TO STA: 22+38.27
CG303 ROADWAY CROSS SECTIONS STA: 22+46.27 TO STA: 23+54.22
CG304 ROADWAY CROSS SECTIONS STA: 23+75.00 TO STA: 24+38.50
CG305 ROADWAY CROSS SECTIONS STA: 24+46.50 TO STA: 25+75.00
CG306 ROADWAY CROSS SECTIONS STA: 26+00.00 TO STA: 27+15.01
CG307 ROADWAY CROSS SECTIONS STA: 27+27.93 TO STA: 27+75.00
CG308 ROADWAY CROSS SECTIONS STA: 27+81.72 TO STA: 28+25.00
CG309 ROADWAY CROSS SECTIONS STA: 28+50.00 TO STA: 29+75.00
CG310 ROADWAY CROSS SECTIONS STA: 30+00.00 TO STA: 31+25.00
CG311 ROADWAY CROSS SECTIONS STA: 31+50.00 TO STA: 32+22.65
CG312 ROADWAY CROSS SECTIONS STA: 32+30.65 TO STA: 33+25.00
CG313 ROADWAY CROSS SECTIONS STA: 33+50.00 TO STA: 34+33.77
C-501 EROSION AND SEDIMENT CONTROL DETAILS
C-502 EROSION AND SEDIMENT CONTROL DETAILS
C-503 SITE DETAILS
C-504 SITE DETAILS
C-505 SITE DETAILS
C-506 DRAINAGE DETAILS
C-507 DRAINAGE DETAILS
C-508 TYPICAL ROAD SECTIONS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A R
LI
N
G
TO
N N
A
TI
O N
A L
C E
M E
TE
R
Y , A
R
LI
N G
TO
N
, V
IR
G
IN
IA
N
O R
FO
LK
D
IS
TR
IC
T
FR
O N
T S
T.
N
O R
FO
LK
, V A
. 2
FY
R
O A
D S
U R
V E
Y A
N D
D E
S
IG
N O
F H
U M
P H
R E
Y S
D R
IV
E
R o u se
D ri v e, S u it e
V ir g in ia
B ea ch
V A
-4
-9 w w w .m sa o n li n e.
co m
W
6-
-F
-0
E N
W
M
JP
G B
H
D M
W N
A O
F
IL
E N
O
M S
A
P .C
09/25/2020
S E
P
TE
M B
E R
SITE
PROJECT SITE
ARLINGTON NATIONAL CEMETERY, ARLINGTON, VIRGINIA
FY19 ROAD SURVEY AND DESIGN OF
HUMPHREYS DRIVE
VICINITY MAP
SCALE: 1" = 5000'
LOCATION MAP
SCALE: 1" = 1000'
G-001
C O
V E
R S
H E
E T
SHEET INDEX
SHEET # SHEET TITLE
US Army Corps of Engineers ® Norfolk District
SOLICITATION NO.:
CONTRACT NO.: W91236-19-F-0005
ISSUE DATE: SEPTEMBER 2020
NAO FILE NO.: 912
CHIEF, ENGINEERING & CONSTRUCTION DIVISION
CHIEF, ENGINEERING BRANCH
APPROVED
ENGINEERING BRANCH DESIGN LEAD
RECOMMENDED
THIS PROJECT WAS DESIGNED BY THE NORFOLK DISTRICT OF THE ARMY
CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS
WITHIN THE SCOPE OF THEIR SIGNATURES AFFIXED BY ER 110-1-8152.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND
APPROVAL OF DRAWINGS IN THIS SET.
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 028336
AutoCAD SHX Text
DOUGLAS M WILL
R O
O S
E V
E
LT
D R
ORD AND WEITZEL DR
EI
SE
N H
O W
ER
D
R
McCLELLAN DR
ARNOLD DR
MEMORIAL AVE
LEGEND
LINCOLN DR
L'ENFANT DR
GATE 123
ORD & WEITZEL ROAD REPAIRS
ORD & WEITZEL GATE
McPHERSON
PERSHING
WILSON & McCLELLAN
SHERIDAN
PROJECT LIMITS
OUTFALL
PROPOSED ANC CAPITAL IMPROVEMENT PROJECT LOCATIONS
HUMPHREYS STORMWATER MANAGEMENT NARRATIVE
THE PROPOSED PROJECT SITE IS WITHIN THE WATERSHED AREA THAT RUNS WEST
TO EAST TOWARD THE CEMETERY ENTRANCE AND THE POTOMAC RIVER. THE
EXISTING WATERSHED OUTFALL CONSISTS OF A 60-INCH CORRUGATED PLASTIC
PIPE THAT OUTFALLS INTO A CONCRETE CHANNEL IN SECTION 52 OF THE
CEMETERY. THERE ARE CURRENTLY NO EXISTING STORMWATER MANAGEMENT
FACILITIES LOCATED WITHIN THE HUMPHREYS DRIVE PROJECT SITE. SOIL BORINGS
WITHIN THE PROJECT CONSIST MOSTLY OF HYDROLOGIC GROUP D.
THE PROPOSED IMPROVEMENTS INCLUDE REPLACEMENT AND MAINTENANCE OF
EXISTING ROADWAY, SUB-GRADE, INLETS AND DRAIN PIPES. ALSO, TO
MAINTAIN/REHAB HISTORICAL DRAINAGE FEATURES.
STORMWATER MANAGEMENT DESIGN FOR THIS PROJECT WILL COMPLY WITH
TECHNICAL CRITERIA IIB FOR LAND DISTURBING ACTIVITIES UNDER THE VSMP
REGULATION 9VAC-870. STORMWATER QUALITY COMPLIANCE SHALL BE MET
THROUGH THE USE OF EXCESS PHOSPHORUS REMOVAL PROVIDED BY
STORMWATER MANAGEMENT FACILITIES LISTED IN THE ANC COMPREHENSIVE
STORMWATER MANAGEMENT PLAN AND IN TABLE 1. STORMWATER QUANTITY
COMPLIANCE SHALL BE MET THROUGH AN ANALYSIS OF THE 2- AND 10-YEAR
STORM EVENTS FOR EROSION AND FLOOD CONTROL. STORMWATER
CALCULATIONS ARE PROVIDED IN THE STORMWATER REPORT.
ANC COMPREHENSIVE STORMWATER MANAGEMENT PLAN NARRATIVE
THE PURPOSE OF THE ANC COMPREHENSIVE STORMWATER MANAGEMENT PLAN IS
TO PROVIDE WATER QUALITY AND WATER QUANTITY TREATMENT FOR CAPITAL
IMPROVEMENT PROJECTS AT ARLINGTON NATIONAL CEMETERY (ANC). TWO
STORMWATER MANAGEMENT FACILITIES (SWMFS) WERE INSTALLED IN SECTION 52
OF THE CEMETERY DURING THE FIRST CAPITAL IMPROVEMENT PROJECT, ORD &
WEITZEL ROAD REPAIRS. THE SWMFS WILL TREAT THE 57.91 ACRE WATERSHED
THAT DRAINS TO SECTION 52.
THE STORMWATER MANAGEMENT FACILITIES WILL BE USED FOR A
COMPREHENSIVE PLAN PER 9VAC25-870-92. ADDITIONAL NUTRIENT CREDITS WILL
BE APPLIED TOWARDS, BUT NOT LIMITED TO, THE PROJECTS LISTED IN TABLE 3.
THE SWMFS ARE MANUFACTURED TREATMENT DEVICES (MTDS). A HYDRODYNAMIC
SEPARATOR WILL PROVIDE PRETREATMENT AND AN UNDERGROUND CHAMBER
SYSTEM WILL PROVIDE WATER QUALITY AND WATER QUANTITY TREATMENT. THE
MTDS ARE DESIGNED TO COMPLY WITH TECHNICAL CRITERIA IIB OF THE VIRGINIA
STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS 9VAC25-870.
INSPECTION & MAINTENANCE: UNDERGROUND CHAMBER SYSTEM
ARLINGTON NATIONAL CEMETERY IS RESPONSIBLE FOR THE LONG TERM
OPERATIONS AND MAINTENANCE OF ALL PROPOSED MANUFACTURED TREATMENT
DEVICES.
THE PROPOSED MTD SHALL BE INSPECTED EVERY 6 MONTHS DURING THE FIRST
YEAR OF OPERATION AND NO LESS THAN 1 YEAR THEREAFTER. INSPECTION
INTERVALS SHALL BE BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT
ACCUMULATION AND HIGH WATER ELEVATIONS.
CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS
THAT MAINTENANCE IS NECESSARY.
ALL INSPECTION & MAINTENANCE PROCEDURES SHALL BE IN ACCORDANCE WITH
THE MANUFACTURERS STANDARDS AND SPECIFICATIONS.
ORD & WEITZEL
ORD & WEITZEL GATE
SHERIDAN
WILSON & MCCLELLAN
MCPHERSON
PERSHING
HUMPHREYS
ORD & WEITZEL ROAD REPAIRS
PERSHING
MCPHERSON
ORD & WEITZEL GATE
WILSON & MCCLELLAN
SHERIDAN
HUMPHREYS
4.69 4.36 6.65 1.18 1.42* 2.23* 0.75
PROJECT
TOTAL AREA
(AC)
4.36 3.77 5.45 0.50 1.21* 1.76* 0.53
IMPERVIOUS
COVER (AC)
0.33 0.59 1.20 0.68 0.21* 0.47* 0.22
MANAGED
TURF (AC)
0.00
FORESTED/OPEN
SPACE (AC)
1.93 1.70 2.50 0.35 0.55* 0.82* 0.18
TP REMOVAL
REQUIRED (LB/YR)
PROPOSED LAND COVER
0.00 0.00 0.00 0.00 0.00 0.00
8.03*0.00TOTAL 21.28* 17.58* 3.70*
*ESTIMATED BASED ON PRELIMINARY DESIGN BY OTHERS AND SUBJECT TO CHANGE AS DESIGN PROCEEDS.
TABLE 2. ANC PLANNED CAPITAL IMPROVEMENT PROJECTS AND ESTIMATED REMOVAL REQUIRED
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A R
LI
N
G
TO
N N
A
TI
O N
A L
C E
M E
TE
R
Y , A
R
LI
N G
TO
N
, V
IR
G
IN
IA
N
O R
FO
LK
D
IS
TR
IC
T
FR
O N
T S
T.
N
O R
FO
LK
, V A
. 2
FY
R
O A
D S
U R
V E
Y A
N D
D E
S
IG
N O
F H
U M
P H
R E
Y S
D R
IV
E
R o u se
D ri v e, S u it e
V ir g in ia
B ea ch V
A
-4
-9 w w w .m sa o n li n e.
co m
W
6-
-F
-0
E N
W
M
JP
G B
H
D M
W N
A O
F
IL
E N
O
M S
A
P .C
09/25/2020
S E
P
TE
M B
E R
S
TO
R M
W A
TE
R
P O
LL
U
TI
O
N P
R E
V E
N
TI
O N
P
LA
N
G-002
WATER QUALITY
1-YEAR
10-YEAR
7.56 41.07 127.64
24-HR DESIGN
STORM IN
2.61 32.50 127.08
OUT
14.92 18.55 20.75
HYDRODYNAMIC
SEPARATOR
UNDERGROUND
CHAMBER
SYSTEM
14.65 18.53 20.56
PEAK FLOW (CFS)
20.56 18.53 14.60
TABLE 3. PCSWMM FLOW ROUTING RESULTS FOR THE STORMWATER MANAGEMENT FACILITIES
PRECIPITATION
(IN)
1.00 2.59 4.81
MAXIMUM HGL (FT)
JUNCTION BOX
BMP
TABLE 1. WATER QUALITY ACHIEVED
HYDRODYNAMIC SEPARATOR
UNDERGROUND CHAMBER SYSTEM
TOTAL
TP REMOVAL
(LB/YR)
8.15 13.04 21.19
HUMPHREYS
INSPECTION & MAINTENANCE: HYDRODYNAMIC SEPARATOR
ARLINGTON NATIONAL CEMETERY IS RESPONSIBLE FOR THE LONG TERM
OPERATIONS AND MAINTENANCE OF ALL PROPOSED MANUFACTURED TREATMENT
DEVICES.
THE PROPOSED MTD SHALL BE INSPECTED EVERY 6 MONTHS DURING THE FIRST
YEAR OF OPERATION AND NO LESS THAN 1 YEAR THEREAFTER. INSPECTION
INTERVALS SHALL BE BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT
ACCUMULATION AND HIGH WATER ELEVATIONS.
CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT
MAINTENANCE IS NECESSARY.
ALL INSPECTION & MAINTENANCE PROCEDURES SHALL BE IN ACCORDANCE WITH
THE MANUFACTURERS STANDARDS AND SPECIFICATIONS.
AutoCAD SHX Text
SCALE: 1" = 500'-0"
AutoCAD SHX Text 500'
AutoCAD SHX Text 250'
AutoCAD SHX Text 500'
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 028336
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A R
LI
N
G
TO
N N
A
TI
O N
A L
C E
M E
TE
R
Y , A
R
LI
N G
TO
N
, V
IR
G
IN
IA
N
O R
FO
LK
D
IS
TR
IC
T
FR
O N
T S
T.
N
O R
FO
LK
, V A
. 2
FY
R
O A
D S
U R
V E
Y A
N D
D E
S
IG
N O
F H
U M
P H
R E
Y S
D R
IV
E
R o u se
D ri v e, S u it e
V ir g in ia
B ea ch
V A
-4
-9 w w w .m sa o n li n e.
co m
W
6-
-F
-0
E N
W
M
JP
G B
H
D M
W N
A O
F
IL
E N
O
M S
A
P .C
09/25/2020
S E
P
TE
M B
E R
E R
O S
IO
N
S
E D
IM
E
N T
C O
N
TR
O L
N O
TE
S
G-003
EROSION AND SEDIMENT CONTROL NARRATIVE
FY19 ROAD SURVEY AND DESIGN OF HUMPHREYS DRIVE
ARLINGTON NATIONAL CEMETERY, ARLINGTON, VA
1. PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF THE SURVEY, DEMOLITION, AND NEW ROADWAY
CONSTRUCTION OF THE HUMPHREYS DRIVE LOOP AT THE ARLINGTON
NATIONAL CEMETERY IN ARLINGTON, VA. THE NEW ROADWAY CROSS
SECTION CONSISTS OF CONDUIT TO ALLOW FOR FUTURE INSTALLATION OF
COMMUNICATION LINES AND A PAVEMENT SECTION DESIGNED PER
GEOTECHNICAL OBSERVATIONS AND CALCULATIONS. ADDITIONALLY, ANY
STORM SEWER INLET OR PIPE NOTED TO BE CURRENTLY INADEQUATE WILL
BE REPLACED. CARE MUST BE TAKEN DURING CONSTRUCTION TO PREVENT
ANY DISTURBANCE TO CULTURAL FEATURES OF THE CEMETERY, TO INCLUDE
BURIAL PLOTS ADJACENT TO THE ROADWAY. DISTURBANCE THAT OCCURS
DURING THE DEMOLITION PHASE INCLUDES REMOVING THE EXISTING
ROADWAY WITHIN THE LIMITS OF DISTURBANCE INDICATED IN THE SITE PLAN,
REMOVAL OF A PORTION OF THE SIDEWALK AT LODGE 1, AND REMOVAL OF
THE STORM DRAINAGE SYSTEMS AS SHOWN.
PROPOSED DRAINAGE FOR THE PROJECT IS VIA SHEET FLOW AND
CHANNELIZED FLOW TO STORM SEWER INLETS. WHILE EXISTING PIPES MAY
BE REMOVED AND REPLACED PER CALCULATIONS, THE POINT OF OUTFALL
WILL BE MAINTAINED DURING CONSTRUCTION, WITH THE SAME
CONTRIBUTING DRAINAGE AREA DIRECTED TO THIS POINT BEFORE AND
AFTER CONSTRUCTION. PROPOSED GRADES RANGE FROM 1% TO 2% AND UP
TO 3:1 IN LAWN AREAS TO CONNECT TO EXISTING GRADE. OFFSITE PEAK
FLOWS AND CONTRIBUTING VOLUMES HAVE BEEN REDUCED TO COMPLY
WITH THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
REQUIREMENTS FOR STORMWATER QUANTITY. THE SITE GREATER THAN
2,500 SF AND IS LOCATED IN THE CHESAPEAKE BAY PRESERVATION AREA
(CBPA). THEREFORE, STORMWATER QUALITY COMPLIANCE SHALL BE MET
THROUGH THE USE OF EXCESS PHOSPHORUS REMOVAL PROVIDED BY
STORMWATER MANAGEMENT FACILITIES PREVIOUS CONSTRUCTED WITHIN
ARLINGTON NATIONAL CEMETERY AND LISTED IN THE ANC COMPREHENSIVE
STORMWATER MANAGEMENT PLAN.
ACCESS DURING SITE CONSTRUCTION WILL BE FROM THE INTERSECTION OF
HUMPHREYS DRIVE AND HUMPHREYS DRIVE FOR THE SOUTHERN ACCESS
POINT AND FROM HUMPHREYS DRIVE NEAR THE CHAFFEE PARKING LOT FOR
THE NORTHERN ACCESS POINT. CARE MUST BE TAKEN TO ALLOW ACCESS TO
THE CHAFFEE PARKING LOT, LODGE 1, AND THE PAN AM FLIGHT 103
MEMORIAL AT ALL TIMES.
0.75 ACRES OF LAND WILL BE DISTURBED DURING THE CONSTRUCTION OF
THIS PROJECT. LAND DISTURBING ACTIVITIES INCLUDE EROSION AND
SEDIMENT CONTROL (ESC) INSTALLATION, CLEARING AND GRUBBING, ROUGH
GRADING, AND ALL OTHER LAND DISTURBING ACTIVITIES NECESSARY TO
COMPLETE THE PROJECT, AND WILL INCLUDE THE FINAL SITE GRADING AND
ROADWAY CONSTRUCTION.
CONSTRUCTION CREWS WILL MOBILIZE, OCCUPY THE PROJECT SITE, INSTALL
EROSION AND SEDIMENT CONTROL MEASURES, DEMOLISH AND REMOVE ALL
MATERIAL IDENTIFIED IN THE DEMOLITION PLAN, AND BRING THE SITE TO
ROUGH GRADE PRIOR TO THE INSTALLATION OF PROPOSED SITE ITEMS.
DEMOLITION IS TO BE CONDUCTED IN ACCORDANCE WITH THE DEMOLITION
PLAN, INCLUDED IN THE ESC PLAN SHEETS. MATERIALS TO BE DEMOLISHED
AND REMOVED INCLUDE:
- ASPHALT
- CURB/GUTTER
- STORM SEWER PIPES AND STRUCTURES
- SIDEWALK
THE RESPONSIBLE LAND DISTURBER (RLD), AS CERTIFIED BY THE VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ), WILL BE IN CHARGE OF
AND RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITIES
ASSOCIATED WITH THIS PROJECT.
2. EXISTING SITE CONDITIONS
CURRENT LAND COVER IS DEVELOPED WITH LAWN AREA AND IMPERVIOUS
COVER ALONG THE ROADWAY AND CONSISTS OF MOSTLY PERVIOUS AREA
THAT CONSISTS OF HSG D SOILS. SLOPES THROUGH THE LAWN AREAS RANGE
FROM 1% TO 15%; SLOPES ALONG HUMPHREYS DRIVE TYPICALLY INCLUDE A
2% CROSS SLOPE WITH 0.5% TO 3.5% LONGITUDINAL SLOPES.
THE AVERAGE ELEVATION IS APPROXIMATELY 204 FEET NAVD 88, AND
ELEVATIONS RANGE FROM APPROXIMATELY 199 TO 209 FEET NAVD 88. THERE
ARE 0.59 ACRES OF EXISTING IMPERVIOUS COVER WITHIN THE PROPOSED
LIMITS OF DISTURBANCE. SITE RUNOFF CONSISTS OF SHEET FLOW DIRECTLY
ONSITE VIA INFILTRATION OR SHEET FLOW TO A CLOSED PIPE SYSTEM THAT
IS CARRIED OFFSITE.
THE SITE APPEARS TO LIE WITHIN FLOOD ZONE D, AREAS DETERMINED TO BE
OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ON FEMA'S
FLOOD RATE INSURANCE MAP COMMUNITY PANEL NUMBER 51013C0039C FOR
ARLINGTON COUNTY, VA, DATED AUGUST 19, 2013.
THE WATER TABLE WAS NOT ENCOUNTERED AT SOIL BORING
LOCATIONS. THE UNDERLYING SOILS CONSISTS PRIMARILY OF LEAN
CLAY, FAT CLAY, SILT-CLAYEY SAND, AND CLAYEY SAND. A
GEOTECHNICAL REPORT HAS BEEN COMPLETED BY GET, INC.
(REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL
ENGINEERING SERVICES FOR FY19-ROADWAY SURVEYS AND
DESIGN-HUMPHREYS DRIVE, ARLINGTON NATIONAL CEMETERY,
ARLINGTON, VIRGINIA, DATED 1/27/20) WHICH CONTAINS ADDITIONAL
SUBSURFACE INFORMATION.
3. ADJACENT PROPERTY
THE PROJECT SITE IS LOCATED AT ARLINGTON NATIONAL
CEMETERY, ALONG THE MAIN LOOP OF HUMPHREYS DRIVE NORTH
OF SHERMAN DRIVE. ALL ADJACENT AREAS ARE ON ARLINGTON
NATIONAL CEMETERY PROPERTY.
4. CRITICAL EROSION AREAS
IT HAS BEEN DETERMINED THAT THERE ARE NOT CRITICAL
EROSION AREAS ON THIS SITE.
5. EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATED AND STRUCTURAL
ESC CONTROL PRACTICES SHALL BE CONSTRUCTED AND
MAINTAINED ACCORDING TO THE LATEST EDITION OF THE MINIMUM
STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK (VESCH) APPLICABLE TO THE
COASTAL PLAIN REGION OF VIRGINIA. THE MINIMUM STANDARDS OF
THE VESCH SHALL BE ADHERED TO BEFORE, DURING, AND AFTER
CONSTRUCTION, UNLESS OTHERWISE WAIVED OR APPROVED BY A
VARIANCE. REFER TO THE CONSTRUCTION PLANS FOR DETAILS AND
LOCATIONS ASSOCIATED WITH THE CONTROL MEASURES.
GENERAL
1) A COPY OF THE APPROVED ESC PLAN AND THE VESCH SHALL BE
MAINTAINED ON THE SITE AT ALL TIMES.
2) PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS
OTHER THAN INDICATED ON THE ESC PLANS (INCLUDING, BUT
NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS), THE
CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY ESC PLAN TO
THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN
APPROVING AUTHORITY.
3) THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION
AND MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES
NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS
DETERMINED NECESSARY BY THE PLAN APPROVING AUTHORITY
AT NO ADDITIONAL COST TO THE OWNER.
MINIMUM STANDARDS
MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL
BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF
THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS
THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN FOURTEEN (14) DAYS.
PERMANENT STABILIZATION SHALL BE APPLIED TO
AREAS THAT ARE TO BE LEFT DORMANT FOR MORE
THAN ONE (1) YEAR.
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL
STOCKPILES AND BORROW AREAS SHALL BE STABILIZED
OR PROTECTED WITH SEDIMENT TRAPPING MEASURES.
THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL
SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE
PROJECT SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE
ESTABLISHED ON DENUDED AREAS NOT OTHERWISE
PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A
GROUND COVER IS ACHIEVED THAT IS UNIFORM,
MATURE ENOUGH TO SURVIVE AND WILL INHIBIT
EROSION.
MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES,
SEDIMENT BARRIERS AND OTHER MEASURES INTENDED
TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A
FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND
SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND
DISTURBANCE TAKES PLACE.
MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN
STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS, IF REQUIRED, SHALL
BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL
DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP
SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA
AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS
THAN THREE (3) ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS
COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER
THAN OR EQUAL TO THREE (3) ACES SHALL BE CONTROLLED
BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF
A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF
DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A
MINIMUM, MAINTAIN STRUCTURAL INTEGRITY OF THE BASIN
DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF
COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL
CORRESPOND TO A BARE EARTH CONDITION OR THOSE
CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT
BASIN IS UTILIZED.
C.MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND
CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY
WITHIN ONE (1) YEAR OF PERMANENT STABILIZATION SHALL
BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING
MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL
SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE
DRAIN STRUCTURE.
MS-9. WHENEVER WATER SEEPS FROM SLOPE FACE, ADEQUATE
DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.
MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE
SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE
TREATED TO REMOVE SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE
CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE
OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR
PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH
THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED,
PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT,
CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK
AREA TO THE GREATEST EXTENT POSSIBLE DURING
CONSTRUCTION. NON-ERODIBLE MATERIAL SHALL BE USED FOR
THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS.
EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF
ARMORED BY NON-ERODIBLE COVER MATERIALS.
MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY
CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY
SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM
CROSSING CONSTRUCTED OF NON-ERODIBLE MATERIAL SHALL
BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE, AND LOCAL CHAPTERS
PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE
STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE
IS COMPLETED.
MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN
ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION
TO OTHER APPLICABLE CRITERIA:
A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE
OPENED AT ONE TIME.
B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL
SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE
FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN A MANNER THAT DOES NOT
ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE
PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL
BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN
ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS SHALL BE
COMPLIED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES
INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS
SHALL BE MADE TO MINIMIZE THE TRANSPORT OF
SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED
SURFACE. WHERE SEDIMENT TRANSPORTED ONTO A
PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE
SHALL BE CLEANED THOROUGHLY AT THE END OF EACH
DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS
BY SHOVELING OR SWEEPING AND TRANSPORTED TO A
SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING
SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED
IN THIS MANNER. THIS PROVISION SHALL APPLY TO
INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO
LARGER LAND-DISTURBING ACTIVITIES.
MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE REMOVED WITHIN THIRTY (30)
DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED,
UNLESS OTHERWISE AUTHORIZED BY THE LOCAL
PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE
DISTURBED SOIL AREAS RESULTING FROM THE
DEPOSITION OF TEMPORARY MEASURES SHALL BE
PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.
MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM
DEVELOPMENT SITES SHALL BE PROTECTED FROM
SEDIMENT DEPOSITION, EROSION, AND DAMAGE DUE TO
INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE
OF STORMWATER RUNOFF FOR THE STATED
FREQUENCY STORM OF 24-HOUR IN ACCORDANCE WITH
THE FOLLOWING STANDARDS AND CRITERIA:
A. CONCENTRATED STORMWATER RUNOFF LEAVING A
DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY
IN AN ADEQUATE NATURAL OR MAN-MADE RECEIVING
CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR
THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A
PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY
ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE
SYSTEM SHALL BE PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE
VERIFIED IN THE FOLLOWING MANNER:
1) THE APPLICANT SHALL DEMONSTRATE THAT THE
TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS
WITHIN THE CHANNEL IS ONE HUNDRED TIMES
GREATER THAN THE CONTRIBUTING DRAINAGE AREA
OF THE PROJECT: OR
2) a) NATURAL CHANNELS SHALL BE ANALYZED BY THE
USE OF A 2-YEAR STORM TO VERIFY THAT
STORMWATER WILL NOT OVERTOP CHANNEL BANKS
NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE
CHANNELS SHALL BE ANALYZED BY THE USE OF A
10-YEAR STORM TO VERIFY THAT STORMWATER WILL
NOT OVERTOP ITS BANK AND BY THE USE OF A
2-YEAR STORM TO DEMONSTRATE THAT
STORMWATER WILL NOT CAUSE EROSION OF
CHANNEL BED OR BANKS; AND
c) PIPES AND STORM SEWER SYSTEMS SHALL BE
ANALYZED BY THE USE OF A 10-YEAR STORM TO
VERIFY THAT STORMWATER WILL BE CONTAINED
WITHIN THE PIPE OR SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR
PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR
PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL:
1) IMPROVE THE CHANNELS TO A CONDITION WHERE AT
10-YEAR STORM WILL NOT OVERTOP THE BANKS AND
A TWO-YEAR STORM WILL NOT CAUSE EROSION TO
THE CHANNEL, THE BED, OR THE BANKS; OR
2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION
WHERE THE 10-YEAR STORM IS CONTAINED WITHIN
THE APPURTENANCES;
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 028336
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A R
LI
N
G
TO
N N
A
TI
O N
A L
C E
M E
TE
R
Y , A
R
LI
N G
TO
N
, V
IR
G
IN
IA
N
O R
FO
LK
D
IS
TR
IC
T
FR
O N
T S
T.
N
O R
FO
LK
, V A
. 2
FY
R
O A
D S
U R
V E
Y A
N D
D E
S
IG
N O
F H
U M
P H
R E
Y S
D R
IV
E
R o u se
D ri v e, S u it e
V ir g in ia
B ea ch
V A
-4
-9 w w w .m sa o n li n e.
co m
W
6-
-F
-0
E N
W
M
JP
G B
H
D M
W N
A O
F
IL
E N
O
M S
A
P .C
09/25/2020
S E
P
TE
M B
E R
E R
O S
IO
N
S
E D
IM
E
N T
C O
N
TR
O L
N O
TE
S
G-004
4) ALL ESC CONTROL MEASURES SHALL BE CHECKED
CONTINUOUSLY AND ESPECIALLY AFTER SIGNIFICANT STORM
EVENTS TO LOCATE DAMAGES AND CONDUCT MAINTENANCE
OPERATIONS. ALL MEASURES SHALL HAVE AN INSPECTION AND
MAINTENANCE PLAN THAT IDENTIFIES THE OWNER AND THE
RESPONSIBLE PARTY FOR CARRYING OUT THE INSPECTION AND
MAINTENANCE PLAN.
5) ALL TEMPORARY ESC CONTROL MEASURES SHALL BE REMOVED
WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS
OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY.
TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING
FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE
PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
SEDIMENTATION.
6) UNDERGROUND UTILITY LINES
a. NO MORE THAN 500 LF OF TRENCH MAY BE OPENED AT ONE
TIME.
b. EXCAVATED FILL SHALL BE PLACED ON THE UPHILL SIDE OF
TRENCHES.
c. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE
PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND
PROMOTE STABILIZATION.
7) WHENEVER A SLOPE FACE HAS WATER SEEPING FROM IT,
ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE
PROVIDED.
8) STORM DRAIN AND CULVERT INLET PROTECTION SHALL BE
REQUIRED ON ALL ACTIVE STORM SEWER INLETS. INLET
PROTECTION SHALL BE ESTABLISHED ON INLETS PRIOR TO
PLACING THEM IN SERVICE.
9) LIVE WATERCOURSE WILL NOT BE DISTURBED.
10) ANY AND ALL MATERIAL TRANSPORTED ONTO A PUBLIC OR
PRIVATE ROAD SURFACE WILL BE REMOVED THOROUGHLY AT THE
END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE
ROAD BY SHOVELING OR SWEEPING AND TRANSPORTED TO A
SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE
ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
11) CONSTRUCTION TRAFFIC SHALL BE LIMITED TO ACCESS ROADS.
ALL TRAFFIC IS PROHIBITED FROM CROSSING DRAINAGE SWALES
AND STREAMS, EXCEPT WHERE ABSOLUTELY NECESSARY.
12) IF NEEDED, DEWATERING AND WELL POINT DISCHARGE
OPERATIONS MUST PROVIDE APPROPRIATE EROSION AND
SEDIMENT CONTROL DEVICES AND PRACTICES, AND BE
APPROVED BY THE INSPECTOR PRIOR TO THE COMMENCEMENT
OF DISCHARGE OPERATIONS. A “STOP WORK ORDER” MAY BE
ISSUED AND/OR LEGAL ACTION TAKEN FOR NON-COMPLIANCE.
13) THE CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO
CONTROL DUST, INCLUDING (BUT NOT LIMITED TO) USE OF WATER
OR CHEMICAL DUST PALLIATIVE, LIMITING THE NUMBER OF
VEHICLES ALLOWED ON-SITE, MINIMIZING THE OPERATING SPEED
OF ALL VEHICLES, ETC.
14) ALL TEMPORARY EQUIPMENT, CONSTRUCTION MATERIAL, AND
DEBRIS MUST BE REMOVED FROM THE SITE IN A LAWFUL MANNER
IN ORDER FOR CONSTRUCTION TO BE CONSIDERED COMPLETE.
15) MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER THAT
NATURAL DRAINAGE IS NOT OBSTRUCTED AND NO OFF-SITE
SEDIMENT DAMAGE SHALL RESULT. STABILIZE OR PROTECT
STOCKPILES IN ACCORDANCE WITH MS-2. SIDE SLOPES OF THE
STOCKPILE SHALL NOT EXCEED 2:1. PERIMETER CONTROLS MUST
BE PLACED AROUND THE STOCKPILE IMMEDIATELY; SEEDING OF
STOCKPILES SHALL BE COMPLETED WITHIN 7 DAYS OF THE
FORMATION OF THE STOCKPILE, IN ACCORDANCE WITH STD. &
SPEC. 3.31, TEMPORARY SEEDING IF IT IS TO REMAIN DORMANT
FOR LONGER THAN 30 DAYS (REFER TO MS-1 AND MS-2).
PERMANENT STABILIZATION
FINISH GRADING WILL NOT BE COMPLETED DURING LAND
DISTURBING ACTIVITIES. ALL AREAS DISTURBED SHALL BE
STABILIZED WITH TEMPORARY SEEDING IMMEDIATELY FOLLOWING
FINISH GRADING. SODDING SHALL BE DONE IN ACCORDANCE WITH
ARLINGTON NATIONAL CEMETERY REQUIREMENTS FOR SOD. SOIL
SURFACE SHALL BE CLEARED OF TRASH, DEBRIS, LARGE ROOTS,
BRANCHES, STONES AND CLODS PRIOR TO SEEDING.
IRREGULARITIES TO THE SOIL SURFACE SHALL BE LEVELED OR
FILLED TO PREVENT DEPRESSIONS AND WATER POCKETS PRIOR TO
INSTALLATION. SOD SHALL NOT BE INSTALLED IN EXCESSIVELY WET
OR DRY WEATHER OR WHEN THE GROUND IS FROZEN. TORN OR
UNEVEN PADS WILL NOT BE ACCEPTABLE.
STORMWATER MANAGEMENT
STONE CONSTRUCTION ENTRANCES, STORM DRAIN INLET
PROTECTION, AND SILT FENCING WILL BE CONSTRUCTED PRIOR TO
LAND DISTURBANCES TO PROVIDE FOR SETTLEMENT OF SEDIMENTS
IN STORM WATER RUNOFF PRIOR TO RELEASE TO THE RECEIVING
WATERS.
MAINTENANCE
IN GENERAL, ALL ESC MEASURES WILL BE CHECKED DAILY AND
AFTER EACH SIGNIFICANT RAINFALL. ITEMS WILL BE CHECKED IN
ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL
MAINTENANCE NOTES.
EROSION AND SEDIMENT CONTROL MAINTENANCE NOTES
1) TEMPORARY STONE CONSTRUCTION ENTRANCE (CE) - VESCH STD.
3.02
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC ROADWAYS.
THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL
STONE OR THE WASHING AND REWORKING OF EXISTING STONE AS
CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY
STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED,
DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO
ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED
IMMEDIATELY. THE USE OF WATER TRUCKS TO REMOVE MATERIALS
DROPPED, WASHED, OR TRACKED ONTO ROADWAYS WILL NOT BE
PERMITTED UNDER ANY CIRCUMSTANCES.
2) SILT FENCE (SF) - VESCH STD. 3.05
1. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL.
ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
2. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED
SILT FENCE RESULTING FROM END RUNS AND UNDERCUTTING.
3. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME
INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE
AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE
REPLACED PROMPTLY.
4. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM
EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH
APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT
FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM
TO THE EXISTING GRADE, PREPARED AND SEEDED.
3) STORM DRAIN INLET PROTECTION (IP) - VESCH STD. 3.07
1. INLET PROTECTION SHALL BE INSPECTED IMMEDIATELY AFTER
EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED
RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
2. SEDIMENT SHALL BE REMOVED AND THE MEASURE RESTORED TO
ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO
ONE HALF THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT
SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER
THAT IT WILL NOT ERODE.
3. INLET PROTECTION SHALL BE REMOVED AND THE AREA STABILIZED
WHEN THE REMAINING DRAINING AREA HAS BEEN PROPERLY
STABILIZED.
4. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
4) TREE PROTECTION & PRESERVATION (TP) - VESCH STD. 3.38
1. TREE PROTECTION SHALL BE INSPECTED DAILY
FOR DAMAGE. ANY REQUIRED REPAIRS SHALL BE
MADE IMMEDIATELY.
N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM
STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA
STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS
SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF
SUBDIVISION 19 OF THIS SUBSECTION.
STRUCTURAL PRACTICES
1) TEMPORARY STONE CONSTRUCTION ENTRANCE (CE) - VESCH STD.
3.02
TEMPORARY STONE CONSTRUCTION ENTRANCE IS PROVIDED TO
REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO ADJACENT
PAVED ROADWAYS BY CONSTRUCTION VEHICLES. TEMPORARY
STONE CONSTRUCTION ENTRANCES WILL ALLOW ACCESS TO THE
SITE FROM CHAFFEE PARKING LOT AND MEIGS AVE. THE
CONSTRUCTION ENTRANCE IS 70-FEET IN LENGTH, 6-INCHES DEEP,
AND 14-FEET IN WIDTH. THE SECTION CONSISTS OF 2-INCH STONE
UNDER-LAID WITH FILTER FABRIC.
2) SILT FENCE (SF) - VESCH STD. 3.05
SILT FENCING WILL SERVE AS A PERIMETER CONTROL TO PROTECT
DISTURBED AREAS FROM OFF-SITE RUNOFF AND TO PREVENT
SEDIMENTATION DAMAGE TO AREAS OUTSIDE THE PROJECT SITE.
NOTE: CARE MUST BE TAKEN TO USE TRENCHLESS SILT FENCE AS
INDICATED IN EROSION AND SEDIMENT CONTROL PLANS.
3) STORM DRAIN INLET PROTECTION (IP) - VESCH STD. 3.07
INLET PROTECTION WILL BE USED TO PREVENT ANY SEDIMENT
CREATED BY CONSTRUCTION ACTIVITIES AND DISTURBED AREAS
FROM ENTERING THE EXISTING STORM SEWER SYSTEM. INLET
PROTECTION FOR PROPOSED STORM WATER STRUCTURES SHOULD
BE IMMEDIATELY BUILT AT EACH STRUCTURE IN ORDER TO REDUCE
THE AMOUNT OF FINE SEDIMENT TRANSPORTED INTO THE STORM
WATER PIPING.
4) TREE PRESERVATION & PROTECTION (TP) - ANC STD - SHEET C-501
TREE PROTECTION WILL BE USED TO PROTECT DESIRABLE TREES
FROM MECHANICAL AND OTHER INJURY DURING LAND DISTURBING
AND CONSTRUCTION ACTIVITY. AT MINIMUM, THE LIMITS OF CLEARING
SHALL BE LOCATED OUTSIDE THE DRIP LINE OF ANY TREE TO BE
RETAINED, AND IN NO CASE, CLOSER THAN 5-FEET TO THE TRUNK OF
ANY TREE.
VEGETATED PRACTICES
1) TEMPORARY SEEDING - VESCH STD. 3.31
TEMPORARY SEEDING SHALL BE USED AS AN ESC MEASURE.
TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED
AREAS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON
ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL
BE APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY
NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER
THAN FOURTEEN (14) DAYS. TEMPORARY SEEDING SHALL BE APPLIED
IMMEDIATELY AFTER ROUGH GRADING IS COMPLETED ON THE
RESPECTIVE AREAS. REFER TO TABLE 3.31-B FOR TEMPORARY
SEEDING GUIDANCE.
2) SODDING - VESC STD. 3.33
STABILIZING FINE-GRADED AREAS BY ESTABLISHING PERMANENT
GRASS STANDS WITH SOD. PROVIDES IMMEDIATE PROTECTION
AGAINST EROSION, AND IS ESPECIALLY EFFECTIVE IN GRASSED
SWALES AND WATER-WAYS OR IN AREAS WHERE AN IMMEDIATE
AESTHETIC EFFECT IS DESIRABLE.
MANAGEMENT STRATEGIES
1) STORM DRAIN INLET PROTECTION, STONE CONSTRUCTION
ENTRANCE, AND SILT FENCE WILL BE INSTALLED AS AN EARLY STEP
DURING LAND DISTURBING ACTIVITIES.
2) THE SITE IS TO DRAIN TO SEDIMENT-TRAPPING CONTROLS AT ALL
TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE
DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
3) RESPONSIBILITY FOR PLAN IMPLEMENTATION SHOULD BE GIVEN TO
THE CONSTRUCTION SUPERINTENDENT AND HE/SHE SHALL MAKE
ALL CONSTRUCTION WORKERS AWARE OF THE PROVISIONS OF THE
PLAN.
3. DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE
PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR
STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A
NATURAL CHANNEL OR WILL NOT CAUSE THE
PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A 10-YEAR
STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A
MAN-MADE CHANNEL; OR
4. PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT,
STORMWATER DETENTION OR OTHER MEASURES WHICH IS
SATISFACTORY TO THE LOCAL AUTHORITY TO PREVENT
DOWNSTREAM EROSION.
D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO
MAKE THE IMPROVEMENTS.
E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING
WATERSHED CHARACTERIZES AND THE ULTIMATE
DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES
STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM
THE LOCAL AUTHORITY OF A PLAN FOR MAINTENANCE OF THE
DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE
MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE
PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED
TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE
PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS
NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE
FACILITY TO THE RECEIVING CHANNEL.
H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE
EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL
BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE
OR PIPE SYSTEM, OR TO A DETENTION FACILITY.
J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA,
INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL
OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO
BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE
DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO A
SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS
THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL
BE USED IN ALL ENGINEERING CALCULATIONS.
K. ALL MEASURES USED TO PROTECT PROPERTIES AND
WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH
MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND
BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER
WATERS OF THE STATE.
L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES
FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW
RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL
OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR
MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I)
DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER
48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD
THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR,
24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW
RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR
STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE
PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD
FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION
OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR
THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN
IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE
RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION,
AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND
VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE
CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED
PURSUANT TO §62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW
RATE CAPACITY AND VELOCITY REQUIREMENTS OF
§62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE
SATISFIED BY COMPLIANCE WITH WATER QUANTITY
REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT
(§62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND
ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING
ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE
VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP)
REGULATIONS.
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 028336
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
A R
LI
N
G
TO
N N
A
TI
O N
A L
C E
M E
TE
R
Y , A
R
LI
N G
TO
N
, V
IR
G
IN
IA
N
O R
FO
LK
D
IS
TR
IC
T
FR
O N
T S
T.
N
O R
FO
LK
, V A
. 2
FY
R
O A
D S
U R
V E
Y A
N D
D E
S
IG
N O
F H
U M
P H
R E
Y S
D R
IV
E
R o u se
D ri v e, S u it e
V ir g in ia
B ea ch
V A
-4
-9 w w w .m sa o n li n e.
co m
W
6-
-F
-0
E N
W
M
JP
G B
H
D M
W N
A O
F
IL
E N
O
M S
A
P .C
09/25/2020
S E
P
TE
M B
E R
G E
N E
R A
L N
O
TE
S
S E
Q U
E N
C E
O F
C O
N S
TR
U
C
TI
O N
G-005
1. OBTAIN NECESSARY PERMITS.
2. THE CONTRACTOR WILL CONTACT THE ASSIGNED DEQ INSPECTOR ONE (1)
WEEK PRIOR TO COMMENCING ANY LAND DISTURBING ACTIVITIES.
3. MOBILIZATION.
4. ERECT CONTRACTOR STAGING AREAS.
5. INSTALL SAFETY FENCE AROUND AREAS TO REMAIN UNDISTURBED.
6. INSTALL EROSION AND SEDIMENT CONTROL MEASURES AROUND LAND
DISTURBING ACTIVITIES ON PROJECT SITE. NO EROSION AND SEDIMENT
CONTROLS MAY BE REMOVED WITHOUT THE DEQ INSPECTOR'S
APPROVAL. STOCKPILE LOCATION, IF ACCEPTABLE, SHALL BE
COORDINATED WITH COR (CONTRACTING OFFICER'S REPRESENTATIVE).
7. BEGIN DEMOLITION AND REMOVAL OF SITE FEATURES.
8. RELOCATE UTILITIES WITHIN PROJECT LIMITS, AS IDENTIFIED ON SHEETS
CD101-CD104.
9. PERFORM ROUGH GRADING OF THE SITE.
10. DEMOLISH AND MILL / OVERLAY HUMPHREYS DRIVE AS IDENTIFIED ON
SHEETS CD101-CD104 AND CS101-CS104.
11. INSTALL ALL PROPOSED STORM DRAINAGE STRUCTURES, PIPES, AND
CULVERTS.
12. INSTALL INLET PROTECTION FOR STORMWATER INLET STRUCTURES AS
THEY ARE CONSTRUCTED.
13. INSTALL TEMPORARY SEEDING IN ALL DENUDED AREAS.
14. FINE GRADE ROADWAY.
15. COMPACT SUBGRADE, PLACE SUBBASE AND AGGREGATE.
16. INSTALL HARDSCAPE, INCLUDING SIDEWALK AND PAVING OPERATIONS.
17. FINE GRADE REMAINING SITE.
18. INSTALL SIGNAGE.
19. CLEAN STORM SEWER PIPES AND STORM STRUCTURES OF DEBRIS AND
ERODED MATERIAL DURING THE LAST STAGES OF CONSTRUCTION.
20. INSTALL FINAL STABILIZATION.
21. ALL EXCAVATED MATERIAL SHALL BE DISPOSED OF IN A LAWFUL MANNER.
22. REMOVE TEMPORARY EQUIPMENT, CONSTRUCTION MATERIALS, AND
DEBRIS FROM SITE.
23. REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
AFTER FINAL STABILIZATION OF THE SITE.
SEQUENCE OF CONSTRUCTIONGENERAL NOTES
1. ARLINGTON NATIONAL CEMETERY IS OUR NATION'S MOST SACRED SHRINE AND THE
FINAL RESTING PLACE FOR OUR MOST REVERED MILITARY AND CIVILIAN LEADERS. THE
CEMETERY RECEIVES AN ESTIMATED FOUR MILLION VISITORS PER YEAR INCLUDING
VISITS FROM THE PRESIDENT OF THE UNITED STATES, OTHER HEADS OF STATE, FAMILY
MEMBERS OF THE DECEASED, AND MILLIONS OF TOURISTS FROM AROUND THE WORLD.
OVER 6,000 FUNERALS ARE CONDUCTED YEARLY - IN ADDITION TO OVER 2,000 OTHER
CEREMONIES SUCH AS COMMEMORATIONS, AND HEAD-OF-STATE VISITS. THESE
CEREMONIES AND FUNERALS OFTEN RECEIVE THE INTENSE FOCUS OF THE PRESS AND
OTHER MEDIA - ESPECIALLY PRESIDENT KENNEDY'S GRAVE SITE, THE MEMORIAL
AMPHITHEATER, AND THE COLUMBARIUM COMPLEX. BECAUSE OF ARLINGTON'S SPECIAL
SIGNIFICANCE AND THE ATTENTION IT RECEIVES, STRICT ADHERENCE TO THESE
SPECIFICATIONS IS ESSENTIAL. FAILURE TO MEET SPECIFICATIONS WILL HAVE A
NEGATIVE IMPACT ON OUT NATION'S IMAGE AND WILL NOT BE TOLERATED. ARLINGTON
NATIONAL CEMETERY IS A HISTORIC DISTRICT ON THE NATION REGISTER OF HISTORIC
PLACES. THE NATIONAL HISTORIC PRESERVATION ACT AND FEDERAL ARCHAEOLOGICAL
ARTIFACTS AND DISCOVERIES.
2. THE CONTRACTOR SHALL UTILIZE ALL MEANS TO ENSURE SAFETY TO ALL CEMETERY
VISITORS. THIS INCLUDES THE USE OF BARRICADES, SAFETY FENCE, AND THE USE OF
FLAGMEN TO CONTROL THE ENTRANCE AND EXIT OF CONSTRUCTION EQUIPMENT.
GENERAL FENCING TO KEEP VISITORS OUT OF THE CONSTRUCTION SITE SHALL BE
GREEN. IF THE FENCING NEEDS TO KEEP TRAFFIC OR VISITORS FROM A FALL HAZARD, IT
SHOULD BE ORANGE. OTHERWISE SAFETY FENCE SHALL BE ORANGE. CONTRACTOR
SHALL COORDINATE HIS WORK EFFORT WITH OTHER CONTRACTORS.
3. BECAUSE OF ARLINGTON'S SPECIAL SIGNIFICANCE AND THE ATTENTION IT RECEIVES,
CLEANLINESS IS A MUST. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP THE
WORKSITE TRASH FREE AT ALL TIMES.
4. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT,
AND OTHER SERVICES AS REQUIRED TO EXCAVATE AND RECONSTRUCT EXISTING
CEMETERY ROADWAYS AS SHOWN ON DRAWINGS. THIS WORK WILL INCLUDE THE
REMOVAL OF CURBS & CURBS/GUTTERS, THE EXCAVATION OF ASPHALT, BASE COURSE,
CONCRETE PAVEMENT AND, IF NEEDED, SUB-BASE COURSE. SUBGRADE THAT HAS BEEN
CLASSIFIED AS POOR SHALL ALSO BE REMOVED AND REPLACED. CONTRACTOR SHALL
ADJUST ROADWAY ELEVATIONS TO ENSURE POSITIVE DRAINAGE AND PREVENT
PONDING ON THE NEW ROADS.
5. TREE PROTECTION SHALL BE INSTALLED AROUND TREES IN THE WORK ZONE. THERE
CAN BE NO STOCKPILING OR STORAGE OF MATERIALS OR VEHICLES PARKED UNDER
THE TREES.
6. CONTRACTOR SHALL DEMOLISH AND REPLACE THE EXISTING STORM SEWER SYSTEM
(LOCATED WITHIN THE FOOTPRINT OF THE ROADWAYS OR AS INDICATED ON THE
DRAWING) INCLUDING PIPES, CATCH BASINS, AND CURB INLETS. ENSURE THAT THE
BEDDING BACKFILL MATERIAL IS PLACED AND COMPACTED.
7. CONTRACTOR SHALL DEMOLISH BITUMINOUS ROAD SURFACE, BASE COURSE, AND
SUB-BASE COURSE AS NEEDED IN ORDER TO PREPARE IT FOR RECONSTRUCTION.
8. CONTRACTOR SHALL DEMOLISH/INSTALL CONCRETE CURB AND GUTTER SYSTEMS. THE
NEW CURBS WILL BE OF THE "MOUNTABLE TYPE" UTILIZING CONCRETE CURB AND
GUTTER SYSTEMS. THE NEW CURBS WILL BE OF THE "MOUNTABLE OR FLUSH TYPE"
UTILIZING CONCRETE WITH A COMPRESSIVE STRENGTH OF 3,500 PSI. AT NO TIME WILL
THE EXCAVATION FOOTERS FOR CURBS EXTEND MORE THAN FOUR INCHES BEHIND THE
EXISTING CURBS WHENEVER TREES OR THEIR ROOT SYSTEM ARE PRESENT.
9. CONTRACTOR SHALL REMOVE ALL ABANDONED/INACTIVE UTILITY LINES CROSSING
BENEATH ROADWAYS TO BE RECONSTRUCTED.
10. CONTRACTOR SHALL INSTALL A TOTAL OF 5" OF ASPHALT WITH 3" BASE COURSE, TYPE
BM-25.0, AND 2" OF WEARING SURFACE COURSE, TYPE SM-9.5A.
11. CONTRACTOR SHALL FINISH GRADE, LEVEL, AND PROVIDE TOPSOIL AND SOD AREA OF
CONSTRUCTION AND RESTORE AREAS DISTURBED DURING DEMOLITION OF CURB AND
GUTTERS. CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING THE SOD PENDING
INITIAL ACCEPTANCE BY THE ANC STAFF AND THE CONTRACTING OFFICER'S
REPRESENTATIVE.
12. ENSURE THAT CONTRACTOR PERSONNEL EMPLOYED ON THE ACTIVITY BECOME
FAMILIAR WITH AND OBEY ACTIVITY REGULATIONS INCLUDING SAFETY, FIRE, TRAFFIC,
AND SECURITY REGULATIONS. KEEP WITHIN THE LIMITS OF THE WORK AND AVENUES OF
INGRESS EGRESS. WEAR HARD HATS IN DESIGNATED AREAS, DO NOT ENTER ANY
RESTRICTED AREAS UNLESS REQUIRED TO DO SO AND UNTIL CLEARED FOR SUCH
ENTRY. THE CONTRACTOR'S EQUIPMENT SHALL BE CONSPICUOUSLY MARKED FOR
IDENTIFICATION. THESE SITE SPECIFIC REGULATIONS WILL BE DISCUSSED IN MORE
DETAIL AT THE PRE-CONSTRUCTION CONFERENCE. INFORMATION IS ALSO AVAILABLE IN
THE SPECIFICATIONS OR UPON REQUEST THROUGH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
13. THE PRIMARY ENTRANCE TO ARLINGTON NATIONAL CEMETERY SHALL BE THE GATE BY
BUILDING 123 UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE. ROUTING TO PROJECT SITE MUST BE COORDINATED WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE.
14. SPACE IS VERY LIMITED. EXCAVATED MATERIAL FROM EACH ROAD IS TO BE
IMMEDIATELY DISPOSED OF OFF SITE. FILL MATERIAL IS TO BE BROUGHT ON AS A
NEEDED BASIS OR TEMPORARILY STOCKPILED AND PROTECTED WITHIN THE CURRENT
ROAD RECONSTRUCTION PHASE PROJECT AREA.
WI-FI CONDUIT NOTES
1. CONDUIT RUNS AND HANDHOLES FOR FUTURE WI-FI SYSTEM TO BE INSTALLED
ALONG THE ROUTE SHOWN ON THE DRAWINGS. HANDHOLES AT ROADWAY
INTERSECTIONS WHERE CONDUITS CROSS BENEATH ROAD INTERSECTION
SHALL BE SUFFICIENTLY DEEP TO ALLOW TWO FEET OF COVER AS MEASURED
TO BOTTOM OF ROADWAY PAVEMENT SECTION.
2. CONDUIT SHALL BE SCHEDULE 80 PVC.
3. IN AREAS REQUIRING LONG RUNS OF CONDUIT BETWEEN HANDHOLES AND AT
INTERSECTIONS, INTERMEDIATE HANDHOLES SHALL BE INSTALLED AT
INTERVALS NOT TO EXCEED 200 FEET. INTERMEDIATE HANDHOLES TO BE
LOCATED BETWEEN THE HANDHOLES SHOWN ON THE DRAWINGS WILL ALSO
BE REQUIRED AT BENDS IN THE ROAD AND CHANGES IN DIRECTION, OR TO
AVOID EXISTING SURFACE OBJECTS. THE CONTRACTOR MAY ALSO
COORDINATE A BETTER ROUTE TO GET FROM POINT A TO B.
GENERAL NOTES (CON'T)
15. DURING THE DEMOLITION OF CONCRETE, PLAN SHOULD SPECIFICALLY
ADDRESS PROVISIONS TO KEEP CONCRETE DUST RESULTING FROM
JACKHAMMERING OR SAWCUTTING OLD CONCRETE ROADWAY FROM
BECOMING AIR BORNE. CONTROL METHODS AND PROCEDURES MUST BE
APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
16. CONTRACTOR SHALL EXERCISE CARE WHEN OPERATING HEAVY EQUIPMENT
OVER EXISTING STORM DRAINS, WATER LINES, AND UTILITY LINES, AND ALSO
IN AND AROUND MONUMENTS, SIGNS AND BOLLARDS.
17. PLAN SHALL ALSO PROVIDE THE MAXIMUM VERTICAL CLEARANCE REQUIRED
FOR ALL MOTORIZED OR TRAILERED VEHICLES/EQUIPMENT TO DETERMINE
THE POTENTIAL NEED FOR POSSIBLE ALTERNATIVE ACCESS ROUTES OR TREE
PRUNING.
18. CONTRACTOR SHALL MAINTAIN POSITIVE WATER DRAINAGE DURING
CONSTRUCTION AND PREVENT PONDING OF WATER THROUGH THE USE OF
PUMPS AND OTHER MEANS. PROVIDE AND MAINTAIN EFFECTIVE INLET
PROTECTION AROUND ALL EXISTING AND NEW DRAINAGE STRUCTURES
DURING COURSE OF CONSTRUCTION. CONTRACTOR SHALL FORMULATE A
PLAN TO KEEP CONSTRUCTION AREA DEWATERED DURING RAIN EVENTS IN A
SAFE AND ENVIRONMENTALLY SOUND MANNER.
19. VERY LIMITED MATERIAL STOCKPILING WILL BE PERFORMED ON THE
PROJECT. STOCKPILES OF STONE AND CONTROLLED SUITABLE FILL MAY BE
TEMPORARILY PLACED ON EXCAVATED ROADBED THAT HAS NOT BEEN
PREPARED. ANY STOCKPILING OF MATERIALS IN PAVED LAY DOWN AREA IS TO
BE ON PLASTIC WITH ENDS TURNED UP, SECURED AND COVERED IN PLASTIC.
20. CONTRACTOR SHALL REMOVE, TRANSPORT, AND REINSTALL ALL SURFACE
OBJECTS ADJACENT TO THE BACK OF CURB (I.E. SIGNS, TRASH CANS,
FLOWER VASES, WOODEN POSTS, ETC.) THAT PROHIBIT CONSTRUCTION
(COORDINATE ITEMS AND DELIVERY LOCATION WITH THE COR).
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text P
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .